Approval for material return issued against the Work Order

Hello,
We are using PM module and issuing materials against the work order.  Many times users are returning the un-used material back to stores.  This un-used material may come back <b>with or without</b> work order reference.  i.e. Sometimes they just return bunch of material but don't know the work order # against it was issued initially.
We need to control this flow of un-used return material through proper system approval.
How can do this.
Thanks,

Hi,
In standard SAP There is no approval process to return the material.
I have one work around , you can create one PM order to return the material & instruct your store people to receive the material only with reference to PM order.
With out releasing a PM order, system will not allow to post the goods return.
I hope it may help you.
Regards,
Manish

Similar Messages

  • STO creation against the Work Order

    How to specify the source plant or source storage location within PM Work Order for the components/materials.
    Currently on the components page of work order, we can specify the material and vendor. In our case the vendor is other storage location within same plant or diff. plant.
    How can we specify the source in components page so that PRs and reservations are created correctly.
    In details here is the problem-
    During work order (PM Order) creation user is specifying a non-stock material and issuing storage location "0002". The material will be issued by sto. loc. 0002.
    Storage location "0002" sources this material from other storage location "0001".
    So we want to generate a Purch Req. with item category "U", account assignment 'F" (with work order) and ability to specify the source plant-storage location.
    But the system is creating a normal expense PR with account assignment "F" to the work order. This PR is having grayed out item category so not able to convert into Stock Transport STR by specifying the source plant and storage location.

    Hi MM
    Have you solved your problem? What did you do to create the STR?
    Regards
    Eduardo Chagas

  • Final issue indicator on the general data button on the work order

    Hi Gurus,
    can anybody please let me know why the final issue check box is checked automatically even before the goods are issued via migo against the work orders. This check box is on the general data tab of the material entered on the components tab of the work order. Please help. As a result of this, the store room clerk cannot issue the material againsth the work order, because this check mark is checked. I want to understand what is causing the check mark to be checked automaticallu even before tthe materials are issued out
    Thanks
    ANusa

    Hello!
    This might have occured due to completion confirmation of order before goods issue. Generally this happens if final issue indicator is set as default in completion confirmation tab. Please check and reply if problem is something else.
    Regards,
    Vaibhav Mishra
    Edited by: Mishra_Vaibhav on Jan 27, 2011 5:23 AM

  • Material Availablity check of the Process Order......

    Hi there,
                  If the reservations of material  are made against the process order & the material is not available and the stock is expected in near future........ then during the material availablity check of the process order........will it show that the material is available............
    Please elucidate me.......
    Thanks
    Kaushik

    Hi Kaushik,
    Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date.
    Therefore the system checks the current available quantity of stocks.........
    but, for example imagine if the available stocks are not sufficient to meet the order............then the system checks replenishment lead time of the material i.e. time taken for the material to become available either internally (in house production) or externally (from a vendor) and then issues a material availability date.........i.e. date on which material would be available for delivery.
    Depending on the above checks, the systems issues the delivery date.
    <b>Reward if helps</b>
    Regards
    Sai

  • Issue with a work order

    Hi Team,
    I am having an issue with the work order having multiple line items for the same component. Out of all line items it is showing error for two line items mentioning,
    No status object available for CMP 81411471 0160 0110
    Double clicked on it msg no displayed BS.001
    Please help on this issue, Thanks in advance.
    Regards
    Nivas

    Are you using Work Clearance Management?? Please provide the detailed error message, if any.
    67826 - Restoring the status for orders RIORDST1
    http://scn.sap.com/thread/3209398
    Check the above details.

  • Advance payment against the Internal Orders - Capex

    Dear friends
    Can you please explain what configuration we have to do regarding the Down payment made against the Internal Orders created for Capital Expenditure.
    Please let me know what cost element category we have to take for Down Payments made against the Internal Orders.
    Please let me know in detail manner.
    Thanks in Advance
    Kiran A

    -

  • Goods return against maintenance work order exceeds goods issue

    Is there a way to prevent returning more quantity (262 movement type done within MB1A) than was issued (261 movement type done within MIGO_GI) against a maintenance work order component?
    Thanks in advance,
    Rick

    Hi,
    Movement Types 261 and 262 works in Planned as well as in Unplanned both ways.
    If you do Goods Issue w.r.t. Maintenance/Work Order (Movement Type - 261) then components and their quantity get defaulted from the reservation created automatically during order creation and system does not allow us to issue more that the quantity in reservation.
    Similarly when you cancel the Goods Issue Document then it hits Movement Type 262 automatically and does not allow to edit the quantity.
    The above two processes are planned ways.
    Now when you want to do extra consumption of components against Maintenance/Work Order then you do not do Goods Issue > Order, instead of this you do Goods Issue > Others and then specify all the necessary details manually (Like; material, quantity, etc...) and enter Maintenance/Work Order as an Account Assignment on which the cost is getting loaded.
    Similarly when you are receiving materials from Maintenance/Work Order using option Goods Receipt > Others then here also there is no control and you can receive any quantity from Maintenance/Work Order since here also Maintenance/Work Order is working as an account assignment not a control document.
    The above two processes are unplanned ways.
    So in short, there is not any control on this movement when it is unplanned.

  • Posting multiple goods issues against the same delivery

    Hello gurus,
    We are a fashion apparel company using ECC 6.0 and would like to know if it is possible to post mutliple goods issues against the same delivery?
    I will explain the business requirement.
    - We create a stock transport order to deliver 400 units of merchandise to on or our retail stores (STO is created and processed to a delivery).
    - This information is passed down to our warehouse management system (which is not SAP)
    - Our warehouse management system has the ability to split a delivery into multiple shipment when needed.  For example, our warehouse may only be able to complete 250 units for our morning shipment and will therefore pick, pack and post this.  This will feed back into SAP and process a 641 movement so that the units now show as "in transit".  This is needed so that our stores can process the ASN and move the units into their inventory when they receive the merchandise later that day.
    - During the afternoon, our warehouse will process the remaining 150 units and will ship this to our store later in the evening or next day.
    Currently, we are not able to process another goods issue against a delivery as we close out the delivery during the first goods issue.  We would prefer not to have to generate a new delivery for our DC and let them continue to process against the same delivery, but we are unsure how to configure this.
    Any help or guideance would be extremely appreciated
    Thanks in advance

    Hi RJ,
    First of all sorry to write such a lengthy reply,In one line if i want to summerize then it is not possible with standard SAP however we can achieve this by writing some piece of code in both the system
    AS - IS
                   Business process
              From business process point of view you are right that once the pick & pack is in process it is not advisable to create a new delivery document for balance quantity and share the same with WMS as then they have to create a new document in WMS and start picking based on that rather then the old delivery document number. if i am in your position then i can give a thought like this
    e.g.
    Delivery                                                  - 100 Unit
    Shipment confirmation from WMS            -   60 Unit
    Change in delievry quanity / Pick qty        -   60 Unit
    Invoice from SAP                                    -   60 Unit
    Second confirmation from WMS                          -   40  Unit
    Change in the existing delivery quantity                -   Now here we have two option either
    1) Change the delivery quantity / Pick qty  to (60+40) =100 or
    2) Remove the 60 and update 40 as delivery and pick quantity
    Pros & Cons
    if you will select option 1 then furhter invoice will happen for 100 unit which is incorrect as physically you are shipping only 40 unit
    if you are selecting option 2 then the document flow is incorrect as you don't have history(in SAP) for the 60 unit which was shipped earlier
    Solution ::
    so in my opinion the best option is to create a seperate delivery document (store the old delviery number in one of the field of the new delivery and pass the same to custom segment of the IDoc) transmit the IDoc to WMS write the validation logic in WMS
    Find the record with old deliver number in the WMS system, check the status whether it is active or inactive
    if it is acitive Validate the Material + qty with the WMS record(Material + balance quantity) if both are same then pass the new deliery number to custom field of the WMS table
    At the time of confirming back to the SAP, Write a piece of code in SAP that if the incoming idoc custom field(new delivery number) field is populated then ignore the orignal document number and post the document using the new delivery document number
    Hope this help

  • Approval for Material Master Creation !

    Dear All ,
    My requirement is to have approval process for Material master. is it possible.?
    My Client is expecting approval process same like PO ( release strategy )
    Is there any standard approval  process for every masters which are  created as part of MM transactions.
    Can it  be achieved by means of any workflow.?
    Thanks
    Jinoy

    Hi,
    Yes it can be achieved by Work flow & also through the Enterprise Portal development.
    If you have Workflow consultant you can take a help in setting up the approval for Material master creation.
    If you want high fund & centralization of Material master you can go for EP development but Cost & effort will be on higher side.
    Discuss with your Workflow consultant he will help you.
    rgds
    gsc

  • Down payment against the Internal Order - for Capital Expenditure

    Dear friends
    I am getting an error while making down payment against the purchase order.
    The order of my entries or steps are as follows:
    Created one internal order for Capital WIP with budget and availability control activation.
    Created one purchase order against a vendor with reference to the above Internal Order.
    When I am making the down payment to the vendor through tcode:F-48, the system throwing an error
    "Define Cost Elements for Down Payments".
    Can any one please explain why this error is coming. When I checked in Internal orders, there is a TCode: OKEP for Define Default Cost Elements for Down Payments.
    System is asking for cost element, but where as what ever the down payment we are making is nothing but advance which is current asset. Why system is asking for cost element?
    Can any one give me the guidance how to handle the issue.
    Thanks in Advance
    Kiran Kumar A

    The reason is when you want the down payment for AUC to be capitalised, then you would need to create cost element for Downpayments.
    Normally as per design of SAP, down payment being a Balance Sheet Account (Current Asset as you rightly mentioned) doesnot need / accept an Cost object, as a special case since down payments for AUC needs to be capitalised and hence need to be carried to Controlling (Internal Order) by creating Cost Element for Downpayments.
    Go ahead and create the cost element. That would resolve your issue.

  • User Exit for Enter / post invoice against the order without goods receipt

    Hi,
    My requirement is to enter or  post the  invoice against the Purchase order without goods receipt.
    Need to an User Exit  for this.
    Thanks in Advance!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

    User exits available are:
    V02V0001 Sales area determination for stock transport order
    V02V0002 User exit for storage location determination
    V02V0003 User exit for gate + matl staging area determination (headr)
    V02V0004 User Exit for Staging Area Determination (Item)
    V50PSTAT Delivery: Item Status Calculation
    V50Q0001 Delivery Monitor: User Exits for Filling Display Fields
    V50R0001 Collective processing for delivery creation
    V50R0002 Collective processing for delivery creation
    V50R0004 Calculation of Stock for POs for Shipping Due Date List
    V50S0001 User Exits for Delivery Processing
    V53C0001 Rough workload calculation in time per item
    V53C0002 W&S: RWE enhancement - shipping material type/time slot
    V53W0001 User exits for creating picking waves
    VMDE0001 Shipping Interface: Error Handling - Inbound IDoc
    VMDE0002 Shipping Interface: Message PICKSD (Picking, Outbound)
    VMDE0003 Shipping Interface: Message SDPICK (Picking, Inbound)
    VMDE0004 Shipping Interface: Message SDPACK (Packing, Inbound)
    user exit when PGI is done
    Reward if useful.

  • About N-step approve for SC item issue

    Dear all,
            We used application controll workflow,And active the WS14500015 N-step approve for SC item,and imp the BADI,Now our issue:
    SC have two items,there are approve step:
    item1   approver01      approver02    approver03      3 step approve,
    item2   approver11      approver12                          2 step approve.
    When order the SC,user approver01 can receive the task about item1, user approver11 can receive   the tast about item2,Now user approver01 approve his task,if user approver11 didn't approve his task,then about item1's workflow will hold it,the system didn't triger the next step to user approver02,if user approver11 approve his task,then item1 's workflow triger the next step to user approver02 and item2's workflow tiger the next step to user approver12.
        who can help me,why the system flow this logic?
        We need the logic's :user approver01 approve his task,if user approver11 didn't approve  or did approve his task,then about item1's workflow allways triger the next step to user approver02.
    Edited by: bill yang on Apr 29, 2011 2:45 PM

    Hi,
    It is designed that way.
    When item 2 is rejected, requester may want to change item 1. So WF should wait for creating next level workitem until all items are rejected/approved.
    Regards,
    Masa

  • How do determine the work orders for a sales order?

    I'm forced to calculate our costs by sales order.  So for a given sales order number, how is this linked to the work order that created the items on the sales order?
    Thanks

    Hi,
    Check this:
    Re: Open Production Orders List with a Field from Sales Order
    Thanks,
    Gordon

  • Need help on IDoc for Picking, Packing and PGI against the Sale order

    Hi All,
    I am new to this IDoc stuffs. Below is the scenario for which I would like to know the details of the IDoc...
    Business Case:
    1. Storage location is a HU Managed but not WM managed.
    2. This storage locations is managed by a third party
    3. Outbound delivery document against the SO will be created by our personnels in SAP for this storage location.
    4. Picking, Packing and PGI needs to happen/post via Idoc. (By packing here, i refer to assign the HUs that are already created for the materials and is available in the storage location and not repacking)
    Is there any standard IDoc that can be used here to Pick, Pack and post PGI. We would like to have picking and packing in a first idoc and PGI on the second idoc.
    Thanks,
    Prashant

    Hi Typewriter,
    Thanks for your reply on this post..
    The business process is as below (it was changed recently to have the creation of OBD, pick HUS and then post GI via single IDOC)
    1. We have a storage loc in our enterprise structure that is HU managed but not WM managed.
    2. This storage loc is being maintained by a third party.
    3. SO will be created to be shipped out of this plant/sloc.
    3. The stocks at this storage loc will be Special stock "E" against the sales order. And the stocks will be Packed in HUs.
    4. The third party is informed to deliver the stocks (HUs - that do have the special stock number which internally refers to the the SO number and the line item number) directly to ship to party address in SO.
    5. The 3rd party will physically ship the HUs to customer and send in the details that they have shipped goods against the sales order.
    6. The details sent by the 3rd party will be received in SAP to create OBD for the sales order, Pick, Pack and post GI. This can happen via a single IDOC..
    I am now planning to create a custom IDOC type referring to the standard IDOC type DELVRY03 and message type DESADV and to use a custom BAPI/FM.
    Do you think I am using the right ones?
    Thanks,
    Prashant Kumar

  • How to use BAPI_GOODSMVT_CREATE against the Production Order

    Hi Friends,
    I need ur help very urgently,
    I am using the BAPI_GOODSMVT_CREATE (movement code '03') for goods return against the production order (movement type '262').
    everything working fine, ie it gets updated in IM/WM.
    but when we check in the CO03 transaction for the production order, the qty withdrwan not gets updated in the component overview. still showing the old value. But when we used regular SAP transaction MB1A, it gets updated in CO03 (qty withdrwan in the component overview).
    How to solve this issue using this BAPI.
    I have attached the code, plese help me is there any other parameter to set for this BAPI.
    Thanks in advance.
    Shankar
    Code:
    *Header Structure
    st_gm_code-gm_code = '03'. "
    st_gm_header-pstng_date = st_gm_header-doc_date = sy-datum.
    SORT itab BY aufnr matnr j_3asized.
    LOOP AT itab.
    itab_afs_gm_itemx-material = itab-matnr.
    itab_afs_gm_itemx-plant = itab-werks.
    itab_afs_gm_itemx-stge_loc = itab-lgort.
    itab_afs_gm_itemx-batch = itab-new_charg .
    itab_afs_gm_itemx-stock_cat = itab-j_4kscat.
    itab_afs_gm_itemx-stck_type = 'F'.
    itab_afs_gm_itemx-move_type = '262'.
    itab_afs_gm_itemx-entry_qnt = itab-j_3aerfmg .
    itab_afs_gm_itemx-grid_value = itab-j_3asized.
    itab_afs_gm_itemx-orderid = itab-aufnr.
    itab_afs_gm_itemx-move_reas = itab-move_reas.
    APPEND itab_afs_gm_itemx .
    SELECT SINGLE etenr
    INTO etenr
    FROM j_3abdsi WHERE aufnr = itab-aufnr
    AND matnr = itab-matnr.
    gr_afs-matdoc_itm = '0100'.
    gr_afs-sched_line_sku = etenr.
    gr_afs-stock_cat = itab-j_4kscat.
    gr_afs-grid_value = itab-j_3asized.
    APPEND gr_afs.
    ENDLOOP.
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
    EXPORTING
    goodsmvt_header = st_gm_header
    goodsmvt_code = st_gm_code
    IMPORTING
    goodsmvt_headret = st_gm_headret
    materialdocument = mat_doc
    matdocumentyear = doc_year
    TABLES
    goodsmvt_item = itab_afs_gm_itemx
    return = bapi_return
    afs_goodsmvt_sku = gr_afs.
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'

    Hi Friends,
    I need ur help very urgently,
    I am using the BAPI_GOODSMVT_CREATE (movement code '03') for goods return against the production order (movement type '262').
    everything working fine, ie it gets updated in IM/WM.
    but when we check in the CO03 transaction for the production order, the qty withdrwan not gets updated in the component overview. still showing the old value. But when we used regular SAP transaction MB1A, it gets updated in CO03 (qty withdrwan in the component overview).
    How to solve this issue using this BAPI.
    I have attached the code, plese help me is there any other parameter to set for this BAPI.
    Thanks in advance.
    Shankar
    Code:
    *Header Structure
    st_gm_code-gm_code = '03'. "
    st_gm_header-pstng_date = st_gm_header-doc_date = sy-datum.
    SORT itab BY aufnr matnr j_3asized.
    LOOP AT itab.
    itab_afs_gm_itemx-material = itab-matnr.
    itab_afs_gm_itemx-plant = itab-werks.
    itab_afs_gm_itemx-stge_loc = itab-lgort.
    itab_afs_gm_itemx-batch = itab-new_charg .
    itab_afs_gm_itemx-stock_cat = itab-j_4kscat.
    itab_afs_gm_itemx-stck_type = 'F'.
    itab_afs_gm_itemx-move_type = '262'.
    itab_afs_gm_itemx-entry_qnt = itab-j_3aerfmg .
    itab_afs_gm_itemx-grid_value = itab-j_3asized.
    itab_afs_gm_itemx-orderid = itab-aufnr.
    itab_afs_gm_itemx-move_reas = itab-move_reas.
    APPEND itab_afs_gm_itemx .
    SELECT SINGLE etenr
    INTO etenr
    FROM j_3abdsi WHERE aufnr = itab-aufnr
    AND matnr = itab-matnr.
    gr_afs-matdoc_itm = '0100'.
    gr_afs-sched_line_sku = etenr.
    gr_afs-stock_cat = itab-j_4kscat.
    gr_afs-grid_value = itab-j_3asized.
    APPEND gr_afs.
    ENDLOOP.
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
    EXPORTING
    goodsmvt_header = st_gm_header
    goodsmvt_code = st_gm_code
    IMPORTING
    goodsmvt_headret = st_gm_headret
    materialdocument = mat_doc
    matdocumentyear = doc_year
    TABLES
    goodsmvt_item = itab_afs_gm_itemx
    return = bapi_return
    afs_goodsmvt_sku = gr_afs.
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'

Maybe you are looking for

  • Problem with lines in Flash!!!

    Hello, I am currently using flash cs5.5. I am not having any software malfunctions or anything like that, I am just having a prolem with lines. When drawing with the pen, (or even pencil tool), is there anyway to make the lines you draw one solid lin

  • Error while accessing a file located in the server from JSP

              Hi           I am having problem while accessing the file located in the server from a JSP           page. I am not getting the RealPath from a JSP page using getRealPath(request.getServletpath()).           The same code is working if the

  • Reference with purchase order

    Hi, This is emanuel from hyderabad SAP SD consultant, well can we do billing with reference with purchase order. for exampl.:- One company code -1000, and two plants one is 1000 and another one is 2000 suppose 1000 plant raise the purchase to plant 2

  • Livecycle on Websphere 6.1--configuring SSL problem

    I have installed and set up adobe livecycle es 8.2 on websphere on an AIX platform.  I'm on page 27 of the Administering Livecycle ES guide but have hit a brick wall in regards to the SSL implementation part. I have an existing websphere DMGR console

  • Windows XP won't connect to Internet via Time Capsule AE

    I've got a MacBook Pro and MacBook using Airport Extreme via Time Capsule. I recently partitioned MacBook Pro and added Windows XP via Boot Camp. The XP sees the Airport but cannot connect. I've added the same key to XP as used for Mac access, but it