11g and Coherence (pre-requisite?, included?)

We are planning to work with SOA Suite 11g for a mid scale project.
From the download's site it looks like Weblogic + Coherence "package" is a pre-requisite.
However we see licencing issues as we did not purchase any license for Coherence.
Is Coherence a Formal Pre-Requisite for SOA Suite 11g and/or OSB (service bus) 11g ?
Some people on forums suggest Coherence is "included" in SOA Suite. Would this be the case from the licensing point of view (i.e. licence for SOA Suite / OSB gives us the right to use Coherence without paying separately ?
Last not least, can we install SOA Suite with Weblogic only (no Coherence), even if the download page indicates we should have the Weblogic + Coherence package in place ?
Many thanks,
CL.

Hi
1. I am not much familiar with Coherence License stuff. As far as I know, Coherence is used for Caching Framework and is part of the Weblogic Server and it may not have anything to do with SOA Stuff. BUT incase if internally SOA files uses Coherence APIs for Caching, then you may need this component also installed.
2. YES, you can install WLS without coherence. Even though your installer has WLS + Coherence, at the time of installation of WLS, choose the option like Custom (instead of default Typical). In the following screens, you can UnCheck the boxes for Coherence (and its samples). So you get only WLS installed. On top of this install SOA. Create a SOA Domain. Start admin and soa servers. If they start fine without any errors referring coherence APIs, then you are good to go.
Thanks
Ravi Jegga

Similar Messages

  • 11g grid infrastructure pre requisite errors

    Hi All,
    I am installing 11g grid infrastructure in a Solaris 10 SPARC 64 Bit
    During the pre requisite check, the installer gave failure for umask
    Error : PRVF-7612: User file creation mask check cannot be performed for user"oracle" on node
    We have the umask set as 022 for oracle/
    Please advice.
    Thanks & Regards,
    Rakesh

    Has anybody found a solution for this ubiquituous 022 umask error?
    Our DBA is going nuts thinking we have her oracle user environment hosed, but have ensured her 10 ways to Sunday that 'umask' returns 022.
    I thought maybe the OUI was expecting a literal 0022, so I have modified the umask command to actually run a script which calls the real umask binary and prefixes a '0' to the output if no args are passed.
    so ... umask would actually return "printf '0%s\n' umask.bin"
    Still getting the error:
    WARNING: Result values are not available for this verification task
    INFO: *********************************************
    INFO: User Mask: This is a prerequisite condition to make sure the user file creation mask (umask) is "0022".
    INFO: Severity:CRITICAL
    INFO: OverallStatus:OPERATION_FAILED
    INFO: -----------------------------------------------
    INFO: Verification Result for Node:blueora73
    INFO: Expected Value:0022
    INFO: Actual Value:022

  • Afaria Environment setup and technical pre-requisites

    Dear Gurus,
    Could anyone help in providing the environment setup/technical pre-requisites for setting up the Afaria and its components?
    We wanted to implement it in our production environment.  Went through the Sybase documentation and got some overview on it.  Would appreciate if some one share the documentation implemented in their environment.
    Regards,
    Raghu

    Hi Shival,
    I have a question about Afaria 7 parts.
    Is it possible to install API ve AdminUI in different server than Afaria 7 Server?
    I tried it but i get some error when try to open Afaria Admin Page. Such as:
    Error accessing Afaria Administrator
    Database service is not available.
    Click here to reload the home page.
    Show detail
    And here is the detail:
    Server Error in '/Afaria' Application.
    RoleMgr.Initialize, Database not available
    Description: An unhandled exception occurred during the execution of the current web request. Please review the stack trace for more information about the error and where it originated in the code.
    Exception Details: System.Exception: RoleMgr.Initialize, Database not available
    Source Error:
    An unhandled exception was generated during the execution of the current web request. Information regarding the origin and location of the exception can be identified using the exception stack trace below.
    Stack Trace:
    [Exception: RoleMgr.Initialize, Database not available]
       Afaria.Admin.Utilities.RoleMGR.Initialize(HttpSessionState session, String User) +794
       Afaria.Admin._Default.Page_Load(Object sender, EventArgs e) +449
       System.Web.Util.CalliHelper.EventArgFunctionCaller(IntPtr fp, Object o, Object t, EventArgs e) +25
       System.Web.UI.Control.LoadRecursive() +11424383
       System.Web.UI.Page.ProcessRequestMain(Boolean includeStagesBeforeAsyncPoint, Boolean includeStagesAfterAsyncPoint) +3064
    Have you any idea about how can troubleshoot and solve this?

  • TopLink 11g and coherence integration

    TopLink 11g comes up with seamless integration with coherence. Integration options are discussed at http://www.oracle.com/technology/products/ias/toplink/tl_grid.html
    Can someone provide working examples of each configuration options:
    1. Oracle TopLink Grid Coherence Read
    2. Oracle TopLink Grid: Coherence Read/Write Configuration
    3. Oracle TopLink Grid: Using Coherence as a Shared L2 Cache
    Thanks in Advance.

    On the above listed page each of the configuration option listed links to a how-to showing the configuration in use.
    Doug

  • All 11g pre-requisites check failed on solaris 10

    During 11g R2 (64 bit) installation on Solaris 10 64 bit, all pre-requisites checks were failed.
    Like the first one given below:
    =======================
    Physical Memory - This is a prerequisite condition to test whether the system has at least 1GB (1048576.0KB) of total physical memory.
    Expected Value : n/a
    Actual Value : n/a
     List of errors:  - 
    PRVF-7531 : Physical memory check cannot be performed on node "sol11oracle-vm"  -
    Cause:  Could not perform check of physical memory on the node indicated.  -
    Action:  Ensure ability to access the node specified and view memory information.
    =======================
    It seems that oracle installer not able to resolve the name "sol11oracle-vm".
    Please suggest.

    Hi, know that its an old thread but anyway.
    Check metalink for *11GR2 INSTALL ON SOLARIS FAILS MANY PREREQUISITE CHECKS [ID 989727.1]*.
    Oracle 11gR2 software is NOT certified for:
    a.) Solaris 10 “less than update 6” with the right patches.
    b.) Solaris 10 “less than update 6” with a Solaris patch bundle.
    c.) Solaris 10 “less than update 6” with a Solaris release update
    It is only certified for a base install image of Solaris 10 update 6 or greater.

  • Pre-requisites for installing OBIEE 11g

    Hi folks,
    Can anyone post me the pre-requisites for OBIEE 11g server installation.
    Regards,
    Arun

    Hi,
    Looback adoptor (Static Ip)
    JDK/jrockit 1.6.0_29 and above version bit
    RCU and OBIEE 11.1.1.6.0 software
    Disk Space: 20GB or more
    Available Memory: 20GB or more
    Temp Space: 2GB or more
    Swap Space: 3GB or more
    CPU: dual-core Pentium, 1.5GHz or greater
    For more Refer
    http://www.oracle.com/technetwork/middleware/bi-enterprise-edition/bi-11gr1certmatrix-166168.xls

  • Pre-requisites for running oracle forms 11G

    What are the pre-requisits for running Oracle forms 11G?

    Ok - where to begin?
    From the beginning....
    <blockquote>1. There are prerequisites for nearly every Oracle product. If you have not read the Installation Guide and Systems Requirements Guide you likely are missing something. Docs are [URL http://docs.oracle.com/cd/E24269_01/index.htm]here
    2. If you followed the installation guide and completed the installation without error, the basic product works out of the box without any configuration changes. Don't start tweaking unless you understand the change.
    3. In order to use an application server of any kind, you need to ensure it is running.
    4. If you have chosen the "Development" installation type (applies to 11.1.2 only) then you will not have an HTTP Server and it is not needed. Your listener will be the WLS managed server (usually port 9001).
    5. If you have chosed the "Deployment" installation type then you will have HTTP Server. You can access your Forms application via the HTTP Server Listen port (usually 8888) or the WLS_FORMS port.</blockquote>
    To the issue that started this post... "+*Page cannot be displayed*+"
    This error is either caused as a result of there being no listener running, specifically the HTTP Server or the wrong URL was entered in the browser, or the hostname used in the URL does not map to the correct machine where the listener is running. If you have installed and are testing on your local machine and that machine does not have a static IP address and/or a DNS registered name then fixing these issues would be a few of those "prerequisite" steps I mentioned. This is documented here:
    http://docs.oracle.com/html/E18558_01/fusion_requirements.htm#BABFHBID
    The above configuration needs to be completed before the installation is started.
    To the next issue or change in error message: "+*Failure of server APACHE bridge: No backend server available for connection...*+"
    This means that HTTP Server (specifically mod_wls) is unable to contact WLS_FORMS. This could be because WLS_FORMS is not running or because of those prereq steps noted above or a variety of other things related to not following the instructions. Refer to MyOracleSupport Note 1304095.1 for more details about this error.
    Finally, as for the need for a JRE, you can do this either before you attempt to run a form or allow the autoinstall feature of the browser perform the installation. However, as Craig mentioned, you would be better off installing the latest version which is 1.6.0_33. You can change your configuration to automatically do this, but if you are new to FusionMiddleware and/or Forms doing the JRE installation manually at this point is probably a good idea. I also recommend starting with Internet Explorer because likely some config changes will be necessary to get it working.
    As I mentioned, for the most part, the installation should work out of the box without changes. I would recommend getting the default form (test.fmx) running before attempting to make too many changes.
    (If you chose the Deployment install type) http://youMachine:8888/forms/frmservlet?form=test
    (If you chose the Development install type) http://youMachine:9001/forms/frmservlet?form=test
    .

  • Failing PATH pre-requisite check installing 11g client

    Greetings -
    I'm trying to install the 32bit oracle 11g database client on Win 7 Professional x64. I'm stuck with this error when the installer gets to the "Perform Prerequisite Checks" step:
    Environment variable: "PATH" - This test checks whether the length of the environment variable "PATH" does not exceed the recommended length.
    Details:
    -      PRVF-3919 : Failed to retrieve value of environment variable "PATH"
    - Cause: Environment variable value could not be determined.
    - Action: Check user equivalence and whether the user has administrative privileges on the node.
    Google tells me this might be related to an excessive PATH environment variable length, so I made multiple repetitions of "clean some crap out and try to install again" with no effect. Currently it is set to:
    C:\>path
    PATH=C:\Windows\system32;C:\Windows;
    And the installer still fails.
    I've tried explicitly running the installer via "Run as Administrator" and as a regular user (who is in the Administrators group). No change either way.
    Someone on my team suggested making sure the installation target path has no spaces in it. I'm keeping the default path suggested by the installer, which is
    D:\app\ladams\product\11.2.0\client_1
    where ladams is my Windows user name. I did some experimentation here, changing the install path to things like "D:\oracle" and that hasn't resolved the issue.
    Interestingly, if I open the installer log, I can find this line in it near the top:
    INFO: PATH has :==>C:\Users\ladams\AppData\Local\Temp\OraInstall2013-01-28_02-19-03PM\jdk\jre\bin;C:\Windows\system32;C:\Windows;C:\Windows\system32;C:\Windows;;;.
    So it can apparently read the path at some point before the pre-requisite check, although it seems to be doubling up the contents for some reason...
    Later on in the log file, I see this:
    INFO: -----------------------------------------------
    INFO: *********************************************
    INFO: Environment variable: "PATH": This test checks whether the length of the environment variable "PATH" does not exceed the recommended length.
    INFO: Severity:CRITICAL
    INFO: OverallStatus:OPERATION_FAILED
    INFO: -----------------------------------------------
    Is there some way to work around this issue, or just skip the prerequisites check entirely? I found something on a blog via google about being able to pass a "-ignoreSysPrereqs" switch to the installer to bypass the check. When I tried that, the installer still performed it's checks, and failed with the same error, so apparently that was bad info...
    Any help would be appreciated.

    Thanks for the reply.
    I did indeed take a look at the client installation instructions here: http://docs.oracle.com/cd/E11882_01/install.112/e24282/toc.htm#BABGCIFF
    However, it appears to be out of date, or at least not applicable to my problem. Step 10 refers to an Ignore All button:
    "Note: Oracle recommends that you use caution in checking the Ignore All option. If you check this option, then Oracle Universal Installer may not confirm that your system is able to install Oracle Database successfully."
    I don't have an ignore all button. At least if there is, it's cleverly disguised. The only option I have after the check fails is "Cancel."
    Is there another section of the fine manual I should take a look at?
    Edited by: 984635 on Jan 28, 2013 6:09 PM
    Edited by: 984635 on Jan 28, 2013 6:17 PM

  • Pre-requisites and steps for uploading chart of accounts in sap r/3

    Hi,
    I am a fresher in SAP FI. I have a completly new set of Chart of Accounts which i need to upload in the system. How do i do it and are there any pre-requisites for the same i.e variants to be defined and assigned completly before uploading the Chart of Accounts.
    I have heard of LSMW , but then how do i use it can anybody help me on the same.
    Thanks
    Poornima

    Hi,
    Yes, you need to define first the chart of account name and it should be assigned to the company code in OBY6.
    Please refer below thread:-
    [Upload Chart Of Accounts - Indian Localisation;
    Regards,
    Gaurav

  • Pre requisits for Internation HR and Payroll Setups

    Hi All,
    Can any one help me in Pre requisits for Internation HR and Payroll Setups.
    Thanks in advance.

    Here's some stuff to get you started:
    International HR and Payroll (Doc ID 261452.1)
    Running International HR and Payroll Setup (Doc ID 278006.1)
    HOW TO ENABLE ENHANCED RETROPAY FOR INTERNATIONAL HRMS PAYROLL SETUP (Doc ID 458535.1)
    If you have specific problems, please give full details of what they are and error messages (etc) and I'm sure someone can help further.

  • Pre requisites and steps for BI content installation.

    Hi ,
    We need to install Complete BI content in our production system , I am aware of the steps to be exeuted in SPRO but wanted to know the complete procedure step by step .
    1) what are the pre requisites and checks before and after doing activation in SPRO .
    2) If we already have some BI content installed and now we do complete reinstallation, will that create any issue .
    3)Can we do activation directly in Production ?
    Thanks,
    Neetika.

    Hello Neethika, for your second question
    2) If we already have some BI content installed and now we do complete reinstallation, will that create any issue
    If the object which you are going to install is already active and if it is customised, and if you go for reinstallation, new standard object will reinstall the already customised existing oblect. However, if you select the check box MATCH (X) or COPY and do the installation, object will be activated with retainging customisation. so there will be no need to customise it again.
    It is always recommended to go for manual collection of objects rather then automatic collection, because there might be wierd chances that all the objects might not get activated and this will cause a problem while you move the same from DEV to PRODUCTION.
    feel free write if any further clarication need
    Thanks

  • Pre-requisites for RFID and XI

    Hi
    Could any explain me what is XI, RFID and MDM and there relationship. Also what are the pre-requisites to learn XI and RFID?
    Regards
    Rak

    Hi,
    SAP XI (Exchange Infrastructure) - Process level integration for various components.
    RFID (Radio Frequency Identification) - A means of identifying a unique object or person using a Radio Frequency Transmission.
    MDM -SAP NetWeaver Master Data Management ensures cross-system data consistency through interactive distribution. It integrates business processes across the extended value chain, delivering features and functions.
    Thanking you
    Boopathi Thangavel

  • Pre-requisite checker script for EBS R12 and R12.1

    hi
    is it possible to make a pre-requisite checker script (in perl or shell) for EBS R12 and R12.1 in RHEL5 or sun OS??
    can anyone help / guide me to do so??
    rgrds

    I don't know about EBS R12, but apparently the Oracle Universal Installer can use options to just run the prerequisite checks without having to install the product.
    E.g. /runInstaller -prereqChecker or -executeSysPrereqs
    There is also a specific OTN forum available for installing E-Business suite:
    LCM: 11i Install/Upgrade

  • SYCLO INSTALLATION PRE-REQUISITES and Procedure

    Hello guys,
                    i am now starting a new mobility enhancement on SYCLO. Since i am new to SYCLO i googled some of its concepts and my primary concern is to configure Syclo in our Enterprise Landscape. so  i want to know about the pre-requisites like :
    1.what are the ADD-ONS need to be installed for  syclo.
    2-how Agentry mobile platform is integrated and built.
    3-how Syclo's Agentry Editor is worked nested with Eclipse Development platform and installation procedure.
    4- some more concepts on SMP 2.3.
                                       so guys help me regarding on this SYCLO work-shop.
    Thanks
    ashish satapathy
    Tags edited by: Michael Appleby

    I am also new to syclo and so far i have come across these add-ons to be installed at ERP system.
    SMFND 610_700
    SMERP 610_700
    Ref: Re: How to do app configuration in SAP ERP system for Agentry development
    Regards,
    Jitendra

  • Pre-requisites and steps to configure ChaRM and SDA

    HI ,
    We are implementing the Solman EHP1 with configuration of ChaRm and SDA , I need pre-requisite to configure ChaRm and SDA . Request your help on this .
    Thanks,
    Om

    hi,
    best way to start charm using this forum
    First steps to work with Change Request Management scenario in SAP Solution Manager 7.0
    and other related links for charm scenarios are here on this wiki
    http://wiki.sdn.sap.com/wiki/display/SM/WeblogsrelatedtoSolutionManager check out the below topics
    Change Request Management scenario: Usual questions
    Change Request Management scenario: Working examples
    Change Request Management scenario: Working examples "Development without Release" phase
    Change Request Management scenario: Working examples "Development with Release" phase
    Change Request Management scenario: Working examples "Test" phase
    Change Request Management scenario: Working examples "Emergency Correction" phase
    Change Request Management scenario: Working examples "Go-Live" phase
    Change Request Management scenario: Working examples "Being Completed" and "Completed" phase
    Change Request Management scenario: Working examples Final Points and Appendix
    Thanks
    Jansi

Maybe you are looking for

  • How to configure multiple clusters on the same machine.

    I am attempting to configure multiple clusters on the same set of machines. I have set the cluster name and multicase IP addresses to be different for each cluster. However I am still getting and error that states: "This indicates that there are mult

  • How do i get video out to connect to aprojector

    How do I get video out of my Ipod touch(4th gen) to connect to my projector. I have the correct cable and the projector work fine when connected to my laptop, mirrors the creen correctly But I cannot get an output from my Ipod.Cheers

  • JDBC sender Adapter consistency and Transaction level - URGENT

    Hi, We are using the JDBC adapter to read data from an Oracle view. The view joins two tables on their keys where flag = 0. The JDBC adapter carries out the select and then updates the selected rows with flag = 1. The transaction level used is the de

  • TS3989 Photo Stream won't upload to iOS devices

    My Photo Stream has 999 photo's currently showing in iPhoto, but my iOS devices stop uploading at 195 photos.  Is there a way to refresh the uploading process without having to turn off/on Photo Stream in the settings?

  • Update NW 7.0 J2EE engine to SP-14 but used NW7.0.1.SP9

    Hello I was asked to update NW 7.0 J2EE engine to SP-14 or higher. However we are using NW701. Eg under SystemInfo of the portal I can see: sap.com/SAP-JEECOR  7.01 SP9 (1000.7.01.9.0.20110512080600) . So do I have to update portal  and if so to whic