Auto creation of time based inspection points against in process required

Hi
We want system to create/generate inspection points automatically when process order is released and inspection lot is created. Currently we have to create inspection point manually using either QE71 or QE11. Previously when scheduling was active in PP, inspection points had been creating automatically for the duration of process order. But now PP scheduling is not required and as a results inspection points are not being created automatically.
Please assist.
regards
Chris

SAP provides a FM, (QAPP_CUST_IP_CREATE), to be used as a template to create your own FM for automatically creating inspection points.  There is documentation in the FM to explain it.  You then assign this FM in configuration where you define the inspeciton point identifiers.
FF

Similar Messages

  • Can we obtain Inspection lots against a Process Order / Production Order

    Can we obtain Inspection lots against a Process Order / Production Order  on time basis i.e hourly or day wise against the same order

    HI
    i think there is no this option.Like Plant maintenance ther is no scheduling tool.
    or you have to go with stability studies...
    -ashok

  • Time based inspection

    The material once produced goes to oven and will be kept in oven for few hours. For example material A can be kept in over for 6.5 hours, Material B u2013 5.5 hrs, and C can be kept for 6.0 hours.
    When the material is pull out of oven before specified time then system then system should not allowed user to move the stock out of the oven. Stock when entering the oven will be un-restricted.
    My thought is to create an inspection lot when material is moved into the oven (08 -Inspection type). When results entered is  validated with the time in which material moved into oven. And check if this time is less than required material time.
    I am not sure where to capture hours for the material and how to do validation of result entered with time which material moved to oven.
    Client don't want to create production order for this process.
    Is there a standard way to do map to SAP. ? ?
    Please adviceu2026
    Thanks
    S

    Well, you'd have to get an ABAP'er to write the code.  But assuming you create the inspection lot, (I.e. do whatever movement you setup), when the material is placed in the oven, then your start time is the lot creation time.  Alternatively you could use inspection points and then you create the inspection point when the material is placed in the oven.  The start time would be part of the insp. point identifier and could be edited to the exact time.
    When someone attempts the UD you take the current date/ time and subtract the date/time of the insp. point or of the lot creation.  Compare that difference to the value in the inspection plan.  If it doesn't exceed the time, don't allow the UD.
    There are many places you could store the cure time for the material.  You could use a general characteristic in a material class assigned to the material.  That would probably be my first choice.  You could use the QM inspection text in the material master. 
    This shouldn't be to hard for a good programmer.
    FF

  • Quantity based Inspection points

    Dear Gurus
    In the master recipe,i assigned inspection points (Insp. Points         150        Generated insp. point, quantity or time) and characteristics also assigned in that operation(for  QM control key QM02). My requirement is each 50kg i want a inspection lot but in the master recipe & process order operation details no such Quantity entering field is not there. How can i get this?...
    Note : 03 inspection type also activated in the mat master

    Dear Anupama
    Inspection point doesnt mean that you will get 5 inspection lots. Inspection point means you will get option for entering results 5 times through points. you can get the points through QA32> Result recording> Pop up> click on Assigned inspection point. You will get the list of inspection point> click on any one of them it will take you to result recording
    Hope this is clear
    Regards
    Gajesh

  • Setting up inspection point in a scenario require more than one inspection

    Hi all,
    Maybe I am still not very clear on the PP-QM conceptu2026 hope you can see my problem on the following questionu2026..
    According to SAP in the QM-production environment, we key in ONE inspection point in the task list header level (i.e. either the master recipe, routing, or rate of routing).
    Based on the following business scenario which is going to use inspection point for the inspection:
    u2022     Time-based intervals (for example, an inspection point every hour or for each work shift)
    u2022     Quantity-based intervals (for example, an inspection point for each container)
    u2022     Freely-defined intervals (for example, an inspection point each time a tool change occurs)
    Since each of the above scenarios require more than one inspection points to be created and to be assigned to the task list header.
    Thus, how to accomplish multiple inspection point assignment when the task-list header only allow me to assign one inspection point at a time?
    Thanks
    YY

    Hi guys,
    Thanks. However, in the SAP help portal it does said the system allows several inspection points to be assigned to an inspection operation whether it is in routing or recipe.
    Therefore, does it means I can assign more than one inspection points in the operation detail level for either recipe or routing if I will to click the u201CNo relationu201D radio button in the u201CQuality Management: Inspection Pointu201D section. (i.e. is this is the right place to allows this assignment)?
    For example, on the change master recipe screen at the Operation tab, I highlight one line item (i.e. one operation line item and zoom into this operation line item, I donu2019t see any field box that allow me to assign several inspection points to an operation? Instead, on the u201CQuality Management: Inspection Pointu201D section, there are the following fields appear:
    - Insp.pointCompletion dropdown box
    - 4 radio buttons on the inspection interval (ie. Time-related, Qty-related, No-relation) and its subseq time and quantity value input box.
    - Quan.pt. lot checkbox
    - Last Part Lot Assgmt checkbox
    Thus, where is the section in the operation overview screen at Master Recipe or Routing level that I can assign several inspection points?
    Thanks
    YY

  • Dynamically (auto) creation of ODS based on a key or reaching a max size

    BW 3.5 Receiving data from a RDBMS (likely dbconnect):
    I am working for an aviation company where we are expecting to receive large  number of records from flying aircrafts. Since the number of aircraft could be in thousands and data could reach 2 GB per flight, we must create ODSs dynamically. Firstly, a new ODS should be created for a new plane as the plane sends in first chunk of data. Secondly if an ODS reaches to a certain size, we would like to create a new one just so that the size wouldn't kill performance. Lastly we have to also store binary data in the ODS.
    Any ideas? Clue or code for creating an ODS dynamically and not messing the BW system integrity. Also best way to deal with binary data in an ODS table.
    I'll appreciate any ideas and examples of succesful implementations. Thanks a lot.

    Hi!
    Actually, you can use the search feature in your guide. Just press Menu and go to search and you can search for a program by keywords there. Once you find the program you're looking for, you can click on it and set it to record either as a series recording or a one time recording instead. We hope that this helps you as for the search function.
    Thanks,
    CJ

  • Creation of multiple inspection points

    Hello experts,
    I try to figure out how to create multiple inspection points for one operation at process order release.
    It means that the release of the process order triggers:
    - inspection lot creation (lot origin 03)
    - inspection points creation for operation with inspection characteristics assigned to it
    In the recipe header, I entered inspection points = 150 - generated inspection point, qty or time
    (module function QAPP_CUST_IP_CREATE is activated for "automatic creation of insp. points")
    In the operation header, I select time related -and enter 1 HR
    However no inspection point is created at process order release. Only inspection point identifier is created automatically when I select the next inspection point in TR QE51N.
    Do you have any tips on the subject ?
    Thanks in advance
    Best regards
    Amaury

    Dear Amuary
    Doubt if there is any solution in standard. Use exit so that thr first 3 inspection points gets activated quickly. Try these exits
    QAPP0001
    User exit QAPP 1 (create inspection point)
    |  QAPP0002 |User exit QAPP 2 (create inspection point & other data)    
    Regards
    Gajesh

  • Inspection point 150

    Gurus,
    I have activated insp pt 150.When i try to record the results,the sytem is asking for Partial qty no.What is this & waht should be entered?

    To ,
    150 Inspection point you can use where you have to take inprocees inspection regular interval of time or qty ,
    You can confirm here partial qty also
    Regards
    SANIL
    You can refer this link
    Re: Quantity based Inspection points
    Regards
    SANIL
    Edited by: Sanil Vadke on Feb 11, 2010 5:42 PM

  • Automatic Inspection points...

    Hi,
    There are two operations in routing and inspection will be done at each operation hourly. When the first operation is rejected material will be scrapped / re-worked. I attached in-process inspection (03 inspection type) to material master.
    Attached inspection points 150 at routing header and at the operation details I checked the u201CTime-Relatedu201D radio button.  I assigned TFac = 1 Hour.
    When I create a production order system generates in-process inspection lot. However, I am unable to generate hourly inspection points for both operations. Please advice how to carryout hourly inspection at both the operations? Does these inspection points get generate automatically ? If so how to set up for automatic inspection points generations ?
    Am I following the right steps to perform hourly inspection? Is there any other way to handle this process ?
    Please advice
    Many thanks
    Regards
    S

    The characteristics tested at operation 10 and operations 20 are different. For example, if diameter is measured at operation 10 then if diameter is not ok the manufacturing stops at operation 10.
    If diameter measurement at operation 10 is OK then operation 20 will be performed. The characteristic viscosity is measured at operation 20. If viscosity is OK at operation 20 then further operations in the routings are executed else manufacturing stops at operation 20.
    If any issue identified at operation 10 or 20 further execution of operations will be stopped and some actions are taken to improve the process.
    When I assigned inspection point 150 to routing header an inspection lot ( 03 type) is getting created. When I click on u201CResultsu201D in QA32 system is asking me to enter the u201CPartial quantity no.u201D.
    In QE71 I see an two inspection lot created for each operation (same inspection lot number for both the operations). When I save QE71 after entering Partial quantity, Validate Inspection point and Result system is creating another inspection point.
    However, the new inspection point is getting created only when I save the first inspection point.  This process is not happening automatically.  I would expect system to create inspection points automatically for every hour.
    I may need to work with technical guys to enhance the functional module QAPP_CUST_IP_CREATE for automatic creation of inspection points.
    Please advice if there is any other way to map this scenario.
    Many thanks
    Regards
    S
    Regards
    S

  • Auto populate system time for start/end times in OTL Time card

    Hi,
    Is there an option of defaulting the time-card entry/exit times to system-time.
    Say on the time-card a press of a button will default the start-time and end-time(and have these as read-only).
    Is this possible in OTL with any preferences ?
    The client wants to do-away with the time-clocks all together. If such a feature is available in OTL.
    TIA,
    VB
    Edited by: VB on Jun 13, 2011 5:39 PM

    VB,
    You can't add logic in layouts to auto populate the time based on clock. You will have to depend on a custom process to do it.
    Also least time period of entry is day, not week. Look at the preferences setup of your test employee.
    --Shiv                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

  • QM about the Inspection Points

    Hello everyone, I have create the inspection points in the process of the material incoming inspection. BUT, now our Data Entry input worry information in the inspection points. SO, how can i delete this point ?
    I looking forward to your answer, thank you very much~~!

    once create point you cont  do any thing  remove inspection point  in routing or receipe then create  production order or process order  then you wont get the  inspection point in results recording

  • Batch creation at inspection point valuation.

    While doing sampling inspection thru in process inspn lot. I want to valuate inspection points and also need to use short text field for capturing qty information. During sampliong inspection some times a particular qty may get Rejected and it will be kept as blocked qty.
    Whats is the best way to capture that Rejected qty. Here we planned to generate Batch number at the GR time. Batch number is auto generated and can I create batch number at Partial lot screen of inspection point valuation.
    Is there any way to skip batcha ssignment during inspection point valuation.

    Hi,
    When the Material is subjected to Quality management & batch management is active for that material.
    Then during Goods receipt you can use automatic batch for that material so the material will be in Quality inspection with batch update
    when you do the GR in 101
    Whenever you do the usage decision then the same batch will flow.
    rgds
    Chidanand

  • Auto Creation of new requisitions based on a list of items

    Auto Creation of new requisitions based on a list of items
    We are starting discussions to determine how we could auto-create requisitions based on a list of servers in order to perform periodic health checks. 
    One approach we thought about was creating one service request that could spawn multiple requests, again based on a list and using a set schedule (weekly, monthly, quarterly, yearly, etc.)
    Has anyone implemented this and can provide some guidance/tips?

    You can check this article for more references on how to use sp_helptext object_name stored procedure:
    http://blog.sqlauthority.com/2007/05/25/sql-server-stored-procedure-to-display-code-text-of-stored-procedure-trigger-view-or-object/
    I also suggest trying commercial tools to sync and compare the stored procedures between two databases. We used
    ApexSQL Diff, but I've also heard some good things about
    Devart's tools.

  • Reg., Quality Inspection at the time of Goods Receipt against the P.O.

    Hi
    Pls provide the procedure for the "Quality Inspection at the time of Goods Receipt against the P.O."
    Thanks in advance.
    Regards
    Ravi

    Answers:
    1.Our client wants that he want to send back to Vendor, In which way we have to do in SAP?
    In QM,Raise notification for rejected qty in special stock, this will carry task of return delivery.
    2. Without Quality inspection User shouldn't do the MIRO?
    User discipline only it will be solved or
    Prepare user exit with help of ABAP'r
    while goods receipt(MIGO) for all scenarios(under delivery/over delivery/rejected) in development,
    Check MIRO for QC passed qty is allowed for bill booking, give meaningful messages for all scenarios.
    3. Quantity was certified by 13 only, so the user should do the MIRO for 13 only, Kindly suggest iIn which way we have to configure in SAP?
    Do return delivery for rejected quantity(2),if there excise,reverse it thru J1IS.
    After finishing above steps,Wheu u do IV only Quantity 13 will flow.
    Invoice verification will be done only for the accepted quantity.
    Above solution will solve problem.
    Edited by: Jeyakanthan A on Jan 11, 2010 12:01 PM
    Edited by: Jeyakanthan A on Jan 11, 2010 12:02 PM

  • Assembly Point with mix of time based and discrete components

    Hi all,
    I have a scenario where I want to assemble 2 different components - one of them time based (assy data EXTERNAL_LOT), the other one discrete (assy data INV_SFC).
    Resource system rule "time based resource (genealogy)" is set to true.
    I set up and loaded slot config on resource for the time based component.
    Operation is configured to not allow SFC complete if components are missing (CT520 on PRE_COMPLETE hook)
    When I start SFC at operation and resource in POD the time based component is assembled automatically (according to device history record) However, once I open assembly activity (COMP_LIST_DISPLAY, CT500) to assemble the discrete component both components are displayed as not assembled in component list. If I assemble the discrete component only and then try to complete SFC I receive an error message pointing out that not all components are assembled yet.
    I would have expected that time based component is displayed as already assembled and also CT520 hook does recognize the time based component as already assembled.
    Am I missing any settings?
    Or does such a mixed scenario not work at all?
    We are using ME 6.1.4.2
    Thanks for your help!
    BR Ulrike

    Hi,
    The issue you are seeing with CT520  whereby the hook does not recognize the time based component as already assembled was resolved in a later release.  Please patch to latest version.  Associated release notes will detail which patch fixed it.
    You would need to use assembly point in POD to add the INV_SFC
    Thanks
    Steve

Maybe you are looking for

  • Read the Org Model

    Hi, I need to read the BP assigned to a specific position on my CRM Org Model. This position is assigned to the first organizational unit of it. Could you give some functions in order to do this. I though to use HRP1000 and HRP1001 for this purpose b

  • I have am IPhone 3GS. I put all my pics in folders and now I dont know how to pull the folders off my phone on my laptop . I want to change up and delete some of them, Can anyone help

    I have am IPhone 3GS. I put all my pics in folders and now I dont know how to pull the folders off my phone on my laptop . I want to change up and delete some of them, Can anyone help

  • Disable Warning Message

    Each time I perform an action in Forms, I have the following Message Code ('Do you want to save the changes you have made ?'). For instance, when I perform an execute_Query ... I would disable these warning Messages ... ?Is it possible ? Tx in advanc

  • X-Fi Xtreme Audio + Windows 7 = Freeze

    &X-Fi Xtreme Audio + Windows 7 = Freeze@ So after installing Windows 7 64bit Build 700, I downloaded the beta drivers and installed them. I went into the Audio/Sound options and selected the proper drivers to use for audio. The first time I did this,

  • What is INVERTER BOARD?

    I sent my 17in MBP in for repair and they are in the process of shipping it back to my apple store. I had sent it in for the CPU whine and the applecare rep I just spoke with told me that they had replaced the INVERTER BOARD and not the Main Logic Bo