A/P Credit memo after GRIN Quality Inspection

Hi all,
We have to implement GRIN Quality Check module for one implementation. What we have done in the add on that for one GRIN, we go to Quality Check Program where item wise we enter the Accepted Quantity and Rejected Quantity . Then for all the Rejected Quantity we move the items from Raw Material W/Hs (GRIN W/Hs) to Rejection W/Hs and then create the invoice for complete GRIN Quantity for all the items . We have thought  to return back the rejected items using A/P Credit memo which will both nullify the Invoice affect as well as Stock Affect . But there is a problem that we are encountering during A/P Credit memo :
When we perform Copy From from A/P Invoice to A/P Credit Memo , all the details form A/P Invoice are copied don to A/P Credit memo , but we want to return the goods not from RM WHs but from the Rejection WHs as we had already moved the Rejected Items stock to Rejection WHs ,when we change the code of Warehouse from RM WHs to Rejection WHs , it removed the tax code from Tax Code columns for that row and later does not even allow to edit the Tax Code for that row without which we are not able to save the A/P Credit memo.
please suggest the best way of implementing the complete scenario so that we could both be able to maintaining the separate stock of Rejected Items, Return it back after creating the complete Invoice . We also wanted to create the complete invoice after GRIN irrespective of the no. of items rejected.
Thanks and Regards,
Pooja Singh.

Hi,
Might be I have elaborated too much thats why I have not received any solution so far.
Actually I just want to confirm one thing first, that we are working for GRIN Inspection as follows :
1. GRIN
2. Inspection of all the items in a particular GRIN
3.Stock Transfer of Rejected Items to Rejection Locations
4.Now we want to create Complete Invoice that is invoice for Complete Quantity irrespective of Rejected Qty.
5.Now Returning back the Rejected Qty of items from Rejection Whs and Credit note for Vendor to reduce the due balance.
But when I try to create A/P Credit memo from AP invoice I want to change the WhsCode from RM Whs to Rehection Whs which if done , Tax code disaapears and disables.
What should be done.
Thanks and Regards,
Pooja Singh.

Similar Messages

  • Open status of Credit Memo after rejecting all line items

    Dear Gurus
    I am facing a problem. In my company we are using 2 credit memo types. One is CR and other ZCR (Copy of CR). I have tried both but both have same problem. I have also tried creating credit memos with reference to billing document, sales document and without reference also but the issue is same.
    Problem is this we create credit memo with VA01 and post it with VF01. After posting if we cancel its posting with VF11 and reject the line items in VA02 the status of credit memo remain open. Cancellation documents are ok and completed but only credit memo in VA02 remain open even after rejecting all line items.
    I have checked incomplete log of sales document type (CR and ZCR) in VOV8 and item types (G2N) in VOV7. All fields which are defined in incompletion log are there in document header and item.
    Following is the copy paste data of Header Status tab
    Overall status       Open
    Rejection status     Everything rejected
    Credit status        Not performed
    Bill.stat.order-rel. Not invoiced
    Overall blkd status  Not blocked
    Header data     Complete                   Item data       All items complete
    Header dlv.data Complete                 Item deliv.data All items complete
    Header bill.dat Complete                   Item bill.data  All items complete
    please help.

    dear sir
    if you mean to say to check Reason for rejection's settings in OVAG i have checked it and all rejection reasons are being in use in all other sales documents too. They are working fine in all other sales document. Issue is only in these two credit memos types.
    Assigned by the System (Internal)
    Delivery date too late
    Poor quality
    Too expensive
    Competitor better
    Guarantee
    Unreasonable request
    Cust.to receive replacement
    Transaction is being checked
    These are reasons and Stat column is empty for all. Other 3 columns have no tick in any reason.

  • How to post parked vendor credit memo after clearing that invoice

    Hai
    I had an issue where the user is trying to post the parked credit memo and he is getting the error. I had investigated that and found there for that vendor already Invoice amount already paid. After making the payment to vendor with respect to Invoice is it possible to post the parked credit memo for that vendor.In this case the vendor acount balance is zero. Kindly let me know how to post that parked credit memo to that vendor. Is it possible or not if its so how?
    I appreciate the early response.
    Akash Narayana

    Hai Ashok
    The vendor  parked credit memo has posted with referece to PO. And that invoice has been cleared. Currently the Vendor is sitting with the zero balance. Now when the user want to post the parked vedor credit memo it is not allowing.
    Kindly anyone can help. Its Urgent.
    Regards,
    Akash Narayana

  • Reverse Goods receipt after Quality Inspection...

    Hi Expets,
    I'm able to do the GR reverse  after the Quality inspection Lot also using mb01 and mov type 102.The stcok is also updating as soon as i do the reverse. Here my questions are.......
    1)Why  I need to do the cancel of Inspection Lot since there is no effect on stock postings by cancellation and stock postings are effected by GR only.
    2) GR = 10 qty
        Inspection  Lot  = 5 Unrestricted, and for remaining UD for 5 has not been made.
    here I'm able to do the reversal of GR  for 10 Qty and I did also. and same time I,M  not able to do the cancellation of Lot because the qty 5 is still pending, for this If i post the qty 5 to un restricted in the Lot  and do the cancellation  lot , the stock will be duplicated in mmbe. kindly guide me how to handle this type of issue....
    where reversal of GR for full qty before partial Inspection qty for the lot and completing the inspection lot after GR reversal and cancellation of full Lot
    Regards,
    Sri.........

    Hi Manu,
    For wht Z-Tcode and programme has to be developed ?
    Regards,
    Sri......

  • Credir Memo Scenario

    Hi expert
    i need to give a vendor credit memo after i send the material for scrap
    scenario :
    i procure a Packaging role i dont find any quality rejection when its check at quality dept, because we come know the material at the time of opening of packaging role at the time of production.
    then we send the particular quantity for scrap, now in this case i dont do vendor return, because i have internal agreement with the vendor for the same.
    For the same i would like to for credit memo for the vendor, because at the time of audit, it will show a liabilities.for FI dept
    Regard
    Nabil

    If you invoiced already,then do credit memo for scrapped qty & value.
    Edited by: Jeyakanthan A on May 11, 2011 2:17 PM

  • Excisable Material - Credit Memo

    Dear All,
            When i am posting the Document of A/P and A/R Credit Memo those are Excisable Materials, i am trying to post the Credit memo after the creation Invoices i am getting error like
           No matching Record found G/L. Accounts.
    But when i am posting Credit memo for Non - Excisable Material System is allowing to post the particullar transcations.
    The Excisable Materials comes under Chapter ID. RG 23 D (Finished Goods) so 100% Cenvat credit.
        How to solve this quarry.
    Please guide to me.

    hello again.
    for freight and insurance, your approach will depend on how these are treated.  if freight and insurance are represented by material numbers, then these are entered in the credit and/or debit memo requests (also in sales orders).  this will then be a straight-forward process.  these items can have a set price, or the value can be manually entered.
    however, freight and insurance are sometimes represented as condition types,  these can then be entered manually in the order at header and/or item level again depending on your approach.
    regards.

  • Problem in Sales Order Credit Memo

    Hello All,
    The problem is related to item category ZTAN where we have changed the Completion Rule to B and in VTAF ( Bill to Order Copy Control) under Item details for Credit Memo Request for example from Domestic Invoice to Credit Memo we changed the positive/negative quantity updation to positive. Now after changing the completion rule we were facing a problem where after completion of Sales Process till generation of Invoice the document flow was showing the status as :Being Processed". Then after changing the Completion Rule again to 'blank' the problem of document flow status was solved as it showed the status as "Completed".
    Now after doing this change in Item Category for normal sales order we are facing a problem in Credit Memo where again after completion of Credit Memo the document flow status here is showing as 'Being Processed' instead of 'Completed'. Please suggest what configurations need to be done to get the desired result which is in Credit Memo after completion the status will show as "Completed".
    Thanks & Regards
    Priyanka Mitra

    Hello Mr. Shiva Ram,
    First of all thanks a lot for your help.The problem of credit memo is now solved but to resolve the status of the existing sales order documents as per your suggestion we have run the  program SDVBUK00 in SA38.Still we didn't get the desired result as the status of the completed normal sales orders are still showing "Being Processed" even after running the program.
    Please suggest what else need to be done to change the status of the completed sales documents till invoice.
    Regards
    Priyanka Mitra

  • How to update the status of Credit memo request as "Close" by putting reason of rejection

    Dear All,
    Our requirement is to close credit memo request, We already cancelled the subsequent document i.e. billing. In credit memo request we are trying to close it by putting "Reason of Rejection", but instead of closed is coming as " Being Process". I already did the required configuration at Item Level for G2N in VOV7, but still the status is "Being Process".
    Please let me know if I m missing config.
    Thanks,
    Sumeet Sah

    Hi
    Check this below link. I had faced this issue years ago and got a strange solution which is still applicable.
    Open status of Credit Memo after rejecting all line items
    Thank$

  • About credit memo

    sir
    when i am creating credit memo after Releasing Credit Memo to Billing the amount  the accounting  is not created how to slove this error
    regrads
    senthilkumar

    Hi senthil,
    -->Please check the Revenue account determination settings in VKOA transaction.
    -->Check the pricing procedure also have maintaining the account keys properly for the condition types or not.
    -->Go to VOFA transaction select your creditmemo document type then go in to detail here you check whether you have assigned your revenue account determination procedure in the account assignment/pricing tab to your document type or not.
    And also check posting block should not be check
    All settings are correct then you go to VF02 enter your billing document then go in to that then go to menu >Environment>Acct.determ.analysis-->Click on Reneue accounts now system will take you to the acct determination analysis screen here you can find what is cause.
    I hope it will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on May 29, 2008 11:37 AM

  • Update Profit centre for Credit Memo request whose Billing is compeleted

    Dear All,
    I have an issue for a creditmemo request whose billing is already been completed and consequently the invoice has been cancelled but unfortunately the Credit memo request (CMR) is pending in the incompleteion log for the profit center which need to be entered. The document flow shows blank in the status field for the CMR.
    Need your advice how we can update in the sales order (CMR) thou the field is greyed out and not able to change the profit Center field in the change mode by changing any other fields as well.
    Is there any transaction where in can we change the field values directly related to Profit Centre (In account assignement tab at Item level of the sales order)
    Appreciate your quick reply on this
    Regards
    Mahesh

    Hi
    Check this below link. I had faced this issue years ago and got a strange solution which is still applicable.
    Open status of Credit Memo after rejecting all line items
    Thank$

  • Two times quality inspection

    In our business, there is requirement of two times of quality inspection. For some parts, the testing is done when they are received which is as good as inspection and after testing quality inspection is done.
    Can I map this in SAP ? how ?

    Hi,
    You can do following -
    1) In material master assign the relevant inspection type (Quality Managamant view) & in the inspection details, maintain tick at 'Inspection with task list'.
    2) Prepare Sampling Procedure with Sampling Scheme & assign the type 'Independent Sampling' in Sampling Procedure. Enter the number of times you want to carry out the inspection.
    3) Prepare the Quality Inspection Plan for the component. In the Inspection Plan, select control indicator 'Sampling Procedure Required'. Enter the sampling procedure number in the inspection plan. 
    4) After you complete the above master data & post GRN, system will create the Inspection lot & will create multiple samples (equal to number you have selected) for the lot. Then you can carry out the inspection for first lot & then quality inspection for second lot & post the results for both lots & take usage decision for the lot.
    Hope this helps.
    Regards,
    Prashant
    - Pl. award points if the answer is helpful to you

  • Block Customer Credit Memo via Quality Management

    Hi
    We are using QM in sale for customer return SO. We activated inspection type 9902 customer return with Movement type 655.
    We create return sale order and against return SO does the GRN at that time  inspection lot generates for Inspection type 9902.material goes to quality stock.
    After this quality department check whether this material is accepted or Rejected and provide usage decision.In case of rejected we provide Credit Invoice to customer against Return SO.
    Now we want validate or control on Credit Invoice will be issue only In case of Usage decision is rejected (Material is block).
    Similarly we use Invoice block functionality for Vendor through control key.
    Regards
    Sandeep

    Hi Sandeep,
    I think you can try Follow-up action linked to UD = "R" in QS51, where you can assign a FM/BAPI to create Credit Invoice. You can use the appropriate FM form the below list -
    BAPI_BILLINGDOC_CREATE
    BAPI_ACC_DOCUMENT_POST
    SD_SALESDOCUMENT_CREATE
    BAPI_SALESDOCU_CREATEFROMDATA
    You may need to work with FI team to test the Follow-up action in Sandbox/Dev system, once you implement it.
    Thanks,
    Arijit

  • Create 2nd AR Invoice base on Delivery after create a partial Credit Memo

    Hi,
    Here is the scenario:
    1) User create an AR Credit Memo (base on AR Invoice) partially for wrongly entered the unit price on 1 of the item out of 5 items in the AR Invoice.
    2) User need to create a new AR Invoice with the corrected pricing, the newly created AR Invoice must not lost the linking between the base document. Meaning, we need to copy the new AR invoice from Delivery or Sales Order to maintain the base document tracking.
    Is there anyway to accomplish this? Because the system will not re-open the Delivery or Sales Order after the AR Invoice copied to AR Credit Memo.
    Thanks.
    Regards,
    Kong Chee Ann

    Hello
    We are investigating the same issue because we have the exact same problem. Same issues on the Purchase side.
    We are looking into two paths:
    1) either cancel invoice and recreate it. I doubt this path as efficient / possible in the system
    2) or generate a second group of document with a UDF to keep the link to the original documents
    Either way, this looks very manual and potentially dangerous in terms of authority.
    If you have other ideas, I would be happy to work with you on that topic.
    Regards
    Fabrice

  • Document still appears on Billing Due List after creation of Credit Memo

    Hello everyone!
    I would like to seek your help in knowing the reason why documents in the Billing Due List dated on or before June 30, 2008 with billing type ZRJF would require three creations of Credit Memo before the delivery returns status will change from "being processed" to "completed." Please note that there was a configuration made on June 31, 2008 in the copy control of ZREF to ZRBO wherein the pos./neg. quantity of item cat ZRBO was changed from to (+).
    Moreover, what should I do with the documents in VF04 dated on or before June 30, 2008 that still appears after one creation of credit memo?
    Thanks in advance. Have a great day to all!

    Hi Ravi,
    Thanks for your prompt response. I checked the delivery return status and it is still "being processed" eventhough I have already created a credit memo for all the returned goods.
    I actually observe this in my documents dated on or before June 31, 2008. At that time, the copy control pos./neg. quantity was set to negative (-). Is this the reason why documents still appear in the billing due list? If so, what should I with these documents so it will no longer appear in the Billing Due List?
    Thank you very much!

  • Invoice Tax left after create credit memo (Receivable)

    Hi All,
    I have problem after creating Credit Memo(CM) in Receivable. The invoice line become 0 but invoice tax still appear.
    It's caused the tax in CM is 0, even the line value have match value.
    Can anyone help me?
    Best regards,
    Erie

    Anyone help?

Maybe you are looking for

  • How can I transfer music from my old iPad to my new MacBook ?

    How can I transfer music from my old iPad to my new MacBook ? My old MacBook was stolen and now I have all my music still on my IPad but like to get it back in my ITunes as well, is this possible ?

  • Duplicate invoice check in FV60/65

    Hi I am trying to set up a custom error message for duplicate invoice based on Vendor number (LIFNR) and Reference number (XBLNR) alone. The system presently considers a bigger set of fields to check for duplicate invoices which are Company code Vend

  • Socket Read Timeout error in weblogic logs happening every 30 min

    One of my customer is getting Socket Read Time out error, when creating connection pool. java.sql.SQLException: Socket read timed out      at oracle.jdbc.driver.SQLStateMapping.newSQLException(SQLStateMapping.java:74)      at oracle.jdbc.driver.Datab

  • Please help with importing packages

    I am trying to learn the Java Advanced Imaging (JAI) API. I have successfully installed java2SDK. I downloaded the JAI library (jai-1_1_2-rc-lib-windows-i586.exe) and have installed it. After installation, I added the JAI lib to the CLASSPATH. CLASSP

  • I want to add just Premiere Pro to my acct, is this possible?

    I want to add just Premiere Pro to my acct, is this possible?