Automatic Plan Order Creation on Sales Order save
Hi friends,
We are having an requirement where Automatic Plan Order should be created on Sales Order saving.
We have Material A in Plant 1000 & Plant 5000.
Plant 5000 in plant where Manufacturing is carried out & Plant 1000 is service Plant.
We are using Special Procurement key for Material A in 1000 Plant which triggers procurement from Plant 5000.
When Sales Order is entered in Service Plant 1000, after saving Order Plan Order should be created in both Service Plant 1000 & Manufacturing Plant 5000 along with Sales order reference.
I have tried using Strategy Type 81 but Plan Order is created while saving Order only in Service plant (1000), but with Procurement Type (E - In-house Production) & No Plan Order created in Plant 5000.
Can you please guide me how to meet requirement?
Thanks in advance.
Hi Jiaul,
Thanx for reply.
I have already assigned the Special Procurement Key to Material A in Plant 1000.
In Plant 1000 procurement type is F (External procurement)
But when Plan Order is created after saving Sales Order it is created with Procurement type E (In house production).
If I delete Firm Plan Order generated & run MRP for Sales Order / Item. It gives me required output generating Plan Order in both Plants.
Regards,
Rameshvar
Similar Messages
-
TCODE for Process order creation against Sales order
Hi gurus,
Pls tell me what is the TCODE for Process order creation against Sales order
Eg. CO07 is for production order from sales ordeTypically, in MTO scenario after the sales order is created you run MRP which will create planned order and then you convert that into production order using MD04.
Or if you have SD settings correctly directly from the release of Sales Order it will create planned order or production order.
please check and revert back. -
PLANNED ORDER CREATION FROM SALES ORDER SAVING (REQUIREMENT CLASS 200)
Dear All,
By using requirement class 200, assembly type 4 (dinamic planned order) Iwould like that at sales order registration the planned order for the sales order material is created.
I have two problems.
The system doesn't schedule the planned order, even if the scheduling parametres are entered for planned order type (relation between routing id and planned order type).
So I have a planned order in which i have to manually schedule it.
The second problem is that the planned order is firmed at creation. I would like that it was not firmed to adjust by MPS procedure the components from BOM modification. Infact at the creation of the sales order The complete BOM is not defined, and I don't want to unfirm the planned order so run th mps procedure.
Can anyone answer to these questions?
Thank's in advance
Luca PasturaHi Luca Pastura,
For Scheduling
1. You need to Give the appropriate check mark ( 1 or 2 ) In the capccity check of the requirement class configuration (ovzg)
For Firming
1. Since youare using dyanamic processing ""During dynamic assembly processing, you can not change the quantities and deadlines"
2. kindly refer the F1 help for the assembly type inthe OVZG.
Check and confirm
Reg
Dsk
1. -
Planned Order creation for Sales Order and Purchase Order
Hi
We have a following requirement.
In normal scenario when we have demand for material which was created by MD61 and in addition to that if there is Sales Order the 1st planned order gets revised.To better expalin this consider possible scenario
You create plan via MD61 for 200 qty .The system creates Planned Order for 200.
Now there is Sales Order for 150 peices.Then what happens is original Planed Order of 200 is changed to 50 and another planned order is created for 150 peices.The requirement is not summed.
Now in new scenario instead of Sales Order there is Intercompany Purchase Order of 150 peices.
Now the system is not changing original Planned Order of 200,but it created another planned order of 150.So now there are 2 Planned Orders of 150 and 200.
What I want to know is there any way wherein the system will reduce the original planned order (similar to Sales Order scenario)
RegardsHi,
Use Strategy 52 in urs case.
PIR witll be created .
None convertable planned order will be created.
Once you get sales order for that material.
New planned order will be created which will consume PIR( planned order ).
Eg.
PIR 10.
Planned order 10 qty.
Sales oder 6
Planned order for SO 6 qty
Planned order through pir will become 4 qty.
Regards,
Vishal -
Planned order creation with sale order assingment at the run time of MRP
some material item not planed with sale order stock in MRP run time. all setting in material master are corrected as i knowing.having some mistake in setting other configuration.
Planning strategy is Make to order individual collective as individual but still come as make to stock plan orders
Incase of Header material- Plan order is creating in MTS
Check the sale order procurement tab, Is The requiremnt type is relevant to your Stratergy?, if not chnage it to correct requiremnt type and rerun MRP again
Incase of component material- Plan order is creating in MTS
Check for the component material MRP 4 View, individual/Coll.req- as 1. If not set as 1 and rerun the MRP again -
Planned Order Creation after Sale Order MRP MD50
In a BOM of FERT material, one HALB material is present at different BOM levels. When we run sale order MRP (MD50), system will create one planned order for complete quantity (total qty of HALB material at all levels put together). Is there any way, so that system will create different planned orders for the same material present at different levels ?
Hi,
MD50 is T code for running MRP w.r.t sales sales, During MRP run system will explode the BOM and plan the requirements for all the levels( i.e, multiple levels)
with regards,
P.P.Anand -
Service order creation from sale order
Hi Friends,
Could you please tell me where is the setting for the automatic creation of service order from sale order.
Iam using LEIS , TAD and CD as the sales documents and SM01 as service order document.
Am I missing something?
Please let me know.
Regards,
satishHi Satish,
The setting for creation of a service order from sales order can be found in the Requirement class configuration.
To know how to link, check the procurement tab in the sales order, note down the requirement type associated to the line item. Requirement type is linked to requirement class. In requirement class you find the configuration.
Standard SAP creates SM03 (refurbishment) type of service order from sales order.
Reward points if useful.
Regards
Ananth -
Purchase order creation from sale order (Third party )
Hii..
I have a requirement where i create a sale order for third party, system automatically creates purchase requisition,
my requirement is i dont want to convert purchase requistion everytime into PO when ever sale order is created.
can i automate the process where the moment i crete s sale order purchase order is created direclty.
Suggestions will be worth rewarding..
Regards
SARFRAZHi
first you need to do seeting for Automatic PO creation from PR
1.You need to check the Auto POcheck box in Purchasing view of the material master
2.You need check the Autoamic PO check box in Vendor master in Purchasing org data
3.You need to maintai the source list with one of the vendor as fixed vendor
4.Purchasing info record for Vendor and material
Then you need to schedule the batch job for ME59N with the variant (Required input selection parameters) with the time intervals.
One third party order created, PR will be generated automatically based on the item category defined in the sales order and source will be assigned in PR.Based o time interval schduled for batch job, the PRs will be automatically converted into PO.
Regards
Ramakrishna -
Service Order Creation through Sales Order...
Hello,
I got one requirement it is , we need to copy the account assignment (WBS element ) from sales order line item to service order line item . Morever same wbs element should be used to create automatic settlement rule in service order.
This should also work even if user changes the WBS element later. i.e, updated WBS element should again update service order and settlement rule automatically.
I tried to use Exit MV45AFZB and routine USEREXIT_MOVE_FIELD_TO_COBL, but still i am not able to see the data in service order Location tab, Object tab.
I checked the table ILOA, its not getting updated when creating Service order via sales order.
I am not able to see any fields value coming on Service order screen when creating through sales order.
Regards,
Sujeet MishraHi ARC,
Here the issue is that, Sales Order is getting created but while sending the Order num. to Webpage through web service then rasing below Exception.
Runtime Error UNCAUGHT_EXCEPTION
Except. CX_SOAP_CORE
Date and Time 07.05.2008 20:13:24
ShrtText
An exception that could not be caught occurred.
What happened?
The exception 'CX_SOAP_CORE' was raised but was not caught at any stage in the
call hierarchy.
Since exceptions represent error situations, and since the system could
not react adequately to this error, the current program,
'CL_SOAP_TRANSPORT_EXTENSN_ROOTCP', had to
be terminated -
Production Order creation wrt Sales order
Hi,
I am having one doubt please clarify, In MTO scenario.
Creating Production Order wrt sales order in co08 and also we can run mrp in md50.
what is the use instead of going to md50 can we create directly from co08?
Please clarify this.
Thanks & Regards
VenkatDear Venkat
You scenario is make-to-order i.e., you procure raw materails only on receipt of sales order.
For the requirements calculation specific to the sales order you run MRP w.r.t. sales order in transaction MD50. This will create the relevant PR and planned orders for the shortage requirements.
The PR can be converted into PO for procurement activities. Once you receive the required raw mateirals you need to produce the product in inhouse for that you can convert the planned order to production order or you may create production orders manually in transaction CO08
So MD50 is to calculate the requirements and raise PR and Planned orders i.e., procuremetns elements
CO08 is to create production order manually w.r.t. sales order for producing the materail in inhouse.
Regards
Soundar -
Production order creation from sales order
Hi PP Gurus,
I am creating a production order automatically from sales order by using strategy group exactly similar to 82. Once i create the sales order , its showing missing parts error in prouction order and if i check missing parts overview,it says over all confirmation date is not determine.We have stock in MMBE for that material and storage location combination.
I have also chekced the requierement class and type and found ok.
Please help me resolving this issue.
Thanks in advance.!
Regards,
SudheerHi Mario,
Yes, the availability check will check other stock types also. My concern is why the availability check is failing and giving missing parts even if the components are there in stock after considering the reservations.
I checked OPJJ setting, availability check is active and we did that.
Can you please help me in this as we are stuck up at this point.
Regards,
sudheer -
Plant maintanance service order creation using Sales order
Hi,
We have created plant maintanance service orders using requiremnt class in sales . so in sales order schedule line the service order is created. but in some sales orders it will show the service order number and when we double click on that shows an error service order does not exist. please let us know what would be the problem.
Thanks & regards,
RohitHi ROHIT,
First check do you have authorization for (IW32 , IW33) and Check your number ranges in OION and check is there any status is blocking that number.
Regards
Nishad -
Automatic project creation from sales order
Hi,
I am creating project from the sales order. I have all necessary configuration and maintained master data.
But during the creation of the project, I am getting 2 errors
1. I have to maintain network start date (maintained forward scheduling in customization) and systems prompts for availability check
2. After maintaining start date and confirming the ATP check, when I try to save the sales order, I get error like "Create Network: Project Allocation" where in I can see 2 standard projects, one SAP standard project and another which I created by copying this standard, against which there are 2 black fields for project definition. and below 3 options. COPY, ALLOCATE WBS ELEM and CREATE.
If cancel this, system asks ' Copy project allocation in the network?' if i say yes then i cant leave the above window and if i say no then new window pops up asking me for WBS element acc assgn and billing WBS elem.
Does anybody aware of this issue?
Please help.
ThanksHi,
If you want to have availability check on sales order then customize accordingly using OVZ9 & OVZ0. if you don't want availability check then you remove that customization with reference requirement class.
If you don't want have availability check in project with reference to network type, which I hope has been maintained in the system right now, you can skip that.
Secondly, your business requires where stock to be release (Sale order/ Project). For the same, kindly check in OVZG what has been maintained for special stock and for account assignment cat.
If you want to have through sale order, kindly use sale order stock.
Third, check in CN08, which all values has been defaulted with respect material number, generally if you want to run project through sale order and then header assigned network type is used.
I hope it would be helpful in resolving the issue.
Regards
Avisek Bhardwaj -
Automatic PR Creation from Sales order
Hi All,
This is with respect to PR creation from Sales order for 3rd party items.
I am able to create PR from standard sales order and i dont have any issues with that. I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
Thank you
KrisHi,
Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
kapil -
Automatic credit release of blocked Sales orders with pre payment
Hi ,
We have a requirement as given below.Please suggest a better solution for this.
The customers have the 'prepayment ' payment terms with different percentages of the sales order
value to be paid before the delivery creation.
When the sales orders are created, they are blocked for delivery by some credit block.
The business use VKM1 transaction to view these blocked orders and release them manually for
delivery creation after checking if the customer has made the prepayment.This is a tedious work
(since there are too many sales orders )for the credit manager who dont have the complete
visibility of how much prepayment the customer has made and need to manually check if the
payment made covers the sales order prepayment amount to be paid.
1. How can we do a automatic release of these blocked sales orders?
2. Is there any program(which can be setup as batch job) to do a credit recheck and release the order
automatically?
3. Will Milestone billing plan functionality satisfy this requirement?If so how?
We are using SAP version 4.7 without Project System.
Thanks in advance.
Regards,
RageshHello,
This is not possible because when you created the sales order it has checked the credit limit for that credit limit and if you increase also now that block cant go automatically.
Go to VA02 i.e change mode of sales order and change something and enter may be if you created a order for 2 quantity then go to VA02 and remove the quantity 2 and again type 2 then system will again check for credit and now that is increased so the order will not block..
If this is for many order then you can run changes sales order BAPI for mass update. Take help from ABAP guys.
Cheers
Say
Maybe you are looking for
-
How to copy a file from application server to local system
Guys, Need to copy a file from application server to local system.Is there an FM for the same. Tried searching for it but couldn't find anything useful. Code snippets will be highly appreciated. Warm Regards, P. Moderator message: very frequently ask
-
I recently purchased a MacBook Pro. I would like to transfer Aperture from my Mac Mini to my new MP. How can I do this?
-
Query is taking too long fetch data
Hi, Working on EBS Version 11.5.10.2 This below query takes 7 minutes reterive to job orders. I need some help to improve this query to retrieve faster. select inventory_item_id ,job ,item_code ,item_description ,subinventory_code ,locators ,quantity
-
How to hide full name when publishing photos to icloud's public website?
When allowing iPhoto to publish photos to iCloud (Public Website, allow anyone to view this photo stream at:..." my full Name (xxx by xxx) is always displayed when opening the link. Does anyone know how to hide or change the name displayed?
-
Referencing object outside a form
Hello, I have a form with an icon (form A). This one creates another form (form B ) with the open_form built-in. I would like modifying the graphical attribute of the icon when I am in form B. How can I reference an object in another form ? Name_in (