Batch Mandatory in inspection lot

Hi,
I need to have a batch as mandatory while creating inspection lots manually with inspection type 89. As of now batch field is not mandatory.
Please suggest.
Thanks,
Kalyan

Hi ,
Manual Inspection lot batch field is not mandatory .It is not possible during creation of lot .
But at the time of UD system will ask you batch & not allow you to proceed further .
If you want at time creation of lot please cheke with abaper that any user exit can be possible
Regards
SANIL

Similar Messages

  • GRN With 2line items(material,batch same)one inspection lot for 2line items

    Dear Experts
    As and when we make a GRN with 2 line items and same batch number we enter no. of containers differently but only the number from the first line item is flowing into the Inspection lot origin.We are creating only one inspection lot for 2 line items as the batch number is same for the items.
    1. In material master i have given 01 inspection type ( with control inslot.. Each material document,batch, storage location) :---
    this is the reason system is creating only one inspection lot.
    i am entering manually same batch number for 2line items...
    Here my problem is ... while giving UD... SYSTEM IS PICKING ONLY FIRST LINE ITEM NO.OF CONTAINER... IT HAS TO BE BOTH LINE ITEMS CONTAINERS.... IT IS PICKING BOTH LINE ITEMS QUANTITY... NO.CONTAINER ONLY IT IS NOT PICKING....
    Waitting for  experts reply

    Hi,
    As per your query if you put in MM forums then you will get the reply immly.
    Anil

  • Batch missing in inspection lot

    Hi All,
    1. Porcess order created for final product A
    2. Confirmation is done so GR posted with 101 for A and batch 01
    Issue:  But in inspeciton lot there is no batch for this material . in QA03 the batch is not there.
    inspection type is 03 and usage decision is not yet done
    I would like to know what could be the reason that batch is not there
    GR was posted on 15.9.2010
    Lot created on 15.9.2010
    Edited by: Sap: IN on Sep 30, 2010 1:40 PM
    Edited by: Sap: IN on Sep 30, 2010 1:50 PM

    If you are talking about the 03 inspection lot a batch number is not required.  The batch number is only in the 03 lot when the batch number is preassigned in the process order.  If it is not preassinged, you can receipt multiple batches against the same process order, (hence the same 03 lot).  In many scenarios, a business will receipt many batches against the same process order.
    FF

  • Batch number archiving- Inspection lot is causing the problem

    Hai,
    I am trying to archive a batch, but I do receive the below message:
    u201CMaterial is used in Inspection Lotu201D. Message number W4123.
    How do I archive an Inspection Lot?
    Note We are not using Long term Inspection.. We are in ECC 6.
    Anyone had this issue before?
    Thank you in advance!
    Sonali

    Hi Senthil,
    Thank you for your reply. Infact, I do not have any open inspection lots. UD was done against it. I could successfully archive the inspection lot. The status on the inspection lot is now ARCH. Now I ran MM_SPSTOCK to archive the associated batch number. But still I get message "Material is used in Inspection Lots".
    any ideas?
    I am actually going to post this under PLM forum.
    Thank you!
    Sonali

  • Wrong batch populated on Inspection lot

    Recently we came across the following issue.
    GR have been posted for two by-products(mvt type 531) for a process order within a gap of 6 minutes. Since 05 inspection type was active for both the by-products, two inspection lots were created for two material documents. The batch updated in second inspection lot is same as first inspection lot (Tcode: QA03, Table: QALS). But the batch updated in the corresponding material document is different one (Tcode: MIGO, Table: MSEG). Even the batch in inspection lot is not created in the system (Tcode: MSC3N, Table: MCH1, MCHA).
    Batch level is "Batch unique at material level".
    Have anyone of you came across this issue? Please reply with your thoughts and experience.

    No. We don't have split valuation. I am giving you example of issue . I am trying to search mat A and batch 100 in system but I didn't find in MCH1,MCHB,MCS3N. In short batch not created for particular mat and batch combination . When I searched inspection lot for both mat and batch combination then I found . This inspection lot is created after GRN for by product , movement type 531 , inspection type 05.When I saw batch in material document it is 101 instead of 100 .
    Question
    1. If batch 100 is not created for mat A then why it is showing on inspection lot header ?
    2. If batch in mat document is 101 then actually same batch should show on inspection lot header .How come batch 100 populating on inspection lot header ?
    Thanks ,

  • Batch data transfer from batch classification to inspection lot.

    Hi Gurus,
    My client requirement is that the results he enters in batch classification should get transfer to inspection lot in QM.The results in batch classification will be maintained by prod. person.
    These results should be visible in QM lot and Q.M person should be able change these results and these changed results should get reflected in Batch classification.
    for eg.
    Production person will enter width in batch classification. for eg 1200mm.This value should be visible to QM person in QM lot and it should be modifiable and if modified by QM person(for eg 1300 mm) , the changed value should be updated in batch classification.
    Is this scenario possible in std. SAP and if possible pls. provide the information as early as possible.
    thanks in advance.

    My guess is your having a production person perform an in-process test themseleves or entering in a vendor provided value for the characteristic.
    Why not just set up a separate operation in the inspection plan for the production person?  Set up a workcenter for the operation and do security at that level so the production person can only record against his/her workcenter.
    Create a second operation for the lab with there own workcenter.  Make the characteristic required for the production operation and optional on the lab operation.
    Allow the lab access to both workcenters.
    The lab can now review any data enterred by production, and if necessary, record a new value in there own operation. 
    The UD copies the last recorded result to the batch, (std SAP).
    Craig

  • Batch & inspection lot activation

    hi experts,
    I have one isssue in our client side.
    I am working for process industry.I will creat one production for ome for a particular product.
    I will get a regular output for every day,
    For every output , i want to create batchnumber & inspection lot.
    I can create batch number for regular input. At the same time i can create one inspection lot for one production lot.
    How to solve these issue
    Thanks& Regards
    K.Bhuvaneswaran

    Hi K.Bhuvaneswaran
    The business scinario you have explained is not very clear, What I have understood is a product is being manufactured and for inspecting the same you wan't to create a lot with batch number and daily there will be one lot for the production of a day.
    It is not clear that whether you are looking for creating a lot or batch automaticlly or manually.
    If you want to create the lot and batch manually then refer following SAP Help
    Batch Creation in Inspection Lots
    Use
    When you create an inspection lot manually, you can also create and assign a new batch to the inspection lot. When you create a new batch, you can assign the batch an external number or the system can assign an internal number, depending on your settings in Customizing. If the batch status management is active for your plant, the system sets the initial status for the new batch (for example, restricted or unrestricted) based on the setting for the material type in Customizing.
    Prerequisites
    The following settings are active in Customizing for Logistics - General (Batch Management):
    An external or internal number assignment is specified for newly created batches (see Batch Number Assignment)
    An initial status is defined for newly created batches (see Specify batch level and activate status management)
    Activities
    When you create an inspection lot manually, you specify the number for the new batch or, in case of an internal number assignment, the system assigns the number automatically.
    When you save the inspection lot, the system creates the new batch.
    Regards
    Suhas Joshi

  • Change "Vendor batch" data in the inspection lot

    Hi gurus,
    I have created an inspection lot. It is created in automatic once the GR is made.
    But, I have introduce the wrong "Vendor batch" and the inspection lot has the incorrect data there.
    How I can change the "Vendor batch" data in the inspection lot?
    This field is showed as greyed in the transaction QA02.
    Many thanks in advance for your help!
    Kind regards,
    SP

    Hi Sandra,
    Iam not sure about the option to change the Vendor Batch but i can Suggest the other option. i.e Cancellation of GR and creating the new one.
    1. First remove the 01 inspection type in Quality Management tab in Material master,
    2. Go to goods receipt in MIGo and put 102 movement type and do the reversal.
    Now the stock is in the order level. and you can do the GR again.
    Activate the QM tab before doing the 2nd GR.
    revert back for clarifications if any.

  • Solution of Inspection Lot creation

    Hi expert,
    I am newbie in QM module.  I have some question for solution in QM inspetion.
    sample
    Production Order created order for 100,000 pcs and goods receipt batch split(2,000 per batch), 50 batch per production order.
    Then in QM generate 50 inspection lot (inspection lot per batch). Usually QM inspector inspected some batch not all of 50 batch.
    How i can result record in SAP only 1 inspection lot for all of 50 batch and 49 inspection lot auto result record and auto UD.
    Or
    1 Production Order generate 1 inspection lot.
    thank you

    Hi Sandip,
    Thank you for your reply.
    I try to setting following with you.
    In SPRO
    and
    In Material Master
    and then I created production order for 10,000 pc and goods receipt 5 batch@2,000 pc
    such as
    BATCH001 : 2,000
    BATCH002 : 2,000
    BATCH003 : 2,000
    BATCH004 : 2,000
    BATCH005 : 2,000
    I want system generate 1 inspection lot per material document. but system generate 5 inspection lot
    How i can set for 1 inspection lot
    thank you ^__^

  • Standard Report for all inspection lots

    Dear all,
    Pls guide me from where I can retrieve the data for result recorded for MIC, inspection lot wise.
    Actually currently working for Pharma company where we are using, Inspection Plan (task list type Q), with inspection point 200 u2013 Physical sample. Materials are being managed through Batches, so each inspection lot is having separate batch number.
    Now the requirement is to find a STD sap report that can retrieve us the result for a material for all the inspection lots (Batches) it have, in the report type from where I can down load it to word/excel.
    In short, the report should contain, Material, results for all MICs under all inspection lots.
    I have already tried out;
    QGP1 but it shoe the result for only a MIC at a time.
    QGA2 but not able to visualize results for all MICs at once.
    MCXB but, gives only the quantity of MICs not the results of it.
    Regards,
    Shyamal Joshi

    Hi Craig,
    The requriement is to have results for the Inspection lots only, not for the batch values.
    The report MCXD is giving the quantitative analysis for the batches, I will be very pleased if you suggest me any report that gives me the results (values entered during result recording) of these MICs, inspection lot wise, just as the MCXD give quantitative.
    I think the term BATCH is creating confusion, that is Y u have suggested me CL03N, but as I have mentioned eariler also, currenlt working with Pharma company, where each manufacturing lot is give a batch number, (in sap terminology the Batch management function, MSC1N), that is why i freauently used BATCH. Sorry for that communicational error from my side, and I am very much thank full to you for your each valuable comment, suggestion.
    Regards,
    Shyamal Joshi

  • Usage decision thru QA11 for forcibly give the UD code on a inspection lot

    All,
    I am trying to do an usage decision through QA11.Where in Batch for respective Inspection Lot we have to find the PD,SLED and NID there .
    when i forcibly give the UD code  on a inspection lot  and save this it will calculate the NEXT inspection Date.But some times the NID value is greater than SLED value after the UD.
    My requirment if NID is greater than SLED after UD then give a waring message.
    Any suggestions would be appreciated.
    Regards,
    Sanjit

    Hi Sanjit,
    You can just try the BAPI: BAPI_INSPLOT_SETUSAGEDECISION
    for more help, check the following helpful link:
    Re: Stock posting through mb1b
    Hope this will help you.

  • Scenarios for "manual creation of inspection lot"

    Hi QM gurus!!
       I would just like to ask the main function of QA01 or "<b>Manual creation of inspection lot</b>"
    What are the cases/scenarios where this tcode is used? I would really appreciate if you could help me.. Thank you.
    Regards,
    Heinrick Palad

    HI,
    The table below provides a brief overview of the functions you can use to process inspection lots. Appropriate cross references are included for the more extensive tasks or for those for which additional information is available.
    Prerequisites
    The inspection lot processing functions can be linked to various authorizations that are checked by the system whenever you try to process an inspection lot. The following types authorizations are relevant to inspection lot processing:
    Material authorizations
    The material authorization for QM is stored in the material master. For more information, see  Creating and Changing QM-Specific Data for a Material.
    Inspection type authorizations
    This authorization controls which inspection type the user can access in order to create an inspection lot. The inspection type authorization is plant-specific.
    No authorization checks are executed in QM when an inspection lot is created automatically.
    Features
    Function
    Pushbutton / Menu path
    What you should know
    Accessing the initial screen for the inspection lot processing functions
    Logistics ® Quality management ® Quality inspection ® Inspection lot processing ® Inspection lot
    Creating an inspection lot manually
    See Creating an Inspection Lot Manually
    Changing an inspection lot
    Choose Change
    Enter the number of the inspection lot you want to change and then choose Enter.
    Displaying an inspection lot
    Choose Display
    Enter the number of the inspection lot you want to display and then choose Enter.
    Creating a new batch in an inspection lot
    See Batch Creation in Inspection Lots
    Cancelling an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Cancel lot.
    See Cancellation of an Inspection Lot
    Blocking/unblocking an inspection lot
    Call up an inspection lot in the change mode and choose Inspection lot ® Functions ® Block lot.
    To unblock an inspection lot, choose Inspection lot ® Functions ® Unblock lot.
    When you block an inspection lot, you cannot process the lot further. You must unblock the lot if you want to perform any additional operations.
    Transferring stock in an inspection lot
    See Stock Transfers
    Making corrections to inspection lot quantities
    See Corrections to Inspection Lot Quantities
    Creating a QM order
    Call up an inspection lot in the create or change mode and choose Goto ® Insp. lot acc. assgnmt.
    See QM Order Creation
    Resetting the sample calculation
    See Resetting the Sample Calculation
    Printing inspection instruction/sample-drawing instruction
    See Printout of Instructions
    Approving a task list
    Call up an inspection lot in the create or change mode and choose Inspection lot ® Functions ® Give approval
    If the task lists in your company must be approved before they can be used, you should make sure that only approved task lists are assigned to an inspection lot. If the system selects a task list that has not yet been approved, you can use this function to approve the task list (provided you have the necessary material authorization).
    this link help u.
    http://help.sap.com/saphelp_erp2004/helpdata/EN/be/00bbe7ca5311d2961800a0c930e04c/frameset.htm
    reward is usefull.
    tahnks.

  • QM Inspection Lot Qty vs Actual Lot Qty

    Gang,
    What is the difference between Inspection Lot Qty vs Actual Lot Qty. And which one of these should get updated when more than one receipt is against the same Material/Batch/SLoc?
    Thanks
    Bruce

    Inspection lot Qty & actual lot qty as I remind are most of the time same but when you do the QTy correction through QAC1 ,they come into picture...or may be when you have inspection control defined in the QM view
    Inspection lot qty has significance for inspection & calculation of sample size.
    When more than one receipt is against the same Material/Batch/SLoc the inspection lot QTy will be Qty for which he material document is created,

  • How to copy Inspection Results into Inspection Lot in Good Recipt Process

    Dear Members,
    I am working on a Automatic copy of MIC values [Micro Inspection Characteristics (CML 260-CML 299)] into a batch(new) and Inspection lot( QA32 - Results Screen) in Goods Receipt process(Process order) using MB31.
    I have successfully implemented the customer Exit (EXIT_SAPMM07M_004) for copy MIC values to Batch(Batch Records only).
    But I am not able to find out the proper process or User-Exits to update the same MIC values into Inspection lot which is being created in the same GR process for the order.
    Can anyone please share your experience or tips on this requirement?
    Thanks,
    Vass

    check this link :
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/60221c69-0f8b-2b10-eebf-bec51a601dd6?quicklink=index&overridelayout=true

  • Inspection lot per HU instead of batch in inter company stock transfers

    Hello,
    We are testing intercompany stock transfers and we face the following problem when we check inspection lots created at the receiving plant: one inspection lot is created for each HU, while we want one per batch.
    We multiplied tests with many combination on  material settings on inspection type 01 (which is inspection type used on inspection lot):
    u2022     with or w/o u201CInsp. for HUu201D
    u2022     u201CControl inspLotu201D: blank, 1, 2 or X
    without success!
    Letu2019s me precise that inbound delivery is created automatically from goods issue at issuing plant because we activated SPED functionality (then Hus numbers are directly taken from outbound delivery to inbound delivery).
    Also we noticed something that could help understand the problem:
    1.     when issuing plant picks HUs into the warehouse, they confirm TO via RF transaction (LM61). As a result, outbound delivery as a main item and there is a split by several sub items, as many as HUs confirmed
    2.     when we test the picking confirmation out of a non RF transaction (LT12), there is a main item but only sub items per batch (qty is then aggregated)
    What is maybe interesting to notice is in the first case, inspection lot at receiving plant is created per HU while in the second case, it is created per batch!
    Second behavior is what we require but RF pick confirmation is mandatory for us!
    Is there any chance to change QM behavior in that case?
    Thank you,

    Dear Gajesh,
    thanks for your replay. It is very helpful.
    Option A
    1) The finish goods would be are already release and that does not go with our Q-policy.
    2) Does this mean, I have an inspection lot at the point of time of GR from production to warehouse and another inspection lot at the time of delivery. That would mean I double my work?  And the time of delivery happens one day after GR from production but the Q-results still need some more days. I do not see how this should work.
    Option B
    1) What do you mean by multiple GR to the warehouse storage location?
    Where do I have to activate the copying option for the inspection lot?
    Here I see the problem still existing. The result of the MIC has not been found out yet, the UD can not be done and I do multiple goods movement to the warehouse. What is the lelp? If I could make several stock transfer from the q-stock within the inspection lot that would be the best.
    May I am thinking wrongly but the best would be to keep the stock in the q-stock. Does a suitable BAPI exist where I could program a logic to it or what do you think?
    Thanks for your feedback,
    Best regards,
    Heinz

Maybe you are looking for

  • Project Takes FOREVER to Open and Close

    We have a large RoboHTML project that outputs to a WebHelp system. The version of RoboHelp is X 5, possibly a version after that, I think - but dated 2004. Two of us share this project, but we don't use Version Control. The size of the project is abo

  • PSE how to have photo automatically resize the a 12 X 12 background document

    I was told that when you drag a photo onto a 12x12 document it will automatically resize to the 12 x 12. When I do it in PSE the photo is small...and asking me to transform it. Is this different within these two programs or is there a work around in

  • Photos lost

    How can i get my photos back that i removed. Are they still on my harddisk?? Do i need to install something?

  • Working with formatters

    I am teenager making my first steps into programming by learning cocoa and objective-c.  I decided to make a basic four-function calculator and have some questions related to formatters - specifically the NSNumber formatter.  When the user clicks a n

  • Multi track selection tool keabord shortcut

    I am aware that A = track selction tool holding down shift key make it multi track selection tool is there a shortkey for multi track selection tool without pressing all the time the shift key or how can i make a shortkey for that? thank you in advan