2 times goods issue

Hi
There is another system for order confirmation. When user confirms the order, auto goods issue, confirmation and auto GR , all happens in Sap through IDOC in the background.
Issue :- For one order and one material system has created only 1 line item in IDOC for GI with movement type 261. So no problem. But in the material document, system has generated one more line item for this particular material and has done the goods issue with a different qty. This has happened with this material 2 times wrt same order on 2 different days, same time and with different qty. So total GI qty is more than reqd. I just surprised to see this.
No1 has done manually, all are thru a scheduled background user. same day,same time.
Any1 has experienced such a strange issue?
Thanks

if so,
you would check out that particular material and order.
run MM04 and look at last changes first, then look at order and confirmation (focus on details, you may see the reason).
you would  also run COGI (just in case for that particular order) and ST22 (if you had any code termination for that time)
good luck!

Similar Messages

  • Planning Good Issue date and loading date

    Hi All,
    How I can get the planning Good issue date? I found that the loading date is the same as the planned Good issue date, what's the loading time?
    As what I understanding, loading date + loading time = Good issue date,  But I am not sure how to calculate the planned Good issue date.
    thanks,

    Hello Friend,
    It is determined in Shipping Point configuration.The path is as follows SPRO--> Enterprise Structure >Definition>Logistics Execution-->Define, copy, delete, check shipping point and go in detail the concerned shipping point.

  • How can partially goods issue in delivery document?

    hi,
    I created delivery document with 20 delivery quantity at first. after that I want to create partially goods issue. for example i want to have 10 quantity in pick quantity and at first 10 quantity goods issue and save and another time goods issue the remained quantity. but I can not configure the system to do this.
    thank you.

    Lida,
    As per standard SAP, you cant do partially picking. If you want to do partial elivery of item, change the quantity of the delivery item in the delivery and pick the full qty. for example :
    Sales Order 10 Qty,
    Delivery 5 qty
    Picking 5Qty
    This will be partial delivery,
    Thanks,
    Raja

  • Serial No at the time of Goods Issue

    Dear Experts,
    I have Auto serial no setting at the time of Goods Receipt.
    I want to de-activate the same & wants to allow serial no. generation at the time of Goods Issue.
    Is it spossible, how to do the same?
    Thanks in advance.

    Yes you can
    SPRO ..> Sales and Distribution ..> Basic Function ..> Serial Numbers ..> Determine serial Number profile
    Here you can define and assigne the serial no. profile to Material master .
    ANother thing
    Select the serial Profile go to seriallising procedure ....> Procedure ( MMSL) Maintain goods receipt and issue doc.
    Here you need to choose Serial Number Usage
    01     None
    02     Optional
    03     Obligatory
    04     Automatic
    Suppose you want some materials at GR time Serial no. to be optional choose 02 , and some material while doing GI requires Mandatory  then you choose 03.

  • Budget error is not coming  at the time of goods issue

    Dear all,
    I am using  warehouse funds center concept. While creating Purchase requisition and Purchase order i am getting budget exceeded error. but  while goods issue i am not getting any budget exceeded error even budget is not available for the respected fund center and commitment item.
    Please let me know how to get the budget exceeded error at the time of goods issue.
    Thanks in advance.
    ANJI REDDY

    It seems as per your business requirement the budgets are checked up to inventory level only.
    That is to elobarate,
    Suppose you have a fund center X for which the budget is let's say 100,000/- LC.
    The system is configured to check the procurements VIA PR>PO>MIGO-->MIRO only.
    As you have checked budgets at above stages it is not necessary to check at Goods issue to consumption as this will create unnecessary process spokes.
    check for the Inventory GL account and consumptions for any "Dummy" or "Not Budget related commitments are assigned" or in teh derivation strategies.
    If the business needs  you to check the budgets, you need to have the Fund centers for consumption of funds and as well as budget amounts for the same combinations.
    The cycle of Procure to Receive ends at MIGO and the Material what you got is against Inventory which is a balance sheet Items which usually not related to budgets.
    When you want to check budgets on consumption, as far as my opinion is concerned at the PO time it self use Account assignemnt "K". But I feel it is only suggested when you don't have a requirement of Inventory keeping.

  • Substitution of Profit center at the time of goods issue for consumption

    Dear All,
    We have a requirement of changing the profit center at goods issue level i.e. when goods is issued for consumption, it will pick the profit center maintained at Sales order level instead of picking Profit center maintained in Finished Goods.
    In our case, we have to maitain the profit center in the finished goods but the problem arises when we put the different profit center in sales order in place of FG Material master PC, then at the time of PGI & billing, system picks the PC maintained at sales order but the problem starts when we issue the goods for consumption i.e. it picks the FG material master PC.
    Can we go for substitution for it? but for substitution, i dont have any idea how it works & how to create it?
    Kindly do the needful asap.
    Regards
    Anuj

    ok

  • Issue with Std price & Overheads at the time of goods issue

    Hi Experts,
    Please help me on below concern.
    system is taking the std price at the time of goods issue as we marked price control "S" for all materials to track the PPV seperately. So once we run the std costing system is calculating the std cost= direct material+overheads and updating the same in std price in accounting 1 tab.
       But as per our requirement at the time of goods issue system has to take only direct material not overheads,  also one more problem is at the time of actual overheads calculation in the period end , system is calculating overheads on total of direct material+overheads instead of direct material only.
      So please suggest how to config the system to meet my client's requirement.
    Thanks&Regards,
    Spandana.

    Hi Ajay,
      Thanks for your inputs.  In the std costing run system is showing components as below.
    Material cost       110$
    Material overheads  10$
    Labor cost  20$
    Labor Overheads 10$
    In this Material cost 110$ , materials overheads also included(100$+10$). Why system is calculating Material overheads twice please suggest what mistake i did.
      The material overhead percentage rate is 10%.
    As per my client requirement system should calculate components as shown below
    Material cost 100$
    Material overheads 10$
    Labor cost  20$
    Labor overheads 10$
    Please advise its very urgent, your inputs will be rewarded with points.
    Thanks&Regards,
    Spandana.

  • Error during the time of Goods Issue

    Dear,
    I facing a problem during the time of MIGO i.e. Goods Issue.
    Error Is :- Please enter relevant Profit center for Business area.
    Kindly help
    Thanks & regards
    Varun Bisaria

    Hi,
    Please check assignment of Business are and porfit center against cost element in OKB9,maintain the same and try.
    Hope this will resolve your issue.
    Regards,
    Sandesh Sawant

  • Serialization at time of goods issue

    Good Day Guru's:
    I have a client that wants to be able to assign their serial numbers at the time of goods issue of Sub contract PO.  The requirement in this is within their own process for traceability purposes.  I can not go into details on this as I am working on classified information.
    An example of this would be:
    Material used needs to be sent to vendor to go in as assembly, however the client tells the vendor what serial number to mark on the material.  The material comes back and is placed into a workorder with that serial number.  We will also be using a batch number, but not in the sense of shelf life material, there are other reasons to use this.
    The goal is to be able to use one batch number (batch characteristics) with multiple serial numbers.
    Where may I find the configuration to perform this, is there customization needed, if so, any help would be greatly appreciated.  Points will be awarded...thanks in advance

    Thanks for replying....and what you said I already know...what I am asking is....(sorry if I was not Clear)
    The client wants to assign the serial numbers up front, the parts are not physically serialized until they issue parts to vendor....the serial numbers are not in the system at this point and will not show in the system until they are issued to vendor in order to tell Vendor what to serialize them as.....basically the part is like a dash 01-  they want it to come back as a -02 with the serial numbers that they told the vendor to serial them as.  They want to be able to see these serial numbers in the system so they do duplicate those serial numbers on another PO. So the system needs to say basically these serial numbers are already being used.  Then when the PO comes back, it tells the receiver that these are the serial numbers he should have.

  • Post Goods Issue (VL06O) - taking more time approximate 30 to 45 minutes

    Dear Sir,
    While doing post goods issue against delivery document system is taking lots of time, this issue is very very urgent can any one resolved or provide suitable solution for solving this issue.
    We creates every day approximate 160 sales order / delivery and goods issue against the same by using transaction code VL06O system is taking more time for PGI.
    Kindly provide suitable solution for the same.
    Regards,
    Vijay Sanguri

    Hi
    See Note 113048 - Collective note on delivery monitor and search notes related with performance.
    Do a trace with tcode ST05 (look for help from a basis consultant) and search the bottleneck. Search possible sources of performance problems in userexits, enhancements and so on.
    I hope this helps you
    Regards
    Eduardo

  • Master data: maintain "Goods Issue Processing Time" in R3 and CIF it ?

    Hello,
    we want to use the so called GIPRT (Goods Issue Processing Time) in the APO material master (Tab: GR/GI) to schedule SNP PREQs. I can maintain the field in APO but finally I'm looking for maintaining it in the conencted R3 material master (MM02). I see a field in R3 called MARC-GI_PR_TIME but after scanning the material master customizing I think you can't add that to any dynpro in MM01/02/03.
    I wonder if this field (MARC-GI_PR_TIME) in R3 is truly meant for maintaining the Goods Issue Processing Time in R3 and transfering it to SCM via the CIF or whether its there but has no function or is maintained somewhere else in R3. Any idea ?
    Workaround obviously would be to maintain the field in APO directly - but that's what I want to avoid since 99% of master data are coming from R3.
    Regards
    Thomas

    Hi Thomas,
    You can implement user exit EXIT_SAPLCMAT_001 and can write code based on your requirement ( May be you want to transfer this GR time for some of the products only). You can push the values by this user exit for any field in APO.
    Thanks,
    Abhilasha

  • Budget check at the time of goods issue

    Friendds,
    can we do budget check ( with Funds Mgt ), at the time of goods issue ( mb21), if yes, pl share withme.
    regards

    Hi,
    MB21 is MM reservation. This kind of transaction has no impact on FM tables, but you can achieve this by activating a business function (see note 1321375).
    Regards,
    Eli

  • Goods Issue Posting Time

    hi all
    how to get the Goods Issue Posting Time for the purchase order.
    thanks
    bala

    Hi
    If i understood correctly, you are looking to track the issues pertaining to PO.
    There is no relevancy of issues of PO, if the material procured is stock material. This means, your procurement is intended for stock only. Issues will be made to the departments who approachs with necessary requirement.
    If your procurement is for consumption (account assigned PO), your GR document is nothing but the consumption doc. You can find the goods consumption time from the GR document.
    warm regards
    sairam akundi

  • Profit Centre Document issue at the time of Post Goods Issue on SD.

    Dear Experts,
    While SD person is posting Post Goods Issue, System is generating Profit Centre Document along with other documents. We are facing an issue with Profit Centre document here and the issue is:
    Some Profit Centre Documents are populating Delivery Order Number on respective field while some are not. Ideally all profit centre line items should show Delivery Order Numbers.
    Please guide any solution to resolve this issue, its urgent.
    Thanks in Advance.
    Regards,
    Zain Bashir

    Hi Zain
    This is a tricky issue
    Are you saying that the PCA document has the Delivery Number (VL01N) updated in some cases and not updated in some cases?
    The Delivery Number is updated in PCA document when you create Delivery from VL01N and do PGI from VL02N
    But, if you do PGI from VL01N itself, then the delivery number is not updated in the PCA document
    SAP recommends to post PGI from VL02N
    Br. Ajay M

  • Movement Type 161error in STO return (Plant to Plant) at the time of goods issue .

    Hi all...
    Am getting the following error while posting goods issue through VL02N
    Update control of movement type is incorrect (entry 161 X X _ L)
    Message no. M7226
    Diagnosis
    The system could not find entry 161 X X _ L in any of the movement type control tables.
    Process : STO Return Plant to Plant.
    Purchase Order ( STO) done.
    Goods issue done.
    Goods receipt at the receiving plant.
    Amended Purchase order, added one more line item and ticked return.
    Inbound delivery done.
    VL02n Goods issue am getting the error.
    Pls help.
    Suhas
    MM consultant

    Update control of movement type is incorrect (entry 161 X X _ L)
    Have a look into your OMJJ customizing for 161 movement type:
    It probably looks like mine:
    the error message has the info in exact the same sequence
    161 X X _ L
    this is 161, checkmark checkmark blank L  in the table above.
    L would mean reference to a delivery.
    But as you can see here, there is no L, everything is B which means reference to purchase order.
    It is not allowed to add items in a delivery without purchase order reference, it is technically possible, but it finally ends in the error you have.
    The process has to start from the purchase order.

Maybe you are looking for

  • VNICs (both uplinks and VM's vNIC) are blocked on N5K DVS after upgrading to ESXi 5.1

    Hello Gents, I cought into weird situation after upgrade VMware ESXi 5.0 to 5.1 on UCS C200M2. Before upgrade I have had server with configured static adapter-fex VNICS and floating/dynamic vm-fex interfaces working perfectly in DirectPathIO mode for

  • How do i remove java from registry

    i tried to install j2se and it went wrong... now i can't re install or uninstall, because the installshield says that i need to remove previous program' but doesn't removes it. i tried anything ti remove the program and couldn't , i know that some ho

  • Incompetent and Liars thinking of switching providers

    I have been a Verizon Wireless customer for almost 20 years.  I have had as many as five lines that I have paid for over the years.   At the current time I am paying for 3 lines.  For those 20 years I have had insurance on my lines the whole time.  M

  • How do I fix Adobe Illustrator PARM error?

    We are on Yosemite OS 10.10.2, running CS6. When opening files in Illustrator we keep getting a PARM error. We have been unable to find a fix for this online. We have 3 production Macs involved in a very busy agency, so this is critical.

  • Tabular forms question

    This should be a simple one. I have a tabular form right now but I have a field in that form I want read only when another field in the record is not null (ie. you are not adding a new record). Any ideas here? For the record were running APEX 3.1.2.