Billing of Finished Product (TAN) and DIEN Material

Hello,
There is a requirement by a user that a finished product and a service material needs to be invoiced together in a single invoice.
The dien material has an item category TAD.
Please let me know the configuration steps to achieve this requirement.
Alternatively any other options to meet the requirement.
Thanks

In Std system settings, System settings, it will not allow to create single invoice by combining order related & delivery related items. To achieve this you have to fine tune copy control settings, but i dont think its feasible solution. just because of this one requirement changing the control , instead for this requirement if you can have seperate document types, then hope you can achieve this.
                 Play with copy control settings in invoice split criteria, copying requirements & reference number.
For initial testing, Maintain the above fields as blank & run a test cycle.
     Update the results in forum.
Regards,
Reazuddin MD

Similar Messages

  • Multiple finished product from one ram material

    Hi Everyone,
    I have a scenario like from one ram material there are multiple finished products are produced. For example,
    they are procured the nuts with the shell and its seperated from shell by performing an operation. At the time of operation the nuts may be brokern into small pieces. They have some specification so based on the classified the finished product. How can i map this scenario in sap.
    Thanks very much

    Look at by-product and/or coproduct funtionality.
    You can specify that certain byproducts can be produced.  These can be received as other FG materials or semi-finished good materials,
    See this link:
    http://help.sap.com/bp_fm603/BBLibrary/HTML/355_EN_FR.htm
    It has links to other areas such as master data, configuration and business processes.
    FF

  • Can I use the fields Product allocation and Basic material for bifurcation of material

    Dear Users,
    We have a requirement for bifurcation of material so we need two field in material master for fulfilling the requirement. First requirement is material category like insurance or revenue etc., second requirement is department wise like electrical, maintenance etc, so i have choosen the fields 'Product allocation' in basic data 1 screen in material master for fulfilling department requirement and then in basic data 2 i have choosen 'Basic Material' field for fulfilling material category requirement. My doubt is whether this change will effect the reports and i need to know the effects of such changes.
    Thanks,
    Manoj

    As you are trying to use the standard fields, so you can read the F1 help for these fields.
    Also check in which table and program, the fields are used.
    Read the F1 help and find the table and program by using this document How to find Table name for a Field which is shown structure name on press F1.
    After reading this, If these fields are suitable for your requirement, then you can continue.
    Regards
    Dev

  • Purchasing of finished product

    Hi Experts,
                   For finished product we have not maintained the purchasing view in material master. While creating purchase order i am not getting error that material is not maintained for purchasing. Msg no ME 046. But I have checked the system msgs there i have made it error. Still i am not getting. But in developement server error is coming. In production server it is not coming. Kindly help me out.
    Thank you
    Sap MM

    Hi
    First check it out for the material master purchasing views extended or not? Normally fiish product wont have a purchasing view. For this u select the SPRO-SAP IMG- LOGISTICS  GENERAL-bASIC SETTINGS- MASTER DATA -MATERIAL TPE- DEFINE ATTRIBUTES OF MATERIAL TYPE. and select the finish product view and save.
    Then it will appear.
    One more thing, while giving purchasing view in material master, u give the procurement type (both internal and external)
    Regards,
    Raman

  • Dismantling of a Finished Product

    Hi Gurus,
    I am facing a Problem
    My client sends a finished product 'A' to his customer.
    It is returned back as customer return and Quality people does quality inspection and keep it in the block stock.
    Now my client wants to dismantle the finished product 'A' and
    use the component which he got by dismantling the finished product 'A' in the new production order.
    For that after dismantling of the material 'A', The BOM of Component of finished material 'A' has to be updated in the stock.
    How can I map this Senario.
    Please guide me.
    Thanx and Regards,
    Praveen Kumar.S

    Dear Praveenkumar,
    Checkout this procedure,
    1.A production order without material using CO07 will be created .
    2.And in the BOM components will be entered in - ve quantity,so that their stock will get uploaded using 531 movement as a By-
    Product.And enter the header material in + quantity so,that its getting issued using 261 movement.
    3.But for this ,the same has to finalised with FICO & MM consultants as accoutn determination for 531 movement should be
    configured.
    Regards
    Mangalraj.S

  • Make to stock planning for a finished product with variant attributes

    Hello All,
    I have one finished product with different characteristics like color and sizes, I have to create demand for the same finished product
    and to define different characteristics but should get one planned order for each combination of characteristics. Can anybody suggest how to create demand in make to stock situation.

    Hi ,
    Try using "Planning with Planning Material' .
    1: Define Planning material ( which is never produced) & it's BOM with only common assemblies( Finished product specific assmblies should not be added here)
    2: Create Finished products seperately & assign planning material to Finished products. Finished product BOM should contain common assemblies & Variant assemblies
    2:Enter Planned independent req for planning material & run MRP , it will generate procurement of it's  common componenets
    3: SO for Finished product reduces PIR of planning material & triggers Final assembly.
    4: Planning with planning material should be 60 strategy . it must be entered in both planning material & Finsihed goods.
    This is possible with make -to stock as seperate Finished goods are created for each combinatin of color & sizes.
    Hope it helps,
    Jatin

  • Mm- valuation of finished product

    dear gurus,
    i have a problem...
    a production process is going on as such :
                   rejection
    A>B>C>D>E (final finished product)
               Quality Check
    at stage D we get finished product but after this step the product is going for Quality Check and thus after this we get rejection as well as the final finished product.
    i want to have the valuation of this final finished product only and not of the QA and rejection material.
    please help me out response me soon.
    thanks:
    piyush singh

    Hi,
    TO change the valuation class there should not be any stock, Produciton order, Purchaser order or PR. If stock is there then issue to some cost center then change the valuation class  then bring back the stock.
    regards
    ramakant

  • Evaluation Structure for Production Order and Repetitive Manufacturing

    Dear PP friends,
    I am trying to create a Evaluation Structure with reference to an Evaluation Structure (t-code MCR7). I need to join the Standard Evaluation Structures S021 (Production Order) and S026 (Material Usage), but S021 is not appearing to choose characteristics and key figures.
    Does anyone have suggestions?
    My requirement is to create a report where I can see goods receipt x goods issues per order.
    Thanks in advance.
    Marcos

    Hi,
             As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
    To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
    Regards
    Chandra

  • Combination of plant SUNP and material type finished product does not exist

    HI i am  suneel
    my issue is  combination of plant SUNP and material type finished product does not exist  when i posting to material in t.code
    MB!C after entering materiel and qty in the selection screen i pressed enter on that time this massage is happening
    Thanks
    with regards
    suneel

    Hi lakshmi pathi ,
    Sorry for the inconvenience i am new for this sap sd and also this community . Actually  yesterday and today i got lot of solutions  from this community .really i feel very happy with this and i continuous searching for my issues and i got so many solutions. these are also i searched but i dint got any solutions so i posted here .
    sorry for the inconvenience
    any way thanking you for giving valuable suggestion.
    with regards
    suneel

  • How to consolidate service item and finished product into a billing doc.

    There are two items in my sales order.
    one is the finished product, therefore I need to do delivery and billing.
    another one is a service item, so i don't need to do the delivery but billing.
    When I do the billing, the system split two billing document for this sales order.
    How can I consolidate this two items into a billing document? and that is normal invoice for business.

    Please search the forum before posting questions as similar questions are answered before, see for example Multiple item categories on one order and Billing Document
    If this does not help resolve, then be specific to provide where the issue happens.
    Regards,
    If you solve by yourself, can you provide the details?
    Edited by: Shiva Ram on Nov 12, 2011 8:57 PM

  • Change the configurable material set against a ERP finished product

    One of our users has entered the wrong configurable material against a finished product in MARC-STDPD. Is it possible to change this?
    Thanks in advance

    Hi Pherasath,
    I'm not sure how changing the material type will help. What would I change it to and why? I need the material to be a ERP finished product?
    I too have noticed the OSS note but wasn't totally sure that it applied to the issue we specifically have, do you think it does?
    Regards,
    Craig

  • Combine billing of service material and std. material

    Hi all,
    i have a query regarding my client requirement is they are creating a bill manually with two different kind of mat. with two type of taxes i.e. Service tax and vat. example this invoice has 5 line items 1-3 are the chemicals which are deliverable and 4-5 are service items are not relevant for deliver. from 1-3 they will charge Vat% and 4-5 at service tax we have two doc. type one is for chemicals and other one is for services, can i design a new document type to do both in one, not able to understand please help...
    Vivek Sharma

    For these kind of business process,
    Maintain to 2 diff Item cat for Deliverable(TAN) and service items(TAS) based on there deliverable and service characteristics/functionality.
    I Cat determination for same sales doc type, maintain 2 different I Cat Group in material master for Deliverable and service items. Accordingly, your Deliverable and service items will determine there respective I Cat in sales doc.
    Now, formulate wisely include both VAT and Service tax condition type accordingly into your pricing procedure.
    So, when your maintaining Deliverable material, in Sales:Sales org1 tab, in Tax data section, accordingly maintain TAX Classification for VAT Condition Type as Taxable and service tax condition type TAX Classification as NO TAX (or as according to your tax classification tax condition types). And accordingly, maintain tax classification for your service material.
    Thereafter, maintain condition record for VAT & service tax as per requirement.
    Hope it solves your query.
    Thanks & Regards,
    JP

  • Raw mat and procured finish product cost

    we need to run cost run for both raw material and product, we want have the following scenario:
    first mark the raw mat. cost run,  then our finished product will get the future price of raw mat and base on BOM to update the future price of finished product.
    after we mark finished product, we then release raw mat standard price and subsequently release finished product.
    is any solution we can define  costing variant for above scenario?
    we have another scenario, we need to run costing run for finished good A, but this product A 's BOM contain only one procured finished product B, B doesn't have BOM and purchase info record, how can we change product B 's price, so finally finished product A 's standard price will be updated upon costing run?

    Hi ,
    In Costing Variant .. we have a Tab for valuation variant . In the valuation variant type , we have seperate valuations for raw Materials , activities, subcontracting etc .
    Cost Estimate with Quanity Structure will refer to the Costing Variant and compute costs .. Hence , maintain Costing Variant and Valuation Variant properly..
    This will solve both your issues..
    Kindly revert back for any further questions..
    Regards
    Sarada

  • Material Valuation for Finished Product in Production Scenario

    Dear SAP Gurus,
    Kindly recommend appropriate Material Valuation Control for Finished Product in manufacturing scenario. SAP recommends pricing control 'S' (Standard), but my client's buying nature is not periodic(varies), they buy material on requirement basis (On actual material consumption ) which is very frequent. Pricing for each buy also changes due to the market conditions. You are requested to suggest me appropriate Material Valuation Control (either S / V) for Finished Product along with reasons, advantages & disadvantages for the same.
    Thanks,
    Shantanu

    Hi Alll
    Well one disavantage in material with 2/V for production consumption is in case of incorrect goods receipt, incorrect price for example, all your consumption will be wrong.
    For correction you would have to reverse all production posting, correct the goods receipt and repost the production confirmation.
    If you were using 3/S configuration, all consumption would be done in standard price and at month end material ledger would calculate the actual price for price revaluation. People from MM would have time to correct the entries during the month.
    Regards.

  • Finished product as packaging material

    Dear experts,
    Plz help. Many thanks.
    Background: Product A is finished product and can be sold. Meanwhile, it can be used as packaging material for another finished product B. However, only B has selling price as customers only buy B.
    Q1: Can product A be maintained as packaging material and finished product as well? Any impact on accounting?
    Q2: If answer for Q1 is yes, can product A be used to create sales order together with B? You know, product A also need production. Production department want production requirements from sales orders (say Tcode MD04). Meanwhile, they're required to pack B with A before warehouse receives B.
    Q3: If answer for Q1\2 is no, how to solve?

    Hi Cathy,
    You only need to do the normal packaging material related masterdata maintanence and configurations. I created a query long ago and was answered by many people on packaging. I am giving you the link. Please go to the thread to know how to enable packing. Using this set up, you can do multilevel  packaging or any kind of packaging you want.
    Packing process
    Normal sales doesnt need any explanation here.

Maybe you are looking for

  • Spry Tabbed XML data panels within HTMLPanel not working.

    Many thanks for reading. s I trying to provide a rapid solution using adobe's samples to make Spry Tabs work within an html panel (in order to avoid many links in my page). I am using the following code: initial page with html panel with the ready pr

  • How can I remove the encryption from the iPhone backup without restore

    I have not lost any data yet, I recovered it from icloud, but I cannot remove the encryption check and restore from I cloud at the same time, if I restore then the encryption returns... please don't ask me why I forgot the password i did the setup 3

  • How to trace a USER in oracle?

    Hi Sir, I have a rquirement that I need to Trace a session created through the Application. The only data I have is that I know the application will connect to a Database schema and nothing else. How is it possilbe that I can create a trace file for

  • Table in Schema1 using XMLIndexes But not in View- Schema2

    Hi, We are using : Oracle Database 11g Enterprise Edition Release 11.2.0.2.0 - 64bit I have a view with following query: CREATE OR REPLACE FORCE VIEW VIEW_TNAME XML AS SELECT Column_Name FROM TNAME WHERE XMLEXISTS ( 'declare namespace Namesp1 ="Abc:S

  • Query row structure to restrict on multiple ranges of Calendar Year /Month using Custom exit

    Hi All, I have written 2 queries in Bex 7.x which have similar requirement. One uses 0CALMONTH and other 0FISCPER. I will describe scenario with Calendar Year month query. Query to have user entry screen for 0CALMONTH. Added 0CALMONTH in Filters sect