Hi,
I have Assembly Work center for details are as follows,
Start                         06:30:00
Finish                       23:30:00          Capacity utilization 100
Length of breaks     01:00:00           No. of indiv. cap.   2
Operating time          16.00             Capacity             32.00        H
Here available capacity is shown as 16 Hours.
But in actual there are two shift 06.30 to 15.00 with 1 person and second 15.00 to 23.30 with 1 person
So available capacity should be 8 Hours as two person are working in two shift but system shows that two person are working for 16 Hours hence available capacity as 32 hours which is wrong.
Please let me know how we can show available hours as 8 in this case withoout changing utilization,no of ind.
Thanks,
Lalit

Dear Lalit,
1.In the capacity header of that work center,click on intervals and shift and click on interval by mentioning the valid from and to
date and allocate the shift sequence(first shift starting from 06:30:00 and ending at 15:00:00) and the second shift starting at
15:00:00 and ending at 23:30:00(assuming the length of brak for each shift has also been properly defined).
In the capacity header page also mention the active version as 01(for which you have defined the shifts).
2.Now in CM01,for the same work center in the top settings->General->mention the capacity version as 01 and check the
results.
Check and revert back
Regards
Mangalraj.S

Similar Messages

  • Work center design and operation confirmation

    Hi All,
    In my scenario im grouping the similar m/c to a work center
    say for ex. 4 lathes m/c into a single work center as LatheALL and also the indiv cap as 4
    my customer wants the traceability in which m/c the job is done
    So i had designed in such a way that
    1 LatheALL -4 cap(this will be additional wc)
    2. lathe1 - 1cap
    3.lathe2 - 1cap
    4.lathe3-1cap
    5.lathe4-1cap
    in the routing only latheALL will be given., this will help customer in planning
    when going for operation confirmation i will give confirmation for that operation and will confirm as lathe1or lathe2  or etc.. this will help prodn dept for traceability in which m/c the work is done
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    also suggest by giving confirmation for another work center will the capacity for the original work center will be reduced
    Regards
    Anand Srinivasan

    Hi Anand,
    this is method i have informed to client .,
    pls advice is this approach is correct ?
    yes, during confirmation time to enter the orginal actual work center, this suitable for your client requirement, do the settings for OPK0 - change the confirmations parameters (0410 or 0420)
    Regards,
    Sankaran

  • Capacity planning for Work Center

    I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has  a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
    When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
    Any suggestion where to look for?
    The data used for creating the Work Center on Capacities:
    - Capacity Category : 002 Person
    - Other formula: SAP008
    The data used for capacity:
    - Base unit of meas.:H
    - Start: 08:00:00
    - Finish: 17:00:00
    - Capacity utilization: 100
    - No. of indiv. cap.:1
    - Unit: H
    - Relevant to finite scheduling: active
    - Can be used by several operations: active
    - Long-term planning: active
    The data used for creating the Work Center on  Scheduling:
    - Capacity Category: 002 Person
    - Other formula: SAP004
    - Work dimension: Time
    - Work unit: H
    Best Regards...

    Hi,
    Please activate the capacity requirement in Capacity tab in CNR2.
    Thanks..

  • Capacity evaluation in work center which has number of indivisual capacity.

    Hi. guys.
    Work Center(WC01) has 2 indivisual capacity.
    and available capacity is 16H.  (8H * 2)
    I made capacity requirement(production order)  with 26H.
    Capacity evaluation displays the result as below.
    Entries        Rem.cap.reqs      Avail.capacity   R
    Total                       26 H            1,632 H
    2009.10.09               0 H               16 H     0
    2009.10.10               0 H               16 H     0
    2009.10.11               8 H               16 H    50
    2009.10.12               8 H               16 H    50
    2009.10.13               8 H               16 H    50
    2009.10.14               2 H               16 H    12
    2009.10.15               0 H               16 H     0
    I don't know why the requriment capacity is only 8H per day.
    I think that the requirement capacity should be 16H per day.
    can anyone explain the reason?

    Thanks.
    But  It's not what i want.
    I'll explain my problem more detail
    Work Center(WC01) -  Available Capacity: 16H   ( 8H * 2 (No. of Indivisual capacity))
    Caracity Requirement -  production order 1000001 (Start date: 10/10,   Excution Time:  24H)
    Capacity Evaluation (CM01)  <NOW.>
    Day        Requirements    AvailCap. CapLoad 
    2009.10.10         8.00        16.00    50%
    2009.10.11         8.00        16.00    50%
    2009.10.12         8.00        16.00    50%
    So, I don't understand 'capacity load(%')
    I want to product the material using two capcity
    but capacity evaluation calcuate only one capacity now.
    I think the below result is right.
    Capacity Evaluation (CM01)  <NOW.>
    Day        Requirements    AvailCap. CapLoad 
    2009.10.10        16.00        16.00    100%
    2009.10.11          8.00          8.00      50%
    2009.10.12          0.00          0.00        0%
    Is it impossible??

  • Capacity cumulation in work center hierarchy

    Hello
    Does anyone uses workcenter hierarchies to cumulate capacity requirements ?
    I've created a hierarchy but in the capacity evaluation transaction cm01,
    the capacity requirements are not cumulated from the underlying work center.
    Instead a capacity requirement of zero is shown on the hierarchy work center.
    Is there any specifics to cumulate the capacity requirement to work center hierarchy header
    Best regards
    Pascal

    Hi,
      In the transaction CM01, choose the pull-down menu Settings-> General. In the pop-up screen, under the "Herarchy" tab, select the check boxes "Cumulation of reqmts" and "Dyn. capacity cumulation", choose the "Hierarchy" and "Plant" and click on "Continue".
    Now the "Available Capacity" will be as per hierarchy setup and Rem. avail cap = Reqmts-Available capacity.
    Hope this solves the requirement.
    -Thaila Shree

  • Capacity categories in work center

    Dear PP gurus,
    I have a work center where i have maintained 2 capacity categories in capacity tab screen. One m/c and other labour. Now when i assign this work center to a routing.....in the routing operation details screen, i see only the formula from the 1st capacity category showing up. How/Where can i see the formulas from the other capacity category, maintained in the work center?

    Hi,
      For the capacity category say:Machine, in the "capacity header" in workcenter, you assign "no. of individual capacities" as 2. Also, you can create the capacities in CR11 and assign the same to the work center.
       In routing you can just enable the check box "Required splitting" and assign no. of splits =2. you cannot assign the individual capacities you have created in CR11 in routing.
      In Production order, in operation details, "Cap. reqmt assignment", you can assign those two individual capacities and assign qty to be processed in those capacities.
       Hope this clarifies you..
    -Thaila Shree

  • Work center hierarch cumulation problem

    hi
      I am trying to cumulate capacity requirement from 3 work centers...I created a work center hierarchy as below steps but I cann't see the cumulate result..it prompt no available capacity requirement or work center exist..anyone knows what I should do next?I can do capacity leveling/evaluation,so I think my IMG setting is good..i searched the SDN forum but no workable solution for me..
    thanks.
    Create a new WC (in CR01) as category 0004. This will be the top level WC in your hierarchy.
    Create a hierarchy (in CR21).
    Add your 5 lathes and the newly created top level WC to the hierarchy (in CR22). This can be tricky: the WC you just created must be the top level, the other 5 must be under it.
    Pull the capacity data (in CM01) for the hierarchy: go to settings, hierarchy, check the cumulation of requirements and capacities and type the hierarchy name.
    Route things as before, to the original 5 lathes.

    Hi ,
    Dispatching is used to allocate or schedule the planned orders in the work center/resource.
    We can use CM25 transaction-Graphical planning board for dispatching.
    Planner can assign /dispatch the planned orders manually here. He can see graphically the planned orders overload work center which are dispatched with other.
    Using cm21 you can do capacity levelling graphically or using cm22 can do cap levelling using tabular column.I feel using this would be easy.
    Regards,
    R.Brahmankar

  • Work center creation

    please tell me how to create work center required in calibration.
    and when i am trying to do result recoeding second time for same lot.the result field is grey.so how can i do it again.
    also in the inspection lot there is no equipment no.so how can i identify the loty is of which instrument no.?

    Hi Sandip,
    1. W/c category depends upon your reqmt. You can take Machine as a w/c category. Default values, and if reqd. scheduling , cap. details are the data to be fed.
    2.If you want to take single result for no. of euipment, then select summarized result as control indcator. Else select single result.
    If you want to record results once again after you`ve done rr, then select the characteristic in RR screen, and unlock it. Later you can again perform RR.
    3. In QA32, Equipment no. cannot be viewed. It can be known from the Inspection Lot.
    Reward if cleared and close the thread.

  • Maint.Work Center -Length of Break Hours-Reg

    Dear PM Guys,
    I want to specify the exact timing of Break in Maint.Work Center.Eg
    Start time-08.00.00
    Finish time 17:00:00
    Length of Break:01:30:00
    My requirement is I want to specify the 11/2 hours break timing as
    12:00:00-13:00:00(1 hr) and 15:00:00-15:30:00.
    Where to specify this in work center.

    Dear
    Pls process the ur req as below
    IR02--Cap. tab- Cap Header---
    Here u can find shifts, breaks, cap profile, HR assignment.
    But using this ensure that shift created at OP4A t codes before doing the above.
    our friend is given I/p it will helps you , if its ok close the thread . unless log ur query
    Thenna

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

  • Changing operations work center during creation of  PM order

    Hi all,
    I am looking for BADI or EXIT in order to change operationS work center which created from maintenance calls.
    Does anyone know such possibility?
    Assaf

    Assaf,
    Have a look at BADI IWO1_TL_INTEGRATION2.
    Also see [OSS Note 925072|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=925072]
    Which system are you running?
    PeteA

  • All default routing value has to be changed, while changed the work center in production order

    Dear friends,
    our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
    Thanks&Regards
    Sabhapathy R

    Hi Rahul,
    Thanks for reply. I am maintained in diff value  maintained routing , Ex :First routing i have  work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
    second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
    Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
    Now I think you get to know what the client requirement, kindly do the need full.
    Regards,
    Sabhapathy R

  • Work center wise production order infomation report

    Hi all,
    i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
    Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
          i have three operation in production order.
          my order scheduled start date - todays date.
    In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
    Clent want like that (with quantity break) report..
    Any standard report ???
    If customization.... How it can be mapped in SAP.??
    Thanks in advance

    Hi,
    You can use the FM COIS_SELECT_ORDER_DATA_READ.
    CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
          EXPORTING
            iv_prod_order_sel       = lv_prod_order_sel
            iv_proc_order_sel       = lv_proc_order_sel
            iv_planned_order_sel    = lv_planned_order_sel
            iv_rem_objects_only_sel = lv_rem_objects_only_sel
            is_objects_to_read      = ls_objects_to_read
            it_parameter            = lt_parameter  "General Structure for PARAMETERS and SELECT-OPTIONS
            it_status_hdr           = lt_status_hdr
            it_status_opr           = lt_status_opr
            it_status_cmp           = lt_status_cmp
          TABLES
            ct_ioheader             = lt_ioheader
            ct_ioitem               = lt_ioitem
            ct_iodocl               = lt_iodocl
            ct_ioopdocl             = lt_ioopdocl
            ct_iomamo               = lt_iomamo
            ct_ioconf               = lt_ioconf
            ct_ioopconf             = lt_ioopconf
            ct_iosoconf             = lt_iosoconf
            ct_iogomo               = lt_iogomo
            ct_ioopgomo             = lt_ioopgomo
            ct_iosogomo             = lt_iosogomo
            ct_iogmer               = lt_iogmer
            ct_ioopgmer             = lt_ioopgmer
            ct_iosogmer             = lt_iosogmer
            ct_iosequen             = lt_iosequen
            ct_iooper               = lt_iooper
            ct_iosoper              = lt_iosoper
            ct_ioopcomp             = lt_ioopcomp
            ct_iooppreq             = lt_iooppreq
            ct_iosopreq             = lt_iosopreq
            ct_iooppord             = lt_iooppord
            ct_iosopord             = lt_iosopord
            ct_ioopmst              = lt_ioopmst
            ct_ioopprt              = lt_ioopprt
            ct_ioopcap              = lt_ioopcap
            ct_ioopscap             = lt_ioopscap
            ct_iosocap              = lt_iosocap
            ct_iososcap             = lt_iososcap
            ct_ioopsccf             = lt_ioopsccf
            ct_iososccf             = lt_iososccf
            ct_ioprodlist           = lt_ioprodlist
            ct_iomatver             = lt_iomatver.
    This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
    Thanks and regards,
    Pradip
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
    Edited by: Pradip Ray on Aug 26, 2009 8:27 AM

  • In the report level user wants two persons against each work center.

    Hi Experts,
    Please let me know the solution, I have provided scenario below.
    check the query which the user is referring to report:
    Example
    Work center     Person
    KNE33102     44003850
    According to the user, the names for the Work centers should be as follows:
    Work center          Person
    KNE33102         44003850,
    KNE33102        44003603
    I have check the data in T-code-CR03, each work center getting two persons, as can be shown below.
    Work center        Person
    KNE33102           44003850,
    KNE33102           44003603
    In RSA3 it can be seen that both the records are being extracted
    Work center     Start date     End date     Person
    KNE33102     09.02.2009     31.12.2009     44003850
    KNE33102     09.02.2009     31.12.2009     44003603
    In BI , when checking in PSA, it can be seen that the data is also being loaded to BI (Two persons loaded against Work center-KNE33102)
    Work center     Start date     End date     Person
    KNE33102     09.02.2009     31.12.2009     44003850
    KNE33102     09.02.2009     31.12.2009     44003603
    But when loading to the Info Object, one person has deleted. Because of this, in the report level displaying one person.
    Note:-Please let me know what is the procedure, in the report level user wants two persons against each work center.

    Hi,
    As you said in your post the data has mentioned up to 2009. can you try execute the query till to date .
    Regards
    sivaraju

  • How to reuse standard Activity subcomponents - Appointments, Tasks, Phone Calls and Emails within a custom work center?

    Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
    We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
    Ø  Open Question:
    a.      Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center?  We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
    b.      Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
    We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
    Regards .. Dheeraj Saini

    Whenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.

Maybe you are looking for