Work-center timings not reflecting in maintenance order.

Hi,
My requirement is, I want the work-center timings to reflect in my call object (Maintenance Order) generated through a maintenance plan.
My scenario is: I've made a work-center with the following data,
wrkcntr category as 0005; usage 004; control key PM06 with scheduling indicator checked;
in capacities start-finish timings as, 06:00-14:00; operating time of 8hrs, and factory calendar is chosen for maint. people.
The order type say pm08 is selected.
now in the maint. plan we choose this work center in the planning data field.
Task-list is also attached and the data are OK.
in maint. plan scheduling parameter shift factor etc NOT given.
Now when after schedulling I got one order with the
SchedStart: DD.MM.YYYY 06:00
Sched.Fin.: NEXT DATE 06:00
but I need the date to be 06:00 to 14:00 as in the respective work-center.
For for fastly solving the problem my analysis:
I checked the order,goto operation tab,goto dates tab and found that basic finish time of activity is 24:00:00
If this is the reason than how to make it 08:00:00 default for this order type.
Thanks in advance,

Hi Tyag,
the details are cmins as below
Erl. start: 19.09.2008 06:00:00      Earl. fin. 20.09.2008 06:00:01
LatestStart: 19.09.2008 06:00:00  LatestFin. 20.09.2008 06:00:01
Act. start:                    00:00:00  Act. finish                  00:00:00
                                                 FcstFinish                  00:00:00
Restriction
StartPoint
End                                                         24:00:00   
I am new to this and need your help.
The req is how to reflect wrk center timing in the wrk order generated through a maintenance plan.
Regards,
sanjay
Edited by: ganesh sarasvati on Sep 23, 2008 11:47 AM

Similar Messages

  • How Can i Block the Work Center Once is used in Maintainence Order

    Dear Experts,
    How Can i Block the Work Center Once is used in Maintainence Order in PM module.
    In standard its not blocking the Work Center automatically. How this can be achieved.
    Regards
    Raghu
    Edited by: raghu m on Apr 21, 2009 10:36 AM

    Hi Muthukumar,
    1. You can using the user exit or BADI to control this.
    CONFPP01            PP order conf.: Determine customer specific default values           
    CONFPP02            PP order conf.: Customer specific input checks 1                     
    CONFPP03            PP order conf.: Cust. specific check after op. selection             
    CONFPP04            PP order conf.: Customer specific input checks 2                     
    CONFPP05            PP order conf.: Customer specific enhancements when saving           
    CONFPP06            PP Order Confirmations: Actual Data Transfer                         
    CONFPP07            Single Screen Entry: Inclusion of User-Defined Subscreens            
    BADI
    WORKORDER_CONFIRM
    the above are the user exits that are available fro the CO11N tcode.
    2. we have to take a help of the abaper to write coding fort his.
    3. The user exit should be called for the
    Work Center : YYYYY
    then check the relevant Work Center Once is used in open Maintainence Order and if it has a entry if then give a error message else allow the CO11N to perform.
    Regards,
    Sankaran

  • WCM Work Operation tab  is disappearing in Maintenance Order

    HI All,
    I am facing problem in WCM.
    In the Maintenance Order,Work Operation tab  is disappear after seleting Task list.
    After saving the maintenance order and open in change mode,The WCM operation tab appears again.
    Can anybody help me on this
    Thnaks in Advance
    Vishal

    HI Uwe,
    Many many thanks
    As per note implementation,
    General task list secetion problem is solved
    but still we are facing the problem in selection of Functional task list 
    Can you please suggest on this
    Thanks
    Vishal

  • GR for production order post to cost center and not to the production order

    Hi all,
    when we post the goods receipt for the finished product against the production order (mov. type 101), the order is not credited with the corresponding stock value. Instead of this, the value accounts to a cost center.
    We specified this cost center in OKB9 (Default account assignment), because if not, we get an error when posting the goods receipt cause of lacking accounting object.
    I can't see why the system does not credit the production order?
    Any ideas?
    Thanks for your time
    Daniel

    Hi Daniel,
    This is the first time i am coming across an issue like this.
    neverthless from a logical front,
    1. Remove Cost center as a valid receiver in Settlement Profile.
    2. Your OKB9 setting are pretty much good. No need to worry about it.  Becasue, OKB9 only will work if the system doesn't identify any other cost object. In this case Production Order is an automatic cost object which system should have taken.
    3. Check the Settlement rule when you have created Production Order. It should have been MAT.
    4. I hope you are creating Production Order with Material (using CO01 and not CO07)
    5. Make sure in OPL8, the default rule in controlling tab is PP1.
    Once all these are fine, i do not see any reason why you will get your probelm.
    Please check and revert back to me if the problem still persists.
    Best Regards
    Surya

  • No of operations in routing &Overlapping not reflection in Production order

    Greeting for all gurus.
    Process
    We have three set of operations , one will be blend, , other will be cured and the third will be finished goods.
    Basically one FG and three components , the components will be consumed in the first process. The same  FG materials will be used for the 2nd / 3 rd Process
    ,1)  we want to confirm the first set by making auto GR/GI
    2) The Overlapping is 8 weeks , the 2nd operation should start , after that and the third operation should wait for 6 days . 2ND  operation  is confirmation only.
    3) The third will be for standard process, Only GR
    We have to use the same materials . Say 1st process O/P will be 50,000 and second process will be 40,000 and third will be 30,000. We want to account the loss in between the 1st and 3rd operation . 2 nd operation , no need to record .
    Requirements  - Discrete Manufacturing
    u2022     How to set the control key for three operations.
    u2022     How to confirm every stage in a single production order.
    u2022     How to  consider all the operation days in the Production order
    u2022     How to report loss in various stages
    u2022     How to print all the operation at various stages in the shop floor
    Any help will be highly appreciated
    Thanks
    JJ

    Thank you very much
    As you use single production order, input the overlapping time in routing in "Min Overlapping time" = 8 weeks (in no. of working days) for the first operation and 6 days for the second operation after selecting "Required Overlapping". ( If you mean it as wait time, you can control the same with the wait time in work center).
        ----I already set it , but it is not considering the days , it took only the base qty and no of hrs calculation
    in the prod order ,Our base qty and hrs will set for two hrs only . the remaining 6 weeks is not consider -
    With Single Production order, you cannot do goods receipt after the first operation. Since 2nd and 3rd operation are pending, why do you want to do goods receipt at this stage?
    ----- We want to account the loss , as it will be loosing pounds at various stage -
    Carry out confirmation for the sequence of operations in CO11N with the yield qty and use reason for variance as the loss of qty. Using confirmation tables, create z-report to know the actual qty after the last operation. ..
    --- Where to set the sequence of operation - i am getting error , No zero sequence ---
    I want the system to consider the 7 weeks for this production time. How to do this ?
    You can print the operations from pull-down menu in CO02 - order - settings - List control - Op. control ticket

  • Cost Center is not reflected in FI Document

    Hi All
    user is trying to create the internal order based PO, In that PO Cost centre is not reflected and when settle payment the cost is not captured in Financial document.
    Please help us to resolve the above issue.
    Regards
    Krish.

    We have created Internal order based PO. We did the GR/IR for that particular PO and user posted the document in MIRO.
    FI document is not showing cost center other than all the values are populated properly.
    I think there is no issue in GL Account. we have already posted the vendor crdit memo with same GL Account.
    Please help us to resolve the issue.
    Regards
    K.Gunasekar

  • Credit check not reflecting in sales order level

    Hi,Experts,
    I have configured a dynamic credit check,but even if the credit limit for the customer is crossed,still it is not reflecting in the sales document level,and allows me to create the sales order.please guide me as where should I check the error in the system,
    Thanks in advance,
    A.Chakraborty

    yes it is active for order type,and active for item category,as well as the dynamic credit check setting that is the combination of
    risk categoryccaccgrp(for sales order) ,is also done,still when the sales order is created,and even though the credit limit has crossed it is not throwing any message ,which is supposed to appear in the sales order,when we are going to save...
    please revert bach to me,to guide me about any further areas i need to explore within the particular area so far as the setting is concerned.
    Many thanks,
    Anshuman

  • Amount in PR not reflected on Internal Order .

    HI SAP,
    When i creating a PR i got sap message said "Do Not assign any objects in cost accounting to account XXXXXXXX ". Then i just press enter because it just a warning from SAP.
    My total Valution Price in PR is 10K. My PR is using Account Assignment A and have internal order (BUDGET)
    After saving. i check my internal order report (S_ALR_87013019), than i noticed that my total amount in PR is not reflected on My internal Order list.
    is there any condition missing ?

    >
    Nizamkz wrote:
    > HI SAP,
    >
    > When i creating a PR i got sap message said "Do Not assign any objects in cost accounting to account XXXXXXXX ". Then i just press enter because it just a warning from SAP.
    >
    > My total Valution Price in PR is 10K. My PR is using Account Assignment A and have internal order (BUDGET)
    >
    > After saving. i check my internal order report (S_ALR_87013019), than i noticed that my total amount in PR is not reflected on My internal Order list.
    >
    > is there any condition missing ?
    The above warning message meant that your cost accounting is not configured for this account, in this case your account was not linked with internal orders, thats why it did not pick up the price there. You need to consult with FI to get this account fixed, or use some other account which is linked to internal order.

  • Profit center is not picking from sales order to the billing document

    Hi
    I am creating billing document but it is not picking profit centre from the sales order.
    Could you please help me in this.
    thanks in advamce.

    Hi,
    Ensure that the profit center is assigned to your Sales order.
    Also maintain the following settings in copy control.
    Goto the T.Code "VTFA".
    Select your valid combination.Details.
    Double click on "Item".Select your Item category.
    Details.
    Maintain "Copy requirements" as "002".
    Data VBRK/VBRP as "002".
    Regards,
    Krishna.

  • Profit center is not Detemined in sales order for a scenario below

    1. profit center is maintained in Material Master
    2.Create a sales order and enter the item , hit the enter key, Profit center is shown,
    3. Now delete the plant at item level and hit enter, Profit center is not shown,
    4. NOW ENTER THE PLANT AGAIN AND HIT THE ENTER KEY, THE PROFIT CENTER IS NOT SHOWN AT THE ITEM LEVEL,
    thanks is advance for the help !!

    Hi,
    Ensure that the profit center is assigned to your Sales order.
    Also maintain the following settings in copy control.
    Goto the T.Code "VTFA".
    Select your valid combination.Details.
    Double click on "Item".Select your Item category.
    Details.
    Maintain "Copy requirements" as "002".
    Data VBRK/VBRP as "002".
    Regards,
    Krishna.

  • Service order component not reflecting in sales order

    Dear All,
    I have mapped service notification type & service order type now if i create sales order directly from the service notification sales order is not reflecting the componets assigned in service order for that service notification. can anybody help me out?

    Sanjay,
    This is not standard, although it is possible through development (e.g. via action-box).
    However, there is the advance shipment functionality in the service order which does allow you to create a sales order from the service order components...
    PeteA

  • CTI Work Center ID not defaulted

    Hi,
    we're running CRM 7.0 with Computer Telephony Integration via Cisco/Bucher&Suter. My question is related to the Work Center ID which has to be entered by the agents during log-on. The work center ID is usually defaulted on the next log on, however, sometimes the work center ID is blank for some agents during log on and they have to manually enter it. I'm trying to find out how the work center ID is linked to the user logging on. I cleared my browser settings, deleted cookies, etc., but couldn't reproduce the issue some of the agents have. My work center ID is still defaulted when I log on. Anybody had this issue before or can tell me where the link between user and work center ID is stored?
    Thanks
    Ulf

    Hello Ulf
    As far as I know, the default workcenter Id is retrived from the CMS each time ICI request for user capabilities during log in process so you should have a talk with your CMS provider to check why it's not sending the default worcenter id. Check the method IciSystem_getWorkcenterCapability_Request defined in the ICI specification,
    I hope this helps
    Regards
    Julio Peralta

  • Excise duty - not reflected in Purchase Order

    Hi Dears
    I have maintained tax code JMOP with tax code FV11 and selected country-plant-control code wise. I have also entered desired rate of excise duty here. Further J1ID was properly maintained for material-control code (Chapter id). But when I prepare purchase order, condition type JMOP is missing. After analysing it is found that control code value is not shown in anaysis pricing in value of document. Plz refer attachement.
    Plz let me know where settings is incomplete. I will heartly appreciate pinpointing solution.
    Thanks in anticipation
    Manish K Ojha
    Chartered Accountant
    Certified FICO Consultant
    8275058999

    check your Tax procedure has your cdn type JMOP .
    in FV 11 maintain cdn records for both set off and  %.
    follow the below link to understand better. Do the check and it will work.
    SAP CIN MM_check point_Logic_Q&A
    regards
    manu

  • Condition type is not reflecting in sales orders

    hi,
    i have created two condition type like jser (service tax) and other one is jste(service tax +cess) but in pricing procedure jfact  it is reflecting but while making contract order these two condition type is not accessing.
    please help in this connection.

    Hi,
    After Creating the CONDITION TYPES you need to assign the condition types in the PRICING PROCEDURE
    goto the
    SPRO->FINANCIALACCOUNTING>FINANCIAL ACCONTING& GLOBAL SETTINGS>TAX ON SALES /PURCHASE>BASIC SETTINGS--->CHECK CALCULATION PROCEDURE.
    Here select you procedure and assign the CONDITION TYPE
    regards,
    santosh

  • Change in SAPScript form not reflect in old orders

    Hi Expert,
       I have modified the layout of a sales order SAPScript form. For newly created one, I can get the new sales order printed with new layout. But for those who already exists, even though I go to the sales order, Extra -> Output -> Header to delete the original output, and manually add the output type again, the printout are always shown with old layout. I just wonder how can I have my old sales order printed with the new layout, thanks!

    Kumar,
    Remove and add the query into the workbook again, save the work, close and reopen. You should get it working again.
    Workbook also saves the format details and does not work well sometimes. So every time you do any format changes to the query, it is advisable to remove and add back the query into the workbook.
    Hope it helps
    _RJA

Maybe you are looking for

  • .mov file does not display on the web-site

    iWeb is easy to use but my simply link to a .mov file does not work. I am working on the Domain file on my Desktop so I can move it between computers, and it renames the media file in the inspector from name.mov to name-1.mov. In the end the site doe

  • Package: SUNWcsu is "missing"

    Running Solaris 9 on V280R I am getting numerous error messages when installing the latest Solaris 9 Recommended Patch Cluster : ERROR: Information for SUNWcsu.* was not found (The DST of course is not correct as it needs this) the command: pkginfo S

  • How can I change the thickness of the cell border of a table in Pages for iPad ?

    Hi, i want to change the thickness of cell borders in tables in Pages for iPad to at least 2pt, better 3pt. How can I change the thickness in the iOS Version of Pages ? Thanks

  • Dutch Siri doesn't understand am/pm

    Since iOS 8.3 Siri also supports dutch (sadly only with a male voice ) Today I asked Siri where my 9 o'clock meeting was. In dutch "Siri, waar is de vergadering van negen uur" ("Siri, where is the 9 o'clock meeting"). Siri responded with "No meetings

  • Struts Portlet to Struts Portlet Communication

    Hello, We have two struts portlets (portlet1, portlet2) in our page. We have the following queries: 1. When user performs some action (submit) in portlet1, can we render the second porlet (portlet2). Second portlet should be visible only after submit