Assigning to differenet consumption a/c for same Raw Mat 261 MOV-Diff FG

Dear Experts,
We have the Current Settings in the same plant 5160:-
Raw             Valuation          Mov         Finished Product
Material        Class               Type     
MOP                9000              261        NPK
MOP                9000              261        MOP-Traded
We have OBYC Settings:-
Valuation Modifier 0002
General Modification VBR
Valuation Class 9000
GL Code (605001-Raw Material Consumption)
Now when we are doing MFBF in same plant 5160
both the consumption entry posted to Raw Material Consumption (605001).
We want for Producing NPK with 261 movement it should hit Raw material Consumption A/c(605001) but for producing MOP-Traded it should hit some other GL code Say - 606001 with same 261 movement.
Please advise if it is possible, then where to make changes.
Regards,
Alok Parida

Use diff vauation calss becuase you are asking the solution for the same plant that can be done using valuation class only.
you should have diff valuation calss for raw material and trading items

Similar Messages

  • Quality info records: different pack configurations for same raw material

    how can i differentiate different pack configuration for same raw material in quality info records, as one might approved and the other not? that is, besides creating different material master for each packaging?
    thanks
    Alisa

    You need to use the MPN profile functionality that is a standard part of SAP.
    In Config under the purchasing define the MPN profile.  There are several options you can turn on/off including info records.
    You assign the MPN profile to your material. It now is considered by SAP to be an internal material number. 
    You then create a HERS material type for each separate manufacturer material number you have.  You only need the purchasing view for these materials.  You can also create purchasing text views, classification and some others if you wish.
    In the SAP approved vendors list (AVL), you then assign each manufacturer vendor(s) with the HERS material created.
    You create a Q-info record for each manufacturer/HERS material combination.
    Now, when you specify the internal material number in a PO, the system will tell you to order the MPN material.  When you do the drop down for the material now, it will show you the approved manufacturers allowed in the AVL for the ordering plant.
    When the 01 inspection lot is created you will have a vendor number as well as a manufacturer's number in the inspection lot.  The DMR can be done by the manufacturer or the vendor depending on how you set up the inspection plan. Q-info record will be used accordingly.
    Take a look at it and research it.  It's not hard to set up.
    FF

  • In the production order for 1 of the component material no 261 movement

    Hi SAP Gurus,
    In the production order out of 8 components for 1 of the component material 261 movement is not happening ( Not getting backflushed) Please give some input on this issue.
    Thanks and Regards,
    SHARAN.

    Hi Dhaval,
    In MRP2 view the backflush indicator has been set. But in the parent material BOM setup this material itself not there I informed the user about this, please refer the below user comment ( In BOM the material:Q7829-60184 is appearing and mat:Q7829-60140 not there in BOM, in production order for both the materials 261 movement not happened ) Please give your input on this issue.
    Hi Sharanappa
    We just did a PCO roll  PCO #4619999R3 on Tuesday 30th Dec.
    From Q7829-60140 to Q7829-60184
    All options for Q7840A, Q7829A, Q7830A (except #ACJ, already completed), Q7831A.
    That's why you are not able to see the part in BOM
    How can we rectify this from here?
    Thanks and Regards,
    SHARANAPPA.

  • Consumption is happenign for all the operation in PI sheet

    Hi experts,
    The consumption is happening for all the operations in the pi sheets evethough the Process message characterstic for consumption is assigned only to one of the Operation in master recipe. I, also tried removing the backflush indicator but this is not helping me and it is failing with below error. Can any one of you help me in solving this.

    Hi Sandesh,
    Please check Generation scope & Filter in the configuration "Process Instructions to be generated" inside set up Control Recipe destinations.
    If you are using same CRD for more than one operation, it might be the issue.
    Please check & revert with screen shots of "Set up Control Recipe Destinations".
    BR
    Rahul

  • Can we assign process order in MB21 RESEVATION for extra material

    Sir,
    in Production sometimes we required extra raw material but already we issues raw material against  process order then that time where we assign extra raw material in process order or where we check costing of extra material qnty aginst process order.
         can we asssign extra material against process order in MB21 with movement type 261

    Dear,
    It is not possible to create the manual reservation against the order for 261 movement type. Because system generate the automatic reservation for an order whcih can not be modified. Better you go for component or operation scarp to plan the extra requirement. MB21 you create the reservation with 311 movement here you give reference of an order also maintain the long text for same. By this you can transfer the extra consumption from main storage location to production storage location. And issue material against the order with MB1A 261 against the oder as unplanned consumption.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Need help in setting up Group Policy for same user in local system and Terminal server

    Hi All,
    Currently our remote users are using our network using VPN client over internet.
    They are generally at their home computer and doing VPN as they have to work only in one RDP server for application.
    We actually have a OU created for these RDP users and assign then some strict policy like they can not use any other .exe,they can not user any explorer ,they can not even use windows explorer when they are on RDP they just use one exe of their application.
    Now what my management want is they want their home computers in Domain and want them to login via their same credentials they are using for RDP but they don't want them to restrict in their home computers with any strict policy.
    Now my confusion is how can I configure different policies for same users or same OU.
    Can any one guide me please...

    you can achieve this fairly easily with group policy.
    create an OU and put your remote desktop servers in that OU.
    configure both user and computer policies in a group policy and link it to that ou.
    you need to enable loopback mode - you may want it in merge or replace depending on your other policies you have. Probably replace though I would guess. this is set in the computer configuration > admin templates > system / group policy section.
    now remove the policy you have currently setup for your users on the users OU containing the rdp users. If you want you can move these users back to your main users OU.
    when your users login to the RDP server the settings in the user section of the GPO linked to the RDP Servers OU will apply.
    when the user logs in to their own computer the policies from the user OU and computer OU will apply - but not the more restrictive RDP OU.
    hope that makes sense.
    Regards,
    Denis Cooper
    MCITP EA - MCT
    Help keep the forums tidy, if this has helped please mark it as an answer
    My Blog
    LinkedIn:

  • Error message during duplicate Pur Requisition creation for same Sale Order

    Dear Experts,
    I need your help to sort out a issue related to Stock Transport Order.
    Our scenario is as below:
    1) Sales order is raised first.
    2) Stock transport requisition raised off in the background of a sales order automatically.
    3) This PR turned into an Stock Transport Order PO manually.
    4) Create delivery for STO from supplying plant and then GR is done in receiving plant. Create inter-company invoice.
    5)Create delivery for sales order to issue the stock to end-customer and raise invoice.
    This is standard scenario.
    Problem comes when some smart uses manually creates another stock transport requisition again for same SO, which is turned into an STO. Means there is a duplication of STO PO.
    My question to you experts, is there any standard way to prompt error or warning message, when users try to create purchase requisition manually for the same SO.
    Account assignment category in PR is M - Ind. cust. w/o KD-CO.
    Please suggest.
    Regards,
    Praveen

    Hi!
    Is it possible to create / configure a seperate PR document type for PRs created automatically from SO and don't give authorization to any user to create / amend the same manually?
    Regards,
    Riju

  • Configuration for consolidated check for same vendor from different company

    Hi All,
    My company is trying to print a single check for same vendor with same vendor number in multiple company code.
    The Automatic payment parameters has all company codes where the vendor is having open items.
    But when payment run is carried out and the check is printed, there are more than 1 check printed for the same vendor corresponding to the cleared invoices.
    One company is paying for all other companies and still multiple checks are printed.
    Can someone help with some lead to resolve this issue.
    Points will be assigned for helpful tips and answers.
    Thanks alot in advance

    Hi,
    i understood ur problem so dont worry.... solution is there in sap
    while confiqure automatic payment program in FBZP give paying company code payment transaction give company code what check through you want to pay that ....ofter that payment will go through this company code check only
    may be this information is useful to you

  • Net price not fetching to new PO thru' existing PO for same vendor

    While creating new PO for a material system is not fetching "net price" data from already existing PO for same material against same vendor.
    This is happening after attaching OMET settings in User authorisation.
    How to solve this issue?

    Hi,
    This shoudl not happen but still you try in OMET - For the Key, allow indicator "Enter Conditions" and then check.
    Also check if any key has been created in OMFI and assigned to user parameter EVO. - Here in OMFI, check under "Price Adoption" Tab, "Always Copy" radio button should be selected if you want to copy last PO price in current PO.

  • How to apply 1 pamment check to multiple invo in diff OU for Same Supplier

    We have a payment check for a supplier. AP accountant want to a apply single payment check againest multiple invoices in different operating units for same supplier but he can’t do it. How it can be solved.

    Hi
    You can use the same project for multiple PJM organizations.
    In each PJM organization you need to set up the Assign Project Parameters. That means you need to allow that PJM organization to act on the specific project.
    Since the PJM organization belong to a different operating unit, you should also setup the project itself to allow charges from other operating units, and setup the provider-receiver transfer price rules, to allow cross charge and intercompany billing.
    Wip jobs are organization specific. That means there is no way two separate organizations will act on the same work order. You will need to open a workorder in the US organization and complete it there (for the project and task). Then transfer the goods to the INTL organization and receive it to the same project and task locator. In INTL organization you will need to create a new work order (for the same project and task). Issue the items from stocks to the work order to complete the finished goods. Issue the finished goods from the INTL to the customer sale order.
    The INTL PJM/Inventory/WIP organization can receive items from external vendors and from the sibling US organization.
    Dina

  • Can we assign two repeating frames to have the same source(group)?

    hi all,
    can we assign two repeating frames to have the same source(group)?..pls reply soon... bye..

    You can assign the same source group to two repeating frames.
    For more information on repeating frames, refer to the Oracle Reports Building Reports manual available on OTN: http://www.oracle.com/technology/documentation/devsuite.html

  • Muliple inspection plan for same material and same usage

    Hi,
    I need to create multiple inspection plans for same material with same usage.during the inspection lot creation i need to select any one inspection plan.
    In standard SAP its not possible.Any user exits available for this..
    Regards,
    S.P.Selvathangam

    Dear Selvathangam Palanisamy ,
                                                       My Dear Shayamal is absolutely correct and we are corrently using this SAP facility. You can create 'N' number of inspectio plans for a material and then whenever the inspection lot will created ( Thru a process order or Manual) then you will get the Inspection Lot Status 'CRTD' (Created mode) then you have to select your Inspection Task list manually by two way...
    Either go to QA02 and then select it from the list of multiple plans.
    Or you can directly go from QA32 ...select your inspection lot row and directly click on the Inspection Lot icon to go directly to the inspection lot window to slect the Task list.
    Further there is no need to remove the Automatic Assignment from the QM View of the Material Master as if there is only one task List then system will automatically assign the TASK LIST, if you deselect it then you have to select in every case.
    Thanks

  • BPEL - multiple receive elements for same partner/operation

    Is it possible to have more Receive elements for same operation in one BP? I need to create a business process for approving requests in a number of steps. The process looks like this:
    RECEIVE (createRequest)= INVOKE (...)
    < REPLY (createRequest)
    RECEIVE (approveRequest)= INVOKE (...)
    < REPLY (approveRequest)
    RECEIVE (approveRequest)= INVOKE (...)
    < REPLY (approveRequest)
    (...)The creation and first recieve element for "approveRequest" is ok, but the others are never executed. I believe the correlation sets are set correctly. I also can't use a While element since every step could be a bit different. If I substitute the other recieves for different operations, the whole process executes correctly.
    Can someone please advice me on what i am doing wrong? If it's somehow not possible to have more then one Recieve for a particular message in one BP, what is the best way to do it differently?

    Thank you for your answer. I tried to change the Receive elements to Pick + OnMessage, but it's not working either. It goes past the first one but it never reaches the second one. That's what i had in the first place - two Pick elements after each other, each with an 'approve' and 'dispprove' branch, but it didn't work so I simplified it to an easier process with just receive elements.
    If it's working for you, do you do something special in the process? Which version of OpenESB are you using? Would it be possible for you to send the BPEL file? Here is a part of mine I've just made to test this solution.
    <bpws:pick name="Pick1">
        <bpws:onMessage partnerLink="Client" operation="approveOrderItem" portType="ns1:OrderManagementClientPortType" variable="ApproveOrderItemIn5">
            <bpws:correlations>
                <bpws:correlation set="orderItemId" initiate="no"/>
            </bpws:correlations>
            <bpws:sequence name="Sequence2">
                <bpws:assign name="Assign7">
                    <bpws:copy>
                        <bpws:from>true()</bpws:from>
                        <bpws:to part="return" variable="ApproveOrderItemOut4"/>
                    </bpws:copy>
                </bpws:assign>
                <bpws:reply name="Reply3" partnerLink="Client" operation="approveOrderItem" portType="ns1:OrderManagementClientPortType" variable="ApproveOrderItemOut4"/>
            </bpws:sequence>
        </bpws:onMessage>
    </bpws:pick>
    <bpws:pick name="Pick2">
        <bpws:onMessage partnerLink="Client" operation="approveOrderItem" portType="ns1:OrderManagementClientPortType" variable="ApproveOrderItemIn6">
            <bpws:correlations>
                <bpws:correlation set="orderItemId" initiate="no"/>
            </bpws:correlations>
            <bpws:sequence name="Sequence1">
                <bpws:assign name="Assign6">
                    <bpws:copy>
                        <bpws:from>true()</bpws:from>
                        <bpws:to part="return" variable="ApproveOrderItemOut3"/>
                    </bpws:copy>
                </bpws:assign>
                <bpws:reply name="Reply2" partnerLink="Client" operation="approveOrderItem" portType="ns1:OrderManagementClientPortType" variable="ApproveOrderItemOut3"/>
            </bpws:sequence>
        </bpws:onMessage>
    </bpws:pick>

  • 2 business areas for same accouting doument

    Hi,
    We have released the Accounting document and we have seen that 2 business area assigned for same accounting document.
    Customer line item has one business area
    Remaining GL account has one business area.
    One thing I need to understand that how customer line item has different business area from the remaining line items.
    How business area will determine for the customer line item.
    Thanks,
    Venkata harish.

    harish venkat,
    Your business area may come from manual input or substitution rule. You have to check your business area purpose. If you are looking for a balance sheet report this isn't the best solution because you won't close your balance.
    regards

  • Two reconciliation account for same one time vendor

    Is it possible to have two reconciliation account for same one time vendor?

    Hi
    1.Two reconciliation account for same one time vendor IS NOT POSSIBLE.
    2.create 2 vendor master for the same ONE TIME VENDOR and maintain the recon account accordingly
    3.Multiple recon a/c can be assigned to a vendor only thru spl g/l indicators but if u go thru this way then we cant use the purchase flow of PO-MIGO-MIRO . Vendor invoice can be passed only thru fb60 using spl gl indicators. Spl gl indicators cannot be used in MIRO.
    Check which will help u
    Thx
    Raja

Maybe you are looking for

  • Free goods when material out of stock

    Dear Guru's, I have scenario wherein my order is e.g. 100 10 (excusive) and the stock is only 60.User want to create the order for 100 10 only and in dekivery he want to send the stock for available material. System is allowing to send the stock for

  • Export jpgs from final cut pro x

    How do I now export jpgs from my final cut pro x?  They seemed to have changed it in the new version.

  • Need to change Display settings, either resolution or color

    HI Due to a faulty graphics driver I need to be able to change my display settings dynamically. I know that I should use DLL calls to user32.dll, and I know that I should use the EnumDisplaySetting and ChangeDisplaySettings. But No matter what I try

  • HT3951 downloaded magasine wont open

    Hi looking for help. Last month I subscribed to a fashion magasine (loulou) and got disconnected before dowloading was completed. I therefore was never able to open the magasine, but was charged by apple store the yearly fee.  I tried again to purcha

  • Permissions in Adobe 9

    Hi, I have Adobe Reader 9 on my desktop but am unable to amend the document. I have looked at permissions and it says that I'm not allowed to amend the doc. How am I able to do it as I need to update some details for our company. Thanks