Material Availability Date and Corresponding Basic finish date

Hi experts,
I have one requirement from my Business for updating Basic Finish date based on the Material availability date
Requirement goes like this, When we enter a Component of 100 qty  in the service order , if stock is not available we get system status as MSPT and IWBK we can see how much quantity confirmed
But i dont see any table or report which shows when this material can be available for further delivery. Based on the next available material date i have to change the basic finish date in the service Order
Please let me know if you any report available for this or any standard approach. I want to know if any exist to leverage this functionality and logic how to get this accomplished
thanks
sarvan

Sarvan,
You would need to perform this check when saving the work order as there could be multiple components all with differing ATP dates.
But a development could do something like:
Read all active/open components/materials on the work order
Determine the availability data for each component/material
Determine the latest of the above dates
Apply this date to the order Basic Finish Date
You would need to ensure your scheduling parameters do not set this date back to its original value (OPU7).
You could achiev the above through user-exit IWO10009 (SMOD) or BADI WORKORDER_UPDATE (SE18).
PeteA

Similar Messages

  • Production finish date differs from basic finish date in backward schedulin

    Hi, experts.
    When i do scheduling the planned order,
    production finish date differs from basic finish date in backward scheduling as below.
    Scheduling: Backward
    Basic finish date : 2010.01.22
    Basic start date : 2010.01.21
    Production finish date : 2010.01.23  09:00:00
    Production start date ; 2010.01.22 03:57:09
    *GR time : 0.
    *Scheduling Margin key : 0.
    I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
    Please reply me.
    Thanks.

    Dear Jong,
    1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
    2) you must find a exception Mssg for that plan order in MD04
    3) basic scheduling take the time from material master & lead time scheduling will take time
    from Routing
    Regards
    Madhu

  • Req. delivery date and plan order finish date relationship

    Dear Experts,
    I have a question on setting the req. delivery date and plan order finish date relationship. Now, I want the plan order finish date is one day before the req. delivery date, is it possible to set it in configuration? Please advised! Many thanks!
    Regards,
    Matt Yim

    Matt,
    Please use a schedule margin key(SMK) in the material master MPR2 view which has float after production defined as 1day.
    If there are no SMK with that defination then you can define you own in customisation and assign the same in the material master. (SPRO--->Production ->MRP->Planning ->Scheduling and Capacity Parameters->Define Floats).
    Regards,
    Prasobh

  • Process Order Basic Finish Date and Scheduled Finish Date

    Folks,
    I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
    In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
    I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
    I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
    Or does anyone have any ideas how to measure proces order performance to the production schedule?
    Thank you for your help,
    Greg

    Rajesha, thank you for your reply but it doesn't solve my problem.
    Let me restate my scenario:
    I start a process order and both the basic and scheduled finish dates are the same, June 1.
    At some point, shop floor tells me they will be late and cannot deliver until June 15.
    I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
    I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the  order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
    Thank you for your help,
    Greg

  • Basic start date and basic finish date in the maintenance sub-order

    Hi guys,
    when I create a maintenance sub-order by the transaction IW36 are the Basic start date and the Basic finish date taken,inherited from the principal Maintenance order?And if it is in this way,is there the possibility to put these two dates as a current day only on the  maintenance sub-order ?Thanks in advance...
    Maximilian

    Here is my code
      DATA : lv_date_diff TYPE i.
      lv_date_diff =  caufvd_imp-gltrp - caufvd_imp-gstrp.
      caufvd_exp-gstrp = sy-datum.
      caufvd_exp-gltrp = sy-datum + lv_date_diff.
    This is a 4 year old answered message. Please open a thread for your specific query.
    -Paul
    Moderator
    Edited by: Paul Meehan on Nov 24, 2011 8:42 AM

  • Work Order Basic Start Date and Basic Finish Date to be changed

    Hi,
    Currently the business creates work orders without specifying the work resulting which the start and fish dates on work order are same. Also we have automatic scheduling turned off. In spite of this If I am trying to manual modify the basic start and basic finish dates on work order it does not allow me to do so. This issue is seen with work orders which are Released whereas orders with status outstanding have no issues. Could anyone please let me know what could be the reason?
    Thanks,
    Vinay

    Please check whether Scheduling type only capacity requirement is configured.
    If yes, choose this scheduling type in order, you can able to change Basic start date & basic finish date.

  • Why the basic finish date is not adjusted in planned orders

    Hi, all.
    Can anybody help me to understand:
    "Why the basic finish date is not adjusted in planned orders during
    forward scheduling, but in production order basic finish date is adjusted?
    It is look like non-coordination between groups of developers.
    And lead to situation, when planner don't see in MD04 when he can really wait material receipt. He must go to planed order and check production data there, it's unusable."
    Am I right, or SAP have it's own logic.

    Hi,
    Production orders are different story. Since production order is a constant element, they are not created in the course of MRP, basic dates can be adjusted. In production order basic finish date is adjusted, but you won't see for the upper level materials', basic dates of the planned orders adjusted according to the prodcution order you create. Production order is consistent within itself in terms of date and is not dependent to other elements of MRP, but planned orders are not like that.
    MRP creates planned orders whose basic finish dates are calculated by subtracting goods receipt time from production start date of the source of requirement. MRP works backwards without changing directions. Meanwhile if any production finish date is calculated different than the basic finish date due to forward scheduling, in order not to violate the alignment between the basic finish date and source of requirement's start date, basic finish date is not adjusted. If it was, dates of all the planned orders calculated so far at the upper levels of the BOMs had to be recalculated, otherwise all the consistency of all the dates is violated. This cannot be done because changes in any level affects all lower levels.

  • Basic finish date earlier than basic start date while backward scheduling

    I am encountering an issue where in when I am selecting backward scheduling for a process order and I am entering the Basic finish date, afte which system is giving me a Basic startdate which is after the basic finish date.
    For eg:- When i give the basic finish date as 08.12.2011, system is giving me basic start date as 09.12.2011
    I have checked the recipe of the material. In the recipe one major flaw that i found out was that all the activity timings were maintained as 0. But when i created a similar scenario in the testing client, i am not getting the issue.
    Please help.

    Hi,
    Check what is maintawined in number of days the start day is allowed to be in the past in scheduling parameters of the order type, in OPU3. If there is an opening float defined in schedule margin key of the order, and concerning this float backward scheduling finds a start date which falls into past, lead time scheduling will automatically switch to forward scheduling starting from today. 9.12.2011 could have been deducted this way. Also check the factory calendar if days upto 9.12.2011 are defined as working days.
    Regards.

  • Need to count the number of times the Basic Finish data chages

    HI Expertes,
    I have a requirement I need to count number of times the Basic finish date chaged for PM work order. I went throug our forums I got some info like using a standard function module
    CHANGEDOCUMENT_READ_HDRS_ONLY
    CHANGEDOCUMENT_READ_HEADERS
    CHANGEDOCUMENT_READ_POSITIONS
    But all the above function module will not be suitable for my requirement since  CHANGEDOCUMENT_READ_HDRS_ONLY it gives whole changes but my requirement is just need number of changes occurred in Basic Finish date but CHANGEDOCUMENT_READ_POSITIONS can give the filed number which has been changed but still I need change id.
    So kindly suggest me wether there is any other Standard FM to get number of changes occurred in Basic Finish date?
    Thanks,
    Rajesh

    Hi Debbie,
         To count the number of groups please try the folling steps:
    1) Create a formula @reset and place this formula in the page header
        whileprintingrecords;
        numbervar i:=0;
    2) Create another formula @evalgroup place this in the group header where you want to count the values.
        whileprintingrecords;
        numbervar i:= i+1;
    3) Create another formula @display and place this in report footer.
        whileprintingrecords;
        numbervar i;
    In order to display the count of details which are printing in the detail section place the eval formula in the detail section and the @display formula in the group footer.
    Hope this helps!!!
    Regards,
    Vinay

  • Collective orders header order basic finish date is not changing

    Hai all,
    I am working on collective orders. The header order has Basic finish date as 17.05.2011 . Now i have changed this date to 10.05.2011 and re scheduled the order . But again system changing the Basic finish date to 17.05.2011. how to solve this.
    In the outline dates also i have given finish date 10.05.2011 it is remaining the same but order Basic finish date is not changing and schedulded dates are also not changing. can anybody help.

    Hi gurus,
    In a collective order suppose the lead order is having three child orders.  Kindl
    If one of the child order is partially confirmed is the entire collective order can be rescheduled.
    If one of the child order is Fully confirmed is the entire collective order can be rescheduled
    Can any body help me out

  • Change of Basic Finish Date for a Maintenance Order

    Hi Experts,
    I have a requirement where I need to change the Basic Finish Date of an order. Currently in config for order type and plant combination, scheduling parameters are set as:
    Adjust to Basic Finish Dates
    Automatic Scheduling.
    If in an order, I remove the tick for Automatic Scheduling, I am able to change that but I am not supposed to do that.
    Can you suggest me how thisissue can be resolved. Remember, changing the Config is not an option.
    Regards...

    hi
    Since you have done the adjust basic dates ,kindly change the operation dates ,which will automatically change the dates specified in the operation dates
    regards
    thyagarajan

  • IW31 - Modify Basic Finish Date

    Hi Gurus,
    I'm looking for a badi or user exit that allows me to modify the Basic Finish Date in the IW31/IW32 transactions just before saving.
    I've tried the following ways without any succes:
    - IWO10009 - Function Module --> EXIT_SAPLCOIH_009
    This user exit is treggered before saving (as I would like to) but I'm not able to modify any field. It is used to active the automatic order release when saving the order.
    - IWO10012 - Function Module --> EXIT_SAPLCOIH_012
    It allows me to modify the CAUFVD-GLUZP, CAUFVD-GLTRP fields, but this user exits is triggered when the priority field is modified.
    - BAdi WORKORDER_UPDATE --> I've tried to implement this BAdi but all parameters in the methods AT_SAVE, BEFORE_UPDATE are type = IMPORTING so SAP does not allow to modify them. I've tried it using field symbols but I thing that I've done something wrong.
    Is there another way to do it?
    Thanks and regards,
    Sergi.
    P.D.: I've looked for it in the forum threads but I could not find any valid answer.

    You can use function module CO_IH_SET_HEADER in user-exit IWO10009 (at save).
    Search for more details using "CO_IH_SET_HEADER"
    Be very careful when using this technique as it caould cause data inconsistencies.
    PeteA

  • Set Basic finish date in serviceorder with today + 10 days

    Hi,
    when we create an service order (IW31) the Basic start date and Basic finish date has default
    value of today.
    I will set Basic final date as default with today + 10 days.
    I have search in SPRO but don't find any way.
    Is there an EXIT or BADI to do this?
    thanks.
    Regards, Dieter

    Hi Paul,
    thanks for your answer, i have tried it, but no effect.
    I have to clear what i really want to have (sorry that i havn't done it in the first thread.
    First we create an Service notification via IW51, and go direct via "create" button to "create order".
    A little popup is shown to insert order type, planning plant, main work center. After press enter
    we are in create Service order (with revenues) at this time i don't insert any value.
    Now the value of "Basic start date" and "Basic finish date" has a value of today, it seems that these
    value are set as default, priority is empty.
    Now i want that the 2 date-fields are set as default with today and today + 10 days.
    How can i do this?
    Regards, Dieter

  • Changing basic finish date in Preventive maintenance orders

    Hi Experts,
    My requirement is to block PP work centre when maintenance schedule the equipment for preventive maintenance. I am making system condition as zero in generated preventive maintenance order but basic finish date is not changing in the order automatically. Can anybody please explain how to bring this? Finally my requirement is system should change basic finish date and time as time given in operation of task list.
    Thanks in advance.
    best regards,
    Srinivas M

    Hi Praveen,
    I have done all setting and tested but there is no change.
    My client requirement is like this - whenever maintenance plans are scheduled, for the scheduled dates, production capacity should not be considered by production. We could do this for breakdown orders but not happening for PM orders unless we change the finish date.
    The issue is to get the finish date automatically when scheduling maint.plans with respect to values given in operations. Please suggest how to get the  basic finish dates automatically.
    best regards,
    -Srinivas

  • The Basic Finish date is a Day earlier than Planned date

    Dear Experts,
    I am getting a strange behaviour about Maintenance order Basic Finish Date when generated from Maintenance Plan. I have Customizing settings (TCode : OPU7) Adjust: "Adjust Basic dates, adjust dep reqmts to order start date" and scheduling type : Backwards in Time. For this setting Order Basic Finish Date is a day earlier than Planned date , but when Schduling type is Backwards instead of Backwards in Time, Basic Finish date is same as Planned date.
    Example: The start of cycle of a monthly plan is 14-Nov-2010, 1st Planned date is 14-Dec-2010. When Scheduling type is " Backwards in time" , the order generated is having Basic Finish Date as 13-Dec-2010 .And when Scheduling type is "Backwards" , Basic finish date is 14-Dec-2010.
    Thank you.
    -Malay-

    Hi there,
    Please check the primilinairy buffer in your strategy package. This field have an effect on your order start date.
    But I agree on Pete, you should use a forward planning.
    Regards,
    Johan
    Edited by: Johan Zeeman on Dec 17, 2010 11:29 AM

Maybe you are looking for

  • Implementing SQL Server Reporting Services with a Java EE Application

    Hi All, I need to find some tutorial on "Implementing SQL Server Reporting Services with a Java EE Application" for my j2EE application. Until now i have searched a lot of sites but have not any thing related to this topic. I am using apache axis alo

  • Create single PO with multipule items from soco in massive way

    we need to create one Purchase Order from SOCO to multipule items. In one cart we have 50 items with no vendor. How can we create one PO to all 50 items in massive way from SOCO? If we will not enter vendor to all of the items, every item will be in

  • Problems with built-in installer (sparkle)?

    i've recently started getting errors while trying to install updates to various apps i use. after downloading the new update it would say "extracting archive" then i get this window: !http://www.tobor68.com/images/error.jpg! it's happened with yahoo

  • Not seeing what I should.

    How is it possible see a page in Design View (incomplete) that is very different from seeing it in the browser. This one IS complete! Eleanor T. Culling Leavenworth, WA European Alps Photos http://www.eleanorstravels.com/photoblog-issue19.htm

  • Add-On works on debugging but disonnects when use ard file

    Hi all, I have created a selection on the User Menu "Extract Crystal Report"  which  calls an .exe file and opens a .rpt file. When I run the code on debugging environment it works fine. However, when I compile the code and use the ard file on SAP, b