Activity in Work Center

Dear All,
My question it's regarding at activity in work centers.
I defined "setup time" like first activity, and I established an value for the plan price, for the activity type.
Normally, this setup activity it's applicable just for first piece and for the rest no!
But now, if I intend to produse 100 objects, this setup time it's multiply by the number of pieces.
Can somebody to say me, how can I configure thus the setup time be applicable just for one piece.
Thank you, very much!
Marian

Hi,,
Actually the formula which you are defining at the costing view is giving the error.
Create the varable with first st value and create a formuls with only the variable and assign it into the costing field of work center.Then the system will take the value of the activity time only once.
First define a parameter in transaction OP7B . Change the standard value key and give the parameter in OP19.Define a formula in transaction OP21.
Hope it will help you.
regards,
kaushik

Similar Messages

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

  • Work Center in Project System

    Hi Experts,
    As per our requirement,
    We need to send a workflow task to the users in that particular activity's work center after activity confirmation.
    We have an internal Activity been created with some workcenter value for some plant.
    But we are not getting that workcenter value in Organization Structure while setting recepient for the *Email Task in Workflow.
    Is there any link between plant's workcenter(Project System) and Org Structure Workcenter(PPOCE) ??
    And if its not same, then how can we link them?
    Please help!
    Thanks,
    Runal

    Hi Runal,
    The workcenter used by project system is the logistical workcenter, (T-code CR01, CR02). The project system application does not care 'The Org Structure Workcenter(PPOCE) ' at all.
    As far as I known, it is possible to maintain the link between the logistical workcenter with HR, if you start the CR02 and use button 'HR' assignement. Hope, you can link both workcenter this way.
    Typically usage I known is the link in Capacities with HR, which the assigned person is used by project system workforce planning.
    Kind regards,
    Zhenbo

  • How to reuse standard Activity subcomponents - Appointments, Tasks, Phone Calls and Emails within a custom work center?

    Requirement : We have a requirement to reuse the standard Activity subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work centre. The requirement is to leverage and copy all sub functionalities Appointments, Tasks, Phone Calls and Emails available within the standard activity work center. This feature is available within Accounts, Opportunities, Leads etc. (Refer screenshot: Std_Act_Screen.jpg)
    We are unable to consume/embed the standard Activity (Work center) sub components Appointments, Tasks, Phone Calls and Emails within the custom work center. This is because of backend consistency check violation UI designer error message displayed. (Refer screenshot:Error while consuming standard activities.jpg)
    Ø  Open Question:
    a.      Is there a limitation to consume/embed the standard Activity (Work center) subcomponents Appointments, Tasks, Phone Calls and Emails within a custom work center?  We have noticed that this standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails has been repeatedly reused within the application in Account, Opportunity, Sales lead, Lead, Sales Quote Objects.
    b.      Is there an alternative way in which we can call [Through API etc..] the standard Activity Work center subcomponents Appointments, Tasks, Phone Calls and Emails?
    We need your guidance to overcome the error to enable the reuse of the standard Activity Work center sub-components Appointments, Tasks, Phone Calls and Emails within our custom work center or suggest a suitable workaround on how this can be achieved.
    Regards .. Dheeraj Saini

    Whenever you find out let me know. I wanted to assign a text tone to someone and now in iOS 7 i can't. Or I haven't figured this out yet.

  • IW41: automatic update of activity type when changing the work center?

    Hello colleagues,
    when doing a time confirmation with IW41, we have following problem:
    In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
    Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
    Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
    Thanks for your ideas!
    Regards,
    Patrick

    Hi Maheswaran,
    yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
    We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
    We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
    Thanks for your efforts so far!
    Patrick

  • URGENT........ACTIVITY TYPE AND THEIR ASSIGNEMENT TO WORK CENTER!!!!!!!!!!!

    Hi Friends,
    I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
    I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing.  However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
    I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
    And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
    can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
    regards
    sandhya

    Hi,
    You need to do the following:
    1) Create an Activity type for the Assembly activity.
    2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
    3) Define a Cost Centre corresponding to the above Work Centre.
    4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
    5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
    6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
    7) Execute the Plan price calculation (T-code KSPI)
    After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
    Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
    Regards,
    Assign points if useful

  • Activity cost at work center

    Dear Exports,
    I have a requirement in my project
    1. In a work center we have 3 activities. 1. Labour time
                                                                       2. Machine Time
                                                                        3. No. Kgs treated.
    I am able to give labour & Machine reates  by giving price at kp26. and number of minitus in routing.
    But my client wants machine hour rate : no. labours worked X Time worked  X rate per hour .
    i.e he wanted to give time in labour time activity and no of employees worked in machine time the formula must claculate
      Labour time X Machine time(No of Workers worked) X KP26 Price(Per Labour hour).
    Can Any body help me please...
    Rao

    Check if there is an existing WC formula that you can use or create your own formula for the work center.
    My challenge (at a different business, so I don't have the exact work in front of me, but I have notes) was  Crew size x Machine Hours x Activity rate.
    In the routing Operation Details is a section General Data.
    There is a field: Number of Employees, field name ANZMA,  That is where we populated Crew size
    Use an existing formula if possible
    Which formula do I use??                                   
        Work Center Basic Data (CR02)  determine standard value key                         
        Go to  "Define Standard Value Key" in IMG (OP19); select std value key and click detail button          
         Note the Parameter used                                        IMG path:  Production>Basic Data>WorkCenter>General Data>Standard Value >Define Standard Value Key
        Go to "Define formulas for work centers" in IMG (OP54); select formula that uses the field parameters required          IMG path:  Production>Basic Data>WorkCenter>Capacity Planning>Work Center Formulas>
                         Define formulas for work centers                                        
    Not there?  Create the formula     
         In English - what do you want to calculate?
         Find parameters for the fields in the calculation
         Write formula (op54)  Copy from existing formula if possible - spaces in the equation are necessary
                             OP17 is where to create new Parameters.
    This is all configuration - with some high leve security (in our system).  Configur and TEST CAREFULLY

  • Work Center  takes only 6  activity types

    Hi
    I    have   6  types of labor  activity type  ( L1 to  L6 )  ,  1  machine and  1 set up.  Total  8  activity  types.
    Now   if   the  planned  labor  is  eg  L1,  the  actual  may  be  L6.  But    I  cannot  assign     all   6  labor  type in the  work center.    Work center  allows  only  upto  6  activity types.
    I   checked  in  HR  module,  where  in   CAT2  we  can   record  ACTUAL  activity type  /  order  / employee data.  This can be moved to  controlling.      But  when  it  is  planning,  then  I  dont  know.
    How  can  I   accomodate  all  6  labor  type in the  work center.
    Thanks
    kamala

    Hi Kamala
    If you are in a production order scenario -
    You will have to create 2 work centers... One for Labor and another for Machine/Set up... there by you will have 2 operations in routnig
    If you are in a process order scenario -
    You can do with one single work center... This will accomodate 6 act types..
    Apart from work center, there is a concept of "Secondary Resource" in Process order scenario, which can accomodate your other 2 act types...
    Regards
    Ajay M

  • Work Center wise actual activity information.

    Dear All ,
                  We have  requirement of Z report creation for cost center wise work center wise actual activity report . But we are unable to find work center and actual activity line item wise link up in any table for  development of above report.
    So please provides  us  more information by which we can develop the  above report.
    Thanks & Regards
    Shri

    Hi , the link of Cost center and work center are -
    Cost center - Object Id - CRCO table . Object Id - Work center - CRHD.
    I hope this is sufficient for your report.
    Regards
    Ranjan

  • Activity Type Changes in Work Center

    Hi Experts,
    We now want to change the activity type in a work center, and hope all the routings that have the work center being changed automatically. Currently, the existing routings can not be changed automatically. Is there a way to have all the routings changed as well? 
    Best Regards,
    Helen

    Hi,
    In Costing tab next to the activity you should find a check box for Reference Indicator. If this is ticked, then the changes done in work center will be automatically read into routings.
    If it is not, then you will have to manually change in routings. For individual, you can use CA02, for mass work with CEWB, working area as SAP_OPERATION
    Regards,
    Vivek

  • Assignment of activity group to work center

    Hi,
    We want to assign activity type to work center more than six,
    how we can assign activity type more than six to work center?
    i have created activity type group in klh1,
    in activity group i have assigned activity type more than six,
    How we can assign activity type group in work center?
    Regards
    Gajjen

    HI
    It is not possible to assign more tha six actvities to a cost center as per SVK defined in the WC.
    Check with the business process field for assign  with your CO guy in thw WC.
    A business procedure within an enterprise that uses resources and can involve activities from a number of different cost centers in a controlling area.
    When executing a business process, activities can be utilized for several cost centers of a controlling area.
    Check and revert
    Regards
    Anupam Sharma

  • Activity Types for a Work Center

    Dear Experts,
    I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
    Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
    The Msg No. is CR 091.
    Please guide me to find out where I am missing something?
    Thanks & Regards,
    Rohit.

    HI,
    Create a Cost center using T code - KS01.
    Create an activity type using T code - KL01.
    Assign the Rates for an activity type & cost center combination using T code KP26.
    In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
    Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
    After performing this in work center assign activity type & cost center
    should be assigned. Then while creating routing/task list this work center can assigned for performing
    as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
    Overhead cost is the indirect cost which's spent during production.
    So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
    Hope You will get some idea
    Thanks and regards
    E.Rambabu

  • Active version in work center

    Hi Gurus,
    We have maintained various versions in SPRO under production-basic data-work center-capacity planning-active version of available capacity.
    For a particular main work center we enter the active version in capacity header tab in the work center.
    If I create a maintenance work order for that particular work center then
    Do this active version gets copied to maintenance order ? ( currently it is not getting copied )
    Do we have settings where in we can make this as a default value in maintenance order ? ( whatever set in work center will be copied to maintenance order )
    My client have to enter version in every maintenance order created. The quantum is very large.
    So client would like to have this active version copied from work center to maintenance order,  like wise master data from an equipment gets copied to notification or order while being created.
    Kindly reply at the earliest.
    regards,
    Maneesh

    Hi ,
           In standard SAP there is no field in maintenance order operation or order that captures Active version of Work Center capacity .., In which field ur currently entering manually ?
    If u have defined any custom field in order operation to capture this data , then try to use user exit  : IWO10016 PM Order: Cust. enhancement to check operation user fields   to get this data automatically  in Order operation from work center ..
    regrds
    pushpa

  • Mapping Work Center to Internal activity

    Dear All,
    I have ceated the work center 1000 and mapped it to the plant 0001, Cost Center and Activity type. But when I map it to the Internal activity, there is an error message "Work Center 1000 0001 not allowed (Check).
    I have checked the control key, and also checked whether the planning indicator is clicked for respective WBS element. Relevant mapping is done.
    Still the error message is displayed. Kindly help.
    Thanks.

    Open that error message, and check what it says under Procedure. and do as per that.
    Another thing, check what is the Work center cat. under basic data tab, it should be 0006 (project management)
    Edited by: Ahmed Rifaee on Dec 22, 2009 4:40 PM
    Edited by: Ahmed Rifaee on Dec 22, 2009 4:42 PM

  • Different activity type for different capacity category in a work center

    Hello,
    Multiple capacity categories can be created in a work center like
    Engineer
    Sr. Engineer
    Architect
    Rates for all of them will be different (obviously) , however we can only have 1 activity type as default in a work center . We intend to 'HR assignment' corresponding to each capacity category . how can we have multiple activity type for different capacities (Engineer , architect etc).
    With regards,
    Mrinal

    Hi Paulo,
    thanks for your quick reply.
    Requirement is to assign all persons (Engineer, architect ) to 1 work center and to 1 activity , but to default different activity type (corresponding to capacity category) in worklist of time sheet .
    With regards,
    Mrinal

Maybe you are looking for

  • Field Catalog in ALV

    hi, can any one explain the below program. What is the output of it. thanks REPORT  ZALV_REPORT2                            . TYPES: BEGIN OF TY_KNA1, KUNNR TYPE KNA1-KUNNR, NAME1 TYPE KNA1-NAME1, LAND1 TYPE KNA1-LAND1, END OF TY_KNA1. TYPE-POOLS SLI

  • My pictures in my slides are randomly switching

    I have a heavy keynote file where my little pictures (<15ko) are now randomly being switched between them... what is happening... I use keynote since 2008 and it's happening since i have updated with the last version... what is the problem???? Thank

  • HTTP error 0 testing not serving php pages please help

    Hello everyone, I am using DWCS3, the free version of MAMP on my MacBook Pro Leopard 10.5.6. I have built a customer registration form with a Transitional <!DOCTYPE>. I have been following the instructions from The Essential Guide to Dreamweaver CS3,

  • URGENT Playback Issue - Everything playing too fast!

    I was editing on a project today when final cut suddenly started playing everything in all sequences faster than real speed. I don't know if I hit some kind of shortcut key or what. I already tried messing with the J - K - L shuttle shortcuts, I trie

  • SIP invite error on UC520

    Am setting up a SIP trunk on a UC520.  Outbound calling is working fine.  Inbound is not. The SIP invite comes in but is rejected with a: SPI_validate_own_ip_addr: ReqLine IP addr  does not match with host IP addr I suspect this is caused by the fact