ATP- Confirm full Case

Hello,
We are on 4.7V of SAP. I have a business scenario wherein a product Base unit of measure is "EA", but we want to ship the products in complete cases.
So, if  1 CS = 10 EA and we have 12 EA's in stock. Customer places order for 2 CS, ATP should confirm only 1 CS in this situation as the stock is not enough to ship 2 CS.
Please help me figure out how to acheive this in SAP.
Thank you in advance.
-Naga

Try the following;
1. Maintain the conversion between case and EA in the material master. 2) Add the sales UOM as case in the material master Sales:sales org1 views. 3) Enter the sales order quantity in case and then check how the ATP confirm the quantities.
Just came across SAP OSS Note 547118 - FAQ: Result of ATP calculation. The point 10 of this note suggests to use user exit. Below is the detail.
10. Question
Why is the confirmed quantity a decimal fraction even though I have activated the setting in Customizing that informs the system that decimal places must not be used for the unit of measure?
Answer
This setting in Customizing only refers to the requested quantities accepted by the system. If you only ever work with whole values (that is, inventory postings and all receipts and issues) and if a document works with a sales probability of 100 percent, the whole numbers are also retained even during the ATP invoice.
If, however, a document works with a sales probability between 0 and 100 percent, quantities that are not whole numbers can also be assigned. Consequently, quantities that are not whole numbers also remain available and can then be assigned. Therefore, a result that is not a whole number is possible even though Customizing is defined differently.
The standard R/3 system does not need to have a rounding function because the design objectives can only be defined individually and other rounding problems would occur, such as conservative rounding or rounding that would result in overassignment.
If you nevertheless want to use a rounding function for the confirmed quantities, the EXIT_SAPLATPC_002 function module is provided as a user exit for changing the result of the ATP check. In this case, the T006-ANDEC and T006-DECAN fields must be analyzed depending on the unit of measure used. The T_MDVEX-MNG02 quantity can then be adjusted accordingly.
Refer also to Note 787037, which corrects this particular rounding error.
Attention: The ATP check is always carried out with the base unit of measure.
Regards,
Edited by: Shiva Ram on Jun 30, 2011 1:36 PM
Edited by: Shiva Ram on Jun 30, 2011 1:38 PM

Similar Messages

  • Conversion of Sales Orders with Original ATP Confirmation Dates/ Quantities

    Hi
    Please suggest best practice to maintain ATP confirmation dates/ quantities during sales order conversion. We have committed schedule lines in a legacy SAP system. Now we want to maintain the exact same dates/ quantities when loading these dates into the new SAP system.
    We will not have supply (inventory/ orders) loaded at the time sales orders are loaded.
    Thanks
    Rishi Menon

    Hi
    I will suggest to turn-offthe Transfer of Requirement & Availability Check from the Schedule Line (VOV6). And then make your BDC to upload the Sales Order of Legacy System in SAP.
    While creating the BDC recdord the consider the Schedule line date and quantity.
    Regards,
    Amitesh Anand

  • Rounding the quantity to full case  in TO from PP order

    Hi,
    I create a PP order and one component has only 1 PC in BOM. 
    But when  i create the TO i need the component to be picked in full case , e.g pallet.
    How do i fix the component quantity to be rounded to the full case in TO?
    Thank you

    Hi Kumar,
    Let me explain in more details:
    - the component is stored in pallets with 12 pieces, and the pallet is an alternative Uom
    - when i create the PP order, in the BOM, this component is set up with 1 piece, so in the PP order it has only 1 piece
    - after i create the PP order, the TO for the components is automaticaly created and printed in the warehouse. The picked quantity is equal to the quantity in the TO, in this case 1 piece.
    - the point is that it is needed that the quantity of the component in the TO should be rounded to the quantity in the pallet, 12 in this case, so that, the picking to be done by pallet not by piece.
    I need to know, how can i set up the quatity of the componnent to be rounded to the quantity in the pallet.
    If you need more details, please ask.
    Thank you

  • Thank you. Save or print this page for your records. We'll also send you an email confirmation. Case ID: 421912520 You have chosen to call Apple later. When you're ready, call the phone number below during business hours and refer to your Case ID for fas

    Thank you.
    Save or print this page for your records. We'll also send you an email confirmation.
    Case ID: 421912520
    You have chosen to call Apple later. When you're ready, call the phone number below during business hours and refer to your Case ID for faster support.
    1-800-MY-IPHONE
    6:00 a.m. to 11:00 p.m. Central
    iPhone
    Restore or update not working as expected
    You can review this case in the Cases & Repairs section.
    Additional Resources
    Return to Apple Support home.
    Visit your Support Profile.
    Create another support request.
    Your contact information
    Onechai John
    <Email Edited by Host>

    They already have your number and/or email address and maybe have sold it several times already to others as well. They also use number generators - software that will automatically create them - some work and some don't, they don't care, they send out millions and a few will fall for it and send them money. The only way to "hide" would be to change both and your password, but then it would happen again at some point.

  • ATP check for materials and ATP Confirmed Qty's

    Good morning,
    I have a question regarding the ATP.
    If I have a 100 of box a in stock and I have 2 Planned Orders for 75 (total req on box is 150).
    When I convert the first Planned Ord to a Prodution Ord, the ATP check will run and confirm that I have the 75 boxes required (as we want it), but if I then convert the second Planned Order I would expect the ATP to say that only 25 is available, but it is also telling me that the 75 boxes required are available.
    Can I set the ATP to confirm/allocate the first 75 boxes to the first Production Order and when the second order runs ATP to only commit to 25?
    Thanks in advance.
    ATP novice :o)

    Hi Guy Hall,
    Please check with, "include dependent reservation and production order" has been activated for  checking rule used for production order at "avilabilty checking scope"
    Regards
    Pradeep

  • Can we change ATP confirm qty in sales order?

    Hi All,
    Is it possible to change confirm qty in sales order when run ATP check? This is a rounding issue.
    We have a material with sales unit box and base unit EA, 1BOX =  20 EA, but in storage we just have 8 EA. When we create a sals order, the qty will be 0.4 box...can we rounding it to 0 because we just want to ship it by box.
    In sap help I get some comment to use userexit EXIT_SAPLATPC_002, but no detail, pls help me!
    Andy

    Hello,
    Do a google search.
    Further, for our fill or kill function we use MV45AFZZ.
    Regards
    Waza

  • ATP,confirm quantity for Purchase Order related Sales Order

    Hi everybody,
    I have purchase requisition related sales order item. I created purchase order with this PR.
    I entry confirmation date and quantity on the PO.
    Sales order item's delivery date equal to purchase order item's confirmation date.
    Sales order item's confirmed quantity eq purchase order item's confirmed quantity. It is ok for me.
    But, goods receipt not do yet for this purchase order and sales order stock = 0.
    If I run VL10N for this sales order, I can create delivery.
    I wants to see availilable sales order stock item on the VL10N items. How can I see?
    or
    If no goods receipt for sales order items then sales order item confirmed quantity can equal 0. How can I do?
    Best regards
    Gulay Celik

    Hi
    You can meet your requirement in multiple ways
    1) Modify the requirement routine for copy control from Sales order to Delivery  that DO not create the delivery for third party orders unless the GR is posted for the respective sales order.
    2) IF you have implementded Inbound Delivey functionality in your system, You can change the availabiltity situation every time you modify the GR dates and times. Modify the PO user exit that when ever a new confirmation Key LA is entered in the purchase order it goes and updates the schdule line dates and quantities in the order based on the dates entered in the LA confirmation key.
    and even if delivey gets created also what is the problem ? The GI cannot be posted though unlsess there is sufficient stock.

  • Conversion from 1/2 Case to full case

    Hi,
    I have a reporting requirement where I need to provide user with flexibility to report on 2 different levels. For example there is a material with 12 packs. The actual unit of measurement is 24packs for a case.So 12 packs form 1/2 case. If there are materials belonging to 12 packs the user should be able to report it as 12 packs as well as 24 packs. So if we have to report it as 24 packs, the quantity has to go against the 24 pack material. Pls see example below.
    Material                                                        Qty
    1224 - 12 Pack Orange Juice                         49
    1294 - 24 Pack Orange Juice                         60
    In report the user should be able to see it as
    Material                                                        Qty
    1224 - 12 Pack Orange Juice                         50
    1294 - 24 Pack Orange Juice                         60
    as well as
    Material                                                        Qty
    1294 - 24 Pack Orange Juice                         85 (60 + 25 from 12 pack)
    How do I achieve this? Any ideas?
    Thanks
    Suja

    Hi
    It helps more or less...
    because in the example you give, you want to have 85 cases imputed to one material whereas it comes from 2 different materials.....
    So thebest you can do is to reorganize your hierarchy (or create a new one) .... and calculate the summation with a modulo 24... 12 = 1/2 mod 24....
    Use the mathematical functions to do that...
    But you will never be able to hide everything under one material, except if your hierarchy emulates the grouping at material level....But as you are in the consumer business (I guess), it is going to be very long....
    PY

  • Sales Order Credit Status Block with Schedule Line ATP Confirmed Quantity

    I would like to keep the Credit Status Block on a Sales Order when it is created and over the credit limit and at the same time be able to Confirm the Order Quantity (if inventory is available) on the Schedule Line.  Has anyone done this?  I'm using ECC 5.0
    In the IMG --> Sales and Distribution --> Basis Functions --> Credit Management/Risk Management --> Credit Management --> Define Automatic Credit Control --> If I remove the Status/Block indicator the schedule line does confirm the sales order quantity but the sales order is not blocked and a delivery can be created.
    Thanks.
    Donna

    Hello Donna,
    I think I solved your problem.
    There are two ways to block the sales order - one is to not confirm the Schedule line i.e. block delivery... block further action that can be taken. The second is to not let the person save the sales order.
    Another option is to get Just a warning message, that the credit limit has been exceeded, but able to save the sales order with a confirmed schedule line.
    The setting will be in OVA8.
    For the Document Value you make the setting C or A. and make sure the block is not set.
    Don't worry about the Open order or open delivery unless you want the system to perform a credit check considering the orders that are already existent. Same with open delivery. It will take into account all the cost of the orders that are open for delivery.
    Now here some options:
    Either consider a 'warning' by the system good enough and still be able to confirm the schedule line.
    (ii) Put in a Delivery Block in the Sales Document Types, in the Shipping tab. That way, you will be able to save the sales doc. but not be able to deliver it.
    (iii) Put a Billing Block in the Sales Doc type, in the Billing tab. You will be able to deliver but not bill.
    (iv) Create a new routine (with the help of an ABAP guy) and place it in the auto credit check, 'Reaction' field where it will place a Delivery Block.
    Do let me know what your thoughts are and what you decided to do.
    Thanks
    Noel

  • Prevent ATP confirmation if license check fails

    Hi
    We are using SAP foreign trade ( legal control ) for controlling licensing requirements in sales orders. However, if a line item is on a hold due to failure license check, the schedule line is still confirmed thus blocking stocks against the line item.
    We would like to hold the confirmation on the line item if it has failed license check.
    Has anyone been able to achieve this ?
    Appreciate your help
    Regards
    Rohit Zalani

    Hi,
    I have a similar requirement and I have proposed a solution which was accepted by my client since they have barely 2 or 3 line intems in a particular sales order. I do not know if this will really be helpful for you but you may give it a try.
    The solution would be to place a reason of rejection (with description as approval block) at the item level. When a reason for rejection is placed on a particular item, it will not transfer the requirements to MD04. Once the approval is received you can remove the reason for rejection. This will again populate your requirements in MD04. I have tested and given it to my client and they are using it perfectly fine.
    You can also include this reason for rejection in Incompletion log so that the user dosent forget to assign the reason fofr rejectio before saving the order. You can also get a report of rejected orders in VA05.
    The downside of this is that if there are 100-200 or more line items in a particular order, then manually assigning a reason for rejection and releasing it would be difficult. You might have to think of some logic to be built to automate this.
    Please let me know if this helps and if you find any alternate solution please update it in this thread.
    Regards,
    Rohan

  • ATP confirmation in CRM

    Hi all,
       We have a scenario where ATP check needs to be done before an order is created in CRM. As far as I know the ATP check is done in R/3 and the normal ATP check performs only material availability in stock.
    Is there any way that Rule base product allocation could be done for orders which are created in CRM. I mean is there any BAPI or RFC function which could be included in user exit after the ATP check is done.
    Also what is the APO functionality. What are the advantages and drawbacks for rule based product allocation.
    In general do people use CRM for order creation when rule based product allocation is not supported in CRM.
    Thanks in advance
    Silivia.

    Hi
      The integration of APO &CRM systems is carried out only by BAPI's in CRM&R/3.Sales order triggers a global ATP check which can use inventory,production plans etc..
      The advantage of APO :relieve the load of R/3.Global ATP is integrated in the SCM process all kinds of order processing.In many R/3 systems ATP functionality is restricted or not possible at all.The rule based ATP check is the basis for checking alternative locations as well as for production.
      The integration of the CRM&APO system ensures the data required ofr the APO system is transferred from the CRM system results of teh avaialbility check and scheduling are trasferred to CRM &SAP R/3.The sales order is saved in the CRM system.The requirement are then saved in the APO system but are not relevant for materials planning until the sales order is transferred to the SAP R/3 system and saved.
    If you want to know any other details please let me know.
    Cheers

  • Which number I have to call for double payment for ' document to go' see my bills.Save or print this page for your records. We'll also send you an email confirmation. Case ID: 341915446 You have chosen to call Apple later. When you're ready, call the phon

    Where I have to resolve my problem for double billing for an app I purchased. App under question is ' DOCS TO GO' both normal and premium version.
    Help me
    Thanks

    Where I have to resolve my problem for double billing for an app I purchased. App under question is ' DOCS TO GO' both normal and premium version.
    Help me
    Thanks

  • Split of full pallets into multiple cases and each cases with SU num.

    I have full pallets (SU managed) lying in the hibay.
    I have another storage type full case storage type with fixed bins always relplenished from hibay.
    Hence, I create a replenishment transfer order to fill the full case area..
    we pick the full cases by breaking a full pallet from the hibay.
    and put these cases on the conveyor to shift to full case area.
    Since, individual cases are shifted via conveyor an identity is required on each case. Hence each case should have an SU number on the box.
    Replenishement TO confirmation (2 step) is done thro RF
    Please suggest how this can be achieved.
    Appericiated and will be awarded points for feasible solution.

    Please ignore my previous reply.
    See my material (in many boxes on a pallet) is already moved to hibay from the goods receipt area.(Identification point won't work)
    And the pallet is with SU number
    e.g Material is in 10 boxes on 1 pallet with a SU number for the pallet.
    Now I want to move the 10 boxes leaving the pallet to another storage type by having SU number on each box.

  • PO STO reconfirm ATP don't consider partly confirm ATP qty

    Hi,
    I find an issue in our implementation about PO STO using ATP.We user SAP ECC 6.0
    Here is the description of issue
    1. There is stock = 1000 at (04.03.2010)
    2. there is PO STO XXX out to other plant -600 (ATP confirm 600 and remaining cummulative ATP is 400) at (05.03.2010)
    3. there is PO STO YYY out to other plant -500 (ATP confirm 400 and remaining cummulative ATP is 0) at (06.03.2010)
    here is the issue arrise
    4. there is PO STO ZZZ in from other planr 500 at (01.05.2010)
    5. User will try to reconfirm ATP for PO STO that partly confirm (see point 3)
    the ATP check doesn't consider 400 PCS (partly reconfirm QTP qty /  400 PCS is not available), so the system
    suggest ATP at (01.05.2010) for confirmed ATP 500 PCS
    What we expect is delivery confirmation in PO XXX (point 3) will be
    06.03.2010 confirm 400 (already confirm in point 3)
    01.05.2010 confirm 100 (the remaining will take from PO ZZZ in point 4)
    The result from system
    01.05.2010 confirm 500 (the remaining will take from PO ZZZ in point 4)
    in customizing Assign Delivery Type and Checking Rule, we used adoption E (Dialog Box in Case of Undercoverage (Batch: Deliv. Proposal))
    why is this happend, why the partly confirm ATP qty is not available for the PO itself?
    Any ides is very appreciated, please kndly help.
    Best regards,
    Freddy Ha
    Edited by: Freddy Halim on Mar 4, 2010 9:46 AM

    Pls check the following links
    ATP check at order level and delivery level
    http://www.saptechies.com/what-is-availability-check-how-to-configure-it/

  • No confirmation on partial delivery during ATP from ECC

    Dear All,
    In CRM Sales Order im using ATP from ECC, when the quantity is available on the site the availability works fine, but when I order a quantity more than stock quantity the ATP confirms on Zero stock. It should confirm on the available stock no zero. any help why it didnt confirm the available stock?
    Please note that I allowed partial delivery on shipping data of the customer master and on the order with no help. I also set the maximum partial delivery to 9.
    Regards,
    Ahmed Elders

    Dear DJ,
    when I pefrom this action on ECC, the ECC pops up the screen of the availabilty confirmation, so in ECC I can choose on this screen the partial available stock.
    I mean by site = plant, because we use SAP IS Retail, sorry for this.
    This behavior is on Web UI or SAP CRM GUI transaction CRMD_Order
    note: when I set parameter APO_ATP_PARA to 5, the ECC screen appears on CRM GUI and I'm able to confirm on partial delivery only on this case
    Regards,
    Ahmed
    Edited by: Ahmed Elders on May 16, 2011 9:35 AM

Maybe you are looking for

  • Works in Firefox but not in IE

    I have a webpage that when published looks exactly how I want it to in firefox but not in Internet Explorer. The problem is it shows the bulleted list in Firefox but not in IE. How can I fix this?

  • I can't log in to Game Center

    Starting yesterday I can't log in to my Game Center.  I'm logged in on one device, but on mine I logged out and tried to log back in and it won't let me. I get a message that it can't connect to the server. I've tried my husband's account with the sa

  • BEx query design: defining complex filters?

    Is it possible to define complex filters in a query definition? By complex I mean using logical operators (AND, OR, NOT) Example: report giving sales results I want to have (Customers from Germany <b> AND </b> product type A) <b> OR </b> (Customers f

  • Create a Job for a transaction dynamically through ABAP program.

    Hello Experts, Can a job be created for a transaction dynamically, say for example i have a parameter on selection screen which will take the name of the transaction and then i have to create a job to run that transcation. Plz provide sample code. Re

  • Iphot and Photos libraries taking all my disc space

    I have installed Photos but now seem to have 2 photo libraries on my Laptop - iPhoto and photos. Seeing as I have a small SSD and a large collection of pictures can I safely delete one library to recover some disc space?