Hi all,
i am using the implementation scenario of SolMan. i created an implementation project and related IMG project in the development system. Once stuctured my business scenarios i start to configure them in SOLAR02.
First i reference the IMG customizing tree, then i perform the customizing to the development system which is access by me from the SolMan system. when saving a transport request is required but the IMG project is not automatically assigned to my transport request. Did i miss any configuration to get this automatic step or it is not possible?
If i follow the same steps from the IMG project in the development system (without SolMan) this functionality works.
Thanks for any help
regards
Sara

Hello,
I have collected the data from our systems successfully. I have implemented the steps lsited at http://help.sap.com/saphelp_sm70ehp1_sp26/helpdata/de/45/51fbdbd4941803e10000000a1553f7/frameset.htm and it works fine.
Regards
Andreas

Similar Messages

  • Task object: Linking Opty to Account: on the NEW/create from LookUp

    Hi,
    The User creates a Task from the Account Detail page.
    The Task page has the Opty field (LookUp).
    On the LookUp, User clicks the NEW button to create a new Opty record.
    The Opty page has the Account field (LookUp) -here is it possible to get the original Account Name into the Account field on the Opty page?
    The standard facility is that the Account Name does not get picked up here.
    I understand that the above process/flow is not in the standard model...
    (the current solution is to ask users to create the task from the Opty Detail page, which reflects the actual intent as well; but a config solution to the above process would be helpful).

    Hi,
    Siebel pics up the relevent informaiton like account name or opportunity name automatically if that any record you create from with in the any record. And if you consider the normal sales practice, one create an opp first and then a follow up task for that opp.
    Nisman

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • Creating a static library with XCode cross-project references.

    I have a project and am trying to move a lot of the code into a static shared library, and added a cross project reference to this library in my app.
    However, when I moved a file from my app to the library (removing the reference in my app and moving the file to the library's project directory), and try building my app, I get compiler error messages as if the file I have moved doesn't exist.
    When I build my library project, it says the build has succeeded, but the library.a file remains red. It is also red in the my referencing app project.
    If anybody has any experience setting up cross-project references in XCode, I'd appreciate any help.
    If it helps identify where the problem is, I've performed the following steps to setup the library and cross-project reference:
    1. I created a new Cocoa Touch static library project in XCode which would house the shared code.
    2. I changed the global settings in XCode to place the build products in a shared build directory (rather that the project directory), and made sure the intermediate build files are placed with the build products.
    I changed this using the Preferences menu, but have also gone into the project info for both my app project and the library project and made made sure it is set to place the build projects in the custom shared build directory.
    3. I then added a Source Tree, and made sure that the Path of the project directory of the library project.
    4. I added a project reference to the library project's .xcodeproj file in my application project. I changed the library project reference so that it was relative to JIGSAW24LIBRARY.
    5. I configured the library dependencies by going to my app's target's info, and adding a direct dependency to the library project.
    6. In my app's info build tab, I changed the user header search paths so that it uses the search tree I setup (I used the $(SEARCHTREE_NAME) notation, but checked that this resolves to a valid path). I also made sure that the Always Search User Paths checkbox is checked, and that the Library Search Paths is blank.
    7. I click-dragged the library.a file under the library project so that it was under the Link Binary With Library sub folder of my app's target.
    For step 5, I've also tried adding the reference to the other project as a linked library, rather than a direct dependency, but this doesn't seem to work either.

    I managed to fix the problem. The steps above seem to be correct. The problem seems to be related to the source trees that are defined...
    I was previously using an absolute path for the source tree which pointed at the folder containing the library project. I changed this to a relative path to the same folder (relative from the calling project) and this seems to fix it.
    I'd double checked that the absolute path specified was correct, so it looks like the user header search paths specified must be relative to the current project.

  • Automatic source determination on PR created from PM-order

    Hey,
    I got stuck here....
    I have a PM-order, with a component, creating a PurReq automatically when saving PM-order.
    I have a source list with reference to a contract and fix-indicator.
    If I enter the PurReq and press source of supply, the source and contract will be determined.
    If I use ME57, the source will be determined.
    If I use ME51N, and flag automatic source in the top, it is also working.
    BUT what I want is not working!!
    I want the source to be determined automatically on creation, that is when I save my PM-order, I want SAP to create my PurReq with the source assigned automatically - upon creation!
    How is that possible??
    / peter

    Hi Peter,
    In standard SAP functionality vendor will not be fetched from source list, if the PR is created from Maintenance Order.
    However, you can use user exit  - COZF0002: Maintenance order: Change purchase requisition for external component Area.
    With this customer enhancement you can change the purchase requisition created from PM order.
    We have not implemented the said user exit, so please check the documentation & test the same.
    Hope this helps.
    Thanks & Regards,
    Mihir Popat

  • A JE created from the AP Invoice does not include the project # on all trx

    A JE created from the AP Invoice does not
    include the project # for the amounts entered in the freight box. To
    duplicate, do the following:
    1. Open an AP Invoice
    2. Enter BP Code
    3. Select Service type
    4. Enter a Project Code in drop down box on Accounting tab
    5. Enter a line in the Contents; specify GL Account, amount and Tax
    Code Open Freight box
    6. Enter an amount in one of the lines
    7. Click ADD
    8. Go back to the invoice and go to the Accounting tab Click on the GL
    journal note and you can see that the line corresponding to the
    contents line has a project, but the line corresponding to the Freight
    box item does not.
    My customer users these projects when printing GL agings and the
    information is very important. Shouldn't this information be carried
    forward on all transactions on the Journal entry? Is there a way to get this information to post?

    Hi Pat,
    the project code (PC) on the marketing document may only be applied to the business partner (BP), hence the only row in the associated journal entry (JE) with this project code is that of the BP.
    You can link project codes to specific accounts (CoA -> select account -> account details -> project code) & this project code will then be assigned every time the account is found in a JE.
    If you require the project code to be applied to the freight, you may assign this project code to the account you have defined for this freight. The drawback is naturally that the project code will then  be pulled every time this freight is used, regardless of whether or not the PC is associated with the BP or not.
    It is possible to manually assign project codes to every row in a journal entry, hence this should also be possible with SDK. You might explore the possibility whether it might be possible to automatically assign the BP PC to all rows in the JE using a script.
    All the best,
    Kerstin

  • Why don't VIs created from VITs automatically class members if the VIT is a member?

    I have an .lvclass that contains a VIT that I use to create methods.  The VIT is a member of the class so that it can access the data members.  However, the new VIs that I create from the template are not automatically members of the class, so I have to save them and add them to the class when they are complete.
    Is there anything I can do to save the extra steps?
    Solved!
    Go to Solution.

    New... opens this (I actually keep them on a pallate under favorites too with Place Contents enabled) 1 click to place this including documantation 
    Now if only New... was available in Projects...
    Jeff

  • Difference between SAP Reference IMG & Project IMG...

    Hi SAP Gurus,
              Can anyone explain me about the difference between
              SAP Reference IMG & Project IMG...
    Thanks in advance,
    Praveen.

    Hi !
    The SAP Reference IMG contains alle the customizing functionallity of SAP.
    Within a Project IMG you can restrict the availible customizing function.
    Thinking about having an MM project. When you create an "MM" Project IMG you will only "see" MM relevant customizing functions in your project IMG.
    Regards
    Rainer
    Some points would be nice if that helped.

  • I have photos that are rotated within a photo stream created from a project even though the photo displays properly within the project. How can I get the photos to have the proper rotation within the photo stream?

    I have a photo stream that was created from a subset of photo from a rather large Aperature project. Some of the photos show up rotated within the photo stream but are not rotated within the project. Why is this happening and how do I fix the rotation within the photo stream? I do have the latest version of Aperature and have all of the necessary updates applied to my devices used to view the photo stream. The photos do show up rotated within the photo stream segment of Aperature, so I am sure it is not an issue with the output device (iPad and Apple TV). I do know that I cannot edit photos within a photo stream, but no amount of editing within the project allows the photos to be properly rotated within the photo stream. All help would be greatly appreciated.

    That will work, but it is the long way 'round.
    As Frank noted, Book Albums are just specialized Albums.  Albums can show any Image in your Library, regardless of where the Album is located on the Library Inspector, and regardless of which Project contains the Image.  You can put your Albums anywhere (in a Folder called "Books" for example).  You can put Images from anywhere in your Library in any Album.
    The easy way 'round:
    - Make a new Book Album
    - Select Images you may want to put in your Book.  Flag them.
    - Select some more.  Flag them.
    - Go to the "Flagged" container (listed near the top of the Library Inspector), select all, and drag-and-drop them to your Book Album.
    - Repeat as needed, or just drag-and-drop directly into the Book Album.
    Note that you can remove any Image from any Album (including Books) by selecting and hitting the "{Delete}" key.  This _does not remove the Image from the Project that contains it, or from the Library.
    Note, too, that once the Images are in your Book Album, you then put them in the Book you are creating for publication.  The Book Album contains the superset of Images with which you populate the Book itself.  The Book Album also holds the Book.
    A good (imho ) introduction to the parts of Aperture can be found in this short guide I wrote.
    The User Manual is helpful.  Here is
    the chapter on making Books. 
    From that chapter, here is
    the section detailing how to create and populate a Book Album.

  • Copy Salesperson from Reference PO while creating a new PO using ME21N

    Hi,
    I have requirement to copy the "Salesperson" field that appear in the header (Communication tab) while creating a PO with reference to the other PO.
    Is there any exit's or BADI's available in SAP which will help me to copy the "Salesperson" data from the reference PO while creating                                 a new PO in ME21N.
    Thanks,
    Swapna

    Check the badi ME_PROCESS_PO_CUST.
    Thanks,
    Vikram.M

  • Error while creating IMG project in solar_project_admin for the CHARM maint

    Dear Experts,
       I  am integrating the r3 system to the charm process.
    I have created the maintainenace project in SOLAR_PROJECT_ADMIN
                                               gave tha logiccal component(TMS is configured ( DEV--> QA --> PRD) .
    Now when i create teh img project for this it is throwing the error as below.
    *S:No authorization to:000 on as a trusted system (Trusted RC=1).
    Message no. No authorization to000
    \I have all the roles to my user id mapped
    Trusted rfc's
    S_RFC
    S_RFCacl
    etc......
    What might be the error................??
    my need to be create in the clients 000 for which i am omplementing the charm..........??
    What are the roles should be given in 000 client.
    Regards,
    Umesh
    jsumesh85  at  gmail

    Hi Umesh,
    Please confirm your problem by as issue with the trusted system, check the link below
    [Trouble trusted system|http://help.sap.com/saphelp_nw04/helpdata/en/8b/0010519daef443ab06d38d7ade26f4/content.htm]
    No authorization to log on as a trusted system (trusted RC = <0 1 2 3>).                                                                               
    Here, the trusted return codes ( = 0, 1, 2 or 3 ) have the following meanings:                                                                               
    1   Calling system is not a trusted system, or security                         
         ID for the system is invalid.                             
         Solution: Create (again) the trusted system (see above).
    as of in trusted system, you supposed to get the same user in both the systemm witht the respected access like S_RFCACL.
    complete explanation of trusted RFCs is in note 128447.Please follow the note
    Thanks
    Jansi

  • Error while creating IMG Project in Solman

    Hi Folks,
    As i'm in the process of implementing Charm process in solution manager. After importing the logical components into my project ( implemention / Maintenance ) .when i'm creating the IMG project for Dev system in project administration i'm getting following error ...
    S:NUMBER_GET_NEXT AEND:000 G INTERVAL_MISSING
    Message no. NUMBER_GET_NEXT AEND000
    But where as i'm able to create it for others like Quality and production systems.
    Please let me know if any one can thorough some lights on it.
    Praveen

    Hi Umesh,
    Please confirm your problem by as issue with the trusted system, check the link below
    [Trouble trusted system|http://help.sap.com/saphelp_nw04/helpdata/en/8b/0010519daef443ab06d38d7ade26f4/content.htm]
    No authorization to log on as a trusted system (trusted RC = <0 1 2 3>).                                                                               
    Here, the trusted return codes ( = 0, 1, 2 or 3 ) have the following meanings:                                                                               
    1   Calling system is not a trusted system, or security                         
         ID for the system is invalid.                             
         Solution: Create (again) the trusted system (see above).
    as of in trusted system, you supposed to get the same user in both the systemm witht the respected access like S_RFCACL.
    complete explanation of trusted RFCs is in note 128447.Please follow the note
    Thanks
    Jansi

  • How do I reference a dynamically created MovieClip from another MovieClip?

    Hi,
    I'd be grateful for any pointers to the following problem:
         I'm having trouble referencing dynamically created MovieClips (links in a side panel on a Flash website, created from an XML file) from the current MovieClip (the currently selected link).
         I wish to freeze the the link/MovieClip in its mouseOver state once it has been clicked - this part works. When a new link/MovieClip is clicked on, I wish to release the previously clicked-on link from its mouseOver state, which is what I've so far been unable to do.
         My problem seems to be referencing the previous link/MoveClip. I've used the trace statement trace(MovieClip(this).name) to determine that the MovieClips are named item0, item1, item2 and so on. However, I've been unable thus far to reference the previous clip thus far. I've tried to trace the route to the MovieClip from the stage, and also tried MovieClip(parent).item0.gotoAndStop and lots of other different permutations, but to no avail. It's the fact they seem to be in a container called 'panel' which is defeating me.
         Here's a live version I've uploaded, which might explain the problem better. Click on "UBER UNS" in the top menu bar to get to the page in question. It's the links on the left-hand side (Historie, Unser Team, etc.) which are the problem. You'll see that once they've been clicked on they remain in their mouseOver state.
         This is the code in question on the fla file, which is a file I did not create myself. The parts in black work fine; it's the red parts where the problem lies:
    import flash.display.MovieClip;
    panel.buttonMode = true;
    var lang:uint = 1;
    var url_Link:String=MovieClip(root).program.websiteXML .language[lang].pages.titlePage[MovieClip(root).program.linkPage].texts.pageList.txt[numT XT].@link;
    var urlPage:Number=Number(MovieClip(root).program.webs iteXML.language[lang].pages.titlePage[MovieClip(root).program.linkPage].texts.pageList.tx t[numTXT].@linkPage);
    var request:URLRequest;
    var linkIndex:uint;
    var lastClickedLink:MovieClip;   //This is supposed to store the last link that has been clicked - it doesn't work
    panel.addEventListener(MouseEvent.CLICK, clicLink);
    panel.addEventListener(MouseEvent.ROLL_OVER, mouseOverLink);
    panel.addEventListener(MouseEvent.ROLL_OUT, mouseOutLink);
    function mouseOverLink(event:MouseEvent):void {
          MovieClip(this).gotoAndPlay('s1');
    function mouseOutLink(event:MouseEvent):void {
          if(numTXT !== (linkIndex - 1)/5){         //freezes mouseOver state if this is the link for the current page
               MovieClip(this).gotoAndPlay('s2');
    function clicLink(event:MouseEvent):void {
          var linkpage:uint = MovieClip(root).program.linkPage;
          if (url_Link) {
               request = new URLRequest(url_Link);
               navigateToURL(request);
          } else {
               linkIndex = numTXT * 5 + 1;
               if(linkpage == 1){
                   MovieClip(root).chPages.cont.page_about_mc.page3Tu  rner_mc.gotoAndStop([linkIndex]);
              } else if (linkpage == 2){
                   MovieClip(root).chPages.cont.page3_mc.page3Turner_  mc.gotoAndStop([linkIndex]);
         lastClickedLink.gotoAndPlay('s2');  // this is supposed to release the previous clicked-on link from it's mouseOver state - doesn't work
         lastClickedLink = MovieClip(this).name;    //this is supposed to set the new link as the last link clicked after the old one has been released from it's mouseOver state - doesn't work
    If anyone can help, that would be great.

    What you might be after for that line is to use:
    lastClickedLink = MovieClip(event.currentTarget);
    For what you show, the name property of an object is a String, so I would expect you to be getting an error regarding trying to get a String to act like a MovieClip when you try to tell it to gotoAndPlay('s2').

  • Acrobat 8 Standard crashes when opening PDFs created from  Microsoft Project 2007

    Issue: Acrobat 8 Standard crashes when opening PDFs created from Microsoft Project 2007.
    OS: Win XP Pro SP3
    Error Message(s): None
    Details: This issue happens with multiple Microsoft Project files (including new files), multiple PDF creators (included Acrobat 8 Standard) and on multiple computers. We also tried opening the PDFs in Adobe Reader 8 instead of Acrobat Standard 8. There is no record in the event log on the computers of the application crashes.

    I may have a resolution now...
    I clicked Tools -> Options -> View and turned off Bars and shapes in Gantt views in 3-D" on the advice of someone on a Microsoft Forum. I made three PDFs from three Microsoft Project files (that were having trouble previously) and was not able to get these PDFs to crash when zooming or changing pages. So far so good!
    Regards,
    Josh Gold
    SERA Architects

  • Automatic purchase requisition created from routing needs to be have material no. information in it.

    Hello Experts,
    There are some operations in my routing where external service , from an outside vendor shall be required.
    We are doing this by using a particular control key PP02, for this routing, so that purchase requisition is created automatically, when the production order is created.
    Through customization, I have also been able to make the setting so that instead of single, collective requisition gets  created for the entire order.The requisition that is getting created is a service requisition and can be later converted to a Purchase order.
    Requirement :-  I need to enter material information in this requisition automatically. By material, I mean the material no. and preferably qty of the material,  which will have to be sent out to the external vendor for his services.
    How can I achieve this, in SAP?
    Regards
    P.R

    Hello Caetano,
    Right now we are not considering best practices , so not considering BADI implementation as such.
    So far I have done the following:
    I created a subcontracting purchasing info record for the material and a vendor.
    Then, I have created a routing for the material and the operation which expects to go for external processing, I have used control key YBP2 (tried with PP02) in it.
    I have assigned the subcontracting PIR under the external processing section of this operation in the routing.
    My Production version combines the BOM and routing in the material master.
    Now ,,when I try to create the production order, I get the following errors in succession:
    Control key YBP2: Maintain external processing data
    Message no. CO558
    Diagnosis
    The control key specifies that the operation is processed externally. However, not all data relevant to external processing has been maintained.
    respond by entering the material group where the cursor is.
    Then I get the following error.
    Material class differs from material class  from info record
    Message no. 06354
    Diagnosis
    The material class or material group of the info record differs from that of the item.
    I checked in the material master and the material group there is same as the material group in the info record . Field name is MATKL.
    What material class is it talking about?
    I cannot get past this error and therefore cannot complete the order creation.