ABAP Add-on certification on sub-contractor system

Hi all,
My company has some ABAP Add-on, which was developed for us by an outsourcing contractor on his system based on our design and instructions.
This Add-on and all code sources are our property of course.
Now we wish to certify this ABAP Add-on on our contractor system but the certification needs to be on our company name of course since this is our property.
How can perform such a process?
Thanks for the help,
Roy

Hi Anand,
Has this question ever been answered?
Is it possible to package BC-sets in a PAT file?
if not, how do you package BC-sets for certification?
If yes, how did you manage to do this?
Thanks
Stephan

Similar Messages

  • Creating add-on deployable package using AAK for ABAP add-on certification

    Hi all,
    We are planning for ABAP certification next month.
    I have some doubts if you can clarify please.
    We have our name space registered and AAK is also installed on system.
    Now with ABAP custom development we are planning to create Add-on CD using AAK.
    For custom development I can use AAK (SSDC & SSDA) to create .PAT installable files.
    How to create installable files for customizing i.e. configuration changes ?
    We have to create BC-Set using IMG activity and follow upload - download process or any other process to be followed to install configuration changes.
    Please provide some documentation for creating installabe files using AAK and BC-Set if available.
    Thanks in advance,
    Anand

    Hi Anand,
    Has this question ever been answered?
    Is it possible to package BC-sets in a PAT file?
    if not, how do you package BC-sets for certification?
    If yes, how did you manage to do this?
    Thanks
    Stephan

  • ABAP development for certification

    Hi all,
    When doing ABAP development in SAP certification which is coming under the Third Party Application Development, there it is given  like the development should be done by means of SAP ABAP Add-on development kit under a special ABAP Workbench Development license.Can anybody help me with it.Where to get the licence? how to apply it and the norms followed in custom development of rfcs.
    Regards
    Rohit

    Hi Rohit,
    You need to have an ABAP workbench development license to develop your custom BAPIs/RCFCs in your own namespace and ABAP Add-On Assembly Kit (AAK) to package and deliver your add-on component.
    To get the above license and sign up for an ABAP Add-on certification, please contact your regional Integration & Certification Center (ICC):
    - Europe, Middle-East, Africa: [email protected]
    - Americas: [email protected]
    - Asia-Pacific: [email protected]
    Best regards,
    MaiAnh Chu-Nguyen

  • Reg.how to config sub contract systems

    Hi,
    The sap B1 how to create and config the sub contractor system(Top to end)
    1.Dc prepare
    2.Retun receipt
    3.Billing passing
    4.Another TDS system
    regards
    Prakash

    hi,
    The sap B1 how to create and config the sub contractor system(Top to end)
    1.Dc prepare
    Create subcontractor warehouses.
    Create finished product warehouses.
    Create production order for finished product,Child item defaulted to subcon warehouse,incluse
    conversion charges as child item apply base qty for it.
    Do stock transfer to subcontractor.
    2.Retun receipt
    In case you want to book conversion charge,create conversion charges item as inventory item,
    Do GRPO for total conversion charges as quantity and price as 1.
    Do receipt from production after receipt from subcon.
    3.Billing passing
    Create AP invoice for subcon. from GRPO
    4.Another TDS system
    Apply TDS applicable in AP invoice.
    Hope it will be helpful.
    regards
    Jeyakanthan

  • ABAP ECC6.0 Certification Exam Syallabus and which PDF files

    Hi
    Im Planning to write the ABAP-ECC6.0 certification exam . Can anyone tell which tabs i should read and what is the syallabus for this one
    kumar

    Hi
    certification ..
    /message/213564#213564 [original link is broken]
    /message/514469#514469 [original link is broken]
    /message/1315746#1315746 [original link is broken]
    /message/1736299#1736299 [original link is broken]
    /message/1736299#1736299 [original link is broken]
    /message/257122#257122 [original link is broken]
    /message/130164#130164 [original link is broken]
    This is link from SAP about ABAP certification
    http://www50.sap.com/useducation/certification/curriculum.asp?rid=351
    http://www.sapteched.com/india/confactivities/certexam.htm
    http://www50.sap.com/useducation/certification/curriculum.asp?rid=351
    There is a pdf called ABAP certification.
    http://www.esnips.com/web/SAP-ABAP?
    You can try www.sapdoamin.com
    They provide Certification simulation questions which are very useful and a must try site.
    Have a look at below link for mySAP Technology - ABAP Workbench
    https://websmp206.sap-ag.de/~sapidp/011000358700000746472003E
    Have a look at below link for SAP NetWeaver - ABAP Workbench
    http://www30.sap.com/hk/services/education/pdf/cert/ABAPWB.pdf
    The certification test consists of questions from the areas specified below:
    Topic Areas
    1. mySAP.com Technologies
    - mySAP.com
    - Navigation (system handling)
    - Technical setup of an SAP system
    - System-wide concepts
    2. ABAP Workbench Basics (++)
    - Data types and data objects
    - Internal tables
    - Data retrieval (authorization check)
    - Subroutines
    - The ABAP Runtime System
    - Function groups and function modules
    - Program calls and data transfer
    3. ABAP Objects (++)
    - Classes and objects
    - Inheritance
    - Casting
    - Interfaces
    - Events
    - Global classes and interfaces
    - Exception handling
    - Dynamic programming
    4. ABAP Dictionary (++)
    - Database tables
    - Performance for table access
    - Consistency through input check (foreigh key dependency)
    - Dependency of ABAP Dictionary objects
    - Views
    - Search help
    5. Techniqes for List Generation (++)
    - Data output to lists
    - Selection screen
    - Logical database
    - Program-specific data retrieval
    - Data formatting and control level processing
    - Storage of lists and background processing
    - Interactive lists
    6. Dialog Programming (++)
    - Screen (basics)
    - User interface (GUI title, GUI status)
    - Screen elements for output (text fields, status icons, and group boxes)
    - Screen elements for input/output
    - Subscreen and tabstrip control
    - Table control
    - Context menu
    - Dialog programming lists
    7. Database Changes
    - Database updates with Open SQL
    - LUWs and Client/Server Architecture
    - SAP locking concept
    - Organizing database changes
    - Complex LUW processing
    - Number assignment
    - Change-document creation
    8. Enhancements and Modifications
    - Changes in SAP Standards
    - Personalization
    - Enhancements to Dictionary elements
    - Enhancements using customer exits
    - Business Transaction Events
    - Business Add-Ins
    - Modifications
    Weighting Key in the Test:
    + = 1 - 10%
    ++ = 11 - 20%
    +++ = over 20%
    Reward points for useful Answers
    Regards
    Anji

  • ABAP courses and certifications

    I have more than 5 years of exp. in ABAP and no certifications as yet. Currently the following three are provided by SAP Education.
    SAP Certified Development Associate - ABAP with SAP NetWeaver 7.0
    SAP Certified Development Professional - ABAP User Interfaces with SAP NetWeaver 7.0
    SAP Certified Development Professional - ABAP System Interfaces with SAP NetWeaver 7.0
    What should the best course of action be for me. Do all 3? Just the professional ones? Any input is greatly appreciated.

    Hi this is not the appropriate forum to discuss this.
    post ur question in here:
    SAP Certification
    кu03B1ятu03B9к

  • ABAP Add-On Assembly Kit

    Hi all,
    How to use ABAP Add-on Assembly Kit in SAP R3 (or MiniSAP). I want package code in ABAP and then install for other system.
    Pls help me.
    Thanks so much.

    Did you saw this [small|https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/fbcef0fb-0801-0010-9b82-ad3c4104d458] document?

  • Register ABAP Add-On in SLD

    We have developed an ABAP add-on (AAK/Saint).
    Our add-on is supposed to register itself in the SLD, but we do not know what this means. Is there some metainformation we need to provide along with the add-on, or even some interface we need to implement to provide this information.
    Our systems are coupled with the SLD but we do not find our add-on when we install our product.
    Any idea?
    Edited by: Frank Torst on Jan 8, 2008 6:11 PM

    We have used another library for delpoying it, with this it is working.

  • Sub Contractor challan Reconcillation after subsequent adjustment

    Dear Friends,
    I am sending 1 kg of material to receive back 1kg of material the sub contractor uses .90 kg to make 1 kg of the reqd material. So I do subsequent adjustment after MIGO for under consumption of  0.10kg
    Now after doing subsequent adjustment, while  doing  reconciliation in J1ifq should  I change the assigned qty to 0.90 kg ( as there was under consumption of 0.1kg ), I tried changing the assigned qty to 0.900  but its showing me the message u201Cmaterial xxx is not fully assigned, short by 0.10 kg& itu2019s not letting me reconcile.
    Kindly suggest the correct procedure for reconcillation & sub con challan completion after subsequent adjustment.
    Thanks

    Hello,
    Please check the process supported by SAP for                   
    subcontracting with and without duty payment in the following link:                                                                               
    http://help.sap.com/saphelp_erp60/helpdata/en/09/ebf138cdd78a4be10000000     
    a114084/frameset.htm                                                                               
    It is quite helpful for challan reconciliation issues.                                                                               
    Keep in mid that for challan subcontrating you should perform the            
    following steps:                                                                               
    1) Create Sub contracting PO                                                 
    2) Create MB1B ( 541 mov)                                                    
    3) Create Challan from J1IF01 with reference to material document            
    4) Create GR using MIGO sub cont PO. ( faced error )                                                                               
    Please be ensure that the following note is already applied in your          
    system:                                                                      
    1423896 - The subcontracting challan validation - MIGO                       
    Please chek if you have set the movement types     
    541 and 541 O as relevant for creation of challan. Also, you ha       
    ve to set the number of line items in a challan to be only 1 in the customi       
    sing node 'subcontracting attributes'.                                         
    So the system will create 1 challan per line of the transfer posting           
    document as it finds both 541 and 541 O movements.                                                                               
    If you do not want the system to create challan for 541 as is normal           
    then remove the movement type 541 from movement type group 0001. Also          
    remove 101 from movement type group 0002.    
    I hope it helps you.
    Regards,
    Fábio Almeida                                 
    Mm Consultant

  • Sub Contractor Ledger

    Dear MM Experts,
    I urgently need Sub Contractor Material Ledger (LIKE MB5B Report). It should show Opening & closing balances of material vendor wise.
    Is there is any standard report is SAP. We are using ECC 5.0. If not if anybody having developed report then please send code.
    Thanks in advance
    Ashwani K Mathur

    Hi Ashwani,
    You can goto T-CODE : MB5B in intial screen under stock type select SPECIAL STOCK & under database selection for special stock indicator select "o" & execute you will get with opening stock & closing stock.
    Regards
    Rang
    Message was edited by:
            Ranganath Mysore
    Message was edited by:
            Ranganath Mysore
    Message was edited by:
            Ranganath Mysore

  • Block a material with Sub-Contractor

    Hey All,
    I am just wondering, I have  a business requirement to block a material that is with the sub-contractor as it is with the sub-contractor for rework.
    I have tried to do a 541 Transfer posting and setting the stock as blocked stock but it shows up as unrestricted in MMBE.
    Is there a process that would suit my requirement?

    Hi,
    Check the configuration setting for the 541 movement type once.
    Configure the movement type -stock if necessary.
    Thanks
    Asini

  • Movement of material from Unrestricted to Quality at sub contractor

    Hi Expert,
    I am looking for a way to move stock from Unrestricted to Quality for stock that is stored at a vendor (sub contractor)?
    Have you got any advice?

    Hi Anders,
    Is your wish to move your goods from unrestricted special stock at SC vendor to QI special stock at SC vendor?
    In this case you may have solution, please check transaction MB1B + relevant movement type (sorrowfully I cannot check 'cause I have no access to SAP now). Please take care of choosing proper movement type with special stock category 'O'.
    http://help.sap.com/saphelp_46c/helpdata/en/4d/2b909643ad11d189410000e829fbbd/frameset.htm
    BR
    Csaba

  • Status of material sent to sub-contractor

    Hi, Is there any way to get the report of status of materials supplied to sub-contractor using movement type 541 and 311. we need to know the status of both the materials that were sent through movent type 541 and 341. points will be surely rewarded. thanks in advance.

    Dear,
    Check with MB51 with movement type  541 and 311
    Use TCode ME2L - PO documents per vendor
    So the user enters the vendor name and all the items he has supplied ....a status comes.
    ME80FN.
    Regards,
    R.Brahmankar

  • Month End Stocks of Sub-Contractor

    Hi,
    Our compney is doing lot of sub-contractor activity . I need a month end stocks of Raw Materials with sub-contractors . Is there any standard report available ?
    Thanks & Regards
    Shyam Kogta

    Hi,
    Thanks for your input.
    ME2O , MBLB & MB52 reports are onlie stock at Sub-Contractor's end.
    But I need the sub-contractor wise month end stock , say closing of 31.12.2008.
    Thanks
    Shyam Kogta

  • Sub Contractor Issues.

    We had a sub-contractor from ATT come to our Business Builiding.  They were to drop cable in the right a way on the property for a business located behind us.  The sub-contractor interferred with our telephone communication that was on the building.  The contractor was abusive.  The contractor use vugar names to the owner of the building when the contractor was asked to keep his hands off of the equipment. The subcontractor became beligerent.  He was told to leave the propeerty.  It took severl neighboring business to get the subcontractor off our property after amost 20 mintues of heated exchange. This contractor keeps coming back, and we have told him he is not allowed on the property and to notify ATT for an new sub-contrator.   Its there a number we can call to have some assistance with this issue.  We do not want to involve the police.   Thank you. 

       See if ATT Customer Care can help.  Click the ATT Customer Care link in my signature below, send the PM, explain your bad subcontractor situation.
    Include your name, account #, email address and a good phone # (land or cell) and time to contact you on.
    Check the blue PM envelope, upper right on every page, for their reply. Good luck
    Chris
    Please NO SD stretch-o-vision or 480 SD HD Channels
    Need Help? PM ATT Uverse Care (all service problems)
    ATT Customer Care(all other problems)
    Your Results May Vary, In My Humble Opinion
    I Call It Like I See It, Simply a U-verse user, nothing more

Maybe you are looking for

  • Items with  zero stock quantity show negative stock value in Stock reports

    When running Stock reports for controlling the stock value towards the GL accounts, some items appear with zero stock quantity, but the report still shows a stock value  (negative value in my case) How can this happen, and how can I correct this situ

  • Unable to view settings tab in one GPO. "An error occurred while generating report: Object reference not set to an instance of an object."

    I am the owner of this GPO and I can view the settings tab in any other GPO. But, I get the following message when I try to view the settings tab in one particular GPO: An error occurred while generating report: Object reference not set to an instanc

  • Samsung 840 EVO 500GB

    ASUS G75VX Notebook I moved HDD into drive bay 2 and put SSD in drive bay 1. Used Samsung Data Migration software tool to clone HDD-to-SSD. So far, disk management window says both drives match (numbers wise). Reboot and enter BIOS, changed boot opti

  • How to use this function modules

    Read Function modules FIRST_DAY_IN_PERIOD_GET and LAST_DAY_IN_PERIOD_GET to ge the first and last  dates of the periods entered on the selection screen. Here Year = First 4 characters and Period = Next two characters of YearPeriod field of the select

  • HTML Client related entity look ups

    How are you folks handling the very typical scenario where the user is completing a form and realizes that they need to add a record to a related entity lookup table before they can complete their entry. The primary form will have validation so I don