APO Constrained and unconstrained Forecast for a Product, Location

Hi Gurus,
Please let me know the simple ways to get the constrained and unconstrained forecast for a product / location. I am new to APO, so please help me to send the detailed information. I would really appreciate it.
Thanks in advance for your wonderful help.
Best regards
Nagarajan

Nagarjan,
When you run the fortecast in DP you consider the sales history. Now, this sales history is actual sales. While forecasting all that is considered are these values of the past and not the present and future capability to actually meet this forecast. Its just plain statistically generated numbers. Now suppose based on your sales you generate the following forecastL
Jan 1000
Feb 1000
Mar 1500
This is then released to SNP. Use the TX /sapapo/mc90. The idea is now to EVALUATE THIS FORECAST AGAINST OUR CAPABILITY TO SUPPLY, IN OTEHR WORDS CONTRAINTS!
After releasing to SNP you can do a finite planning taking into consideration constraints such as Capacity, vendor capabilities, procurement constraints etc... Its almost always the case that the exact numbers cannot be met and thats whgy we do all the replanninga and levelling and rescheduling etc etc...
In SNP you can run an unconstrained pla., You can then level this using SNP capacity levelling. Remmeber this process may span certain levels like DC- > FG Plant -> SFG Plant etc...
After considering supply capcbilities you can come up with a REVISED forecast:
Jan: 800
Feb: 1000
Mar: 1600
Note that for March you are able to take an increased volume. You can now release this plan to DP back again to tell it that this is the demand I can meet and this is what should be planned. This can be done using Tx /SAPAPO/SNPFCST or /SAPAPO/LCOUT
Hope this clarifies.
Abhi

Similar Messages

  • HT1339 my older iPod my husband wants to use and his netbook does not have cd drive. How do I down load iPod and iTunes info for this product so he can now use it?

    my older iPod my husband wants to use and his netbook does not have cd drive. How do I down load iPod and iTunes info for this product so he can now use it?

    Your question(s) is/are a little hard to understand.  So your husband has an iPod as well as a netbook and he wants to be able to sync iPod with this netbook is that correct?  If so, he'll need to first download and install iTunes assuming the netbook is running some version of Windows such as 7, Vista, or XP.
    http://www.apple.com/itunes/download/
    As for importing or ripping music, he'll have to either use an external CD/DVD drive that is attached via USB or rip the songs to another PC you have with a built in CD/DVD drive.  Once you have imported them to the other computer, you can transfer the songs to an external hard drive or to his iTunes library via Home Sharing.
    If this isn't quite what you were looking for, please clarify.
    B-rock

  • Releasing a portion of Forecast for SAME product to SNP and a portion to R3

    After running  DP forecasting, can a portion of the forecast for the SAME product be released to SNP and a portion transferred to R3 ?
    The requirement here is for a product, say Prod1, demand comes from 2 Business lines. Through Project System u2013 PS module, system differentiated the business lines
    From a DP phase 1 perspective, client want to do global forecasting for 2 business lines
    The challenge we r facing is demand coming from Business line 2 cannot be consumed in SNP as demand comes in the form of Automatic Reservations and CIF doesnt have the capability to CIF automatic reservations. Standard CIF only cifs manual reservations. So client wants the forecast for Business line 2 (Note that this is for the same product) to be transferred to R3.
    So can a portion of the forecast for the SAME product be released to SNP and a portion transferred to R3 ?
    TIA

    Hi Visu, thanks for the reply
    So if If I want to release the demand plan as a background job to both R/3 and SNP based on certain characteristic(Business Line), I  am thinking of doing the below things.
    Release to R3 -- >
    1. Create a Transfer Profile
    2 . Create an Activity using "MC8T- Define Activities for Mass Processing" and assign this transfer profile to the activity.
    3. Create a Planning Job by selecting a Selection ID( that has the demand separation characteristic)
    4. Schedule the Planning Job
    Release to SNP -- >
    1. Create a Release Profile
    2 . Create an Activity using "MC8T- Define Activities for Mass Processing" and assign this Release profile to the activity.
    3. Create a Planning Job by selecting a Selection ID( that has the demand separation characteristic)
    4. Schedule the Planning Job
    However, I am not sur eif I can do the follwoing.
    1. Can I create a SINGLE Planning job to release demand BOTH to R3 and SNP ?
    2. If I am using Different Key Figures in the planning area( per business line), do I have the need to maintain a separate characteristic value in the POS, as anyway I can load the data from cube to these separate key figures based on business line ?
    3. MOST IMPORTANTLY, if I use different planning jobs to release to R3 and SNP, I can have different selection ID's ( per business line) and select these in the planning job instead of maintaing TWO DIFFERENT Key figures. do you think this is feasible ? Any thoughts/advice ?
    TIA

  • Displaying stock and sales orders for aggregated product in Product View

    Hello,
    We have successfully created an SNP aggregated planning scenario which uses CTM to plan purchase requisitions and planned orders at the aggregated product level.  The disaggregation to the sub-product level is working as well.
    We have one issue.
    We would like to be able to use the Product View (SAPAPO/RRP3) to view the sales order and stock information for both the aggregated products and the sub-products. 
    Currently, the sub-products (which are the materials in the stock and sales orders functions in ECC) show the disaggregated planned orders and purchase Reqs, and the sales order and stock information in the Product View.
    The aggregated-products (which aren't included in the ECC sales order and stock functions), only show the aggregated planned orders and purchase Reqs. 
    Is there a Product View configuration which will show the aggregated stock and sales orders in the aggregated product view?
    thanks in advance for any comments and/or assistance.
    Sarah

    Hi Sarah,
    The Product view configuration is available under customisation menu under the below path.
    spro > sap guide > APO > supply planning > PPDS > settings for order view/product view
    Under this, you can configure your customised product view structure.
    Regards,
    R. Senthil mareeswaran.

  • Attributes and attribute values for a Product

    Hi all
    Is there any table or FM from where I can get a list of all the attributes and the attribute values linked to a particular product?
    I got tables which link product with Prod Category, Prod Category with Set types and so on.
    Could anyoe please provide me an FM which will give the attribute and its values for a particular product?
    Please help!!
    Regards
    Debolina

    Attributes created under s settype will be under the table with the name of that particular settype itself i.e Table name and the settype name are the same.
    The other part of your question of where to find the list of all settypes and their corresposing attributes, you can make use of COMM_PR_FRG_REL.
    Regards,
    Harshit

  • How to rate and give review for the product in SharePoint Contoso demo site by the customer/user from publishing site?

    Hi,
    I am new to SharePoint, and am working on Contoso demo site.
    I want to know where to give star rating and review for the product in SharePoint Contoso demo site. Even after spending enough hours i didn't find solution for this problem. All the answers i got was changing the List/Library settings -> Rating settings,
    if i follow that, i get the rating column displayed in my catalog site. How can i bring it on my publishing site and let the customers give rating or review for the product from publishing site. Is there any OOTB feature in sharepoint or it shoul be customized.
    Thanks in advance. 
    Akshaya

    Are you using the Content Search Web Part?  Just tweaking that once the source library has had the rating column applied should work.  Have you tried this?
    Steven Andrews
    SharePoint Business Analyst: LiveNation Entertainment
    Blog: baron72.wordpress.com
    Twitter: Follow @backpackerd00d
    My Wiki Articles:
    CodePlex Corner Series
    Please remember to mark your question as "answered" if this solves (or helps) your problem.

  • Flash learning interaction and Course Builder for CC products?

    Hi all, Could anyone advise me where I could get extension Flash learning interaction for Flash CC and Course Builder for Dreamweaver CC? Sometimes their use and after stopping the development of eLearning Suite I anywhere on the Adobe site found these extensions.
    Thanks for any response.
    Yarik

    You would be better advised to ask these questions on the Flash or Dreamweaver forums.  This is the Adobe Captivate forum.

  • APO DP and Financial Forecasting

    Hi all,
    Can you use APO Demand Planning's available forecasting methods(MLR or Time Series) for Financial forecasting.
    I think using DP for financial forecasting is stretching Demand Planning but I would like to hear from folks who have either come across using or validating the question if DP can be used for financial forecasting. Is it even possible.
    Are there any alternative tools?
    Appreciate your response.
    Syed

    One challenge to do Financial Forecasting in DP is to be able to maintain  exchange rates in your system current if the DP footprint is multi-regional and have conversions to one specific currency. I think if you have technical setups to do this, it should not be an issue to do Financial Forecasting. APO DP offers quite a few sophisticated ways to do Forecasting like MLR, Holt-Winters, Composite, Linear Regression etc.

  • After migrating CS3 to new Macbook Pro Retina... I get and error: "Licensing for this product has stopped working"...

    Don't have old discs to reinstall nor serial number (unless I can use the serial number that appears on the product info on my previous mac).
    I know that there are other forums indicating some steps to take. I've tried some of these steps but have not had much luck.
    If I reinstall the programs on my old mac I am afraid that I wont be able to re-access them if I cant get either computer to work...
    Thanks!

    The problem is that migrating Adobe applications doesn't work.
    You'll have to clean all the CS stuff off the new computer with the Adobe Cleaner tool:
    Use the CC Cleaner Tool to solve installation problems | CC, CS3-CS6
    Then install with a new clean install file here:
    Other downloads
    However, be aware that CS3 often does not work on the latest Mac OS X versions!

  • How to create constrained or unconstrained Kerberos and know whether the back end is constrained or unconstrained Kerberos?

    Hello Community
        I am considering Kerberos Authenication but there seems to be
    2 kinds of Kerberos: constrained and unconstrained.
        Since when creating Kerberos you are only offered things like "Negotiate\Kerberos"
    Or "Negotiate" or "Setspn" the question is how do you create a constrained
    or unconstrained Kerberos and since the back end has to match how do you
    do you know whether the back end uses constrained or unconstrained Kerberos?
        Thank you
        Shabeaut

    Kerb is used for one of several scenarios:
    - connecting SP to SQL databases, which provides assurances around the connection between the SP service accounts and the SQL service accounts
    - connecting SP to external systems (such as SQL databases, which may be used by BCS, Excel, PerformancePoint, PowerPivot, etc).
    Constrained Delegation is not necessary for SP to use Kerb when connecting to SQL. it IS necessary for SP to talk to external systems (since Constrained Delegation is also known as "Kerberos with protocol transition", since it's
    transitioning a Claims based auth token to a kerberos based auth token).
    The difference is a setting in AD's Delegation tab, for the service account that will be collecting the users' login (presumably the webapp), and for the service account that will be performing the double-hop (presumably the service apps)... in addition
    to the kerb setting, you also need to specify EXACTLY which endpoints can be reached using the Kerb + CD... unconstrained delegation (the default) allows the Kerb token to be passed anywhere... constrained delegation only allows the Kerb token to be used
    by the places you specify (in the delegation tab)... such as the SQL server that the PerformancePoint scorecards will be querying.
    Links:
    - Microsoft's Kerberos guide : http://www.microsoft.com/en-us/download/details.aspx?id=23176
    - more links : http://www.sbrickey.com/Tech/Blog/Post/SharePoint_Troubleshooting_Kerberos_and_External_Data_from_Excel_Services
    - some health analyzers to find problems and recommend solutions : http://sdssharepointlibrary.codeplex.com/releases/view/92022
    Scott Brickey
    MCTS, MCPD, MCITP
    www.sbrickey.com
    Strategic Data Systems - for all your SharePoint needs

  • Function module to get PPM for given product and/or location

    Hi,
    I want to check whether any PPM is existing for given product, location.which function module i can use for the same.

    There is a BAPI that might help - BAPI_PPMSRVAPS_GETLIST which has product and location selection criteria.
    Regards
    Laurence

  • APO SPP: No Historical Forecast visible in transaction /SAPAPO/SPPFCSTTRACK

    Hello
    I am trying to view historical forecast data via transaction /SAPAPO/SPPFCSTTRACK in APO SPP. However i get the message "No hist. fcst time series can be determined".
    The forecast strategy is correctly assigned to the product & the standard deviation period is populated as 12 months.
    The forecast periodicity is months.
    When I execute the forecast using planning service manager or interactively, it correctly calculates the forecast in future as well as ex post forecast in the past. I believe the historical forecast is calculated immediately with the forecast run.
    Can anyone help to identify if some setting is missed or any specific planning service is required to be executed to enable historical forecasting. Thanks in advance

    Hi,
    If the transaction /SAPAPO/SPPFCSTTRACK does not provide any information regarding Historical Forecast data (while you have already performed the forecast for the certain location product) then you probably haven't created a new forecast with a different model. For example, if you created the first forecast with Moving Average then you need to change the Forecast Strategy to an another one (or run Automatic Model Selection which should also select a different strategy). In case when the new Forecast Strategy differs to the previous one, then the appropriate trigger (SPP_FCSTMODEL_CHANGE) will be created for recalculation of the Historical Forecast. Of course, if the trigger is created, you also need to run a PSM service for the recalculation which should be configured for the location product you need to process.
    (You can find more information regarding this [here|http://help.sap.com/saphelp_scm50/helpdata/en/43/300e47bd9e2227e10000000a422035/frameset.htm].)
    Best Regards,
    Zsolt
    Edited by: Zsolt Csoka on Jul 14, 2011 11:06 AM

  • Forecasting of a product

    Hi
    This is a general case ....
    Suppose if i have a new product...say a "X" ..which is a new one , one of its type . Now i want to do a forecast for this product.
    There is no history for this product , there is no old product which is similar to this one, also there is no competitor data available for this to do a forecast...
    Which are the possible methods by which forecast can be done for this , or how can forecst be done for this ..Please help...
    Regards
    RK

    Hi Rakesh,
    For forecasting a product, historical data always helps to fix the exact
    forecast.
    In cases, if you dont have forecast history available, then you can choose
    one of the following ways
    1) Try with manual forecast based on intelligence based forecasting
    2) Try using customer given forecast if available
    3) Try generating own forecast values which matches budget and overall
    sales figures
    4) Try using similar products which were sold in the past and if you feel
    that data will match somehow and then you make modifications in the
    outcome generated
    I suggest you can go far manual forecast based on the marketing advise
    and customer needs in order to avoid pile up of inventory
    Regards
    R. Senthil Mareeswaran.

  • Unable to display the pricing conditions for a product.

    Hi All,
        I have created a product with help of function modules.The problem is that i am able to populate the pricing conditions data into internal table,but the pricing conditions  is not being displayed in the Masterdata->Products-> Maintain Products screen. Can anyone suggest me in this regards.Is there any function module to be used? or any other procedure to be followed for the pricing conditions to be dispalyed? If any sample code also please provide me.Please respond soon it is an Urgent Requirement. Points will be awarded for useful answers.
    Thanks in Advance,
    Shwetha.

    Hi,
    The pricing in SD and MM is a separate module like thing and is maintained for different products based on the Condition records.
    The basic Pricing Procedure consists of Condition  Types, Condition Records, Accesss Sequences and condition tables.
    Generally with respect to all sales and purchase documents the pricing is maintained in KONV  and KONP tables based on the different condition types.
    reward points if useful
    regards,
    ANJI

  • "Licensing For this Product Has Expired" (But I just bought it!)

    I'm having an installation problem, with Adobe CS4 Design Premium for Windows on Vista(64).  For technicality purposes, I believe everything installed fine, but I have not been able to open the programs even once, which apparently means this is an installation issue.
    Here's the situation:
    I had a trial version of Photoshop CS4, it expired, I uninstalled it (or at least went to Control Panel-->Programs And Features--->"Uninstall"), bought Adobe Premier with my student discount, installed it with the new serial number and the 2 CDs without any problems (so I thought), but now every time I try to open any CS4 Program (Photoshop, Dreamweaver, Illustrator, etc.--anything but Acrobat Pro or Bridge CS4) I get a message saying, 'Licensing for this product has expired.'
    I found an equivalent issue with Macs and there appears to be a quick fix:
    "The tech had me remove APPLICATION SUPPORT > ADOBE > ADOBE PCD > cache > cache.db (to trash)"  This apparently solved the problem.
    Does anyone know an equivalent fix for Windows PCs?
    I've have tried downloading the fix from the following website:
    http://www.adobe.com/support/contact/licensing.html
    (Running this multiple times, rebooting, etc.) but I believe the above website is just for problems of "License has stopped working" and not "Licensing for this product has expired"
    I also tried setting my laptop's date/time back to May 31st 2009 following these instructions:
    http://kb2.adobe.com/cps/494/cpsid_49485.html
    but when I do that, I get the original, 'Accept these Terms' page, and as soon as I click "I agree' that page disappears, and nothing else happens. My computer works fine, but the program does not start. Therefore I can't deactivate the program/serial number, reset the correct date, start the program, and enter the proper serial number.
    Any chance someone knows the appropriate Windows File to remove to solve this problem?  Or have any other advice?
    Many thanks in advance,
    Kevin
    PS--I've tried to stay professional about this situation, but it really has me livid.  I'm appalled that something that cost me 300+ dollars (and I am fully aware it costs most honest people significantly more) could have caused me to waste the better part of a day, and get so frustrated, and I am still no closer to a solution.  If it doesn't get resolved soon I am tempted to try returning the software as 'defective' (which for all intents and purposes it is) or never buy an Adobe product again.  My friends have less trouble with the cracks/keygens/etc out there, and they're up $300+ on me.

    UPDATE:
    So, I took John T. Smith's advice (thanks for the phone number--relatively short wait time compared to the other number I had tried), and called Customer Service.  I got the usual run-around, where the first guy wanted me to try all the things I described in the original post. Had me try something else (which involve reinstalling) which didn't work. Finally, the next gal I talked with admitted she didn't know the solution, and the problem would be 'upgraded' to the next higher level of presumably smarter tech people.  I asked the time frame for this, and she said 1-2 days, which I wasn't happy about, and finally spoke with her supervisor.  This person walked me through the uninstallation, and had 'some files' I should delete.  AND FINALLY, I GOT WHAT I WANTED:
    He said if I just removed/deleted the following file:
    C:\Program Files(x86)\Common Files\Adobe\AdobePCD\Cache\Cache.db
    So the order he wanted me to do it was:
    Uninstall CS4 Design Premium (with windows vista Program and Features in the Control Panel, remove the above file, restart my computer, and reinstall the software. The reinstall didn't go smoothly the first time or two (early on, it said Illustrator, Photoshop, etc could not be installed..) so I just closed ALL programs, and tried again) and finally everything works, or seems to!
    From what I read on a Mac forum with the same problem, it seems like I might not have had to uninstall/reinstall the whole suite (which I wish I'd tried, because it would have saved me nearly 2 hours).
    But at any rate, everything seems to be working.  I wrongly assumed the PC version would have had a different culprit file to be removed.  I wish I'd searched my hard drive for the AdobePCD folder earlier.  But...now I am happy.
    Cheers, and I hope this post might be of some help to a poor unfortunate lad with the same problem I had.

Maybe you are looking for

  • Error while using BAPI_SHIPMENT_CHANGE?

    Hi all, I am using BAPI_SHIPMENT_CHANGE to change shipment details like FwdAgent , GC / Way Bill N and Dead Line Tab from Planning to Shiment end. I am getting following error... in BAPI Return .. Action table and data table have different numbers of

  • How to control the DECIMALS in the ALV?

    dear all ,i want to control the display of the decimals of a field in the alv . and i find one  attribute"decimals" in the structure of LVC_S_FCAT . the relatived code  is : ls_fcat4004-fieldname = 'TARGET' .   ls_fcat4004-ref_table = '' .   ls_fcat4

  • Required field check in ALV

    Hi, I'm trying to make a required field check on a ALV field. I can see that the function works as required and produces an error to display in the message_manages but when I return to the program no error is shown and no red box is displayed arround

  • Mixing ADAT tapes down to Garage Band

    I have material on ADAT tapes that I would like to mix down and edit. Is Garage Band and a Mini going to be easy to do this with??? I want the simplest and least expensive way to do this. I think I have everything I need and don't want to get in too

  • BAPI or FM to update item texts?

    Hi all, Is there any BAPI or FM that can be used to change the item texts for Accounting Documents? Regards, Swathi Ragi