Align. finish date of components

Hi Experts,
Now, our system is setting the components scheduling aligned with activity start date as default ( Components , General data tab , indicator : Algn. startdate.Comp )
Is that possible to set the default on Align. finish date ? and how ?
Thanks and Regards
Shubin

Hi Ahmed,
Thanks a lot for your quickly solution.
BR, Shubin

Similar Messages

  • Scheduled Maintenance basic start and finish date

    Hi Expert,
    I'm using WO type say PM04 for schedule maintenance. In its maintenance plan i'm using prioity "medium" that starts form 7 - 14 days.I also have already set the scheduling type in OPU7 - adjust scheduling into "Do not adjust basic dates, dep. reqmts to order start"
    after run deadline monitoring WO PM04 that generated is resulted as per below:
    basic start date: 13.08.2010
    basic finish date: 13.08.2010
    the basic dates does not reflect the priority "medium"
    pls help how can i configure the basic dates setting that align to its priority.
    Thanks
    Rgds,

    Hi ,
    plz check if the below user exit is helpful or no
    IWO10012 :Maintenance Order: Priority Handling on Central Header
    i think priority does not influence the basic start or end dates for order generated from MP ..
    regrds
    pushpa

  • Why the basic finish date is not adjusted in planned orders

    Hi, all.
    Can anybody help me to understand:
    "Why the basic finish date is not adjusted in planned orders during
    forward scheduling, but in production order basic finish date is adjusted?
    It is look like non-coordination between groups of developers.
    And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
    Am I right, or SAP have it's own logic.

    Hi,
    Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
    MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels.

  • Material Availability Date and Corresponding Basic finish date

    Hi experts,
    I have one requirement from my Business for updating Basic Finish date based on the Material availability date
    Requirement goes like this, When we enter a Component of 100 qty  in the service order , if stock is not available we get system status as MSPT and IWBK we can see how much quantity confirmed
    But i dont see any table or report which shows when this material can be available for further delivery. Based on the next available material date i have to change the basic finish date in the service Order
    Please let me know if you any report available for this or any standard approach. I want to know if any exist to leverage this functionality and logic how to get this accomplished
    thanks
    sarvan

    Sarvan,
    You would need to perform this check when saving the work order as there could be multiple components all with differing ATP dates.
    But a development could do something like:
    Read all active/open components/materials on the work order
    Determine the availability data for each component/material
    Determine the latest of the above dates
    Apply this date to the order Basic Finish Date
    You would need to ensure your scheduling parameters do not set this date back to its original value (OPU7).
    You could achiev the above through user-exit IWO10009 (SMOD) or BADI WORKORDER_UPDATE (SE18).
    PeteA

  • PR Delivery date as project finished date

    HI,
    When user is generating Service PR from project system, its delivery date is taken as a Finished date of the project. Further SAP is not allowing to edit this date.
    Can anyone let me know why it is happening. My user do not want delivery date as finished date of the project, he would like to put his own delivery date.
    Kindly  suggest
    regards
    Sanjay Karnekar

    Hi,
    I think that the date comes from the scheduling of the network activity. Go to the project builder and then display the material. On the Purchasing Data tab change the settings from 'Align the finish date' to the 'Manual requirements date'.
    If you'd like to change this setting globally, you need to maintain the customizing under
    Dates -> Scheduling of networks -> Specify scheduling parameters
    Cheers, Aleksandra

  • Trying to update Project scheduled finish date - newbie help needed!

    Guys, I am super new to Oracle Projects, I have never used it before.  I've just learned a few things in the UI and read through the docs documenting the stored procs.  My question is simple (hopefully)   In the UI I choose a responsibility, then under "Projects : Delivery" I choose "Search Projects", I enter the Project ID in the field and click Go, I am able to see all the project details and the Tasks.  No problem there!  What I would like to do through the Update_Project API is to change the "Scheduled Finish Date" of the Project.
    I have the following information that I have managed to scrape up:
    Project_id, Responsibility_id, User_id, Resp_Appl_Id
    I retrieved the project id using:
             Select project_id,name from pa_projects_all
              where name = 'My Project';
    So first I call set_global_info with the appropriate parameters, then this:
        -- SET GLOBAL VALUES
         pa_interface_utils_pub.set_global_info(
         p_api_version_number => 1.0,
         p_responsibility_id => fnd_profile.value('57203'),
         p_user_id => fnd_profile.value('1013415'),
         p_msg_count => l_msg_count,
         p_msg_data => l_msg_data,
         p_return_status => l_return_status);
         l_project_in.pa_project_id := 4608;
         l_project_in.scheduled_finish_date := to_date('2008-02-27', 'YYYY-MM-DD');
      --UPDATE_PROJECT
              pa_project_pub.UPDATE_project(
                        l_api_version_number,
                        p_commit => l_commit,
                        p_init_msg_list => l_init_msg_list,
                        p_msg_count => l_msg_count,
                        p_msg_data => l_msg_data,
                        p_return_status => l_return_status,
                        p_workflow_started => l_workflow_started,
                        p_pm_product_code => null,
                        p_project_in => l_project_in,
                        p_project_out => l_project_out,
                        p_key_members => l_key_members,
                        p_class_categories => l_class_categories,
                        p_tasks_in => l_tasks_in,
                        p_tasks_out => l_tasks_out);
    What I am getting is the message "error :Project ID is invalid" and the status is "E"
    I'm not sure why it is invalid as it is the exact Project ID from the projects table.  The only thing I can think of is that the p_pm_product_code is set to null but I am not sure where this value comes from and why it even matters.  I checked the documents and it says it refers to some external system.  Why does the external system code matter if I am changing data within Oracle Projects?

    Hello,
    Looks like you are not setting the Initialization values correctly. Oracle Project APIs are Org specific and require proper initialization before being called for them to work.
    Few things i noticed from the code is :
    1.  The following is being used to set the User ID and Responsibility ID  :
         p_responsibility_id => fnd_profile.value('57203'),
         p_user_id => fnd_profile.value('1013415'),
    I think the call should be like this. This should be used only if you are going to call the API through a concurrent program from the submit request window (Oracle Apps environment). fnd_profile.value will get the responsibility id and the used id of the user running the program and assign it to the variables.
         p_responsibility_id => fnd_profile.value('RESP_ID'),
         p_user_id => fnd_profile.value('USER_ID'),
    Or If you are directly passing the IDs hardcoded then, This can be used if you are running the script from a Non-Oracle Applications environment, for example from SQL*Plus.
         p_responsibility_id => 57203
         p_user_id => 1013415
    2. I notice that you are not passing P_OPERATING_UNIT_ID parameter in the call to pa_interface_utils_pub.set_global_info. This is fine if you are not using MOAC  and you have set MO: Operating Unit profile for the responsibility being passed.  If you are using MOAC or are not sure, then it is always a good practice to explicitly  pass the P_OPERATING_UNIT_ID parameter in the call to pa_interface_utils_pub.set_global_info.
    Note :  DO NOT use fnd_profile.value('ORG_ID') to set the P_OPERATING_UNIT_ID parameter. In a MOAC environment this may not work.
    3. Always ensure you check the return status of the pa_interface_utils_pub.set_global_info for success before calling the Project APIs. This will save you a lot of frustration when testing.
    4. You might find the following note useful
    Project API Overview and Reference (Doc ID 1424156.1)
    Regards,
    Raghavan Gopalakrishnan

  • Data display - aligning group data and carry over on new page logic - 11G

    I am fairly new to BI Publisher, so any help would be much appreciated. I am working with a standard pdf form to display Purchase Order Data. I have saved the image of the pdf as the background of the page. I have a simple table where I am inserting all the data and aligning it on the page so it appears to be in the correct place on the form.
    The form has a section containing 10 blank lines to display the PO data. Each line is .25 inches.
    The problem occurs that at the line description can have 254 characters but the space on the line allows for 51 characters. So I need to display the data something like this (for simplicity sake)
    TableA.id TableA.Description254
    Line 1 1 Blah, 1-51 characters of line descr
    Line 2 Blah blah, 52 - 102 characters
    Line 3 2 Blah, 1-51 characters of line descr
    Line 4 3 Blah, 1-51 characters of line descr
    Line 5 Blah blah, 52 - 102 characters
    Line 6 Blah blah, 103 - 153 characters
    anything that carries over needs to go to a second page with a different background image. So I have several questions.
    1. Any suggestions on how to display the PO Line, so I can substring the PO line description and display the remaining data on a following line? A second line would write the next 51 characters of data if it exists, and would not display the first column, (TableA.Id)
    2. Any suggestions on how to load the carry over data (anything over the 10 lines on the first page) and display on the following page.
    I am including a screen shot so this might make more sense. I have lightly dashed orange lines showing of my table which I use for aligning the data. It is only for reference.
    [ http://www.fifthq.com/bi.jpg|Pdf image]
    http://www.fifthq.com/bi.jpg

    Ok, just in case anyone runs into the same issue. Here was my solution.
    I added a made up record to the existing xsd template that served as a place holder for my dynamic content.
    I created an app package that has two properties.
    1. Full String
    2. Single Line String
    The Method takes in the column width as a parameter. It searches through the Full String until it finds the last available word before the column width. It then returns that as the Single Line String and updates the Full String to what's remaining.
    If I have any of the Full String remaining I keep calling the method.
    I can provide more specific details about the method if anyone needs it.

  • Planned order creation with PDS valid on only order start date and not finish date

    Hi All,
    We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date.  This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity  in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
    Is there any way in ECC to control this? Any config or customization?
    Regards,
    Santosh

    Nilesh,
    I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
    1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
    2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
    Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
    Hope this helps....
    Regards,
    Prasobh

  • How to Install Oracle Data Access Components (ODAC) on Windows Server 2003?

    I recently installed "32-bit Oracle Data Access Components (ODAC) with Oracle Developer Tools for Visual Studio" on my computer (Windows 7, 64bit). Everything seems fine and I can develop and run my application in Visual Studio 2010 and IIS 7.
    Now, when I deploy my application to the Server, it raises error:
    Exception: System.TypeInitializationException: The type initializer for 'Oracle.DataAccess.Client.OracleCommand' threw an exception. ---> Oracle.DataAccess.Client.OracleException: The provider is not compatible with the version of Oracle client
    Obviously I need to install ODAC on the server, too. My server is:
    - Windows 2003 32 bit R2 (I know, I know!)
    - IIS 6
    So. I downloaded the same installation from Oracle website (ODAC 11.2 Release 5 and Oracle Developer Tools for Visual Studio [11.2.0.3.20]) and installed it on the server. But still getting the same error.
    PS: When I was installing, I chose Oracle Data Access Component for Oracle Client 11.2.0.3.20 in Oracle Universal Installer. hmmmm. Should I choose "Oracle Server" instead? Screenshot
    Edited by: 1000434 on Apr 17, 2013 6:35 AM
    Edited by: 1000434 on Apr 17, 2013 6:36 AM

    ODP.NET, Unmanaged Driver uses unmanaged dependencies in the Oracle Client. The error you see means you have another Oracle Client installed on the Win2003 machine and ODP.NET is attempting to load the incorrect Oracle Client version, rather than the version you installed ODP.NET with.
    What you need to do is direct ODP.NET where to find the correct version of its unamanaged Oracle Client dependencies. This will be generally the bin directory of your Oracle Client home that was installed with ODP.NET.
    You can learn more about DllPath here:
    http://docs.oracle.com/cd/E20434_01/doc/win.112/e23174/InstallODP.htm#sthref94
    If you're not familiar with how to set ODP.NET settings in the Registry or .NET config files, you can read how to do that here:
    http://docs.oracle.com/cd/E20434_01/doc/win.112/e23174/featConfig.htm#sthref106

  • Process Order Basic Finish Date and Scheduled Finish Date

    Folks,
    I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
    In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
    I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
    I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
    Or does anyone have any ideas how to measure proces order performance to the production schedule?
    Thank you for your help,
    Greg

    Rajesha, thank you for your reply but it doesn't solve my problem.
    Let me restate my scenario:
    I start a process order and both the basic and scheduled finish dates are the same, June 1.
    At some point, shop floor tells me they will be late and cannot deliver until June 15.
    I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
    I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the  order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
    Thank you for your help,
    Greg

  • Finish date deleted automatically

    If I delete a resource from a taks that is marked as finish, Project automatically (sometimes) marks the task as unfinished.
    Is there any way to keep Project from trying to be too clever? In most cases there was minimal or no work needed, or done by someone else.. this does not matter as the task is finished and I'm only using Project for planning.
    Valgardur Gudjonsson

    Hi Valgardur,
    I've never heard of such a bug. Nevertheless MS Project has a powerful scheduling engine that requires to follow scheduling best practices. Such as not deleting a resource assigned on a task with actual work which results in loosing the actual.
    That being said, many parameters could create such an unexpected behavior such as the task type (fixed work or duration), constraints on the start date, deleting actual start and finish dates, other resources assined on the same task, new task
    creation date parameter (project start or current date), ...
    If you're willing to dig into this issue, please send me your file at guillaumeDOTrouyreATgcosiDOTcom (replace caps) with some more details and I'll be pleased to investigate.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • In which table we get latest finish date of operation

    Hello all,
    I have one report for planned order in which i have to display the latest finish date of all the operation in that particular plnned order.
    can you please tell me from which table i can get the latest finish date of the operation.
    I have used the table KBED, but in table KBED i am not getting data for all the operation in planned order. I am geting only one or two operation in table KBED.
    Is there is any other table or any other way by which i can find the latest finish date for the opeartion.
    Please help.

    Hello Rudra,
    I don't want dates of planned order.
    In planned order we have number of operation.
    I want latest finish date of these operation,
    In table KBED we get the latest finish date but i am not able to get details of all the operation.
    In table KBED i am getting detials of only two operations where as in planned order i have 7 operations.
    Thanks

  • How to get the finished date of production order

    hi guys
    now i want to get the finished date of production date.  when i search in the table afko , i found the field GLTRI is '0000.00.00'.
    BUT IN the production order display view , the confirm date is '2007.1.1'. so how can i get the confirm date with the production order number? thanks.

    For costing report, you have to read the following tables: based on material Qty/value/ Machine rate and machine posting date , machine rate ( T-code kp26)  and also types of material Raw, finished and semi finished ..
    AFRU ,AFPO,AFKO,AFVV,AFVC,CAUFV FOR PRODUCTION ORDER.
    For material calculation MARA, MSEG and MKPF as well as MAKT...
    Hope this’ll help you .
    Thanks

  • Get earliest finish date for a task of cProject

    i found this method CL_DPR_TASK GET_SCHEDULE_ATTRIBUTES to retrieve earliest finish date.
    but i don't know how to assign the parameter IR_SCHEDULE_OBJECT to this method.
    could you help me with this?
    if i don't use this class, is there any other way to fetch the earliest finish date for a task of project?
    Edited by: Duan ZZ on Aug 26, 2010 5:11 PM

    Hi,
    Have you passed the correct GUID?
    I have tested it in my system. It returns the required data.
    Regards
    Sejo

  • How to check if Oracle Data Access Components  is installed?

    How to check if  Oracle Data Access Components is installed and version on my computer?
    Also How to check if Oracle Data Provider is installed and version?
    TIA
    Steve42

    Regedit HKLM->Software->Oracle.  See what's there...
    At the very least, that can give you paths and can check file versions from there.

Maybe you are looking for

  • Error while creating organization in OIM 11.1.1.5.6

    Hi all, I am seeing the below mentioned issue while creating a new organization in OIM. oracle.adf.controller.ControllerException: ADFC-10001: cannot instantiate class 'oracle.iam.consoles.orgmgmt.tf.createorg.OrganizationCreateBean' This appears as

  • Printing text to form using Pages

    I have a paper form that is 2.75 x 6 inches and I need to print information on it. The text would always be the same. How can I set this up. I have tried but no matter how I set it up the text prints in the middle of an 8.5 x 11 sheet not starting at

  • Ping not using FQDN

    Hello, I'm having an issue with one user (Windows 7 32bit, IE 9) that when he tries to ping one of our servers, for example:  ping can6800vm031.  It pings can6800vm031.abc.com instead of pinging can6800vm031.na.abc.net (abc is our company name).  Thi

  • What happens if I reset cache on iTunes?

    I have iTunes 10.3.1 I want to know What happens if I reset cache on iTunes? also, I have deleted every photo on my iPhone, and iTunes says that I still have 1.22 GB of photos, is it wrong?, or there can be hidden photos some were in my iPhone?

  • Two thursdays in a week

    I use ical - 10.6.7 - and this week got two thursdays in a week - and no saturday. Only in week view. Tried to backup calendar and restore - still two thursdays. And inconsistency in events the following days. What can I do