Automatic price adjustment based on material quality

Hi Gurus,
Please throw some light on following scenario.
X material will be received in batches, and that material will subject to Quality Inspection. (QM is activated)
While doing GR for this material, in inspection it has been found that the material quality is poor. As the requirement is critical, we want to accept that material.
But as we received inferior quality material, we want to pay less price to vendor, than agreed price. 
Can it be managed automatically by the system? If so, what is the procedure, or configuration part to be followed?
Regards,
Naresh

It is very much possible through config in SAP QM. Go through this docu and configure accordingly:
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/60f03349-ff68-2e10-e592-92b18605a2fa?QuickLink=index&…

Similar Messages

  • Automatic price adjustment based on quality of material.

    Hi All,
    Please throw some light on following scenario.
    X material will be received in batches, and that material will subject to Quality Inspection. (QM is activated)
    While doing GR for this material, in inspection it has been found that the material quality is poor. As the requirement is critical, we want to accept that material.
    But as we received inferior quality material, we want to pay less price to vendor, than agreed price. 
    Can it be managed automatically by the system? If so, what is the procedure, or configuration part to be followed?
    Kindly Advice.
    Thanks in advance.
    With regards,
    Prabhakar

    There is no standard SAP process for this . Probably you can send a text message in 101 matl document , which appears during invoice passing . The discounting due to inferior quality has to be done manually while processing the inovice.
    Otherwise it requires the development to meet your requirment.
    Regards
    Mani

  • "Active Ingredients"  - Price adjustment based on Quality Parameters

    Hi
    I have a following situation in hand :-
    Material u2013 GAS (APM)
    Basic Price u2013 700.00 / MMSCM (This price is @ 10,000 NCV u2013 a quality parameter of GAS)
    Example we receive some 100 MMSCM GAS which is @8500 NCV.
    The price here will be 
    700     X      8500 / 10000      =     595       
    Similarly there is Transport Charges which will be readjusted based on the value of NCV at which GAS is supplied.
    This can be done through u201CActive Ingredientsu201D. Request you all to pls. guide how this can be done exactly in the system. Even if there is another way of doing it, pls. suggest.
    Thanks & Regards
    Vikas

    This is very much possible. In fact dairy industry works on the same principle. The pricing takes place only after Inspection lot characteristics are posted.
    This is long exercise, wherein you need to maintain certian special condition types and access sequences. You can get more information at buidling block library Link: [http://help.sap.com/bp_bblibrary/600/BBLibrary_Start.htm]
    Check G95: Dairy procurement.
    Hope this helps.
    Amit

  • Purchase price variance based on Receiving QUALITY

    Problem Statement:
    The client have a requirement that when he places an Order to the vendor for a certain commodity, he agrees to a certain level of Quality Parameters and an agreed Rate based on these parameters.
    Example:
    $100/Kgs on a condition that the physical inspection Quality Parameters are met 100%.
    $90/Kgs on a condition that the physical inspection Quality Parameters are met between 90% to 99%.
    $80/Kgs on a condition that the physical inspection Quality Parameters are met between 70% to 89%.
    When the Receiving is done against the PO, it was found that the Quality was not upto the standard and the result is only 90%. The Client has to pay for the received Quantity at the rate of $ 90/Kgs.
    Q1. How this scenario can be handled in Oracle Purchasing, Inventory, Payables (without Quality module)?
    Q2. What would be the Inventory Cost of the item $ 100 or $ 90?
    Q3. What would be the Financial implications?
    Edited by: user1116442 on 07-May-2011 06:37

    Q1. How this scenario can be handled in Oracle Purchasing, Inventory, Payables (without Quality module)?
    I don't think there is any seeded way to handle this. You may have to modify the PO price manually or generate credit/debit memos after the receipt.
    Q2. What would be the Inventory Cost of the item $ 100 or $ 90?
    If you use std. costing, your cost will remain constant. Any variations will generate PPV
    If you use avg. costing, the receipts will keep updating the cost.
    Q3. What would be the Financial implications?
    The financial implications depend on your costing method. If you have std. costing, you will generate lot of PPV. And your inventory valuation will be done based on the std. cost.
    If you use avg. costing, then you will be able to get inventory valuation at a cost which is weighted avg cost.
    Hope this helps,
    Sandeep Gandhi

  • How to create a Platinum,Gold and Silver Customer and how to set different price for a single material based on customer?

    Hi All,
    How to create a Platinum,Gold and Silver Customer and how to set different price for a single material based on customer?
    Assume Material is Pen.
    While creating Sales Order in VA01 how to bring different price for the same material for Platinum,Gold and Silver Customers.
    Kindly help me out.
    Thanks,
    Renjith Jose

    A good place to start is http://www.javaworld.com/javaworld/javatips/jw-javatip34.html
    Also, do a search in this forum on HttpURLConnection. That class allows you to use POST method to send form data to a web server.
    "Hidden" variables are only hidden in HTML. The HTTP that gets POSTed to the web server doesn't distinguish between hidden and not hidden. That is, the content you would write to the HttpURLConnection.getOutputStream() would be something like:
    hidden=1&submit=ok(Of course, the variable names would depend on what the web server was expecting from the form.)
    Also, be sure to set the Content-Type request parameter to "application/x-www-form-urlencoded"

  • Cost center assignment based on material master

    Hi Experts:
    My client wants cost center assignment to be based on material master, for example, SAP system should be configured in a way that when costs arise due to a product price variance, then SAP should automatically post to the cost center for the specific brand instead of posting to only one default cost center. Is this really possible? In OKB9, I am only able to assign only one cost center to the GL account. Because of this, at the end of each month, the accountant manually allocates the costs from the overhead cost center to the respective cost centers for the brands which incurred this cost.
    Is it possible to configure SAP to detect that the cost belongs to product A therefore post this cost to Cost center for product A; or this cost belongs to product B therefore post this cost to cost center for product B?
    Your feedback is greatly appreciated.
    Thanks,
    Mariam.

    Hi,
    For your scenerio, try Derivative rule of Profit center. If you maintain Derivative rule for Profit center with product which is indirectly assigned to cost center.
    For example :
    Product A - Profit center1-cost center1
    productB- Profit center2- Cost center2
    Regards,
    Sreekanth

  • QC Activity based on Material Production Version

    Hi,
    Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
    Is it possible to perform QC Activity based on Production Version of a material i.e.
    For Example
    Product A having 2 Production Versions
    IF Product A with Production Version 1 then No QC required during goods receipt from production
    IF Product A with Production Version 2 then QC required during goods receipt from production
    So please tell me what feasible solution possible from your side
    With Regards,
    Kunal Sheth

    Dear Sap User,
    Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
    If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
    Do it once and revert in case of any query.
    Rgrds,
    Dheeraj Rawal
    Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM

  • Automatic Price Change at the time of Confirmation of PP order

    Dear Sir,
    When Production Order is being confirmed (T Code COR6), the
    price of the BOM material (Finished Goods with standatd price)is getting
    changed. PR document type FI document is created and UMB key
    is getting the hit with a very minimum amount. (0.01 Indian Rupees) . This is not happening regularly. But suddenly in one confirmation it is happening. The process order are created in
    the system for 1 month say Start Date 01.01.2009 End Date
    31.01.2009
    This is happeing when confirmation is made in first day of next month
    for previous month i.e. for process order of January 2009 (Start
    Date 01.01.2009 End Date 31.01.2009 ) confirmation is made on the
    01.02.2009. Document date is 01.02.2009, posting date is
    31.01.2009.
    The PR (Price Change) docuement is getting generated on 01.02.2009 with posting date on 01.02.2009.
    At the mont end there is no manual Price Change thru MR21 transaction.
    Regards,
    Partha Pratim Bhar

    Hi,
    You need to check that material Standard Cost estimation has run or not for the next period. Normally Standard cost run can be run every period or once in 3 periods or once in a year. Based on this the standard cost estimate will update the material prices in the costing 2 view if any changes in the existing price. May be his could be the reason you may face the problem.
    Regards,
    V. Suresh

  • Why is elements better at photomerge than CC- CC does not appear to automatically fill image based on content but elements does when merging a panorama. Also the stitching is visable in CC but almost perfect in elements- why?

    I took 6 panorama shots of a scene and used CC to Photomerge them as one. Couldn't see where to automatic blend the edges and there was 'stitch' lines when the images were merged. So i did the same in Elements 11 and it was perfect. Am i doing something wrong in CC or perhaps not doing something at all?
    Any help, please?
    Dave

    Hi - Thanks for taking the time to reply and i appreciate the remarks- if a little harsh- we all have to start somewhere and i am fully aware of the limitations of Elements which is why i decided to add CC to my software. I can only say that if an inferior quality software from Adobe does the job well then CC must also be suited to doing the same which is why i can only think, from your comments, that i have not done something simple- however- following tutorials to get to the end result should have sufficed- it didn't so perhaps i will consider posting the difference between the two applications- and, perhaps suffer a few more 'harsh' comments. The learning curve is quite steep and i am a visual learner, but i'm also not totally incompetent:)
    Kind Regards
    Dave Munn
    Original message----
    From : [email protected]
    Date : 02/02/2015 - 06:45 (GMTST)
    To : [email protected]
    Subject :  why is elements better at photomerge than CC- CC does not appear to automatically fill image based on content but elements does when merging a panorama. Also the stitching is visable in CC but almost perfect in elements- why?
        why is elements better at photomerge than CC- CC does not appear to automatically fill image based on content but elements does when merging a panorama. Also the stitching is visable in CC but almost perfect in elements- why?
        created by station_two in Photoshop General Discussion - View the full discussion
    First a clarification: you are not addressing Adobe here in these user forums.  You are requesting help from volunteers users just like you who give their time free of charge. No one has any obligation to answer your questions.
    I'll give it my best shot anyway.
    Few folks in this forum are really familiar with Elements, for which there's a dedicated, totally separate forum.
    Different engineering teams, also.
    From this perspective, it will be difficult to give you a direct answer to your "why?" question.
    Personally, I blend very large panorama shots in Photoshop proper since I can't even remember when without any issues whatsoever, up to and including in Photoshop CS6 13.0.6.
    Without being at your computer and without looking at your images, I couldn't even begin to speculate what you are doing wrong in Photoshop, which I suspect you are.  The least you could show is post examples from your panoramas that have gone wrong.
    I can tell you that panorama stitching requires significant overlap between the individual shots, besides common-sdense techniques like a very solid tripod and precision heads.
    The only version of Elements I have ever used for any significant time was Elements 6 for Windows, which I bought in 2008 to use on a PC (I've been an avid Mac user for 30 years).  I found Elements so limited and so bad that I successfully demanded a refund from Adobe.  IU mention this only to emphasize that I can truly only address your question from a Photoshop (proper) and Mac user point of view.  I couldn't care less about Elements, but if you have comparison examples of panoramas processed in both applications, by all means post those two.
    Generally speaking Photoshop is a professional level application that makes no apologies for its very long and steep learning curve, while Photoshop has many hand-holding features for amateurs and beginners.
    Perhaps the bottom line is that you should stick with Elements if you personally manage to get better results there.
    If the reply above answers your question, please take a moment to mark this answer as correct by visiting: https://forums.adobe.com/message/7152397#7152397 and clicking ‘Correct’ below the answer
    Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
    Please note that the Adobe Forums do not accept email attachments. If you want to embed an image in your message please visit the thread in the forum and click the camera icon: https://forums.adobe.com/message/7152397#7152397
    To unsubscribe from this thread, please visit the message page at , click "Following" at the top right, & "Stop Following"
    Start a new discussion in Photoshop General Discussion by email or at Adobe Community
    For more information about maintaining your forum email notifications please go to https://forums.adobe.com/thread/1516624.

  • How to get ATINN value based on material number and Class Type ?

    I have below SELECT stmt code which gives the correct value of atwrt based on materil no and ATINN.
    However in quality system, it is failing because in quality system "atinn" value is not 0000000381. It is different.
    So how can I get ATINN(Internal characteristic) value based on material number and Class Type?
    -Obtain the batch characterstic value for the Material******************
      SELECT atwrt
        UP TO 1 ROWS
        INTO v_charvalue
        FROM ausp
       WHERE objek = mcha-matnr
         AND atinn = '0000000381'   " 'US80_FRENCH_ON_LABEL'
         AND klart = '001'.
    THANKS N ADVANCE.

    Hi SAm,
    use the Below function module to get the Atinn for Atwrt for thr Class and MAterial combination..
    CALL FUNCTION 'CLAF_CLASSIFICATION_OF_OBJECTS'
          EXPORTING
            classtype          = '023'       "Class type
            object             = w_object  "Material number with Leading zeros
            no_value_descript  = 'X'      "Default X
            objecttable        = 'MCH1'    "Table name Mara or MCH1 or MARC
          TABLES
            t_class            = t_class   "It return the Batch class available for the above combination
            t_objectdata       = t_char  "Return Batch characteristics(ATWRT) and their value ATINN in this table
          EXCEPTIONS
            no_classification  = 1
            no_classtypes      = 2
            invalid_class_type = 3
            OTHERS             = 4.
    Regards,
    Prabhudas

  • Inspection characteristics based on material and goup counter

    Hi,
        Do we have some function module which would give us inspection characteristics based on material and group counter. I have gone through many posts in this regard but find answers to get inspection characteristics based on inspection lot number.
    I do not want to get into quality at all. Is there a FM to get the inspection characteristics based on material and group counter or any related tables would be of gr8 help. T-code QP03 takes material and group counter as input and displays the inspection characteristics. Any input in this regard would be of great help.

    Hi,
    Use tables MMAPL , MAPL and PLMK as per your requirement.
    Thanks,
    Vijay

  • Price adjustment problem with gamers club unlocked

    I've been told i get the 20% from GCU when i do i price adjustment but i did not after giving a called to CSR earlier in the day.
    Basically i bought Little Big Planet 3 Day One Edition for $47.99 because that is the default price for me after GCU 20%.
    It is currently on sale for $39.99 and i pay $31.99 automatically because i am a GCU member. So my question is
    do i get the price adjustment diffrerences between $47.99 and $31.99 or $39.99(pre GCU)
    Same thing with halo MCC, i paid $47.99 and its on sale currently for $44.99(pre gcu), $35.99 post GCU.
    Can a mod please help me, cuz looks like the CSR already credited me incorrectly for my purchases of LBP3 if so

    Hello DavidWu,
    Jimmienomam explained it very well.  If you click the link provided in the post you can view more information about the Gamer Club Unlocked Benefits. 
    You can view the information here as well.
    Did you purchase the games online or in-store?  
    Blake|Social Media Specialist | Best Buy® Corporate
     Private Message

  • Price update from Original Material to copied Material Master

    I have a scenario,
    We are selling Raw materials to outside companies who have shortage of materials on Loan Basis. Once they have materials, they will return the materials within a time period. If they don't have the materials and unable to return within the said time, they will make the payment.
    We will follow the normal sales process to sell the item to the customer.
    1. creating sales order,
    2. Outbound Delivery, and
    3. Billing
    Return process when receiving the materials from the company.
    1. Billing Cancellation
    2. PGI Cancellation
    Since this is not an actual sale, hence we need to maintain selling price same as the purchase price.
    We are planning to extend the Raw Materials to Sales View in the material master. However, we came to know that this will be Violation of Act. Hence we are planning to create a new material by copying the existing Raw Material master but the Material type will be Issue on Loan. This material will have sales view and purchase view.
    This material will have a separate Valuation Class. Price control indicator will be V, since the item should be valuated at Purchase Price and the purchase price will keep changing as and when the price changes. This moving average price will be used as selling price.
    The same price needs to be updated in the Sales Order automatically from the Loan Material Master when selling the Loan Material.
    Now, the problem we are facing is, if we create a new Loan Material by copying Raw Material master with ROH material type, how will the price update in New Loan Material since, we will not purchase the Loan Material. We are purchasing the original item as raw material. Hence, this will not update the Loan Material Price automatically and the price will remain unchanged.
    Please suggest a work around?

    Hi,
    Let me explain to you how I am proceeding.
    Step 1:
    Create new material master by copying existing Raw Material with Issue on Loan material type. I am assigning a new Valuation Class in this material master. Also, we keep the pricing
    Step 2:
    Transfer stock from old material to new material in MB1B with movement type 309.
    Step 3: Issue of Loan Material to Customer on loan basis.
    Creating Sales Order, PGI and Billing
    Step 4: Receipt of Item back from Customer
    Sales Return process.
    Step 5: In case Customer does not return goods, then we will collect payment from them
    In the entire process we need to maintain the selling price at purchase price of the original material. Can you suggest any work around, in case this process is not advisable.

  • How to get net price of a given material(Just like in VA01)

    Hello Experts,
    How do I get the net price of a given material? Just like when entering a
    material in VA01(sales order creation). Hope you can help me guys.
    Thank you and take care!

    This is a million dollar question.
    It depends on how the pricing have been configured in your system and only your SD consultant can answer it correctly. Price in VA01 could be determined by using the pricing conditions or, if allowed, a manual user entry (i.e. when users just type in the price). Discounts, taxes, etc. are calculated in a similar way, also based on the configuration.
    Pricing conditions are displayed in transaction VK13. You might want to take a look at an order in VA03 -> double-click on a line and go to Conditions tab. There are buttons Analysis and Condition Rec. that might be useful for your research. It is possible to configure different price for the same material and different customer, distribution channel, etc., so you will have to ask your SD consultant how to get the correct number in each case.
    Just FYI the net price on the order/contract is in VBAP-NETWR and condition are stored in the tables Annn, e.g. A901, etc. The tables are generated according to the configuration and are different in each system.

  • Automatic lot creation based on time Frequency

    Hi,
    For 01 inspection incoming inspection ,
    F or  certified vendors, without inspection , material is getting posted to UUS without lot creation. ( QI info record settings).
    but for this case , business requirement is to get automatic lot creation based on time like 6 months once .
    Automatic lot to be created for this certified vendor on time frequency basis. how to trigger this Lot creation based on time.
    Help.
    VV.

    Hi,
    In std SAP we dont have option of generating Automatic lot creation based on periodic basis. But we can provide some workaround soultion.
    Option 1:
    USe Source Insepction concept. Here Inspection lot will be created for every P.O. Here u can relase P.O line items in QI07 which can sceduled in Job planning on periodic basis. Use Skip inspection lot concept to skip unwanted lots. This has direct relation with Q-Info record.
    Option 2:
    U can generate automatic lot creation based on Stability study concept. Here are the following steps
    Initiate Stablility study
    Create Initial sample
    Perform intial test
    Confirm initail sample
    stability planning
    Define storage condition
    create testing schedule
    store stability sample
    define cycle start
    schedule
    complete stability study.
    Option 3:
    To get Automatic lot creation u can use BAPI QPL1_INSPECTION_LOT_CREATE . When a due date come for inspection,it created a lot of 01 / Z-01 inspection type automatically through QA01( call the program ,enter the inspection lot origin & material,vendor & save). Create Z-T code which has vendor material plant combination.
    Execute the above T-code based on Periodic basis.
    Explore above 3 options and choose best one according to ur requirements.
    Edited by: Lokesh K on Oct 12, 2010 11:27 AM

Maybe you are looking for