Hi all,
i have a query regarding my client requirement is they are creating a bill manually with two different kind of mat. with two type of taxes i.e. Service tax and vat. example this invoice has 5 line items 1-3 are the chemicals which are deliverable and 4-5 are service items are not relevant for deliver. from 1-3 they will charge Vat% and 4-5 at service tax we have two doc. type one is for chemicals and other one is for services, can i design a new document type to do both in one, not able to understand please help...
Vivek Sharma

For these kind of business process,
Maintain to 2 diff Item cat for Deliverable(TAN) and service items(TAS) based on there deliverable and service characteristics/functionality.
I Cat determination for same sales doc type, maintain 2 different I Cat Group in material master for Deliverable and service items. Accordingly, your Deliverable and service items will determine there respective I Cat in sales doc.
Now, formulate wisely include both VAT and Service tax condition type accordingly into your pricing procedure.
So, when your maintaining Deliverable material, in Sales:Sales org1 tab, in Tax data section, accordingly maintain TAX Classification for VAT Condition Type as Taxable and service tax condition type TAX Classification as NO TAX (or as according to your tax classification tax condition types). And accordingly, maintain tax classification for your service material.
Thereafter, maintain condition record for VAT & service tax as per requirement.
Hope it solves your query.
Thanks & Regards,
JP

Similar Messages

  • Material and representative material in PCA

    Hello all,
    I have an issue concerning material numbers in Profit Center Accounting. My aim is to be able to report on material group (attribute on 0MATERIAL) in BW for both plan and actuals.
    In R/3 PCA they plan on field "representative material". Furthermore they post actuals on "material" field.
    Extractor 0EC_PCA_1 brings all postings (plan + actuals) to BW, but does not include the "material" field. It only includes the "representative material" field, so I'm missing the possiblity to see the actuals per material number.
    Extractor 0EC_PCA_3 brings all actual postings to BW and includes the "material number". However the representative field is not filled (since this is only actuals)
    So I get what I need into BW, but in two different extractors (and also on two different aggregation levels).
    I somehow need to merge the information of these two extractors. Is it a multi cube I should use here? Or should I rather try to modify 0EC_PCA_1 by adding the material number in an append structure? I actually tried this, but I still couldn't find the new field in the extractor. So I guess this is not possible here and that I have to go for the multi cube solution?
    I need to get both the "representative material" and the "material" into info object "0MATERIAL" since the material group is an attribute of that. Could this work if I modify the update rules in cube 0PCA_C01 (this is filled with records from 0EC_PCA_1) so that repr. material points at 0MATERIAL (for plan values) and at the same time use cube 0PCA_C03 (this is filled with records from 0EC_PCA_3) which uses 0MATERIAL as standard (for the actuals).
    I'd be extremely thankful for some ideas/help...
    Thanks in advance!
    best regards,
    Fredrik

    Hi Fredrik,
    Some questions:
    Is there a 1 on 1 relation between repr. mat. and material?
    Do you have PCA_1 as Totals or Line Items?
    If you want to report on material group you somewhere have to have a relation between repr. material and mat. group.
    Of course you can always map the rep. into 0MATERIAL, but you MD has to be correct too.
    And: Adding in PCA extractors is difficult!

  • Product costing configuration material   and study material

    Hi all,
    Can any one pass me the Product costing configuration material and study material email id is [email protected]
    thanks in advance
    Regards
    vijay
    Edited by: vijay matlani on May 11, 2008 11:17 AM

    hi
    Product costing documentation
    http://www.sap-topjobs.com/SpecialPP/746.html
    nagesh

  • Direct material and indirect material

    please explain the what is direct material and indirect material and its different between them

    Hi.
    Direct materils: These material are bulkly needed and regularly needed for that orgnization to have their end product.  these materials usually raw materials ....
    Indirect materials: these materils are needed with direct materlias  for the manufacture or to produce end product.
    Ex: If your orgn's is cement Industry.
    Direct materials: Silica Sand. etc..
    Indirect matrials:BAG. Gypisum.....
    Hope you are Understand with these example...
    Regards
    S B H

  • Aavlaibility check for material and Substitution material

    Hi Gurus,
    I have a requirement where in I need to check the availability of a material and if there is not availability then I need to find out the substituted material maintained for the material.
    for example, Material M1 has no stock in ECC and Material M2 is maintained as substitution in the SCM system. I need to figure out the tables or any Function module that can fetch the Material M2 if I provide Material M1.
    I am able to check the material availability using the BAPI "BAPI_AVAILABILITY_CHECK". But I didnt find any FM or way to find the substituted material for a material.
    Please help me out.
    Thanks.
    Anand.

    I don't know about SCM, but in R/3, the material determination process is based on the standard procedure/access sequence setup.  If you trace the condition record maintenance, you will find your table name.  If the SCM setup doesn't work that way, there will still be a master data setup step that you can trace and find the table.

  • Report for Req Material and Issue Material for Project/WBS

    Dear All,
    My client need a report for a WBS element-wise material required and material issue with value.
    Let me know if any standard report avialble for same??
    Or Incase of devlopment which are the tables we can use to Get req qty and issue qty of materials?
    Thanks and Regards,
    Atul R. Rajmane

    Dear Shirkant,
    Thanks for your input. I am using CN52N report.
    I this I have selected Req Qty, Qty Received, Qty Withdrawn, Shortfall Qty. I am getting figures in  Req Qty, Qty Withdrawn, Shortfall Qty but I am not able to get Qty Received figure. Let me know how I can get it i.e. for this any Note is required or any other configuration??
    If I can get this figure than I can use this report for requirement.
    Thanks and Regards,
    Atul R. Rajmane

  • No link between PR material and PO Material code.

    Dear Gurus
    My industry is textile industry , here issue is that when MRP run it is giving auto PR based on BOM , but when purchase department is received PR , they start analyzing material the material requirement , they check in stock any raw fabric is there or not , if available they send that raw fabric for subcontracting (for dying) then after dying sent for other different operations, and then required material as per PR is ready......
      Now my problem is how to link this auto material PR to different subcontracting PO... because management need report based on what was the material required and why purchase department is not able to provide it on time. please guide me....
    Thanks & Regards,
    Akshay

    Dear Sir ,
    I can not maintain special procurement key as 30 in MRP 2 view as it is not at all conform how material will be procure directly or by subcontracting...
    if i do like that in PO manually change ilem catagory L , but the is possibility that to get right material as per PR purchase has to do more that 2 times subcontracting at different vendor ....if this is the case the material code in PR and PO defiantly different.... will SAP support this that PR and PO item is different?
    Thanks & Regards,
    Akshay

  • Configurable material and project material cost

    Dear all,
    could you help me on the following question?
    we need to calculate the configurable material cost in the projcet.
    the costing varaint is to get the info record of the materials.
    but now the problem is when i use cn33 to assign the materials to the activity, the planned cost is only the material cost shown in the projcet. we cannot get cost of the bottom materials.
    how can i solve this problem, to get the planned cost,just as what we can get in the sales order (VA01)cost planning?
    thanks a lot.
    Judy

    can anyone help me or give me some hints on what to do?
    thanks a lot.

  • GR material and GI material

    I have selected data for GR from mseg table. Now I need corresponding data for GI too. How do i relate these too?

    HI ,
    i think u can check table EKBE and check for VGABE.
    Regards
    Prabhu

  • MPN, block PO for a vendor and material (not MPN material)

    Hello everyone,
    I have a doubt regarding MPN process I created a MPN material referencing an internal material. I have a vendor and a manufacturer.
    If I create a purchase order with the MPN material (in the line the internal material comes automatically) and vendor  and the manufacture is blocked by QM status (MP01). When I try to save the PO I receive a warning message and I am not able to save the PO. No Issues till now.
    The thing is, if I create a PO with the internal material and the vendor I am able to save it, and the MPN material never comes up. And I want to be blocked also in this escenario.
    thanks in advance
    Sebas

    Hi,
    If you want that system should not allow user to create PO for the internal material and should only allow the MPN material then you can use Manufacturer's Part Profile in Internal material and MPN material and maintain Approved Manufacturer Part List (AMPL) in MP01.
    You have to configure MPN Profile in SPRO > MM > Purchasing > Material Master > Define Manufacturer Part Profile
    Here activate "MPN Mandatory" and rest all as per your requirement.

  • How to link Sales Order with Service Contract and then with Install Base?

    Hi Friends,
    1) I would like to know the integeration process from sales order to Service Contract and then with Install Base.
    2) I couldn't see anything enabled in Service Tab in Order Lines, its grayed out. Is there any set up/profile option to get it enabled?
    3) How can we create AR invoice from Service Contract?
    Please let me know if anyone has idea on this.
    Thanks in Adavance,
    Vara

    Dear Sid,
    Thanks for your promt response.
    Let me explain you what I did.
    1) I have booked a Bill Only sales order which has one order line, mentioned it as Service Item and provided the same details in Service Tab in Order lines. Now Line status is "Fulfilled"
    2) Then Submitted Workflow Back Ground Process for OM Order Lines and it has created an AR Invoice and closed the line
    3) And then submitted "Service Contracts Order Capture Integration Program" from SErvice Contracts Responsibility and it completed normal.
    4) Now I went in to Launch Contracts Window and queried with the sales order but couldn't see any contract created
    5) Then I went in to Reprocess Order Window and found this order shows an error message as "Referenced Product not present in the Installed Base", then I tried to reprocessed it, but the same error message again.
    Here I have few doubts:
    1) Are the AR invoice and Service Contract Billing Invoices same?
    2) In above scenario AR Invoice has been created, I would like to do the billing from SErvice Contracts and need to create an Invoice in AR? how can I do that?
    because as you explained in one of my questions earlier, A Single Invoice can be created for the whole duration of the contract. I want to do that and trying for the same.
    3) Regarding the above error message, how can I resolve it and create the service contract against that Order?
    Thank you so much for your helpful answers.
    Regards,
    Vara

  • Is it possible to bill together a FERT material and service item.

    Hi All,
    I have request from the user where in they want to bill together a service and fert material.
    Scenario.
    1. Sales order creation with material one FERT and other service ITEM.
    2. Delivery creation for both item. Stock should be reduced for FERT item and system should not ask for stock for service item.
    Single PGI document for both.
    3, Single billing for both FERT and service item.
    Please confirm is it possible to implement.
    Any guidance is highly welcomed.
    Regards
    Jalaj

    2. Delivery creation for both item. Stock should be reduced for FERT item and system should not ask for stock for service item.
    Single PGI document for both.
    Yes delivery will be created for both FERT and Text items and system would reduce the stock to FERT item only not for Text item(TATX) because at the time creating sales order it self for text line item qty would be Zero so at the time of PGI system will not reduce any qty.this is standard only.
    Please note for text items we don't maintain the material master and order qty also you can observe is in grey mode.
    And coming into billing why you want bill the text item? usually in standard for text items the pricing is not relevant this you can observe in the definition of TATX(VOV7).
    And finally you can combine the both the materials in single billing.
    1. Goto VF04 select order related billing and delivery related billing or
    2. by entering vf01 enter the delivery and order and try to save it.
    Please check the above and let me know your results.
    thanks,
    Srinu.

  • How to put material and service in the same order

    I want to put the material and service in the same order. How do it input different taxes. and also migo for one material item and other service item.

    HI,
    In your scenario create material and service PO using T-code ME21N as follows.
    1) Select PO document type, vendor and PO date
    2) PO first line item account assignment 'N' if project and give input data material code,plant,storage location,qty,rate,delivery date and tax code.
    3) PO second line item account assignment 'K', item category 'D',material short text for service, plant,storage location,material group data's are input given and press enter it will open 'Service Tab' in Item Detail Menu.
    4) In item Detail Menu - Service tab you will give Service no.,qty,gross price for the above  service material activity and service tax code in Invoice TAB and then check PO and SAVE.
    5) After getting PO approved by top management.
    6) PO first line item, you will do MIGO and PO second line item you will do ML81N service entry sheet.
    7) On the vendor bill, you will mention material document number (GRN no.) & Service sheet number and given to accounts dept.. They will book vendor bill and give payment.
    Hope, it is useful for you and solve your requirement.
    Regards,
    K.Rajendran

  • Use of Material price from material master in billing of material services

    Hi,
    In material consumption cycle when material service is billed, the rates/prices  that are used for billing
    come from the service column in service master  whereas the functionality requires to bill on the actual material rates From the material master in MM.
    How can i get this done.I have already tried with pricing procedure configuration.
    How can i use the material price for billing purpose.What exactly i need to do.
    Please assist.
    Regards
    RAMIT

    Hello colleagues,
    I am working on the same topic right now.
    I've done the following steps:
                                   1). Service Rule R24
                                   2). Default Material Service
                                   3). Mode 2 for a material in a material master data
                                   4). A condition table
                                   5). An access sequence for this condition table
                                   6). A condition type
                                   7). A pricing procedure: with the formula 510
    I have two questions:
    1). The system creates an invoice at cost zero when the calculation type of the condition is"Percentage" in the condition type.
    The system creates an invoice at cost nonzero - when the calculation type of the condition is "Quantity" in the condition type. In this case I define an amount for a material directly in the condition.
    I want to use a price of material based on a material master data. Could you please tell me what must I do for that?
    2). I don't maintain a material directly in a material consumption view: I create a good issues for a case and the system creates a record in a material consumption view. In this case the R24 doesn't work: a default material service isn't created by the system based on a material in a material consumption view. (R24 only works when a material is maintained directly in a material consumption view).
    Did somebody face with the issue? Do you have any idea how can I fix it?
    Thank you very much for your time.
    Kind Regards,
    Alexander.

  • Material and Service in a Single Line Req

    Hi
    We hv a requirement of material and service in a single line item, Exampls is client ordering some fabrication work to one vendor. It involves both matl and service changre.
    For the matl cost we need to calculate VAT and for the service charge we need to calculate service tax.
    For ex 1000 is the total amt for a line item. In this 600 to be calaulated for VAT 4% and for balance 400 to be calculated as serv tax 12.5%.
    The same is happening in sales and they can be do this. How tro do the same in MM purchasing.
    Vijay

    Hi
    Can it be possible to make a PO only one line item. Say item 10 thats only one item. That line 10 have both matl and service.
    Both matl tax and service tax need to be calculated for the line item 10.
    Is this possible.
    Client dont req these as 2 line items. Here the scenarion and req is like that.
    Vijay

Maybe you are looking for

  • Using complied Matlab in Labview

    I have a Labview vi that uses Matlab to do calculations and plotting by calling a matlab script in Labview.  I also have complied that same Labview vi so it can run on other machines without labview, but the machine must have Matlab since the vi call

  • Iweb file management

    Hi All I've got a couple of questions hope some one can help. I've produced a 6 page site with iweb using the templates. i have an image that appears on every page (footer) i've placed the image into Media folder and fixed the links to it in the html

  • Why is syncing taking so long?

    It has taken all night to back up and sync. In my task man"ager it says it is "running". In the sync window it had finished backing up but it says, "Starting Sync" and has said that for a while, but the task manager says it is running.

  • Can No Longer Create an Event

    I can no longer create an event in iCal on my iMac.  The new event menu does not appear when a ginve day in double clicked.  This issue arose after attempmting to sync via iCloud to my iPad3 and iPhone5.  Any suggestions?

  • Icloud control panel not an option for me now what????

    We are running and exchange server XP Pro and Outlook 2003 is all I have at work.  I don't have access to Vista or Windows 7 nor outlook 2007 or 2010.  All want to do is transfer my yahoo calendars to icloud calendars.  From the searches I did I foun