Dear All
we are loading the january,08 sales  invoice from the legacy system to SAP system through BDC program.
for this at the time of PGI we are using Actual GI date as month of January, 08 and keeping planned GI date as the system date and at the time of creating sales order, delivery, we are not changing the material available date, loading date, delivery date, at the item level and system taking automatically based on the current date
when doing PGI system accepting and creating PGI document and billing also creating based on this delivery.
But dose it give problem in Inventory managements and FI in future, then what would be the right procedure to uploading the back dated invoices in the system.
Please give me solution for this issue, or what we are doing is the right procedure.
Thanks In advance

For those who might come across this note, the design issue was solved by incorporating Rule Groups.
Problem:
Need to have 2 different Date references for 0calday, based on the key figures. For example for Sales key figure date it would reference to Actual GI Date. But, for Intake key figure I needed the date reference to be Planned GI date.
Solution-- applied to the transfer rules of the desired cube:
1. In the starndard rule group delete the transfer rule for the appropriate key figures. in this case (sales key figure)
2. In the same rule group map all time characteristics from the cube to Planned GI date from DSO
3. Create a new rule group in the transfer rule between the DSO and the Info Cube
4. In the new rule group, create a new rule for the appropriate key figure i.e. sales
5. In the new rule group, Map the date/week/month/fiscal period to Actual GI date
6. save/activate
This solution eliminates the need for changing the data model, which makes everything almost transparent to the report users.
Hope this helps someone.
Edited by: Babak Shafiei on Dec 12, 2008 5:23 PM
Edited by: Babak Shafiei on Dec 12, 2008 5:24 PM

Similar Messages

  • Actual goods issue date required to be equal to planned goods issue date

    Hi All,
    Can anybody tell me on what basis does the actual goods issue date get determined and what needs to be done if we want to restrict the actuall goods issue date to be equal to the planned goods issue date?
    Avinash

    Avinash,
    Can anybody tell me on what basis does the actual goods issue date get determined
    ???? It is the date that the goods are actually issued from stock, e.g. whatever the date was when the delivery was actually issued, that is the date that is normally written to this field in the delivery.
    what needs to be done if we want to restrict the actual goods issue date to be equal to the planned goods issue date
    That's a pretty restrictive criteria.  Basically, you are telling the warehouse that they are not able to issue the goods early or late.  In companies I have seen, that would constitute a lot of deliveries.  Hope your customers don't need the parts....
    Anyhow, the restriction would have to be against the goods issue transactions being used by the warehouse.  I don't believe there is any standard configuration that creates such a restriction, so it would require custom development.  If you pursue this restriction, make sure you leave yourself some kind of override.
    In many companies, this problem is handled through policy and procedure.  Warehouse manager simply creates a policy about early and late goods issues.  The system will track discrepancies in the case the policy is not followed.
    Best Regards,
    DB49

  • What is the difference between delivery date and actual goods issue date?

    Hi ,
    Can you please tell me the difference between Delivery date and Actual goods issue date ?
    Delivery data can be be greater than goods issue date?
    Thanks,
    Ajay

    Hi Ajay,
                  Delivery date means its the original date on which the delivery should be done.Actual goods Issue date is the date on which goods to be delivered according to the purchase order.There can be delay in the delivery so we maintain 2 objects.
    Yes delivery date can be greater than Goods Issue date.
    Hope this clears
    Regards
    Karthik

  • Actual GI (gods issue) date and planned GI date

    Can you explain about actual GI (gods issue) date and planned GI date? Can actual GI date differ from planned GI date? can anyone pls give me the ans.....

    Hi,
    Planned GI Date : It is the date on which the goods must be physically dispatched from the shipping so that it can reach customer on the Requested Delivery Date (RDD) or on-time. It can be calculated as follows :
    Planned GI Date = RDD - (pick/pack time + loading time + transit time)
    Actual GI Date : Actual date on which physical goods movement happens from shipping point. Goods issue document to account for the outgoing inventory is normally created on Actual GI Date.
    Hope it adds info..
    Thanks

  • Collective Invoice - Actual Goods Issue date

    Hi Friends,
    Collective invoice topic has been discussed many times but I didn't find exact solution to solve my issue.
    From sap help and few other threads it is learnt that Billing type, Billing date, Payer, Billing unit, Terms of payment, Incoterms, Letter of credit should be same to have collective invoice. During my tests it is understood that apart from those Actual Goods Issue date (Post Goods Issue) date should be same to have collective invoice for different sales orders/deliveries. In my tests SAP didn't consider Billing date but it did consider Actual GI date. In other words, even the billing date and other requirements are same invoice split happend due to different Actual GI date. However collective invoice created even though the billing date is different but Actual GI date is same.
    My user creates one sales order and one delivery for a customer once in a week (so 4 orders/deliveries in a month) and creates Invoice by end of the month with collective invoice. So based on the above tests I can ask the user to create sales orders, deliveries every week but perform Post Goods Issue month end and then create invoice so that collective invoice can be done. But the issue is they want to do the Post Goods Issue every week because the stock levels should reduce on weekly basis. So how can we create collective invoice even though the Post Goods Issue is done weekly (so Actual GI date will be different)
    Any idea? Please let me know if further information required.
    Thank you

    Hi,
    You may consider writing a routine under copying requirements so that invoice is not split even if the Actual GI date is different.
    Consider the following [thread|Collective billing; for more info.
    Regards,
    Amit

  • Fieldes planned delivery date and actual good recipt date for SAP QUERY

    Hi Gurus
    I am changing sap query. I need to find two fieldes  : planned delivery date and actual goods recipt date
    I dont know MM tables, do you know wrhere are?
    in table EKPO i don't find the fieldes.
    Thanks in advance

    Thank a lot!
    Regards

  • LR dt to be taken as BiIlling dt instead of Actual Goods issue dt

    Hi
    The normal Business practice is the system takes the actual goods issue date mentioned in the delivery document as the billing date and accordingly ,the payment terms or credit days given to the  customer starts from this date.
    Now the requirement is
    The payment terms has to be with ref to LR (lorry receipt ) date and not on Actual goods issue date, for example: If the Actual goods issue date is 15th April & the LR date is 17th april  then the customers credit days has to start from 17th and not from 15th april .
    Because ,in real time we do not know when the transporter will pick and deliver the goods to the customer,so if the transit time is  2 days ,then customer would be loosing the ,2 credit days and the invoice would be due on the 7th day ,where as the customer would have received the stock 5 days back  and not 7days back.(if the  terms of payment is say 7 days)
    can any one suggest how to addresse this scenario apart from the  following
    1) Define  the terms of payment as longer by 2days
    2) Give the actual goods issue date as 2days in advance
    shashi

    Hi TricaC,
    I'm sorry to see your friend is having problems with his BT Broadband.  Please use the 'contact the mods' link in my forum profile to send in his details and we'll be happy to help. You can find the link by clicking on my username.
    Thanks
    Neil
    BTCare Community Mod
    If we have asked you to email us with your details, please make sure you are logged in to the forum, otherwise you will not be able to see our ‘Contact Us’ link within our profiles.
    We are sorry but we are unable to deal with service/account queries via the private message(PM) function so please don't PM your account info, we need to deal with this via our email account :-)
    If someone answers your question correctly please let other members know by clicking on ’Mark as Accepted Solution’.

  • Just bought a new macbook w/ mtn lion. transferred data from my old macbook over n it created another user name. that's actually good--xcept for music, which i want on my new acct. How do i move files from my "old comp" acct to my new one?

    i just bought a new macbook w/ mtn lion. when i transferred data from my old macbook over, it created another user name (i called it "old computer"). That's actually good--I'm not going to be accessing old files frequently--except for music, which i want on my new user name. How do i move files from my "old comp" account to my new one? Is there a way to easily move large #'s of files, or just one by one? I've googled extensively but can only find instructions for OSX 10.6 and previous, which talks about the "Shared folder," which I can't seem to find.      

    jesster03 wrote:
    i just bought a new macbook w/ mtn lion. when i transferred data from my old macbook over, it created another user name (i called it "old computer"). That's actually good
    That's actually bad. Peruse Pondini's Setup New Mac guide and seriously consider starting over.

  • Actual Goods Movement Date is missing in 2LIS_11_V_SSL

    Hi
    Daily we are loading the Order Delivery data from the 2LIS_11_V_SSL datasource into the Global Level DSO(ZTEST) and it is snapshot of ECC Production System . That means, only the latest data is avialable in the ZTEST DSO .
    Now for some of the Sales Order's , actual goods movement date is missing in the ZTEST DSO. So i need to investigate why the actual goods movement date to missing in the ZTEST DSO .
    So i want to test this datasource(2LIS_11_V_SSL ) whether it is bring the actual goods movement date or not .
    So how can i test this datasource 2LIS_11_V_SSL . Do i need to populate the setup with a particular sales order number.
    What is the steps for that . Please let me know .
    Regards
    Mohammed

    Hi,
    Please check the PSA data first whether the field is empty . Because sometimes if you have not added the correct key fields in the DSO,you may not get the changes. So check the PSA first. If it is empty then check the data in the ECC system . If you use the standard field for the actual goods movement date please check with the functional consultant whether the below logic is followed (extracted from help.sap.com) for those sales order missing the date .
    MCEX_I_WADAT
    Actual goods movement date of a delivery
    Definition
    This field contains the actual goods movement date of a delivery of an item order.
    Use
    The field is only used in the extract structure MC11V_0SSL (DataSource 2LIS_11_V_SSL).
    There, this date is determined for one delivery at a time, and is assigned to all data records for this delivery.
    In these data records, you are dealing with confirmed quantities of order schedule lines, which are assigned a corresponding delivery item as delivery.
    The date is only assigned if it was entered in the associated delivery.
    If the logic is correct for the sales order ,then you need to reload the data .Fill the set-up table with those missing sales orders ,and run RSA3 with the selections after the set-up table filling. Check the data again here and if you find date values,then you can run the repair full request to load the data.
    Still if you miss the date ,as i said earlier please check with the functional people whether any business logic is missing .
    Thanks.

  • Report to display (actuals data from one cube and plan from another)

    Hi Gurus,
             I have a requirement in reporting to display actual data from one cube and plan data from a different one.
            The example below might give a clear picture of the requirement.
    rows has key figures and columns = months
    Jan |  Feb |  Mar |  Apr |  May |  Jun  ...   ....
    GrossSales
    Net Sales   
    Now if I run the report for Current month (Apr), then for the months of (Jan, Feb and Mar) i need to get the data from CUBE1   and for the remaining months (Apr thru Dec) from CUBE2.
    Similarly when i run the report next month(may), 
    then (data for Jan, Feb, Mar, Apr  from CUBE1)
    and ( May thru Dec from CUBE2)
    Any suggestions.
    Thanks in Advance
    Kumar

    Hi Henry,
         We alreadey have a multi provider which includes
    FinDat Cube(CUBE1) for actuals and Comm.Goals cube (CUBE2) for plan.
    So you suggest that we have two versions of key figure for actual and plan.
    ie. each KF will have two versions.
    actuals = (version 10, FiscPer<curr.mnth, key figure, acutals cube)
    Plan = (version 20, FiscPer>=curr.mnth, key figure, comm.goals cube)
    eg:
    Jan | Feb | Mar | Apr | May | Jun ...
    GrossSales(Act)
    GrossSlaes(Plan)
    Net Sales(Acutal)
    Net Sales(Plan)
    Correct me if I am wrong.
    the report has a lot of key figures, having two versions for each kf will be confusing.
    the user would like to see
    Jan.....| ...Feb  |..Mar |..Apr.....|  May  | 
    GrossSales   Act Value|Act.V |Act.V| PlanVal|PlanVal|
    Net Sales
    where Act.Value is from CUBE1
             Plan Value is from CUBE2
    Thanks
    Kumar

  • Essbase and Planning 11.1.1.3 Installation issue

    Hi,
    I have installed and configured Essbase and Planning successfully. However, I can't find them in Windows services. They are supposed to be present in windows services if I'm not mistaken.
    Has anyone experienced this issue?
    Regards,
    Eric

    Have you tried to reconfigure them again, if so not it may be worth giving it a go.
    If essbase has been succesfully installed and the service not created it is possible to create the service by running <HyperionHome>\products\Essbase\EssbaseServer\bin\RegisterAgent.bat
    For planning you could try <HyperionHome>\deployments\<WebAppServer>\bininstallServiceHyperionPlanning.bat
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • CO- Actual and Plan data

    Hi gurus,
    I am creating a query with actual and plan column and restricting each column with the value type object of actual and plan respectively,but the plan data is not been shown in the columns.
    I checked the value type master data and it has the plan and actual inside but when I am trying to restrict with the value type object, it only gives me the actual option and I have to force the plan option to restrict for the plan column.Don't know why it is not showing, cos I am showing it in the master data object for value type.Any help?
    Thanks in advance

    Hi Ravi,
    Thanks for ur quick answer. I already tried that and the problem I have is that no data is coming for the plan column. I checked the Value type master data infoobject and saw both 10 and 20  in there,but when I am trying to restrict with the value type 20 in the query, it does not give me the 20 option.
    I also checked the extractor in R/3 and could only see data for value type 10 and not 20, cos am using the datasource 0CO_OM_CCA9.Does that mean my datasource is not extraction data for value type 20 or how can I check for that?
    Thanks

  • Can we use actual and plan data for same cube?

    hi friends,
    can we use actual data and plan data in same cube in bps.
    Thanking u
    suneel.

    Hi,
    Let us take std cube 0SD_C03 where we store billing info,sales order info and delivery info. But still in reporting we can get values without any mismatch in their respective KF. It is possible because of a cahracterstic called Documnet category which gets values in update rule by constant .
    Similarly we can have 2 types of data (plan and actual) in a single cube by having different value for a characterstic. Most frequently used characterstics for this are 0VERSION and Value type.
    With rgds,
    Anil Kumar Sharma .P

  • Actual and Plan Versions annual view - Multiple versions per company code

    Good Day,
    Iu2019m creating an FI-CO query with an annual view of both Actuals and Plan Values, which uses period and version as input values. The dilemma is around the plan versions which are hardcoded per company codes (eg. 1 Company Code = versions 501 u2013 512)
    Can anyone suggest a possible solutions as normally there is only one version used for planning but in this instance there are multiple versions per Company Code.
    Currently the report is hardcoded for one Company Code and going forward it should cater for more than one(Company Company* 12 Version)
    Kind Regards

    Remove restriction on comp code. There could be 2 models.
    1. Include comp code, value type and version in the rows. This way you get multiple records for a comp code. One record for actual data and one record each for plan versions. To have this model at the query, the data model in the cube also should be in this way (what we call as the account model), multiple records differentiated into actual/plan by valuetype and different versions by version.
    2. Include comp code in rows. Create selections, one for actuals (restrict with key fig and value type 10, actuals), one for each plan versions (restrict key fig with value type 20, version 501. Create one selection for each version this way). This way we have one record per comp code with diff key fig for actual and plan versions. We call this as key fig model. To have this model at the query, the data model in the cube could be account model or key fig model. If it is key fig model then no need of selections. The key fig could be taken directly from the cube.

  • Joining Actuals and Planned Work from Project Server

    Hi,
    I have an SQL based query which returns Actuals and Planned work from Project Server; however a number of records (generally generic resources based on the ResourceIsGeneric column) are excluded. I believe this is because my Actuals query does not return
    generic resources as we are joining both sides of the query on ResourceUID. I have included a snippet below - is there a way to join Actuals and Planned work so I can return all Resource data?
    Thanks
    SELECT tl.ResourceUID
    ,tl.ProjectUID
    ,tl.ResourceName AS [ResourceName]
    ,CASE
    WHEN tl.ProjectName = 'Administrative'
    THEN tl.TaskName
    ELSE tl.ProjectName
    END ProjectName
    ,ruv.RBS AS [RBS]
    ,Sum(ta.ActualWorkBillable) ActualWorkBillable
    ,Sum(ta.ActualWorkNonBillable) ActualWorkNonBillable
    ,Sum(ta.ActualOvertimeWorkBillable) ActualOvertimeWorkBillable
    ,Sum(ta.ActualOvertimeWorkNonBillable) ActualOvertimeWorkNonBillable
    ,CASE
    WHEN Sum(ta.ActualOvertimeWorkBillable) > 0
    THEN Sum(ta.ActualOvertimeWorkBillable)
    END [HOURS]
    ,DATEPART(year, ta.TimeByDay) AS [Year]
    ,DATEPART(month, ta.TimeByDay) AS [Month]
    ,DATENAME(month, DATEADD(month, DATEPART(month, ta.TimeByDay), - 1)) AS [MonthName]
    ,puv.[Project Status] AS [ProjectStatus]
    ,ruv.[Primary Role] AS [PrimaryRole]
    ,ruv.[Resource Department] AS [Department]
    ,ruv.ResourceIsGeneric
    ,ruv.[Cost Category] AS [ResourceType]
    ,puv.[SAP Project Code] AS [SAPProjectCode]
    ,CASE
    WHEN tl.ProjectName <> 'Administrative'
    THEN NULL
    ELSE tl.TaskName
    END TaskName
    ,puv.[Project Plan Type] AS [ProjectPlanType]
    ,puv.[GEM Project Manager] AS [GemPM]
    ,ruv.[Rate Code] AS [RateCode]
    ,ruv.[Cost Centre] AS [CostCentre]
    ,ept.EnterpriseProjectTypeName AS [EPT]
    ,puv.[I DO Phase]
    ,puv.ProjectOwnerName AS [ProjectOwner]
    FROM dbo.MSP_TimesheetActual_OlapView ta
    INNER JOIN dbo.MSP_TimesheetLine_UserView tl
    ON ta.TimesheetLineUID = tl.TimesheetLineUID
    INNER JOIN dbo.MSP_EpmResource_UserView ruv
    ON ruv.ResourceUID = tl.ResourceUID
    LEFT JOIN dbo.MSP_EpmProject_UserView puv
    ON puv.ProjectUID = tl.ProjectUID
    LEFT JOIN dbo.MSP_EpmEnterpriseProjectType ept
    ON ept.EnterpriseProjectTypeUID = puv.EnterpriseProjectTypeUID
    WHERE ta.TimeByDay >= @xDate1
    AND ta.TimeByDay < @xDate2
    AND tl.TimesheetStatus IN (
    SELECT ParamValues
    FROM @ParamTable
    AND ta.ActualWorkBillable > 0
    GROUP BY ...
    ) TimesheetActual
    FULL JOIN (
    SELECT ruv.ResourceUID
    ,puv.ProjectUID
    ,ruv.ResourceName
    ,puv.projectname AS ProjectName
    ,ruv.RBS AS [RBS]
    ,Sum(abduv.AssignmentWork) AS [PlannedWork]
    ,DATEPART(year, abduv.TimeByDay) AS [Year]
    ,DATEPART(month, abduv.TimeByDay) AS [Month]
    ,DATENAME(month, DATEADD(month, DATEPART(month, abduv.TimeByDay), - 1)) AS [MonthName]
    ,ruv.ResourceIsGeneric
    ,puv.[Project Status] AS [ProjectStatus]
    FROM dbo.MSP_EpmResource_UserView ruv
    INNER JOIN dbo.MSP_EpmAssignment_UserView auv
    INNER JOIN dbo.MSP_EpmAssignmentByDay_UserView abduv
    ON auv.AssignmentUID = abduv.AssignmentUID
    AND auv.ProjectUID = abduv.ProjectUID
    ON ruv.ResourceUID = auv.ResourceUID INNER JOIN dbo.MSP_EpmProject_UserView puv
    ON auv.ProjectUID = puv.ProjectUID
    AND abduv.ProjectUID = puv.ProjectUID INNER JOIN dbo.MSP_TimeByDay_OlapView tbdov
    ON abduv.TimeByDay = tbdov.TimeByDay WHERE abduv.TimeByDay >= @xDate1
    AND abduv.TimeByDay < @xDate2
    AND ruv.ResourceName <> 'Unassigned Resource'
    AND ruv.ResourceName IS NOT NULL
    AND abduv.AssignmentWork > 0
    GROUP BY ruv.ResourceUID
    ,puv.ProjectUID
    ,ruv.ResourceName
    ,puv.projectname
    ,ruv.RBS
    ,DATEPART(year, abduv.TimeByDay)
    ,DATEPART(month, abduv.TimeByDay)
    ,ruv.ResourceIsGeneric
    ,puv.[Project Status]
    ) TimesheetPlanned
    ON TimesheetActual.ResourceUID = TimesheetPlanned.ResourceUID
    AND TimesheetActual.[Year] = TimesheetPlanned.[Year]
    AND TimesheetActual.[MonthName] = TimesheetPlanned.[MonthName]

    Hi,
    you pasted just part of your query, e.g. is declaration of @ParamTable missing. Without complete query, it is difficult to see, what you are trying to do.
    Could you please provide complete query?
    Barbara
    To increase the value of this forum, please mark the replies that helped to solve your issue as answer. If you find answers to questions from other forum participants to be helpful, please mark them as helpful. Your participation will help others to find
    an appropriate solution faster. Thanks for your support!

  • Process Orders and Planned Orders data

    Hi,
    I am working on extracting process order and Planned Orders data into BW. I could not find any standard DataSources available for my req, so I want to develop generic extractor. the main key figures are Actual Labor and Machine Hours, Target Labor and Machine hours.
    Please help me if there are any standard datasource available or ECC tables to pull the data or any standard function modules available.
    Thanks,
    Reddy

    Hi Sanath,
    Thanks for your reply. I want to pull Actual Machine hours, Target Machine hours, Actual Labor hours and Target Labor hours.
    these fields are not there in PLAF table.
    I am looking for a table or datasource which can give those details.
    Thanks,
    Reddy

Maybe you are looking for

  • Limitation? Printing Address Book "Note"

    Neither I nor the One-to-One people at the SF Apple Store could figure out how to print an AB note that is more than one page in length. Is that a limitation? I have many notes longer than a page that I occasionally print.

  • Date of required availability of a purchasing order

    Hi, Is there a way to get the date of required availability for a list of purchasing orders (PO)?  What I'd like to do is extract the list of all open POs with the date they are required for production to see if they are late or not.  I'm not talking

  • Message Server in place of Application Server in DS Datastore

    Hi, I'm trying to configure my SAP Application Datastore, linking it to the SAP message server instead of one of the four SAP application nodes available. The idea is to let the message server manage on which node the DS abap will be executed. I trie

  • Attempting to set up an off site backup

    Hi, Im attempting to set up an off site back up of the business date from a LaCie Big-Nas storage unit to another LaCie Big-Nas.  All going well until I discovered that the BT Hub 3 router is not  UPnP-IGD / NAT-PMP compatible?  Can I solve this by m

  • Firefox 11 starts automatically at login - usual suspects eliminated

    How do I stop Firefox 11 from starting automatically on login? It starts automatically on one of the user accounts on my less-than-week-old Mac Air (OS X 10.7.3) is started, but not the other. I have investigated the usual suspects and found none of