Regarding Work center
Hi gurus,
Presently I am working for a Engineering and Construction Project, I am new to Project systems. In this project client have one Fabrication unit and 20 Projects across the India. In project site also they are doing some production activities. How to create a work center in this aspect( There is no planned activities as of my knowledge)
Thanks & Regards,
Sudha
hai,
you are saying workcenter needed for Fabrication unit,
As per my experiance in Fabrication unit it mainly consist of all types of welding(manuval, MIG, TIG etc) , and also bending and ctting of rods with (power saw, band saw etc).
find out one suitable Activity unit for welding with time, Power consumption etc
Similar Messages
-
Regarding Work Center Capacities
Dear Exprts,
How many Capacity Categories Can we maintain in Work center.
Regards,
MANOJDear Manoj,
How many Capacity Categories Can we maintain in Work center.
One can maintain any no of Capacity Categories in the work center, provided that you have actually defined/maintained
that no of Capacity categories in customizing.
So while creating work center you can have capacity categories like machine, person, processing unit, lab etc. as per requirements.
Revert back in case of query,
Thanks,
Sudhakar -
Regarding work center hierarchy
Hi all,
I have 2 work centers liked to a superior work center in a hirarchy.
Is it possible to do capacity planning at the superior work center level.
The scenario is like this - I will get planned order at a superior work center level. I will convert the planned order into 2 production orders with child work centers in respective order.
Now I want that, when I see the capacity overview for the superior work center, it should be full. That means I want to link the capacities of the child work centers to the parent work center.
Please let me know if it is possible ?
Regards,
YogeshHi,
Work center hierarchies are used in capacity planning to cumulate available capacity and capacity requirements. You can cumulate available capacities from subordinate work centers to a superior work center level in order to determine the total available capacity for the superior work center.
In your situation, I think you need to create two planned orders with the two work centers and after this you will be able to see the capacity requirements cumulated at the superior WC.
Regards
Datta -
Regarding work center master creation In PP
Hi Iam Kiran working on routings and work centers creation.I want to know how the formulaes are derived for caluculating capacities,shedulling,Costing.where can I find study material regarding formulae derivation.For the above mentioned.Please respond if your having any material with respect to this content.
Hi Kiran,
Please use the following transaction to create/check the parameters & formulas,
OP17 - Create formula parameter
OP19 - Maintain standard value key. (The parameters created are entered in this standard value key & this std value key is used in the work center (CR03) basic data tab page)
OP21 - Create Formulas
These formulas are assigned in the capacity, scheduling & costing tab page in the workcenter.
This workcenter is assigned to an operation in the routing (CA03).
Regards,
Senthilkumar -
Regarding work center configuration.
Hi PP Gurus,
We need to take an account to Rated Line Speed (Bottles per minute) (i.e. It should be the current capacity of the bottling line operating at the full rated speed, irrespective of the bottling format).
We're using Discrete Manufacturing scenario and work center (CR01). How could it be taken into account.
Is there any alternte way to put an additional fiueld in work center create (CR01)/work center change (CR02) transaction code?
Thanks & Regards,
Abu Arbab
Edited by: abu arbaba on Jan 30, 2009 9:46 AMhi,
What I mentioned is , create a reference operation set of one operation with that particular work center and maintain operation times as the speed of that line ( 100 bottles for minute should be entered as base qty as 100 and time as 1 min). Call this reference operation set in any routings that uses this line.
If you do this, you don't need additional field in work center and so don't get confused with it.
cheers
Rav -
Reg: Combined work center / Capacity requirement planning .
Hi,
i need few informations regarding work center.
1. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.
Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..?
We are planning to carry out Proper scheduling and capacity planning for this resource.
3. And May i know how to carry out Proper scheduling and capacity planning of resource.. So if capacity is not available ,i should be not able to go-head even with the releasing of order. How to carry out this. Is any customization required.
4. Can we create combined resource Ex: Crane and laddle.
I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.?
Please let me know.......THANK U IN ADVANCE.
Edited by: dan01234 on Dec 30, 2010 6:21 AMDear
Frist of all , I would appreacite if you can create seperate theard as you have multiple question .Refer : http://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement
However , please find the answers :
1.. Can we create Resource (for process industry) similar to that as Work center which we create for (discreate industry)
can i use the workcenters (CR01) instead of Resource(CRC1) to my master recipe. is there any impact by using workcenter instead of resource to master recipe..?
Yes you can with Usage Type 009.But there may be diffienece in Standard Value Key and Formula Key which will be used for calcuating activity and also Capacity Reuiqemenet .
.2 In foundry we are using some Iron Plates for resting of Moulds. And these Plates we are having in limited numbers in Foundry.Arond 30 Now i want to create a resource for this..? How to consider this Plates for resource..? Whether M/C or what..? We are planning to carry out Proper scheduling and capacity planning for this resource.
A resource is plance where certain operation will happend sequentially as per Master Recipe or Routing .If you have Plate where you carry our certain engineering optiaon rather utlising thoem at requorce to excute the opration , then you can very well create them as resource or work centre .This Resource /Work centre will be having optaion , material , scheuling , CRP etc .Do u think that u will doing the same for Plate ??
If you are interested to carry out CRP/Scheduling the refer this theard : Capacity Leveling of Work Center
4. Can we create combined resource Ex: Crane and laddle.I need to create these two resource has single resource ..is it possible..? may i know how the costs/ time to capture.? :
Yes you can if both of them are intregal part of the resource /work centre as per as Setup , Machine , labour hrs is concern based on selection of Standard value Key and Formula Key .Wor centre or Reosurce cost captured through Actvity type ( KP26 with fixed or variable rate aginst costing elenemts) and Formula Key as assinged in the reosurce or work centre -Costing tab .
Check and revert
Regards
JH -
Please help me regarding VAR customer create new message in work center
Hi, guru
I have encountered with a problem regarding, for example, when VAR customer 'X' create new message in work center and specify message processor to partner no '1' (partner no 1 has employee role with username 'A' in BP) but when username 'A' log on and open work center via SAPGUI to find a new message created to him, username 'A' did't got a new message from VAR customer 'X' whom choose specify message processor to him and work center show My Messages (0)
why, do I set something config wrong ?
Any recommend would be appreciated
thank you very muchHi
1) can you check in CRM_DNO_MONITOR and oepn the ticket , whethere the processor name appearing in the ticket?
2) Does your customer assign the processor manually or any automatic support team assgnemt, if so please verify your automatic support tean assignment against the blog
[/people/dolores.correa/blog/2007/10/06/service-desk-support-team-determination|/people/dolores.correa/blog/2007/10/06/service-desk-support-team-determination]
3)Might be an authoraisation issue of the Processor. assign SAP_ALL access and check again
[Service desk roles|http://help.sap.com/saphelp_sm32/helpdata/en/0a/f12c41ab78f66fe10000000a1550b0/content.htm]
Thanks,
Jansi -
Regarding Size of the iview in the work center
Hi
I created a work center in EP 6.0 having 5 iviews as views in the work center. When i click the view name in the left side of the work center, it is showing the view in the content Area in the right side.
But the area is limited. It is showing tray size scrollable iview.
Even I changed the properties of iview.
Fixed Height
Type of Page
Max height
Min Height
It is showing "Not equal to " Icon with a message"
Property Object is defined locally but not inherited in the source object". Moreover the properties is not reflecting in the work center
Can anyone help me in this thing?Hi Sreekar,
Have you put the iViews onto pages first and then added the pages to the workset? That the way that I go about it.
Try this... Change the Height Type to Automatic.
Also, what kind of iViews are on the page? Are they for ESS or MSS or just custom written? Do they interact with a Team Viewer? The Isolation Method of the iViews has to be the same if they are all on the same page. Isolation Method is important if you are interacting with a Team Viewer. They must all be set to URL. The default when creating an iView from a custom par file is Embedded.
The Not Equals To icon in the iView properties just means that it is not the original setting and has been changed by some user.
So, short of the long, place your iView on a page and the page into the workset.
Does this help or maybe you can tell me what you mean by Work Center.
Cheers!!
Kevin -
How do I create a new Work Center for the transaction launcher and links
Hi
The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
Regards
DeclanHi Robert,
Thanks again for taking the time to reply.
Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
Is this correct?
Cheers
Declan -
All default routing value has to be changed, while changed the work center in production order
Dear friends,
our client they want to change the work center in production order.according to production version work center also they are changed.so while change the WC,all the default value has be changed as per routing what we maintained in routing.At present we have to enter the manually change the W.C as well as set up time and operation time enter manually.Any other option to do the automatically capture value from routing while change in Work center in production order.pl help me on this.
Thanks&Regards
Sabhapathy RHi Rahul,
Thanks for reply. I am maintained in diff value maintained routing , Ex :First routing i have work center 'X' value maintained as a setup time in 15 Min's and operation time 10 Min's
second work center 'Y' I have maintained as set up time 10 Min's and operation time 30 Min's,
Now I want to change the work center in production order as a 'Y' so whatever value maintained in routing , it has to be changed automatically (10 min's and 30 Min's), but system will not change only old value only picked (15Min's AND 10 Min's).
Now I think you get to know what the client requirement, kindly do the need full.
Regards,
Sabhapathy R -
Work center wise production order infomation report
Hi all,
i have a requirement that workcenter wise (with date) production order information with quantity details (plan and actual).
Eg: My production order quantity - 40 nos. (it takes 4 days to finish).
i have three operation in production order.
my order scheduled start date - todays date.
In standard, when enter my first operation work center, system showing production order and its quantity (40 nos) . but i need to split that order quantity in report.. means on todays date for particular production order - order quantity = 10 nos.
Clent want like that (with quantity break) report..
Any standard report ???
If customization.... How it can be mapped in SAP.??
Thanks in advanceHi,
You can use the FM COIS_SELECT_ORDER_DATA_READ.
CALL FUNCTION 'COIS_SELECT_ORDER_DATA_READ'
EXPORTING
iv_prod_order_sel = lv_prod_order_sel
iv_proc_order_sel = lv_proc_order_sel
iv_planned_order_sel = lv_planned_order_sel
iv_rem_objects_only_sel = lv_rem_objects_only_sel
is_objects_to_read = ls_objects_to_read
it_parameter = lt_parameter "General Structure for PARAMETERS and SELECT-OPTIONS
it_status_hdr = lt_status_hdr
it_status_opr = lt_status_opr
it_status_cmp = lt_status_cmp
TABLES
ct_ioheader = lt_ioheader
ct_ioitem = lt_ioitem
ct_iodocl = lt_iodocl
ct_ioopdocl = lt_ioopdocl
ct_iomamo = lt_iomamo
ct_ioconf = lt_ioconf
ct_ioopconf = lt_ioopconf
ct_iosoconf = lt_iosoconf
ct_iogomo = lt_iogomo
ct_ioopgomo = lt_ioopgomo
ct_iosogomo = lt_iosogomo
ct_iogmer = lt_iogmer
ct_ioopgmer = lt_ioopgmer
ct_iosogmer = lt_iosogmer
ct_iosequen = lt_iosequen
ct_iooper = lt_iooper
ct_iosoper = lt_iosoper
ct_ioopcomp = lt_ioopcomp
ct_iooppreq = lt_iooppreq
ct_iosopreq = lt_iosopreq
ct_iooppord = lt_iooppord
ct_iosopord = lt_iosopord
ct_ioopmst = lt_ioopmst
ct_ioopprt = lt_ioopprt
ct_ioopcap = lt_ioopcap
ct_ioopscap = lt_ioopscap
ct_iosocap = lt_iosocap
ct_iososcap = lt_iososcap
ct_ioopsccf = lt_ioopsccf
ct_iososccf = lt_iososccf
ct_ioprodlist = lt_ioprodlist
ct_iomatver = lt_iomatver.
This FM get data from the report used by transaction COOIS. If you needed the header data then you can use lt_ioheader table and seperate the data with the date. If you need at operation basis the you can use lt_iosoper table. You can use this FM to create custom report even with the checks like material availability, PRT availability, capacity requirement etc.
Thanks and regards,
Pradip
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:26 AM
Edited by: Pradip Ray on Aug 26, 2009 8:27 AM -
In the report level user wants two persons against each work center.
Hi Experts,
Please let me know the solution, I have provided scenario below.
check the query which the user is referring to report:
Example
Work center Person
KNE33102 44003850
According to the user, the names for the Work centers should be as follows:
Work center Person
KNE33102 44003850,
KNE33102 44003603
I have check the data in T-code-CR03, each work center getting two persons, as can be shown below.
Work center Person
KNE33102 44003850,
KNE33102 44003603
In RSA3 it can be seen that both the records are being extracted
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
In BI , when checking in PSA, it can be seen that the data is also being loaded to BI (Two persons loaded against Work center-KNE33102)
Work center Start date End date Person
KNE33102 09.02.2009 31.12.2009 44003850
KNE33102 09.02.2009 31.12.2009 44003603
But when loading to the Info Object, one person has deleted. Because of this, in the report level displaying one person.
Note:-Please let me know what is the procedure, in the report level user wants two persons against each work center.Hi,
As you said in your post the data has mentioned up to 2009. can you try execute the query till to date .
Regards
sivaraju -
Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
Ø Open Question:
a. Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center? We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
b. Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
Regards .. Dheeraj SainiWhenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.
-
How can I create a new work center
I try to create a new work center.I found a transaction 'OP42' . But I can't set a personal number and name.where should I write them, or should I use any other transaction??
Thanks...Hi,
Pl go to <b>CR02 -Capacity-Goto menubar select Goto -Individual capacity -Enter personal name here</b>.
Hope this helps.
Regards,
Mani -
Error when launching Work Center
Good Day;
I am getting the following error when I try to launch Work Center (Solman_workcenter).
We are running solution Manager on a 4.6C system.
Any ideas??
The URL http://sd07x797.prod.net:8080/sap/bc/webdynpro/sap/ags_workcenter/ was not called due to an error.
Note
The following error text was processed in the system SM1 : Exception condition "FAILED" raised.
The error occurred on the application server SD07X797_SM1_01 and in the work process 1 .
The termination type was: RABAX_STATE
The ABAP call stack was:
Method: GET_BPM_SOLUTIONS of program CL_AGS_BP_INTERF_MON==========CP
Method: WDDOINIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: IF_WDR_COMPONENT_DELEGATE~WD_DO_INIT of program /1BCWDY/37BSLDTWTRKDYKK9XQEG==CP
Method: DO_INIT of program CL_WDR_DELEGATING_COMPONENT===CP
Method: INIT_CONTROLLER of program CL_WDR_CONTROLLER=============CP
Method: INIT_CONTROLLER of program CL_WDR_COMPONENT==============CP
Method: INIT of program CL_WDR_CONTROLLER=============CP
Method: INIT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WDR_COMPONENT_FACTORY~CREATE_COMPONENT of program CL_WDR_CLIENT_COMPONENT=======CP
Method: IF_WD_COMPONENT_USAGE~CREATE_COMPONENT of program CL_WDR_COMPONENT_USAGE========CP
Thanks All.
Regards
Don> I am getting the following error when I try to launch Work Center (Solman_workcenter).
> We are running solution Manager on a 4.6C system.
I'm pretty sure you don't run SolMan on 4.6c.. maybe on the same server but certainly not in the same instance
What support package level is your SolMan?
Markus
Maybe you are looking for
-
MBP Bootcamp install of USB Windows 7 , Thunderbolt Display
We need support from APPLE! BootCamp Here are my issues. Like many users, I must abandon the marvelous os x, and head to the darkside - Windows 7 for work. I have a MBP early 2011. I must use Bootcamp, because of the resource hogging the 3d CAD prog
-
Error , ORA-19809 & ORA-19804 While restoring RMAN backup .
Hi Experts, I am restoring production RMAN backup to UAT . Using below steps 1)rman target=/ 2)RMAN> startup nomount; 3) RMAN> restore controlfile from '/orabkdump/Rman_Bak/ACME/bkup_CTLFL_2206101206.ctl'; Starting restore at 05-AUG-10 using target d
-
New music player not satisfactory no eas of use an...
Music Player for Symbian^3 Version 16.10.38. Device details Nokia N8 OS Symbian Anna, Software Version 022.014(.356.02=Custom) There was a time that I was telling friends that now cell phones are equipped with all the best features when it comes to m
-
Sales unit V/s Base unit :Urgent
Hi In varrint configuration i have manitained configurable material as Pc. Now once i run sales order system says : "conversion rule of Pc and Ea should be maintain in system' because sales unit is maintained as EA. in line item condition tab. So its
-
CS4: Table issues with MSIE8.0
I could use some help, please. I'm not sure where I went wrong... I was just swapping out some images on my site to be more customer friendly, and now, after publishing, the left row, the one the images are all in, grows in size when browsing with in