Version in Profit Centre Distribution

I am doing a Profit Centre Distribution for actual data.  In the cycle I have defined pre-set criteria like company code=1919 and version=0.  If I set the version=0 there, no distribution is happening as it says no valid senders are there. However, if I select version=1, distribution is happening fine.  I am wondering why 0 is not suitable whereas 1 is suitable in the version field.

Hi Nikki,
Check transaction OKEQ and check the settings for profit center tab for versions 0 and 1 .
In Verson "0", actual column may not be ticked.. where the same is allowed for version 1.
Please check OKEQ and revert back for further clarifications
Regards
Sarada

Similar Messages

  • Profit Centres and Distribution Rules

    Hi, Is there someone who can help me about a problem with cost accounting?
    I've set profit centres, distribution rules (created and linked to profit centres), I've linked accounts to distribution rules so the "profit centre report" shows all the expenses related to each PC/DR. I also can see the table with all the parameters I set. My question is: how can I check (or is it possible to check) if a specific cost (account) is more than the limit I set in the distribution rules? In other terms: If I set 10.000 EUR on DR called "training expenses" with account linked "040001" and then I charge this account with 20.000 EUR; is it possible to have a notification or something in the "profit centre report" or in the "table of PC and DR" who tells: "ehy man, you spent too much!!!" (or at least the possibility to have DR values in the PC report?).
    Thanks a lot in advance and sorry about the length of my post.

    No but you can use the Budget features of B1 to do something similar. If you turn on Budgeting from the System Initialization>General Settings>Budget   You can warn on devations from Budget or block devations from budget, on PO, GRPO and JEs
    dan

  • Profit center Distribution u2013 4KE5 error

    Hi Experts.
    We have some problem in profit centre distribution.
    After execute 4KE5 the balances coming from senders not matching with GL account and profit centre combination value.
    Example:
    In the distribution Sender value for the account 100800 with pctr X ,Y and Z is shows 80000,
    In the FS10N if we check account balance with combination of pctrs X ,Y and Z is shows 52000,
    Why it shows like this could you please help in this.
    Thanks in Advance!
    Regards,
    Suresh

    Hi Ravi,
    Thanks for your reply!
    Reconciliation between FI and PCA was OK.
    Only Problem is when we run 4KE5 the sender value shows too much amount means itu2019s not matching with GL account and profit centre (sender PCA) combination value.
    Example:
    In the distribution Sender value for the account 100800 with pctr X (here sender PC is u2018u2019Xu2019u2019)shows 80000,
    In the FS10N if we check account balance with combination of pctrs X for particular period shows 52000,
    My doubt is the sender value should be 52000,because in Account 100800 with PC X balance is 52000.But sender value for the account 100800 with pctr X shows 80000.
    From where it is coming this difference 28000(80000 u2013 52000)
    Please clarifyu2026..
    Thanks in Advance
    Regards,
    Suresh.

  • Suggestions for improving adaptibility of Profit Centre functionality

    Hi,
    I have recently introduced the Profit Centre functionality in my customer organisation.
    I found that by incorporating following feature will help in a big way for implementation of this feature.
    1.There should be a setting in configuration (may be document wise or General), whether the Profit Centre (Distibution Rule) is mandatory or optional ? Y/N.
    2.Provison for setting up default profit centre against Items(Sales/Purchase).
    By introduction of above two setting SAP B1 customer organisation will be able to easily implement the profit centre functionality.Because the control will remain with the administrator to make profit centre/Distribution Rule entry mandatory in all transactions effecting accounts and as default distribution will come from Item master so users will happily adopt this functionality, and the Management will receive the important and difficult to prepare information.
    Hope the SAP B1 Product development will team accept this and consider this development request for future release.
    Thanking in Advance,
    Samir Gandhi
    Silver Touch Technologies Limited
    Ahmedabad
    Gujarat
    India

    Hello Samir,
    As suggested at the other thread, you can utilize 'Post Transaction Notification' feature of MS SQL. This can help you to set any validation for most of the fields, objects and actions in the product incl. Profit Centers.
    We are planning certain enhancements regarding Cost Accounting functionality for the next major releases after 8.8. We'll consider your idea as a part of it.
    Peter Dominik
    B1 Solution Management

  • Auto update of Profit Centre in JE for Opening Stock

    Hi Experts,
          I am using SAP B1 2007B Version and Patch level 15 and  entering the Opening Stock of  Items in Initial quantities,inventory tracking and Stock posting window and updating the profit centre in distribution rule but the problem is it is not getting updated in the Journal Entry when the back end JE is posting accordingly and for that again we need to update it manually. can any please help me regarding this..
    Thanks,
    Narsing

    Profit Centres are generally applicable only for Revenue & Expense accounts.
    When you load the opening balances, it affect the Inventory Account which is an Account Account and that is why there is no Profit Centre marked in the JE.

  • G/L Account & Profit Centre Wise  Trial Balance Report

    Im working on a Client which is in 5 version and does not have the new GL account and document split.
    They require a  report where they could get the trial balance report (Gl accoun & profit centre).Standard report F.48 provides only Gl Account wise.
    Please suggest me on how i can start this develpomnet.As per my view i need to update a Z table with profit centre and Gl account Amounts and then in turn fetch the values to my report.
    Can the SDN experts help me on this,i would be very gratfull.

    hi,
    you can use these tables for trial balances g/l account wise.
    TABLES : glt0 ,
                   skat ,
                   t001 .

  • How to create a grid like the sample of "profit Centre - Report" use sdk ?

    hi
    in the grid of "profit Centre - Report", it has a button,if you click it ,it can show the detaildata. it can implement many levels "Expand " and "Collaspe",but it's not implemented by group! i want to know how to implement it by ui dpi or udo .
    thanks!

    Hi,
    You need:
    - to know the relevant queries
    - to make copies (use GetAsXML) from the relevant system forms to mimick the standard functionality
    - to do it via UI API (use Grid and DataTable - then you don't need DI API at all)
    Here's some more information on DataTable / Grid:
    The UI sample no. 19 shows you how to load data into the Grid - via the DataTable...
    You can find an enhanced version of the sample (showing you how to get linked buttons, combo boxes etc) in the Education area on SAP Service Marketplace (SMP): http://service.sap.com/smb/education
    Or just try these links (need SMP user account for that...) to download the sample from the Archive of "Live Expert Sessions" (includes a few more things):
    http://service.sap.com/~sapidb/011000358700006282762006E.zip
    That's the link to the PDF for the session:
    http://service.sap.com/~sapidb/011000358700006282742006E.pdf
    ...and that's the recording:
    http://service.sap.com/~sapidb/011000358700006280182006E.wrf
    HTH,
    Frank

  • Profit Centre Accounting Balance Carry Forward

    Hi
    I used report painter to create my own report to show the TB by profit centre. But the when you drill down on certain balance sheet account the actual line items date back to as far as 2004. Is it because we have done a balance carry  forward? How can we correct this? If we do a balance carry forward at year-end will that correct the problem or can we do it now?
    Points will be awarded.
    Thanks

    Dear Noz
    Can u plz tell me which version ur using?
    I know the standard Transaction code which can be helpful ti u
    Regards
    Dnyanesh

  • Doubts on clearing line items in profit centre and deleting the profit cent

    hello All
    We are using ecc 5.0 and new g/l, document splitting is activated. We are not using classic profit centre accounting.
    We have two accounts which has values for profit centre 1010219.
    1. 228100 which is assigned in cross company code clearing account
    2. 228200 which is assigned in cross business unit ( as a part of zero balance account) in documen splitting.
    now i want to clear all he entries for this profit centre and transfer them to another profit centre 1010403.
    I am unable to do so as everytime I try to pass cross profit centre entry, Account 228200 gets a balacing line item( as a part of zero balance). this way my profit centre trail balance will never become zero.
    can some body help me with this,,,,
    1. in classic profi centre we could use t-code ke90 just to pass a document entry in PCA, this is not possible in new g/l... is there alternative.....
    please  help....
    thanks
    sanjeev

    Hi,
    You can try Profit Center Distribution(both sender and receiver gets original account numbers) or Assessment(Assessment cost element shall be a bring in between) to transfer values from multi profit centers to one single profit center or multi profit centers. The cycle can be run on a periodical basis.
    Trust this answers to your query!

  • Profit Centre Hierarchy Change and Profit Centre Budget

    Hello Friends
    For better view of Profit Centre Reports we are planing to change the Profit Centre Hierarchy.
    I wanted to know that, are there some Specific Points which we have to take care of, before changing the Hierarchy?
    Will some other settings get affected in System after changing the Hierarchy?
    Also i want to know the TCode for entering Profit Centre Budget in System.
    regards
    prashant

    Hi,
    Profit centre planning (there is no budget for profit centres) is entered via 7KE1 transaction. If you change your hierarchy you should think of the effect on your reporting and allocation processes. That is if you use certain group in your cost allocation cylce and now you change it, it might have an effect on costs distribution.
    Regards,
    Eli

  • Activity elements planned values not showing in profit centres and cc.

    Hi,
    i'm currently working on a project involving Co and PS. I'm in charge of the CO module and i've got a problem with planned values on activity elements and in PS. Planned values are calculated on activty elements and so are actual and they show in real time in profit centres and cost centres but not their planned counterpart values. i've absolutely nothing on profit and cost centres reports. Integrated planning is activated in PS and so is project in versions.
    i've asked the PS "Expert" and he said it comes from the "plan cost calculation" tab in cj20n, which obviously isn't the cause.
    Doesn't it come from the project profile or status profile customizing? (opsa or ok02)?
    Can the problem come from CO?
    any help appreciated
    regards
    xavier

    Hi Sreenivas,
    thanks for your help and sorry for my late answer.
    what is the difference between FAGL_CO_PLAN and transaction 1ke0.
    when i log on transaction 1ke0, i can see all my planned values.
    wouldn't the issue be resolved by launching t-code faglgcle "fi-gl activate update of plan line items" ?
    regards
    xavier

  • Division and Profit Centre Relationship?

    Hi,
    Is anyone able to provide a definition of the objects DIVISION and PROFIT CENTRE and also what their relationship is with each other?
    Thanks,
    M.

    Division : A way of grouping materials, products, or services. The system uses divisions to determine the sales areas and the business areas for a material, product, or service.
    A product or service is always assigned to just one division. From the point of view of sales and distribution, the use of divisions lets you organize your sales structure around groups of similar products or product lines. This allows the people in a division who process orders and service customers to specialize within a manageable area of expertise.
    Profit Centre: An organizational unit in Accounting that reflects a management-oriented structure of the organization for the purpose of internal control.
    Operating results for profit centers can be analyzed using either the cost of sales approach or the period accounting approach.
    By analyzing the fixed capital as well, you can expand your profit centers for use as investment centers.

  • PROFIT CENTRE DETERMINATION FOR VAT LINE ITEMS

    Hi Experts,
    My client having IS Retail ECC 6.0 Version and having several sites in all over Inida. Now problem Profit centre not updated in VAT Line items while billing. Every site having one profit centre. Site equal to Profit centre.
    Would you please expalin the process of profit centre determiantion for VAT line items.
    Rgds
    Mani Suma

    Dear,
    It is believed and felt it is the persisting problem if you are not using the using Document Splitting functionality in New GL...
    You can map one common profit center in 3KEH and at the month end you can allocated the to respective profit centers based on sales value..
    REgards,
    Chintan Joshi

  • Profit centre report drill down total

    Hi
    I am executing S_ALR_87009722 proft centre report from period 0 to 1. The balance of a bank account is  76,729.18.
    When I drill down to actual line items it's showing the break-ups amounting to 3,320.17; which is only the break up for period 1. Shouldn't this show the break-up of the balance as at the report date?
    We need to see the break-up for 76,729.18 (Balance as at end of period 1).
    The Profit centre currency is different to company code currency and the transaction currency.
    Any assistance is appreciated.
    Thanks & Rgds
    Nadini

    Some things you might to check:
    Actuals/ Plan values?
    Same version?
    Has somebody changed report recently?
    Have you run line item transactions individually and compared?

  • Profit centre error in J1INPR

    Dear All,
    When executing J1INPR during a particular period, I am getting the following error in the second screen.
    "Balancing field profit center for line item 001 is not filled"
    i have checked note 1063850.
    but there i am not able to trace out in which field i need to input the correct profit centre.
    As the prctr field is not recognized by sytem which is suggested in the note.
    Also if i try to populate in bseg-prctr the same is overwritten as soon as the cursor comes out of BTE mentioned in the note.
    Your help will be highly appreciated.
    thanks & Regards
    Ronak

    Dear,
    If you find it difficult to map profit centers through BTEs and substitution then do one thing,, use transation FAGL3KEH and enter the profit center for the TDS provision account and at the month end you can allocate this amount to diffrent profit centers thorugh distribution etc.....demonstrate this process to your business users and take the decision you like....
    REgards,
    Chintan Joshi

Maybe you are looking for

  • Error message from new_block_instance freezes form

    I show a message in the new block_instance of a form by using fnd_message.error. The messages shows up fine but the form freezes after that. Following is the code : if name_in('promise_demand.atp_error_message') is not null then fnd_message.set_strin

  • Sign on is locked

    When I try to sign on to a web page, using Safari, to look at a bill, a lock symbol appears on the right side of the web page title and I am unable to get signed on.  I have signed to this web page before with no trouble.  Why is the lock symbol now

  • Why won't the user name and password for my podcast save when I click "Remember this password?"

    I have to enter the podcast log in information every time I update my podcast even though I click the box to remember the password.

  • Having trouble with icloud on my Iphone 4, please help!

    It keeps telling me to accept the new terms and conditions in order to use icloud, but whenever i hit "view terms" it takes me no where. I deleted and signed back into my icloud account twice and shut my phone off twice. I just deleted the account al

  • Mail Rules in 10.9.5

    In System v10.9.5 my Mail Rules are no longer behaving the way they had been. I went to the painstaking effort of changing All rules, but the was little or no help. So where else might the trouble lie? Are there sys. prefs. that might've been corrupt