Hi QM gurus,
May I know if system allows both the Physical Sample Drawing and Sample Determination to happen at the sametime.
In another word, I assign sampling procedure using sampling schema for the activity of sample size, and in the meantime, there is a physical Sample Type being assign to the inspection type.
Thus under the above scenario both the physical sample drawing and sample size determination will take place during inspection lot creation.
I would assume system would allow this kind of setting to happen in the system, but my question is under what kind of business scenario does the this kind of setting (ie. both functions: physical sample drawing and sample size determination) require?
Thanks
karen

Hi
When you are using a sampling derawing procedure in the Task list then You have to use the Inpsection point related to physical sampling.
Now when you use Inspection point with physical sampling the sample size at the char level will only be determined by sampling procudre & sample size of the lot will be determined by sample drawing procedure.
so in short sampling procedure in applied at char level & sample drawing procdure is for lot level(sample size).
Regards
Sujit

Similar Messages

  • Model Business scenario Required

    Hi Everybody,
    I am a novice in SAP HR and started going thro the modules in SAP HR...Still i need a model business scenario to work out and get the complete understanding before hitting the real time market..can anyone send me the model scenario with the solution for my guidance....Thanks in advance...

    you can get to know the real scenario's once you start working.
    if you have any specific questions you can post on the forum, because the SAP HR is very vast
    and it consist of lot of sub-modules.
    if you are specific i can answer you questions.
    sam

  • Business scenario for CLIX

    Dear Experts,
    At what business scenario we need to use CLIX instead of MDM Console ?

    Hi,
    an example of CLIX that it can be used for Scheduled backups.
    It helps in mounting, unmounting, starting and stopping MDM, and loading, unloading, verify and repairing MDM repositories.
    CLIX is a separate MDM 5.5 application that allows you to manage MDM 5.5 repositories using a command line interface instead of the MDM 5.5 Console. CLIX makes most operational MDM 5.5 Console commands accessible via a command line interface and from within batch files, making it useful for scheduling and automating routine maintenance and backup operations.
    + An
    refer to page 285 on console guide for more info. It has all the info for you.
    In our project we had to use it since we required it to take backup every night and also load repositories automatically after all the software upgrades on windows server or db whenever the basis had to restart server.
    Edited by: An. on May 17, 2008 12:13 PM

  • How to migrate changed Business Scenarios from Template Project to Solution

    SAP Solution Manager - How to migrate changes in Business Scenarios from Template Project to Solution?
    Our Global ASAP strategy is based upon a Template Project, Implementation Project, Maintenance Project and Solution with Business Scenarios.
    Changes in the Template Project for existing and new Business Sceanarios, etc. are correctly executed. Up till now we have successfully implemented our Template Project and secondly extended our Business Scenarios from 4 to 14. Our 3rd upcoming change will be changes on Business Scenarios as well. These planned changes for the Business Scenarios need to be consistent, possibly without manual intervention.
    During a Proof of Concept (PoC) in our Sandbox (SXB) we have identified a possible serious problem when trying to publish these changes in Business Scenarios in the Template Project to the Solution. SAP Solution Manager (SSM) does not seem to support a scenario where Business Scenarios in the Solution can be refreshed or updated with changed Business Scenarios in the Template Project.
    We have identified 2 possibillities:
    1.     Manual project upgrade
    1.1.     Synchronize the changes for the Template Project normally;
    1.2.     Delete the changed Business Scenarios from step 1.1 in the Solution;
    1.3.     Add the changed Business Scenarios from step 1.1 into the Solution.
    For this scenario we foresee a big problem because all Content and Issues connected to the old Solution Business Scenarios loose their coupling with the Solution.
    For the Content this may not be a real problem because the Content is also available in the Template Project.
    However the Issues are loosely coupled to the Solution Scenarios and therefore need to be coupled manually to these processes.
    2.     Manual changes using Maintenance Project
    2.1.     Synchronize the changes for the Template Project normally;
    2.2.     Publish all changes from step 2.1 in the Template Project
    2.3.     Add all new Content from step 2.1 to the structure of the Maintenance Project;
    2.4.     Relocate Content and Issues when the Business Scenario has been relocated.
    Because SSM does not support this activity we need to delete this Business Scenario first and secondly re-create it again on the correct spot.
    Our question: How has SAP done this in other customer projects?
    We need to have a working solution by the end of March, 2009.
    Best regards,
    Peter Hendriksen

    Peter,
    Did you get an anwer to this question from SAP?
    Rgds,
    Eamonn.

  • What are the business scenarios used in plastic industry

    Hi Experts,
    Could you guys please tell me what are the business scenarios (in sap sd) i should use while implementing in plastic industry (as if someone already worked on implementation project at plastic industry).....
    As per my knowledge i would use:
    MTS
    Batch management
    Third party etc....
    but in addition to these (if anyone already worked on the implementation project in plastic industry...then what are the business scenario used for......please suggest.....)
    If have any idea please suggest........ would be a great help.......
    Thank you in advance...........

    it depends which part of the value chain you are working at e.g. your company is B2B, supplying ingredients to Plastic industry manufacturer or you sell to wholesellers.
    Below are the processes you - may - do in Plastic industry -
    - Inter-company stock transfer
    - Subcontracting
    - Contracts
    - QM inspection during delivery process
    If you require business scenario descriptions (in brief) for the above processes, then please convey.
    Edited by: Typewriter on Jul 11, 2011 11:30 AM

  • Steel Industry Business Scenario  and Requirement

    Dear Experts,
    Business Scenario:
    Material is procured and made Goods Receipt ,Material is issued to Shop floor.
    Shop floor records the number of cycles or heats the material has under gone  and gives a report to finance .
    based on report finance intimates supplier to collect payment for perfomance acheived .
    for 100 heats material completed , 25 % payment made up on receipt of invoice.
    for further 200 heats completed , 50 % payment made up on further receipt of invoice.
    when expected performance of material reached or crossed remaining payment of material is done up on receipt of final invoice from Supplier.
    Vendor is the owner of stock till final payment is finished .
    Requirement:
    how to map the Scenario in sap .
    whether u need to go for any specific material type to adress this issue.
    what will be procurement process and payment process , standard or any work around required .
    Please advice on this scenario.
    Thanks & Regards,
    Injeti

    Dear,
    So in that case, I prefer to go for Consignment scenario.
    Consignment u2013 the vendor provides you with materials which you manage on your premises as port of consignment stock. A liability does not arise until the material is withdrawn from consignment stores.
    The stock supplied by the vendor is in the companies premises with the company having no liability for the same.  The liability for the company will only be affected when the goods are issued from the consignment stock for use.
    Create consignment info record with proper tax code, create Po with item category K, maintain output condition record for KONS, process GR, no invoice verification done, but settlement is done through MRKO transaction.
    I prefer this to be done once you receive the final report from SHOP floor. I think you got the point.
    The material is available in your company premises. Let the work perform by all departments. Untill you get the report with heat details for final payment to vendor. Start the process as mentioned above, create PO with conditions, goods receipt and settle the payments.
    I am getting this idea, any further ideas or suggestions, share.
    Please have a look at :http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b8f5943ad11d189410000e829fbbd/frameset.htm
    Regards,
    Syed Hussain.

  • I have a macbook pro4.1 and the sound chip in it failed. My speakers and microphone no longer work. Does anyone know of an external speaker and microphone set that plugs into the USB port so I can continue to use both of these functions?

    I have a macbook pro4.1 and the sound chip in it failed. My speakers and microphone no longer work. Does anyone know of an external speaker and microphone set that plugs into the USB port so I can continue to use both of these functions and not have to pay to have the entire main board replaced. Preferably something under $100.

    I don't think you're likely to find a set of external speakers that come with a microphone and plug directly into a USB port. There are USB audio cards that look like tiny flash drives but have microphone and headphone ports in them, to which you can connect a typical two-plug Windows PC headset with a microphone, or else you can connect external speakers and a stand-alone microphone. Those adapters typically cost under $10. I don't know anything about the quality of sound that can be expected from them.
    I have a Griffin iMic, which is much the same idea but larger, a bit more expensive (retail~$40), and perhaps delivers somewhat better sound quality (I hope so, but I don't know because I've never had occasion to try one of the little ones).
    http://www.google.com/products/catalog?oe=UTF-8&hl=en&client=safari&q=usb+sound+ card&um=1&ie=UTF-8&tbm=shop&cid=9618463009759678039&sa=X&ei=tgQoT5zYOMfZ0QHkiICw Ag&ved=0CHcQ8gIwAQ
    http://compare.ebay.com/like/320779457703?var=lv&ltyp=AllFixedPriceItemTypes&var =sbar

  • I have a iMac Desktop and MacBook Pro laptop. I generate my work related files on both of these machines. What is the best way to keep the files in these machines synchronized?

    I have a iMac Desktop and MacBook Pro laptop. I generate my work related files on both of these machines. After a few days or weeks, I have new files on some folders on either of the machines that is not on the other machine. What is the best way to keep the files in these machines synchronized?

    How did you transfer the files to the iMac.  If you exported the files out of the MB library using Kind = Current you should get the edited version.  Any other  option may not.
    If you want to keep the two libraries "synced"  any photos you want to move to the iMac should be added to an album, connect the two Mac with a LAN, Target Disk Mode,  Transferring files between two computers using FireWire, with WiFi. and use the paid version of  iPhoto Library Manager to copy that album from the MB library to iMac library.  It will also copy the original and edited versions, keywords, titles, etc.
    OT

  • What config is required to set up Transportaion planning for the delivery?

    Hi experts,
    I am trying create shipment for delivery.It not picking the delivery for shipment.I checked the status in delivery and Transportaion planning is not showing as 'A'.What config is required to set up TP for the delivery?
    Please advise

    please define your transportation planning point , shipment type
    u can define ur transportation planning point in IMG- enterprise structure - Logistics execution
    and shipment type u can define under IMG- Log Execution - shipment - define shipment types
    Maintain ur delivery type etc  relevant for transportation in
    IMG- logistic execution- shipments-maintain transportation relevance
    Pls do reward if this information is of helpful to you
    regards
    AMI

  • Setting up inspection point in a scenario require more than one inspection

    Hi all,
    Maybe I am still not very clear on the PP-QM conceptu2026 hope you can see my problem on the following questionu2026..
    According to SAP in the QM-production environment, we key in ONE inspection point in the task list header level (i.e. either the master recipe, routing, or rate of routing).
    Based on the following business scenario which is going to use inspection point for the inspection:
    u2022     Time-based intervals (for example, an inspection point every hour or for each work shift)
    u2022     Quantity-based intervals (for example, an inspection point for each container)
    u2022     Freely-defined intervals (for example, an inspection point each time a tool change occurs)
    Since each of the above scenarios require more than one inspection points to be created and to be assigned to the task list header.
    Thus, how to accomplish multiple inspection point assignment when the task-list header only allow me to assign one inspection point at a time?
    Thanks
    YY

    Hi guys,
    Thanks. However, in the SAP help portal it does said the system allows several inspection points to be assigned to an inspection operation whether it is in routing or recipe.
    Therefore, does it means I can assign more than one inspection points in the operation detail level for either recipe or routing if I will to click the u201CNo relationu201D radio button in the u201CQuality Management: Inspection Pointu201D section. (i.e. is this is the right place to allows this assignment)?
    For example, on the change master recipe screen at the Operation tab, I highlight one line item (i.e. one operation line item and zoom into this operation line item, I donu2019t see any field box that allow me to assign several inspection points to an operation? Instead, on the u201CQuality Management: Inspection Pointu201D section, there are the following fields appear:
    - Insp.pointCompletion dropdown box
    - 4 radio buttons on the inspection interval (ie. Time-related, Qty-related, No-relation) and its subseq time and quantity value input box.
    - Quan.pt. lot checkbox
    - Last Part Lot Assgmt checkbox
    Thus, where is the section in the operation overview screen at Master Recipe or Routing level that I can assign several inspection points?
    Thanks
    YY

  • What are the SAP Business one requirements for intercompany intergration

    Hi. what are the SAP Business one requirements for intercompany intergration

    Hi Wendy,
    Intercompany 1.1 is supported on SAP Business One 8.82 and Intercompany 2.0 is supported on SAP Business One 9.0.
    So depending on Solution version your are looking for, refer to Prerequisites section in the respective version's Administrator Guide.
    For further information on Intercompany Integration Solution for SAP Business one, you may refer the following:
    https://websmp210.sap-ag.de/partneredge/b1/intercompany  
    Regards,
    Agneesh Jain
    SAP Intercompany Team

  • If an artist has to release her song on her own in india and have download capability on Itunes, what does itune require from an artist to set up such a facility?

    if an artist has to release her song on her own in india and have download capability on Itunes, what does itune require from an artist to set up such a facility?

    Google how to sell your music on iTunes
    Here's the Apple link.
    http://www.apple.com/itunes/working-itunes/sell-content/

  • What is the business packages required for "plant maintenance"

    hi experts,
              i got a business requirement
                 how to show the plant maintenance module with the functionalities to show in the portal
                  is ther any process is there
                 or business packages required
    thanks and regards
    bvr

    hi raghu,
    thanks for your reply,
    1.  from portal view  where i have to configure the jco destinations seperatly for plantmaintanance or
              normal jco will work
    2. looking the sap note 1291222  where my ecc60  should be in the sp15 lever for ea-appl-600
         and poral side  bp erp 05 plant magr 20 1.0  sp15
    refering this links
         http://help.sap.com/bp_bl603/BBLibrary/General/Prerequisites_Matrix_BL_EN_IN.xls
    could you guide me
    thanks and regards
    bvr
    Edited by: bvr on May 13, 2009 7:12 AM

  • What equipment is required to calibrate PXI cards.

    I need to know what all is required, hardware and software wise, for me to calibrate the following NI items in my cal lab:
    PXI-1045, PXI-6508, PXI-6552, PXI-8331, and PXI 6251.
    What I have now is an old version 2.0 of Calibration Executive and the software that came with these cards (NI-488.2, GPIB-VXI/C Legacy Documentation and NI-VISA Libraries Version 3.0). My software guy also has the NI Developer Suite from 2003. In the lab we have calibrators (5700,5720,4708,9500) and meters (34401,3458,1281,8508) and scopes (TDS) and PC controllers running XP with NI PCI-GPIB cards.
       I realize I will need to get an upgrade for the Cal Exec, I need to know what all else is required to decide if it is going to be justifiable to gear up for this capability. Any information, including prices, is appreciated.

    Hi Poornima -  
    The SCXI chassis and equipment are used to condition signals sent to and from the DUT.  After being conditioned, the signals are sent to your DAQ device to be digitized and read into the computer.  As such, the SCXI chassis only needs to be cabled to the DAQ device.  You can do this using a shielded E-series cable (SH68-68-EP) and an adapter block (SCXI-1349).  These will connect the leftmost device in your SCXI chassis to your DAQ card, which must reside in the rightmost slot of your PXI chassis.  There is detailed information about SCXI connections in the "SCXI Quick Start Guide", which can be found in the Start Menu documentation for DAQ.
     The GPIB connections will be made in your PXI chassis.  Either the embedded controller of the chassis or a PXI-GPIB card will have the port connections needed.
    There are also detailed text instructions for making the connections in the "Calibration Executive Help" file, which you can find in the program's Start menu group.  Inside this file, browse the tree to "Device Calibration Procedures » Modular Instruments » High-Speed Digital".  The instructions given here explain step-by-step how to connect your equipment for both scenarios (combo chassis and separate SCXI chassis).
    David Staab, CLA
    Staff Systems Engineer
    National Instruments

  • Business scenarios in SAP SNC and aplication

    Hi experts,
    Looking for informatios about SAP SNCi in SAP web site, I found some documents and one that show the business process in SAP SNC and industry tthat are recomended.
    I would like to know what are the reason to use the business scenarios with this specifc industries?
    Supplier Managed Inventory  - Automotive
    Release Processing  - Automotive
    Web-Based Supplier Kanban  - Automotive
    Web-Based Supplier Kanban with MRP  - Automotive
    Responsive Replenishment  - Consumer Products
    Supply Network Inventory  - High Tech
    Contract Manufacturing Procurement  - High Tech
    Work Order Collaboration  - High Tech
    Thanks
    Nilson

    Hi Nilson,
    The business processes mentioned can be used for any industry. There is not restriction as such.
    These business processes are more relevant for those industry.
    e.g. Outsourced Manufacturing / WO Collaboration is extensively used by High-Tech companies. Even the recent enhancement requirements have come from High-Tech companies.
    Similarly, Kanban / SMI is extensively used by Automotive. But SMI is also popular with High-Tech.
    CP industry is biggest consumer of Responsive Replenishment process.
    Regards,
    Sandeep