Intercompany STO Process

Hi Experts
I am in to Intercompany STO process with one step Goods issue procedure.
When i tried to post PGI for the NLCC type D.O obtained the below error.
Error Message
Fld selectn for mvmt type 645 / acct 6005100 differs for Business Area (033)
Please advise how to fix.
Regards
RG
Edited by: R G on Jan 10, 2011 4:40 AM

Hi
Field status group is maintined as: G003 Material Consumption accounts
Post Automatically is ticked.
I understand the Business Area field is not maintained (suppress) in the account group of G003.
But, it is in movement type is maintaied as Optional.
However no requirement to use the Business Area in overall.
So, where should i turn off it in relevant to movement. Thus wouldn't cause the discrepancy against the GL.
Rgds
RG
Edited by: R G on Jan 10, 2011 6:49 AM
Edited by: R G on Jan 10, 2011 7:07 AM

Similar Messages

  • Intercompany STO Process without delivery

    Hi All,
    There were so many posts based on STO process. But i couldntt find any post which could solve my issue. So, i decided to post a new one.
    The scenario is as follows
    Plant A from Company A raises a STO PO to Plant B of Company B. Plant B does the manufactucturing of goods and issues the goods to plant A.
    Business requirement is such that when plant B issues the goods to plant A, they want to automate the GRN at plant A? ie when they do the GI, GRN should take place in the plant A
    I went through the one step process in SAP, where when i do movement type 351, goods are issued but movement type 101 does not take place automatically. Further, business doesnt want to do delivery as they find it as a non value addition to their business process.
    I am not sure if there is any solution in SAP. If not can anyone suggest a workaround?
    Thanks
    sapdt

    Dear jurgon
    I Think you are missing one important thing, UB is not for inter company --for interplant of same company code
    Order type NB is for intercompany
    ●     Item category BLANK (cross-company-code)
    ●     Item category U (intra-company-code without billing document)
    GI: 643
    (2 steps)
    GI: 645
    (1 step)
    GR: 101
    Thanks
    Jeevan

  • Intercompany STO process for non valuated material

    Hi Experts,
    Please advise is intercomany STO process possible for non valuated material?
    Material where only quantity update is there & value costed to a cost object.
    If intercompany process is possible then what are all the steps that complete
    the full cycle?
    Regards,
    Partha

    Hi,
    Intra-company-code stock transfer orders to nonvaluated materials can be created in R/3 without specifying an account assignment.
    Carry out the following steps for the advance correction:
    1. Create the message '159' in the message class 'XC'. To do this, call transaction 'SE91' (message maintenance). Enter the message class 'XC' and create the message '159' with the following short text:
               Message              Message short text
               159          The account assignment category could not be determined
               Save the message.
    Thanks

  • Able to do Goods Receipt without Goods Issue in Intercompany STO process

    Hi,
    We are in ECC 6.0 and noticed that we are able to post Goods Receipt in receiving plant (Intecompany) without even goods issues in supplying plant.
    How to restrict proceeding Goods receipt in case no GI at supplying plant?
    Please advice.
    Regards,
    Ram

    SAP explains in OSS Note 25220 - No stock in transit with cross-company purchase orders:
    This procedure was chosen because usually the issuing and receiving companies have to be managed on different computers.  In addition, goods receipt in the receiving plant can be posted before goods issue in the issuing plant with this kind of stock transfer, i.e., the corresponding stock in transit would temporarily be negative.
    If you want restrict this situation, then you have to do some coding in  userexi: EXIT_SAPMM07M_001

  • Creation of  Sales Order throogh Intercompany STO

    Dear SAP Gurus,
    I have a question
    In the intercompany stock trasnport orders.As per the standard process
    i) Creation of STO
    ii) Creation of replenishment delievry.
    iii) Goods Issue from the supplying plant.
    iV) Good receipt at the receiving plant.
    Our requirement is to create a sales order through IDOC in place of delivery at the delivering company code.
    All the subsequent docuements like delivery and shipment will be based on this newly created sales order.
    I want to know primarily that is there anyway of creating a sales order instead of Delievery subsequent to creation of STO.
    IF so how can we disable the SAP standrad process ( Std Intercompany STO process) and enable our requirement.
    A quick response is highly appreciated.
    Regards
    Ganesh

    Hi,
    You can create sales order in the background while creating intercompany purchase order.
    By using BAPI BAPI  BAPI_SALESORDER_CREATEFROMDAT1.
    Ask your technical team to desing.
    Regards
    Ravi Shankar.

  • Intercompany STO

    Hi
    Intercompany STO Process:
    I am creating the Delivery for Intero-STO using Tcode: VL10B.
    But, when there is no sufficent stock in the shipping plant side, the D.O is not get created. Also there is no any error message shown stating pertinent to delivery failure (or insufficent stock).
    Also, I have choosen the C Delivery proposal option in config on below path.. However there is no any delivery proposal is being shown to select...
    SPRO --> Material Management --> Purchasing --> Purchase Order --> Set up Stock Transport Order --> Assign Delivery Type and checking Rule :  Avilablity Check Rule: C (Delivery proposal)  & Checking Rule: B SD Delivery
    Can anybody advise how to fix.
    Regards
    RG

    Hi,
    It seems you know the reason why a delivery is not created -> lack of stock.
    But according your explanation, no logs are shown into V_sa. Related with this,
    check if your user role used into VL10b has fields:
    "log by request" and "log after delivery creation" with values.
    I hope this info helps!
    david

  • Intercompany STO with inbound delivery with freight....Urgent

    Hi,
    I have following scenario to map.
    There are 2 company codes A & B and a shipment of goods is to be transferred from A to B.
    I wish to use Intercompany STO process with UB.
    However, A & B are geographycally separated so there involves transportation costs which will be beared by B.
    How can I have the pricing procedure if I wish to have one in STO ?
    If I create some freight conditions then I can add the values but I will not able to know the exact freight charges till B receives the shipment and the invoice for the same.
    In this case how can I use pricing procedure ?
    If I do not enter any freight charges in PO then how can I add them before I do the GR in B as this is requirement to add freight costs on material at the time of goods receipt so to arrive at exact landed cost for that material in B.
    Once I wish to transfer the goods from A to B, I will do delivery so that stock gets reduced from A otherwise if I wait till the stock is physically transferred to B and then B changing the PO and add freight and subsequently doing picking, PGI and GR ,it will not correctly reflect stock positions in A.
    What is the better way I can map this process.
    If I wish to use inbound delivery before receiving the goods in B can I add conditions in Inbound delivery ? If so how it can be done ?
    So my intended procedure will look as
    Intercompany STO-UB
    Outbound Delivery
    Picking/PGI
    Inbound Delivery with freight
    GR
    Please suggest as this is very critical and important requirement
    Thanks in advance
    regards,
    manOO

    Hi,
    Thanks for the feedback.I wished to use NB but I don't want to go with the regular NB and subsequent billing cycle.
    I want to use UB.
    Anyways, is there any way by which I can have freight cnditions added at the time of Delivery.Be it Outbound or Inbound.
    Please suggest.
    Thanks in advance
    Regards,
    manOO

  • Critical intercompany STO issue

    Hello Together,
    We are facing a strange issue in Intercompany STO process. Supplying plant has done the goods issue ( movt type 643 ) against STO order and sent us the delivery document.
    Accordingly we have changed the Import STO Po & manintained the BCD, CVD & other duty in PO. With refect to PO we did the custom MIRO for Intercompany STO PO.
    But when i try to do goods receipt against outbond delivery then system ask me to put the MIRO no . When i put the MIRO no then the excise values should be come by defalut but
    in my case the excise values are not comming by default.
    The defalut excise values are coming by defalut in case of normal import PO ( not STO ) when i try to do the goods receipt against PO & not against outbond delivery.
    Why it is so ? Could u please help us.
    We are working in SAP 4.7 version and just 2 weeks back we have updated Patch level 35 ( support package SAPKH47035).
    Thanks in advance

    Hi,
    Did you change the PO after doing the PGI and delivery ? If it so try keeping the CVD values before doing the Delivery.
    Regards,

  • MM Pricing for Intercompany STO

    Hi Experts,
    We have a requirement from our client to configure a pricing procedure as below for the Intercompany STO process.
    E.g
    Standard = $100
    Mark up = 10%
    Transfer Price = $110
    PO pricing
    Dr         Inventory/COS                           $100   (Inventory account)
    Dr         COS I/C Mark Up                        $  10   (Markup G/L instead of PPV GL)
    Cr         I/C Payable                                 $110   (GRIR Clearing)
    They want to have the Standard cost of the Material as $100 and the PO Price as $110, but they want to have the Markup price($10) to go to a Markup Debit account instead of PPV during the Goods Receipt. Please let me know how to configure the pricing procedure to meet this requirement.
    Your valuable suggestions is highly appreciated.
    Regards,
    Hemant Kumar B

    HI,
    1.GO to m/06 create a condition type
        Cond. class   B Prices
        Calculat.type A Percentage
        Cond.category G
    2.Then create a transaction key say xx  in spro->mm->purchase->conditions->price determination->transaction /event key
    3.go to obyc with help of FI consultant maintain posting key, rules,debit g/l as u want.
    4.then go to M/08 and maintain the condition which you have created and from on gross price.assign the transaction key which u have created.
    check the flow.
    Thanks & Regards

  • Intercompany STO Pricing Maintenance

    Hi Gurus
    Scenario: Intercompany STO process (P.O -> D.O ->Billing & GR --> IR) - Involved Different Company Codes.
    I understood the Material is valuated based on Shipping plant Part price.
    1) Now, how do the material price (seller price) to determine in the Buying side ?
    2) If the selling side price changes, how to maintain in the buying side ?
    Appreciated if any one could explain in detail, how the valuation pricings to be maintained on both sides...
    Regards
    RG

    Hello,
    You need to Configure  Pricing Procedure as per the requirements. It is determination which will play an important role.
    Incase of STO,we select Invoice Type JEX (Whether Using JEX or any other Billing Type) ensure to check the Document Pricing procedure in Billing Type (VOFA) & accordingly carry out configuation for determination of Pricing Procedure in transaction: OVKK.
    Determination of pricing procedure :
    In SD, Pricing Procedure is determined based on Sales Area (Sales Organization + Distribution Centre + Division) + Customer Pricing Procedure + Document Pricing Procedure through Transaction  OVKK.
    Sales Area is determined in Sales Order Header Level. Customer Pricing Procedure is determined from Customer Master. Document Pricing Procedure is determined from Sales Document Type / Billing Type (if configured).
    Once the pricing procedure is determined, Condition records are fetched. If appropriate condition records are found, the price is determined. If Mandatory pricing condition is missing, system will through an error message.
    Configuration of pricing procedure
    Condition table (T.Code: V/04): If existing condition table meets the requirement, we need not create a new condition table. Considering the requirement for new condition table, the configuration will be done in spro as follows:
    IMG>>Sales & Distribution>>Basic Function>>Pricing Control>>Condition Table (select the required fields combination, which will store condition record).
    Access Sequence (T.Code: V/07): If existing access sequence meets the requirement, we need not create a new access sequence. Considering the requirement for new sequence, the configuration will be done in spro as follows:
    IMG>>Sales & Distribution>>Basic Function>>Pricing Control>>Access Sequence (Access sequence is made up of Accesses (Tables) & the order of priority in which it is to be accessed. Here we assign the condition table to access sequence.
    Condition Type (T.Code: V/06): If existing condition type meets the requirement, we need not create a new condition type. Considering the requirement for new condition type, the configuration will be done in spro as follows:
    IMG>>Sales & Distribution>>Basic Function>>Pricing Control>>Condition Type. It is always recommended to copy an existing similar condition type & make the neccessary changes. Here we assign Access sequence to Condition type.
    Pricing Procedure (T.Code: V/08): It is recommended to copy a similar pricing procedure & make the neccesary changes in new pricing procedure. Pricing Procedure is a set of condition type & arranged in the sequence in which it has to perform the calculation. Considering the requirement for new Pricing Procedure, the configuration will be done in spro as follows:
    IMG>>Sales & Distribution>>Basic Function>>Pricing Control>>Pricing Procedure>>Maintain Pricing Procedure.
    Pricing Procedure (T.Code: VOK0): After maintaining the pricing procedure the next step will be determination of pricing procedure. Configuration for determining pricing procedure in SPRO is as follows:
    IMG>>Sales & Distribution>> Basic Function>>Pricing Control>>Pricing Procedure>>Determine Pricing Procedure.
    Condition record (T.Code: VK11 / VK12): Condition record is a master data, which is required to be maintained by Core team / person responsible from the client. During new implementation, the condition records can be uploaded using tools like SCAT, LSMW, etc. Condition Record is maintained in T.Code: VK11 / VK12, which are captured in Sales Order & Billing.
    Also check document pricing procedure in Sales Document Type (T.Code: VOV8 - Sales order Type, VOFA: Billing Type (If Required)), customer pricing procedure in Customer Master Data (T.Code: XD02)
    Br,
    Tushar

  • Intercompany STO return process pricing

    Dear Experts,
    SALE PROCESS WITH BILLING
    1) Intercompany Sale with billing
    Company code- 3000
    Plant -D001
    material qty-10 with price pr00 -1 USD with discount 10 %
    raise Purchase order
    TO
    Company code 1000
    Plant A001
    process flow= ME21NVL10B-VL02NVF01MIGO--MIRO
    RETURN PROCESS
    client want the same pricing what they paid from old  PO ( ME21N) to get back  money
    Company code- 3000
    Plant -D001
    material qty-2 with price pr00 -1 USD with discount 10 %
    raise Return Purchase order (with respect to old purchase order) to company code 1000 plat A001
    when i am doing my invoice (IG) at  company code 1000  how pricing should done
    question
    1) all pricing element should copy from Purchase order like PB00 , RA01 condition to my invoice (IG)
    then how account determination will happen
    or
    new SD pricing should carried out how????
    Please guide
    thanks in advance

    Hi Hanumant,
    In the above scenario you have mentioned, A001 is your supplying plant & D001 is the receiving plant (which is raising the intercompany STO).
    So as you mentioned inorder to return the goods, Plant D001 will raise a Return PO with all the conditions as that in its STO & will return the goods to plant A001 using 161 mov. & you can post a credit memo for the return PO.
    Incase of A001, you can create a return order (SD) with ref to its billing doc & do a return delivery to take back the goods.
    Thanks & Regards,

  • Intercompany STO with consignment processing

    Has anyone faced this situation?  I have a client who would like to use consignment processing for VMI orders but as the goods do not get stored at the sales organzation/plant/company code that owns the order -  they need to procure the goods from another company code?  This is almost a mixture of the Intercompany sales process and VMI processing in ECC...  Thoughts?
    Example:
    Company, plant A / Customer 999999999  / Part A - Stock "0"
    Company, plant  B / Part A - Stock "1000 pieces"
    Preferred Sequence:
    1.  Create the VMI fill-up order KB  for customer  999999999  (delivering plant is B, but the sales order belongs to sales org "A")
    2.  Create the delivery for the VMI fill-up order from plant b
    3.  Post goods issue for delivery from plant b
    4.  Create an IC billing document IV between company code B and A (for the goods that have shipped to the customer's consignment location for company A)
    5.  In MMBE see that the goods are consigned to customer  999999999 for plant A and NOT plant B.  Currently, it is not treating the delivery as an intercompany order (as it is consignment and still owned by the other organization).  The stock shows under consignment at plant B.
    We are trying to decrease the steps from standard processing which would be the following:
    1.  Create the VMI fill-up order KB  for customer  999999999  (delivering plant is B, but the sales order belongs to sales org "A")
    2.  Create the delivery for the VMI fill-up order from plant b
    3.  Create an IC STO from Company B to Company A
    4.  Create a delivery to move the goods from B to company A.
    5.  Create and IC billing document
    6.  Post GR for the goods when they arrive in company A.
    7.  PGI the delivery for the delivery from step 2 to move the goods into consignment.
    8.   In MMBE see that the goods are consigned to customer  999999999 for plant A

    Hi Manoj,
    Please confirm the following for your set-up
    I have configured same consignment process for our client.
    the process flow like this
    --> Fillup order
    -->Fillup delivery
    -->STO (Purchase order) (through batch job) ***DID YOU RUN MRP AT THE RECEIVING PLANT TO CREATE THE IC STO?  WHAT MASTER DATA SET-UP/CONFIG DID YOU PUT INTO PLACE?  FOR CONFIG, I AM ASSUMING THE STANDARD IC STO CONFIG IN THE MM/PURCHASING/IC STO SECTION...
    --> replanishment delivery (through batch job)
    PGI of rep delivery
    --Intercompany invoice if intercompany sales.
    -->MIGO****SOUNDS LIKE THIS WAS STILL A TWO STEP PROCESS TO MOVE THE GOODS INTO THE RECEIVING PLANT WITH A GR USING MIGO  AND THEN THE FOLLOWING STEP YOU MENTION BELOW TO MOVE THE STOCK TO THE CUSTOMER'S CONSIGNMENT LOCATION.  IS THAT CORRECT?
    --MB1B with movement type 631 (through batch job)****HOW DID YOU CREATE THE BATCH JOB TO POST THE MOVEMENT?  THIS IS USUALLY A TRANSACTION RUN MANUALLY (UNLESS YOU HAVE CREATED AN INTERFACE THAT HAS THE INFORMATION TO POST)...

  • Intercompany STO - Reverse Process

    Hi Gurus
    What is the process/config steps for the intercompany STO reverse process.
    Forward is:  NB (PO)  --> NLCC (Delivery) --> IV (Billing).  No sales order involved.
    Please advise the reverse flow and necessary configs involved.
    Regards
    RG

    Hello,
    As per standard practice for managing intra compnay or intercompnay stock transfer return, you can use the followig process;
    1.Create stock transport Purchase order and also tick mark the retrun indicator in the item overview.
    2. Now create delivery(return) with VL10B. You must have already customized delivery type and item category settings in customization
    For inter company transfer , use delivery type NCR and item cateory as NCRN
    For intracompany transfer , use delivery type NLR and item category as NLRN
    3. Goods reciept : Do the goods reciept for inventory management with movement type 101 , where as system will do the goods issue for return order with corresponding movement type 161.
    4. Post goods Issue wihch in this case will act as post goods reciept.
    Go to VL02N and do the Post Goods Issue
    With this the system posts the goods receipt in the background.
    For Cross-company-code:
    With Two-step procedure movement type is  673
    With One-step procedure  675
    The goods receipt is automatically posted with movement type 161.
    For Intra company code:
    With Two-step procedure the movement type is 671
    With One step procedure the movement type 677
    The goods receipt is automatically posted with movement type 161.
    I also suggest you please go through SAP OSS Note 430074 - Advice note plant return / store return which will help you in setting up the Stock transport returns.
    BR,
    Tushar

  • Intercompany STO with Delivery & Billing- Return STO

    Hi Everyone,
    Currently I am doing Intercompany STO with Delivery and Billing, which is working perfetly fine.
    We create 1 Purchase order for 1,00000 LB and it will be finish after 6 months ( we provide schedule to supplying plant weekly for next 6 month, how much they have to ship ) Some times we received less quantity from supplying plant lets say weekly they have to sent 100 LB but they sent only 85 LB in last week of month and I have to close the sales.
    In this can I use Return STO process ? I dont want to adjust quanity in next shipment because I have to close sales.
    Some times at the time of GR we found that they have send 85 qty and sometimes we finished GR and Invoice then we get to know later that qty was less.
    Return process
    - Create return PO with Returns check in PO (NB)
    - Create delivery , Vl10B
    - PGI
    - Credit memo
    is this right process?
    Thanks
    Shree

    Slight change in your return process.
    Your Return process.
    Return process
    - Create return PO with Returns check in PO (NB)
    - Create delivery , Vl10B
    - PGI
    - Credit memo
    Correct process :
    - Create return PO with Returns check in PO (NB)
    -GR with 161 MVT  type
    - Create delivery , Vl10B
    - PGI
    - Credit memo
    Returns :
    Case 1 - At the time of GR
    Case 2 -  GR and Invoice both done
    You can follow same process to the both scenarios as you are creating new PO for returns.

  • Accounting entries for intercompany billing process

    hi,
    can any body explain what it intercompany billing process and intra company billing process and STO processess.
    and their individual accounting entries of these three business with excise impact.
    regards,
    balajia

    > Total Questions:  494 (232 unresolved) 
    Perhaps you should reconsider the quality of your questions? In this one you seem to have put in absolutely no effort of your own, but I will put some effort into tracking down your next question for you...
    Please read the forum rules before continuing further.

Maybe you are looking for

  • Form language for dunning

    I use the copy of F150_DUNN_01 for dunning printout. Is there any variable I can use to determine the language of the form? I believe it's coming from the communication language of the customer, so I could get in a PERFORM myself, but I'm sure it's a

  • Automatically add material to sales order/delivery when a mat. is ordered

    Hi, When an order is created for a certain material I need another material to be added to the order automatically. I have tried using material determination for this but it seems that only the subitem is a deliverable item, the "material entered" ca

  • Arch from hdd to usb-stick?

    Hi all. After installing and playing with Arch on a normal desktop computer I have the required functionality and it work very well. But i'm struggling with how i should make the USB stick based on the installation i already have. root ~ # df -h File

  • Offsetting Weeks to check for sick days

    Hi, this is all a bit new to me so please forgive any naivety (or simplicity) of this request I've got the number of absent days by week per line in a DSO, For each instance of a sickday in a week I'd like to be able to see if that is equal to the nu

  • Passing data from jsp/servlet to a Tuxedo Service thru VIEW

    Hi.. We are using Tuxedo10g R3 on AIX 5.3.. We have a Tuxedo Service running which takes values from the VIEW and converts that to upper case.. From the jsp page v r passing values to the VIEW fields which will be accepted by the service.. For testin