I need to locate some documentation/answers on basic SOA application activities, especially utilizing JDeveloper.
Specifically, if a developer updates a method response in a WSDL, then will other objects will need to be manually updated? For example, will the composite.xml need to be re-generated? Will any of the changes be automatically propogated ?
Thanks

will other objects will need to be manually updated? ... Will any of the changes be automatically propogated ?There's no simple answer to that question, it depends on the case and the object involved, JDEV is not usually very good in refactoring things, but in some cases it may work well...
Even for your specific case, changing the method response may end up updating the associated schema, but it's very unlikely it will update a BPEL for example...
Cheers,
Vlad

Similar Messages

  • How to add wsdl files and bpel files in new folders automatically

    Hi All,
    In our project, we have a lot of wsdl files and bpel file generated.
    By default, they are all under the folder of SOA Content, like a mess.
    I want to put them in separate folders.
    I can manually change the wsdl location and manually change references to these wsdls, but it will take a lot of extra time to do so.
    Is there a way to achieve this in UI?
    Thanks and Regards!
    Bruce

    Hi Eric,
    Thanks for your reply!
    I can use refector->move to move the wsdl file to newly created folders.
    But unfortunately, JDeveloper won't update the references to the wsdl files.
    I have to update the references manually, and it will take a lot of time if there exists many wsdl files in one project.
    Thanks and Regards!
    Bruce

  • Reusable BPM And BPEL sub processes

    Hi Heidi,
    Is there support for this already? WIll appreciate a tutorial that covers these two topics. In addition if there is any integration between the two other than web services, would be great to have some information on that as well.
    regards,
    Naresh

    Hi,
    The Reusable BPMN process (also referred to as Callable subprocess) and the Call Activity to call this reusable subprocess are not supported in this version but will be supported in a subsequent patch post the 11gR1 release. You need to use Service Tasks to invoke BPEL as well as BPMN processes exposed as a Service. You need to choose the "Async" or "Sync" template for the BPMN process to be exposed as a Service. We will get a sample out to you via the Beta site.

  • How can I stop Firefox from automatically downloading and installing updates?????? UN-Checking box when installing for auto DOESN"T WORK!!!!

    Have many performance problems with latest versions of Firefox.
    I remove fFrefox and reinstall 18.0 and everything is fine until Firefox automatically updates to 28.x.
    I remove check in box when asked if want Firefox Maintenance installed, but downloads updates anyway and next time I bring-up then problems are back!!!
    I have to start over again and never X Firefox.
    I just want the basic Firefox - simple, FAST and WORKS !!!
    Never liked IE - but may have to go back to it.
    Chrome is also automatic download update.
    using XP, but may have to rethink
    Thanks for any help.

    What kind of problems do you have with the Firefox 28 release?
    Did you check your security software (firewall, anti-virus) to make sure that the new version in allowed?
    It is possible that your security software (firewall, anti-virus) blocks or restricts Firefox or the plugin-container process without informing you, possibly after detecting changes (update) to the Firefox program.
    Remove all rules for Firefox and the plugin-container from the permissions list in the firewall and let your firewall ask again for permission to get full, unrestricted, access to internet for Firefox and the plugin-container process and the updater process.
    See:
    *https://support.mozilla.org/kb/Server+not+found
    *https://support.mozilla.org/kb/Firewalls
    *https://support.mozilla.org/kb/fix-problems-connecting-websites-after-updating
    You can create a new profile as a test to check if your current profile is causing the problem.
    See "Creating a profile":
    *https://support.mozilla.org/kb/profile-manager-create-and-remove-firefox-profiles
    *http://kb.mozillazine.org/Standard_diagnostic_-_Firefox#Profile_issues
    If the new profile works then you can transfer files from a previously used profile to the new profile, but be cautious not to copy corrupted files to avoid carrying over the problem
    *http://kb.mozillazine.org/Transferring_data_to_a_new_profile_-_Firefox

  • On submit perform an insert on one table and an update on aother table

    I am trying to perform and insert on the table one table (the wizard created my form the insert is going against the table that I created using the wizard) and on the form is on field that is also in another table. Therefore, I am trying to perform an update on one attribute of one table and a insert into another table. How do I do this in apex?

    If you have used wizard to create form, then you may see a process of type 'Automatic Row Processing (DML)' in your page which will perform INSERT/UPDATE/DELETE on your form table. Here you can see APEX performs INSERT only when REQUEST is in 'INSERT, CREATE, CREATE_AGAIN, CREATEAGAIN'
    So create one more PL/SQL page process which will execute at 'on Submit after validations' and write update process as follows
    begin
    -- pseudo table/columns
    update tbl_second
    set col1 = :p1_item
    where pk_col = :p1_pk_item;
    end;Make this process conditional so that it will perform UPDATE only when request value is in 'INSERT, CREATE, CREATE_AGAIN, CREATEAGAIN' ( i.e. only when you are inserting into your form table)
    Cheers,
    Hari
    p.s. I think you may also need to update the second table when some-one updates your form table.
    Edited by: Hari_639 on Oct 26, 2009 9:46 AM

  • Query regarding composite.xml and bpel

    Hi,
    I am absolutely new to SOA.Last day, I was experimenting with BPEL processes.I dragged a BPEL process(TestBPEL) onto the SOA composite and exposed it as a SOAP service.Now the component(testbpel_client_ep) that is being shown in the left swimlane wired to the BPEL process, what is that?I mean is that a service itself.Again in the .componentType file, I saw a service was defined but the name of the service defined was testbpel_client.But I didn't define any other service,so where did that service come from?Again in the composite source I saw the follwing code was generated:-
    <service name="testbpel_client_ep" ui:wsdlLocation="TestBPEL.wsdl">
    <interface.wsdl interface="http://xmlns.oracle.com/PatientDataService_jws/Test/TestBPEL#wsdl.interface(TestBPEL)"/>
    <binding.ws port="http://xmlns.oracle.com/PatientDataService_jws/Test/TestBPEL#wsdl.endpoint(testbpel_client_ep/TestBPEL_pt)"/>
    </service>
    I guess it defines the service testbpel_client_ep.But what are the implications of the <interface.wsdl/> and <binding.ws/> tags?In the .componentType file also, the service testbpel_client had the same <interface.wsdl/> tag.
    <service name="testbpel_client" ui:wsdlLocation="TestBPEL.wsdl">
    <interface.wsdl interface="http://xmlns.oracle.com/PatientDataService_jws/Test/TestBPEL#wsdl.interface(TestBPEL)"/>
    </service>
    It also intrigues me that both the services(testbpel_client and testbpel_client_ep ) refer to the same wsdl file.I have no clue what is happening.
    Thanks in advnce

    Now the component(testbpel_client_ep) that is being shown in the left swimlane wired to the BPEL process, what is that?I mean is that a service itselfYes. If you check the generate soap service checkbox when defining the BPEL it will generate the service and wiring as you have seen.
    Again in the .componentType file, I saw a service was defined but the name of the service defined was testbpel_client.But I didn't define any other service,so where did >that service come from?testbpel_client should be the partner link name for the service. If you open the bpel designer you should see this partner link on the left swim lane. And if you check the wire's in the composite source, you will see that the wire target is testbpel/testbpel_client. Partner Links are by which services and references are referred within the bpel designer.
    what are the implications of the <interface.wsdl/> and <binding.ws/> tags?interface.wsdl specifies the wsdl porttype of the interface exposed by bpel.
    bindings.ws specifies the wsdl port and soap:location for the bpel. You are not seeing the location part here as this is a service definition and soa runtime will automatically populate this depending upon your deployed environment. This section is more relevant for 'References' coz this is the place you have to modify the endpoint URL's of services you have to invoke.

  • Process Order Basic Finish Date and Scheduled Finish Date

    Folks,
    I have a requirement from the business to be able to update the Process Order Basic Finish Date and Scheduled Finish Date independently from each other.
    In other words, update the Basic Finish Date and the Scheduled Finish Date cannot change or update the Scheduled Finish Date and the Basic Finish Date cannot change.
    I believe the reason for this is to be able to use the Basic Date to maintain the ATP accurately and keep the Scheduled Date to mark when the order was originally due from the shop floor to be able to measure if orders are being completed on time or late.
    I have worked in tnx OPUZ and had some success with other issues with these dates but I can't seem to make them work independently from each other.
    Or does anyone have any ideas how to measure proces order performance to the production schedule?
    Thank you for your help,
    Greg

    Rajesha, thank you for your reply but it doesn't solve my problem.
    Let me restate my scenario:
    I start a process order and both the basic and scheduled finish dates are the same, June 1.
    At some point, shop floor tells me they will be late and cannot deliver until June 15.
    I need to update a date in the system so the ATP and the MRP planning runs have correct information for promising customers, I will update the Basic Finish date with June 15.
    I also need to keep the original June 1 date in order to measure the shop floor performance to the production schedule to measure how early or late the  order was delivered. How can I keep the original finish date or how can I measure if a process order is early or late??
    Thank you for your help,
    Greg

  • Sync and fire-forget process in a single composite

    Hi,
    I have two composite process, which does the same particular task but in a different way.
    1. Sync BPEL process.
    2. DB Polling a table, which is a fire and forget service
    Can i have both the cases in one singe composite ? Is there any challenges that i would face? Please suggest.
    TIA

    Use 1 composite and 2 bpel processes....
    Arik

  • Esb parallel processing problems with jms adapter and bpel

    Hi,
    I have esb project which dequeues from a jms adapter and then the esb router calls a bpel process. This bpel process takes about 10 seconds. The first step this bpel does is to return true ( to the client) to the esb router so the ESB thinks he is ready. This does not work.
    Now if I use in the esb router asyn routing rule to the bpel ws then the esb dequeus all the messages from the queue. All the esb entries are green. But the esb starts one for one the bpel process and then updates the esb entry with a new start time ( very strange) .
    If I use a sync routing rule then it dequeues and call the bpel process one for one.
    How I can parallel proces the jms messages ,because I have 2 quad cores cpu's . Async routing rules looks like the solution.
    How can the esb detects the bpel is still running even with the first action in bpel is to return true. I expected when the esb retrieves true from the bpel ws it ends the current esb entry and goes on with the next. So the total esb time takes a few seconds and not so long as the last the bpel proces finishes.
    And why is he updating the starting time.
    Thanks Edwin
    Message was edited by:
    biemond

    I have esb project which dequeues from a jms adapter
    and then the esb router calls a bpel process. This
    bpel process takes about 10 seconds. The first step
    this bpel does is to return true ( to the client) to
    the esb router so the ESB thinks he is ready. This
    does not work. I am not sure if it can ever work, if you reply and then still proceed with your BPEL process.
    Here is something I would like to suggest:
    Can you try ESB -- (sync) --> BPEL, where BPEL process itself is Async. In that case, esb will consume all the messages very fast and BPEL will get that message and put in Delivery Queue and reply back to ESB. Now BPEL will process them simultaniously based Receiver/Worker threads defined in your env.
    HTH,
    Chintan

  • During the io 5 update process, my iphone 3gs froze and now will shut off and turn on by itself, and will not allow me to unlock the phone or do anything with it. how do i fix this?

    during the io 5 update process, my iphone 3gs froze and now will shut off and turn on by itself, and will not allow me to unlock the phone or do anything with it. how do i fix this?

    Follow the instructions here > http://support.apple.com/kb/HT1808
    You may need to try a few times to get it to work

  • Update of software for iPad was interrupted and the iPad is now locked up.  Any ideas for how to re-start the update process?

    Hi all,
    I was updating the software on my iPad2 and while trying to multitask stopped the update process.  My iPad is now locked up and unresponsive.  Does anyone have ideas about how to re-load the update?

    You will need to hold down the power + sleep button, wait for restart, then hold home.  iTunes should then be in DFU mode.  Once in DFU mode connect to iTunes and click "Restore".  PRESTO!
    BF

  • HT201210 I am unable to update my IPhone 4 to the IOS 6.  I managed to back up and transfer  and then when it asked to update I said yes and the sync process starte, left it overnight and it came up with an error if continue you will loose all your data. 

    I am unable to update my IPhone 4 to the IOS 6.  I managed to back up and transfer  and then when it asked to update I said yes and the sync process started, left it overnight and it came up with an error if continue you will loose all your data.  So stopped! Help!

    Are you currently on ios 4?  If so that's where the backup comes in.  You'll need to restore your backup once the software is updated.

  • Hi i haven't updated my iDVD seen 2005 and to get the new one i need 7.0.4 first and i downloaded it from the apple website and when i go into the updating process its says "An eligible iDVD application was not found in the location /Applications." why"

    Hi i haven't updated my iDVD seen 2005 and to get the new one i need 7.0.4 first and i downloaded it from the apple website and when i go into the updating process its says "An eligible iDVD application was not found in the location /Applications." why

    Because you need to buy iLife 08 or newer on DVD first. If you're using iDVD 05, you probably have a PowerPC Mac and can't use iLife 11.
    (69573)

  • HT1766 I haveabout 7 App's that I Need to update. However, when trying tot do so,the message I get is 'Can't download the app' (in Dutch). The app, however, such as Pages, is no longer available. What can I do to complete the updating process and start us

    I haveabout 7 App's that I Need to update.
    However, when trying tot do so,the message I get is 'Can't download the app' (in Dutch).
    The App, however, such as Pages, is no longer opening and can't be used.
    What can I do to complete the updating process and start using the Apps again?

    Download iTunes using the tab at the top of this page. Then run the update with iTunes closed.

  • I live in Bidar,Karnataka,India.I recently updated my firmware.i dont have an official sim card to regain access and complete the process,can u please suggest me where can i buy an official sim card,please?

    i live in Bidar,Karnataka,India.I recently updated my firmware.i dont have an official sim card to regain access and complete the process,can u please suggest me where can i buy an official sim card,please?

    From the carrier for your cell phone service.
    Allan

Maybe you are looking for

  • Problem in process order creation.

    Dear Sir/ Madam                          i am facing a problem while process order creation. the problem is: Error when calculating cost for order ATFEDEC11  "see log Log is deleted when saving Do you still want to save?"

  • Illustrator CS5.1 crashes on opening or saving a file-

    I am on a Macbook Pro using Yosemite and Illustrator CS5.1. Everything was working great then out of the blue I couldn't save a file (or open one) onto my hard drive from Illustrator (PhotoShop works great). I can still save on to and open from a fla

  • USB Drive doesn't show up in My Computer

    I have a 2.5" Seagate 500GB 7200RPM laptop drive mounted into a USB case.  I plug it into my USB port along with another one that goes from DC to a different USB port.  In Device Manager, it is shown as "ST950042 0AS USB Device," which tells me that

  • Transfer files from QuickBooks for Mac to TurboTax in Windows 2000

    How can it be done to transfer QuickBooks for Mac data into TurboTax on a Windows 2000 PC? Is there any kind of utility program or file converter? I already know there is NO BUILT-IN SUPPORT in QuickBooks or TurboTax for import/export if the two prog