Creation of multiple inspection points

Hello experts,
I try to figure out how to create multiple inspection points for one operation at process order release.
It means that the release of the process order triggers:
- inspection lot creation (lot origin 03)
- inspection points creation for operation with inspection characteristics assigned to it
In the recipe header, I entered inspection points = 150 - generated inspection point, qty or time
(module function QAPP_CUST_IP_CREATE is activated for "automatic creation of insp. points")
In the operation header, I select time related -and enter 1 HR
However no inspection point is created at process order release. Only inspection point identifier is created automatically when I select the next inspection point in TR QE51N.
Do you have any tips on the subject ?
Thanks in advance
Best regards
Amaury

Dear Amuary
Doubt if there is any solution in standard. Use exit so that thr first 3 inspection points gets activated quickly. Try these exits
QAPP0001
User exit QAPP 1 (create inspection point)
|  QAPP0002 |User exit QAPP 2 (create inspection point & other data)    
Regards
Gajesh

Similar Messages

  • Setting up inspection point in a scenario require more than one inspection

    Hi all,
    Maybe I am still not very clear on the PP-QM conceptu2026 hope you can see my problem on the following questionu2026..
    According to SAP in the QM-production environment, we key in ONE inspection point in the task list header level (i.e. either the master recipe, routing, or rate of routing).
    Based on the following business scenario which is going to use inspection point for the inspection:
    u2022     Time-based intervals (for example, an inspection point every hour or for each work shift)
    u2022     Quantity-based intervals (for example, an inspection point for each container)
    u2022     Freely-defined intervals (for example, an inspection point each time a tool change occurs)
    Since each of the above scenarios require more than one inspection points to be created and to be assigned to the task list header.
    Thus, how to accomplish multiple inspection point assignment when the task-list header only allow me to assign one inspection point at a time?
    Thanks
    YY

    Hi guys,
    Thanks. However, in the SAP help portal it does said the system allows several inspection points to be assigned to an inspection operation whether it is in routing or recipe.
    Therefore, does it means I can assign more than one inspection points in the operation detail level for either recipe or routing if I will to click the u201CNo relationu201D radio button in the u201CQuality Management: Inspection Pointu201D section. (i.e. is this is the right place to allows this assignment)?
    For example, on the change master recipe screen at the Operation tab, I highlight one line item (i.e. one operation line item and zoom into this operation line item, I donu2019t see any field box that allow me to assign several inspection points to an operation? Instead, on the u201CQuality Management: Inspection Pointu201D section, there are the following fields appear:
    - Insp.pointCompletion dropdown box
    - 4 radio buttons on the inspection interval (ie. Time-related, Qty-related, No-relation) and its subseq time and quantity value input box.
    - Quan.pt. lot checkbox
    - Last Part Lot Assgmt checkbox
    Thus, where is the section in the operation overview screen at Master Recipe or Routing level that I can assign several inspection points?
    Thanks
    YY

  • QAPP_CUST_IP_F4 - inspection point help

    Two related questions here.  I haven't set this FM up before.
    One:  the FM mention table T_TQ79_F4_VALUES.  I can't find this table in our system.  Should this table be there? 
    Two:  The FM indicates that the table is index by the user field attribute which is a one character field.  The problem I see is that if I have multiple inspection point identifiers.  I.e. I create 901 and 902. In 901 I use the field number(size =3) as a shift number... 1, 2 or 3.  But in 902 I use the same field as an employee ID number.. 213, 418, etc...  How can I limit the help information for each IP identifier.  The user would be clueless as to the IP identifier being used.  For 901 I want the help to display "Enter the shift number that sample was taken on."  For 902 I want to enter "Enter the employee number of the person that took the sample."
    FF

    Yes.. we saw the defined structure.  But the module help specifically states to maintain the values in the table T_TQ79_F4_VALUES.  The values are then read into the structure from the table.
    We have already designed a Z-table should we need it.  But we try not to use a Z-tables if SAP has a provided solution.  We have submitted an OSS note to them on this.
    I just wanted to see if it was just us that was missing the table, or if others were missing it.  If it is missing, I'm wondering if any one has implemented this FM and if they all used Z-tables for storing their data or if SAP provided something.  I searched OSS already to no avail.
    In any case, SAP either needs to update their documentation for this process, or they need to provide the table that is mentioned.  Seems pretty clear that there is an SAP disconnect here.  I've pasted the help documentation from the SAP provided FM below.
    FF
    F4 - Help for the Inspection Point Fields                                    
    You can use this function module to specify input help (F4) for the user field for inspection point identification. 
    The function module serves as a copy model for user-defined programs. Note that the interface for user-defined programs must correspond to the interface for this function module.
    You must enter values for the specified user field in the table T_TQ79_F4_VALUES to offer a list of values for the user. You can enter an explanatory short text for each value.
    SAP determines the format for the possible values. This means that possible values are determined and exported based on the table. 
    For more information, see documentation on the individual parameters.

  • Inspection point results on characteristics tab QA11

    When you use multiple inspection points standard SAP shows the average of the results on the characteristics tab in transaction QA11. Is it possible to see all separate results instead of the average?

    My client wants to view all the separate results when maken the ud. I think the best way to do this is to click on the Charac data button.
    Edited by: Maarten_m4 on Jan 12, 2011 8:31 AM

  • Multiple result recording for Manual inspection Lot using inspection point

    I want to record inspection result for inspection type 89 against *inspection point*. Then I create new inspection point and assign it in quality plan. Then I have done the multiple result recoding against one manual inspection lot in DEV server. But when it is going to QAS server then error is coming during result recoding. Error is "The results transaction cannot be used for
    inspection" Message no. QE094.
    Plz give me the solution to record the result.

    Reason is very simple : the  the inspection point definition in the task list header is incompatible with the sampling procedure assigned to the characteristic.Make sure that you select the appropriete radio button in QDV1 while creating sampling procedure and assign the same against each of the MIC's in the task list.
    Make sure that the sample tab in QA02 is pressed while assigning the inspection specification & status of the lot is REL

  • Auto creation of time based inspection points against in process required

    Hi
    We want system to create/generate inspection points automatically when process order is released and inspection lot is created. Currently we have to create inspection point manually using either QE71 or QE11. Previously when scheduling was active in PP, inspection points had been creating automatically for the duration of process order. But now PP scheduling is not required and as a results inspection points are not being created automatically.
    Please assist.
    regards
    Chris

    SAP provides a FM, (QAPP_CUST_IP_CREATE), to be used as a template to create your own FM for automatically creating inspection points.  There is documentation in the FM to explain it.  You then assign this FM in configuration where you define the inspeciton point identifiers.
    FF

  • Batch creation at inspection point valuation.

    While doing sampling inspection thru in process inspn lot. I want to valuate inspection points and also need to use short text field for capturing qty information. During sampliong inspection some times a particular qty may get Rejected and it will be kept as blocked qty.
    Whats is the best way to capture that Rejected qty. Here we planned to generate Batch number at the GR time. Batch number is auto generated and can I create batch number at Partial lot screen of inspection point valuation.
    Is there any way to skip batcha ssignment during inspection point valuation.

    Hi,
    When the Material is subjected to Quality management & batch management is active for that material.
    Then during Goods receipt you can use automatic batch for that material so the material will be in Quality inspection with batch update
    when you do the GR in 101
    Whenever you do the usage decision then the same batch will flow.
    rgds
    Chidanand

  • Create ecatt script for one sales order creation with multiple line items

    Hi ,
    I want to create a ecatt script for one sales order creation with multiple line items. Preferably SAP GUI.
    This selection of data will be from an external file/ variants which will have only one row of data in it.
    Firstly: I have to sort the external file having same PO Numbers in an order.Group them together.
    Second: I have to create sales order for those many line items having same PO Number.
    Best Regard
    Taranum

    Hi Micky
    Firstl you should upload the Line items for a particular sales Order in an Internal table
    and then pass that internal table to your BAPI during your coding corresponding to a particu;lar sales order
    In case of any issues pls revert back
    Reward points if helpful
    Regards
    Hitesh

  • Multiple inspection against Batch

    Hi,
    My client doing the inprocess quality checking of the same set of inprocess characteristics every hour for a particular bacth during production. They have both REM and PP-PI and we are using 03 and 13 inspection types for inprocess checking.Now how to handle multiple inspection of same set of characteristics for every hour?
    Regards
    Sandip

    1.Select the "Inspection points based on time " in routing Header
    2.In Operation overview under Inspection points put time 60 min.
    3.check T code QE70
    This will create the Inspection point per Hr..........which will allow you to do the multiple RR on same set of chars

  • Automatic Inspection points...

    Hi,
    There are two operations in routing and inspection will be done at each operation hourly. When the first operation is rejected material will be scrapped / re-worked. I attached in-process inspection (03 inspection type) to material master.
    Attached inspection points 150 at routing header and at the operation details I checked the u201CTime-Relatedu201D radio button.  I assigned TFac = 1 Hour.
    When I create a production order system generates in-process inspection lot. However, I am unable to generate hourly inspection points for both operations. Please advice how to carryout hourly inspection at both the operations? Does these inspection points get generate automatically ? If so how to set up for automatic inspection points generations ?
    Am I following the right steps to perform hourly inspection? Is there any other way to handle this process ?
    Please advice
    Many thanks
    Regards
    S

    The characteristics tested at operation 10 and operations 20 are different. For example, if diameter is measured at operation 10 then if diameter is not ok the manufacturing stops at operation 10.
    If diameter measurement at operation 10 is OK then operation 20 will be performed. The characteristic viscosity is measured at operation 20. If viscosity is OK at operation 20 then further operations in the routings are executed else manufacturing stops at operation 20.
    If any issue identified at operation 10 or 20 further execution of operations will be stopped and some actions are taken to improve the process.
    When I assigned inspection point 150 to routing header an inspection lot ( 03 type) is getting created. When I click on u201CResultsu201D in QA32 system is asking me to enter the u201CPartial quantity no.u201D.
    In QE71 I see an two inspection lot created for each operation (same inspection lot number for both the operations). When I save QE71 after entering Partial quantity, Validate Inspection point and Result system is creating another inspection point.
    However, the new inspection point is getting created only when I save the first inspection point.  This process is not happening automatically.  I would expect system to create inspection points automatically for every hour.
    I may need to work with technical guys to enhance the functional module QAPP_CUST_IP_CREATE for automatic creation of inspection points.
    Please advice if there is any other way to map this scenario.
    Many thanks
    Regards
    S
    Regards
    S

  • Inspection points

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point
    If its SAP's Limitation then please let me know how to hide inspect and inspected columns in result recording screen.

    SIr, I am repeatng my problem again,
    I have a plan for inspection type 04, i have used inspection points 100 as free inspection points.
    each mic have same sampling procedure as:
    Sample type 100 % inspection
    Valuation Mode   Manual
    Inspection Points Free inspection Points
    In inspection plan base quantity for each mic is 1 and unit of measurement EA
    Now  i have created process order of 50000 EA
    Whn process order confirmed lot of quantiy 50000 comes in quality
    Lot quantity come 50000 EA, Sample size comes 50000 EA
    but the problem is that when i do result recording, in the field of Inspect and inspected systm shows default figure 32,767
    as in inspected field it should come 50000 EA if i make PO of less than 32767 then it appears fine same, bt more than PO quantity 32767 it shows default value 32767.

  • QM: Sample Size is 32767 if freely defined inspection point is used

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point.
    Regards,
    Abir.

    Hi,
    Sample size under 'Inspect' column in result recording screen is always 32767, if order quantity >32767.
    I use EARLY lot creation (through material master setting), because I want one lot for one production order... do partial confirmation. Lot is created with production order release, before actual GR takes place.
    Say I have an order with qty 100,000 and if I open the lot after REL of order I see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             0
    Sample Size:                100,000
    Even if I do confirmation and GR for say 100,000 qty and open the Lot I can see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             100,000
    Sample Size:                100,000
    When I go to result recoding screen, against every MIC there is column 'Inspect' (there I get 32767), there is another entry field 'Inspected' (here system don't allow to enter more that 32767)
    Sampling procedure I have used:
    Sample Type:     200    100% Inspection
    Valuation Mode: 500    Manual Valuation
    Free Inspection Point
    May be I made mistake in pointing out the issue; the problem is with 'Inspect' quantity in result recording  - which always appearing 32767. For smaller quantity order its equal to order quantity.  How change the 'Inspect' quantity.
    Also not if I remove Inspection Point from the plan I get "Inspect' quantity equal to Production order quantity.
    Best regards,
    Abir.

  • Discussion: The usage of Inspection Points

    Hi Experts,
    Talking about the INSPECTION POINTS, what kind of usage could it be ?
    In some occasions,  it can be used as an sign that distinguish each delivery from the production line to the QM dept.
    How about any other way to use it?

    An inspection point is an identifiable record of inspection results that is assigned to a work or inspection operation. Several inspection points can be assigned to an inspection operation.
    With inspection points, you can have several inspections and can record multiple sets of characteristic results for an operation.
    Inspection Points for Inspections During Production
    If you inspect during production using routings, rate routings or master recipes and you want to record inspection results in specific intervals, choose the inspection point type Free inspection points in production. You can define your own field combinations for this inspection type in Customizing.
    Inspection Points in Goods Receipt
    If you carry out goods receipt inspections with inspection points, choose the inspection point type Free inspection points in production. You can create your own field combinations for this inspection type in Customizing.
    Inspection Points in Plant Maintenance
    If you carry out calibration inspections and want to record inspection results for equipment or functional locations, choose the inspection point type for Equipment or Functional location. You can create your own field combinations for these inspection types in Customizing. However, the field Equipment or Functional location must exist in the field combination.
    Inspection Points in Sample Management
    If you use the sample management functions in a goods receipt inspection, or inspection during production with planned physical samples, each sample number is uniquely identified by an inspection point. Choose the inspection point type Physical sample. You can create your own field combinations for this inspection type in Customizing. However, the field Sample must exist in the field combination.

  • Inspection point qty confirmation for operation - INprocess Inspection

    Hi Experts,
    After doing partial confirmation in the Result recording, the partial confirmed qty moves down to the next operation and is confirmed. But using QM result recording when I try to post the next partial qty, the system cancels the previous confirmation although the next operation has been confirmed for the partial qty. And I am able to confirm the full qty for the operation
    How to avoid this situation ?
    Regds
    Jomy

    Dear Jomy,
    Please use 150 as the inspection point in your routing header.
    But please make sure that in configuration you have this maintained.
    SPRO>QM> Quality planning > inspection planning > general > define identifier for inspection point> select the inspection point you are using >double click> function module> maintain in Automatic creation of insp. Points > maintain this function module QAPP_CUST_IP_CREATE > tick the use function module
    Test with a  new order and lot.  Each time you go for RR it will go for new partial lots. So confirmation will get added up as in  co11n process.
    Hope this helps
    Regards
    gajesh

  • Goods receipt with inspection points

    hi
    my business process study reveels the following scenario
    i need to do goods receipt inspection with inspection points
    means the finish product say rice
    i given paddy to the miller as a subcontarcting
    iam getting rice as out put
    i need to record inspction results on inprocess as well as at  finish product
    ie while processing from paddy to rice i will made timely inspection points and want to capture the result
    and for final rice also i need to do inspection
    how to achive this
    if i chhose inspection type 04 and freeinspection points
    system not accepting
    plz suggest
    sasikanth

    For my proposal you use 04 inspection lot with early creation of the inspection lot.
    Create an inspection plan with the proper usage for inspection type 04.
    Select free inspection points in the header of the inspection plan.
    Assign your characteristics.  Release the plan.
    Create and release your order.  You should find an 04 inspection lot for it. 
    Select the lot, most work list will give a pop-up showing the two operations.  Double click on the first one.  Then you should get a pop-up asking for the inspection point identification.  Enter in what ever you've set it up to require.
    Record the results.  Repeat previous step as often as you need to.
    Craig

Maybe you are looking for