About Batch management

Hi gurus,
We have been using SAP from last 3 years. Till date we are not using Batch Management.
Now my questions are
1) Can we activate Batch management now? I am already having open PR ,PO and stock.
2) What are the pros and cons of using it in between?
3) If I want to deactivate it in future after implementation what I have to do?

Hi check following notes
30656
Note 533276 - Setting batch management requirement
Regards
Kailas ugale

Similar Messages

  • Batch Management in CRM 2007 Service Transactions

    Dear SAP colleagues,
    I am dealing with a CRM 2007 Service project, and there is a question that has been in my mind for a while.
    As far as I know, it is possible to manage product batches in CRM Sales. In fact, the field is standard delivered, and there are a couple of BADIs in SPRO, under Sales Transactions. But when talking about CRM Service, I can`t find any documentation about batch management anywhere, nor the possibility of configuring the functionality.
    May anybody give me some light about this issue please?
    Thanks in advance.
    Pablo RM

    Hi Rupesh,
    thank you very much for your answer, but shall I understand that batch must be specified in ECC and cannot be recorded in CRM (in stardad logic)?
    Let me explain you a bit more about our needs: we have products with batch numbers that can only be repaired with spare parts with same batch number, since they come from the same manufacturing batch. When defective products arrive to be repaired (we will use In-house repair orders to cope with this) and their batch numbers are identified, there should be an availability check of the spare parts needed considering their batches, just the same way as it is done in CRM Sales for products. As you say, once it has been released, the reservation is made in ECC.
    I suposse that there's no solution but a custom development.
    Well, thank you again and good bye.
    Pablo

  • Material master - batch management not consistence with mara-xchpf

    Dear Experts:
       We have a problem that the user created a new material and only created Basic Data/Accounting/Costing View, inside these views there is no "check field" about "Batch management" but in table both of MARA / MARC  the field XCHPF has value 'X' (checked).
    in our system, there are 2 material no. has the same situation.
    My question is why and how the field "batch management" has been checked and how can we remove it if there is no stocks, no open Doc and no any other transaction??
    Thanks a lot.
    SAP ECC 6.0

    Hi Jürgen L.
    Thanks again.
      The problem is that we can't change the field "batch management", the material no. we have DOES NOT have Batch No., NO stock, the only docments we have are one PR and one PO, and all of them has the status deleted.
      And I had tried to created a new material no. in our QAS, what we did to this new material no. is:
    1. Use MM01 to created  "Basic data 1" view refer to a "batch management" Material no. - Only Basic data 1 view and click save, nothing else.
    2. Use MM01 again to create "General Plant data/Storage 1" view, but the field "Batch Management" is checked and unchangeable, I think this is not reasonable,  and I dont know is there any other way I can change "batch management".
      thanks.
    Last update :
    The issue is resolved:
       2. Use MM01 again to create "General Plant data/Storage 1" view ,( the field "Batch Management" is checked and unchangeable), save material no.
      3. Use MM02 to change "Batch management", now the field "batch management" is changeable.
    Thanks you all
    Edited by: KMateo on Apr 22, 2010 9:49 AM
    Edited by: KMateo on Apr 26, 2010 5:59 AM

  • Batch Management Implementation in Cement Industry.

    Dear All
    I would like to understand about Batch Management Implementation in Cement Industry.
    I have some inputs on Batch Management but from Implementation in Cement Industry would like to exactly understand what are the typical scenarios for Batch Management.What should be the Batch level ie at material,client or plant level?
    Has anybody worked on Batch Management Implementation in Cement Industry.?
    Regards

    Closed

  • Prerequisite of activating batch management

    Hello there,
    I've seen a lot of posts saying PR, PO, Plan order Production order must be clear before activating batch management for a material.  But when we test with our system, it is allowed to activate batch management for the material even there is open PO / planned orders.  Only not allowed for open SO.
    Would like to confirm what is the real answer.  PS, currently we have not made any change to confirgration about batch management.  Would it make some difference of system behavior? 
    Thanks.

    Please review the following notes and KBA
    30656       Change base unit of measure/batch management requirement
    1521082   Error M3530: Change Material to Batch Managed OR Non Batch
                     Managed (field MARA-XCHPF)
    533276     Setting batch management requirement
    As advised in note 30656, changing the batch indicator can only be performed when there is no existing stock in present and previous period. The system behaves like this due to possible inconsistencies that would occur if you post goods movements for previous periods when there was no batch management.
    You will need to delete any open documents and reverse any material movements on this material. If batches (even zero stock batches!) are still assigned to the material you must delete them and reorganize the tables MCH1, MCHA and MCHB.
    At this point the flag could be changed.
    Please also consider the following...
    1) If you want to change the batch management, it is not enough to check for stock. You must also reorganize all existing batches for the material. You can do this using the TA MM73 and MM74 or SARA. After you have reorganized the batches you should be able to change the batch management. The Object to use in the txn SARA is MM_SPSTOCK.
    You must first set the deletion flag for the batch using txn MCH2.
    2) If you have defined the batch level in the TA OMCE to 'unique at material level' it is not possible to turn off the batch management flag in one plant. You can can only turn it off for all plants at the same time. That means if you want to turn it off, the system checks all plants for the existence of stock. In other words, the batch management flag will be the same for all plants at any time if you use the batch level 'unique at material level'.
    I hope this can help!

  • Cost(vprs) of free goods with batch managment

    Dear Gurus,
    I have a problem ahout free goods with batch management.
    Cost(VPRS) is not accumulated in billing(free goods is not relevant for billing).
    My configurations are shown as below:
    Ordered goods (and batch) item category :zta1(copied from tan)
    Free goods (and batch) item category :zann (copied from tann) pricing:B ;not relevant for billing;dermination cost:X
    copy control(from delivery to billing):
    ztan: accumulation cost :X
    If I use the material without batch management,Cost of free goods(without batch) is accumulated to main item(ordered goods).
    So, what can I do?
    Thanks and Best Regards,
    Lykin Kan

    Hi,
    These notes are useful:
    SAP Note 1365939 - VPRS logic and Customizing settings in SD
    SAP Note 547570 - FAQ: VPRS in pricing
    If you have the problem in the transfer from SD conditions to CO-PA, check if you transfer only invoices to COPA, if you don't invoice the deliveries of free goods, then you don't transfer this 'sales' or costs of 'gifts' to COPA. You can check the customizing of COPA in tcode ORKE (IMG for COPA). SAP Note 74486 - INFO: Overview of consulting notes for CO-PA is a good summary about this issue.
    I hope this helps you
    Regards,
    Eduardo
    PD: I forgot SAP Note Number 33968 SD/CO-PA: Characteristics from sales doc tables
    Edited by: E_Hinojosa on Sep 10, 2010 9:44 AM

  • Split valuation with batch management and project stock

    Dear Gurus,
    I need to combine two following requirements:
    1. split valuation with batch management (valuation type = batch number)
    2. project stock
    These two functionalities work fine separately but not together.
    I receipt PO for material with spiit valuation on a batch level into a project stock. Posting is OK and material document (MSEG table) seems to be OK (batch number, valuation type and project stock are in this table). The problem appears when I want to display material in this valuation type (MM03) or batch (MSC3n). They don't exist!!!  Short investigation showed that during goods receipt table MBEW (valuated stock) was not updated with this valuation type.
    But If PO is receipt into normal stock first and then posted into project stock everything is OK.
    Have you had or heart about such issue? I would appreciate any sugestion. 
    Thsnks in advance.
    Marcin Bernat

    Hi,
    As you already know ,u are using project stock and doing goods receipt against project, stock table QBEW will be updated and not MBEW. MBEW only updates in case of plant stock valuation. If u receive any goods against project stock it does not contribute to plant stock. Irrespective whether your material is managed in split valuation or not, If it is received against project stock it only updates QBEW. There is no need to update MBEW, if u r using split valuation in project. QBEW also have valuation type as another level like MBEW. If u want to see material price for project stock, it can be  seen in QBEW -valuation type and not in mm03.
    As u r receiving goods against project stock this is d only reason QBEW is updated and not MBEW.
    QBEW will store all information like MBEW for batch number, valuation type and project stock assignment.
    Hope it answers your question.
    Deepak.

  • Batch Management at delivery

    Hi,
    User1 has created a outbound delivery and assigned a batch manually.
    So that particular batch has been assigned "fully".
    Later after some seconds, User2 created another outbound delivery for the same material against his Sales order.
    User 2 gets the same batch to assign manually for the second delivery ?
    It's for sure that once the picking is completed, this will not happen. But it might be late to know the error.
    How can we restrict this "assigning the same batch to the multiple deliveries" in non-picked status of deliveries ?
    Is this something to do with the data processing delay in SAP ? If yes, how can we improve it ?

    How about automatic batch determination.
    check http://help.sap.com/bestpractices/BBLibrary/Documentation/G91_BB_ConfigGuide_EN_DE.doc
    Logistics – General  Batch Management  Batch Determination and Batch Check  Activate Automatic Batch Determination in SD

  • Batch Management Level

    Hi all,
    Batch management drives us difficulty, all finished goods have a batch number in our system. But cause of this our system grows fastly and process management is so difficult. We think about cancelling batch management and use serial number management for product trace. But one of my friends offers me for managing batches as production order level. This means each production order (material differs) will have batch number and at trace the materials with serial number.
    I want to know the effects of batch level to the system. For example it's useful to cancel batch management for system growth. Or have we use batch management at one level like production order level? For CO side, it's useful for using batches as production level or completely cancel batch management ?
    Thanks,

    >
    techmaster wrote:
    > Hi all,
    > Batch management drives us difficulty, all finished goods have a batch number in our system. But cause of this our system grows fastly and process management is so difficult. We think about cancelling batch management and use serial number management for product trace. But one of my friends offers me for managing batches as production order level. This means each production order (material differs) will have batch number and at trace the materials with serial number.
    >
    > I want to know the effects of batch level to the system. For example it's useful to cancel batch management for system growth. Or have we use batch management at one level like production order level? For CO side, it's useful for using batches as production level or completely cancel batch management ?
    >
    > Thanks,
    It appears that you are referirng to an organization which follows discrete manufacturing techniques, where the individual finished item needs to be uniquely identifiable, which is probably satisfied by batches. Your concern of batch numbers getting exhausted is pertitent, given the limitation of 10 character for the batch number.
    If I try to compare the pros and cons of serial numbers vis a vis batch numbers, here are the points
    - Batch numbers have the obvious limitation of 10 characters, serial numbers allow 18
    - Batches are normally used in process industry (pharma, food etc), serial numbers are linked to equipments, and have the functionality to check the status at the client level (within which plant/sloc, with customer etc)
    - Tracing the history of a serial number becomes easier (particularly useful in case of customer returns / repairs)
    - Serial numbers are unique, you can have multiple units of a particular batch.
    About the question of getting rid of batches altogether, I feel that when serial numbers are present, batches will only lead to additional entry in all movements. Moreover, they will only be redundant, unless you plan to group a few items (serial numbers) into a single batch.
    From the CO side, I feel that the production order is the CO object, and hence all costs are accumulated against the order. I do not think having a batch will help from the CO perspective.
    Regards,
    Aroop

  • Preference calculation with batch management

    Hi experts,
    I am trying to find any documentation or manuals about how to set-up and use preference calculation in SAP-SD-FT or GTS based on batch management.
    Does anyone of you know how to do it and use such kind of "standard"-SAP-solution or is customer-specific programming essential.
    Any reply would be much appreciated.
    Best regards,
    Corinne

    Hi Corinne,
    Did you get anything for your requirement specific to Preference calculation with batch management. I am also looking for the same. let me know if you found something useful or if you created an enhancement to resolve this issue.
    Regards,
    Sumit

  • Batch Managment at Plant

    Hi, good day
    If somebody know about, how can I do to make the choice Batch management at MM01 is only at the Plant and not in general.
    That is, a material is with Batch management in a Plant and another Plant the same material without Batch management.
    If anyone has an idea about this, please anything would be helpful

    Hi,
    Yes, it is possible only for whole plant not for a particular material in a plant. if it is active at a plant level then system will ask for batch.
    Batch Management can be activated in three levels. They are
    1. Client Level
    2. Plant Level
    3. Material Level
    At plant level, the batch number is unique in conjunction
    with the respective material and the plant.
    At Material level, the batches are unique at material level, that is, the batch is independent of any plant. The same batch
    number can also be assigned to another material.
    At client level, the batch number is unique in the whole client. It indicates that batches are managed uniquely for
    exactly one material, that is, independently of the plant, the same batch can exist only once for all materials.
    Example
    a) Plant 1000 item code A Batch 1
    b) Plant 2000 item code A Batch 1
    IMG -->  Logistics General --> Batch Management --> Specify Batch Level and Activate Status Management
    Hope Help  U !!!
    Regards,
    Pardeep Malik

  • Batch Management with Split Valuation

    Hi
    We have a scenario in which we have split valuation for a material and it is also batch managed. In the business process there is regrading step where the material from one valuation type (A) needs to be transferred to a different valuation type (say B). Before regrading each of these grades have different batch nos.
    I tried to do a transfer posting (mvmt type - 309) and put the material (from Val type A to B). It asks for batches for both A and B.
    We can give batch of A (the from material), but we want a new batch to be created for the "to" material.
    How does one go about that?
    Deepak

    Deepak
    I think that you will find that the batch managemenmt is either internal or external at either plant or material level and so if you are changing the valuation in the same plant I do not think that the system will allocate a batch number for you and that you will have to tell the system what the batch is.
    I hope that this helps

  • Sort sequence functionality in Batch management

    Hi All,
    I have a doubt in batch management. I am not sure whether it is a basic doubt. But obviously confusing me a lot and I am not able to find appropriate for that.
    In our company, we have two characteristics assigned to the batch class 023. Shelf life expiration date (LOBM_VFDAT) and Manufacturing date (LOBM_HSDAT).
    Our Sort sequence is FIFO.
    Please find the following example given below.
    Material     GR date           SLED               Manufacturing date          Batch
    M1              21.05.2014     21.06.2014        21.05.2014                      0001
    M1              22.05.2014     22.06.2014        20.05.2014                      0002
    As per the above example, when SLED (LOBM_VFDAT) is concerned, batch 0001 will get selected, when Manufacturing date (LOBM_HSDAT) is concerned, batch 0002 will get selected.
    But which particular batch will be copied into the outbound delivery. I am confused how system can sort out based on multiple characteristics.
    Could someone please exlplain the logic behind this.
    Regards,
    Raja Durai

    I assume in your system
    Ascending = TO
    Descending = From
    But, strange to see no material in key combination.
    Whereas, you said
    when SLED (LOBM_VFDAT) is concerned, batch 0001 will get selected, when Manufacturing date (LOBM_HSDAT) is concerned, batch 0002 will get selected
    Frankly, based on above statement I was expecting batch of the key combination. But, that would very tedious task while maintaining individual sort for each batch & material combination. And that is reason I asked you about the key combination.
    Based on screenshot provided, system will consider sort in following sequence:
    1. LOBM_BSDAT
    2. LOBM_VFDAT
    provided you have dependency maintained for SORT in CU71.
    There in dependency editor may be you have logic to control this behaviour, for example
    Thanks, JP

  • How to Implement the Screen As of Batch Management

    Hello Everyone,
         I want to implement a screen having functionality similar to Batch Management, at "Add" Button another screen popups having two gridviews in First there would be Items and in Second their would be Serial Numbers as defined in Item Master Data.
    The same Functionality for multiple items, like in case of two items when we select first item from GridView1 it gives area in Gridview2 to add data and when we select Item2 it refresh the gridview2 to add the data in gridview2, but again when I select first Item in GridView1 it gives the same data that I added before.
    and in the end on update button all the data save in a table or two.
    How can I do that??
    Thanks in advance,
    Idrees

    Hi Idrees,
    You need two grids and at least 3 datatable.
    Grid 1 bound to DataTable 1 - This will list all the Items, nothing special about this one.
    Grid 2 bound to DataTable 2 - This will list selected batch for current selected Item in Grid 1.
    DataTable3 - This will hold all the selected batches for all the items in Grid 1.
    Now you need to refresh DataTable 2 based on the Selected item in DataTable 1.
    When the user click on a row in DataTable 1, you need to do 2 things :
    1. Read all the records of DataTable 2 and sync it to DataTable 3.
    2. Read all the records of DataTable 3 where the Item Code belongs to the Item selected in Grid 1 populate it into DataTable2.
    Tedious, but will do the job.
    When the user click Add/Update button, write the records of DataTable1 and DataTable3 into database.
    Regards
    Edy

  • Note 533276 - Setting the batch management requirement indicator

    Hi;
    we have found an oss note for setting the batch management requirement
    indicator.. but the program mentioned in oss note does't exist in the
    attachement part.. we urgently need your help..
    how can we find program RVBCONVMAT2BM?
    Note 533276 - Setting the batch management requirement indicator
    Solution
    Here, the standard procedure is to clear stocks of the current and the previous period as well as to complete the open documents. Note 30656 provides further information about this.
    Alternatively, in the case of a large data or document volume, you can use a conversion report from the batch development that sets the batch management requirement indicator without the necessity of manual preliminary works such as the posting of the stocks or the completion of open documents.
    We have developed the main features of this report, but it must be adjusted to individual business processes in a customer project that is subject to charges.
    If you require further information about functions of this tool or about running such a customer project, you can send an e-mail to the consulting department ([email protected]).

    Hi,
    You also need to check for open sales order, open production orders, open WM transfer orders and open deliveries. These documents needs to be closed/completed.
    Check OSS notes 533276 - Setting the batch management requirement indicator.
    Following is the details of this notes;
    Summary
    Symptom
    The attempt to set the batch management requirement indicator for a
    material in the material master record maintenance fails because there are
    stocks or documents that are not completed such as production orders, sales
    orders, deliveries or WM transfer orders.
    More Terms
    MARA-XCHPF, MARC-XCHPF, RVBCONVMAT2BM
    Cause and Prerequisites
    Solution
    Here, the standard procedure is to clear stocks of the current and the
    previous period as well as to complete the open documents. Note 30656
    provides further information about this.
    Alternatively, in the case of a large data or document volume, you can use
    a conversion report from the batch development that sets the batch
    management requirement indicator without the necessity of manual
    preliminary works such as the posting of the stocks or the completion of
    open documents.
    We have developed the main features of this report, but it must be adjusted
    to individual business processes in a customer project that is subject to
    charges.
    If you require further information about functions of this tool or about
    running such a customer project, you can send an e-mail to the consulting
    department (BMToolsatsap.com).
    Regards,

Maybe you are looking for

  • Regarding alv output

    Hi all,           My user command is not working in my program.            When i am clicking in any value on any filed its not working out. I have debuuged also i m not getting. <code> *& Report  ZVEN_PRA REPORT  zven_pra         NO STANDARD PAGE HE

  • Glitch Energy for pci-mio-16xe-10

    The E-Series user manual does not provide the "glitch energy" for the pci-mio-16xe-10 board's analog output. It DOES give the glitch energy for the other boards (pci-mio-16E-1, pci-mio-16xe-50, etc.). Why the ommision for my board? I know that my boa

  • LMS 4.1 user tracking does not pull ip address from hosts on switches

    New install discovered router and switches at same location with no issues. However when running an acquisition on those switches most fields are populated except the ip address of end host associated with port. Mac address, port speed, etc. but no i

  • How do you bring a mp3 into garageband ?

    im trying to bring in beats and other mp3 clips into garageband from my itunes but the dragging and dropping does not work. how do you do it !!?? please help  /FYI: im using a 15inch mac book pro OSX 10.8.2

  • HT1923 Removing and installing iTunes for Windows 7

    I can no longer open my iTunes.  Shows "Window Error 126."  MSVCR80.dll is missing so need to reinstall.  If I uninstall then re-install, will I lost all my playlists, downloads and purchases on my computer?