Budget availabilty control error

Dear Gurus,
I am facing problem while doing time sheet booking at WBS ELement. System gives error "Budget exceeded for the WBS (Error no:BP 603)"
The steps I follow are as under:
1. I created a project in CJ20N
2. Budgeted the project in CJ30
3. Released Budget in CJ32
4. The settings of the budget profile are such that when I release the budget, Availability Control gets activated.
5. Released the project
6. In CAT2, I post actual hours and give reference of the reciever WBS of the project.
Now, in CAT7, when I try to transfer to CO, system gives me the error:
"Item 001 WBS xxxx BUDGET EXCEEDED (error no. BP 603)"
Same thing happens if I try to settle a work order on the WBS and any FI posting
But it allows to post costs for Goods issue.
In tolerance limit settings, the usage is 100% and "All activity grps " is selected
Regards,
VDS

Hi
It seems to be the budget is increased once ur doing CAT7.. so increase the Budget in the WBS element and try to post it again..
I hope this is the problem
- Pithan

Similar Messages

  • COST ELEMENT WISE BUDGETING AND AVAILABILTY CONTROL

    Dear Experts,
    I am looking at Cost Element wise Budgeting and Availabilty control in internal Order, Availabilty control also should be Cost element wise.
    Regards
    Deendayal

    Dear Surya Narayana,
    Thanks for your prompt response, well i know that Budgeting is at summary level, want to just explore any other way out, is there any possibilty to link planning to budget as plannig is done on cost element wise.
    you can also send me the details of budgeting and avaiilability control at dayal05 at gmail.com.
    regards
    Deendayal
    Edited by: DEENDAYAL RAMACHANDRAN on Mar 3, 2009 2:15 PM

  • Issue on availabilty control

    Hello Experts,
    Requesting your suggestions/solutuon to the below issue on availabiltiy control.
    Few days back we faced a issue that , the AVAC status set for the projects automatically gets deactivated and we were not able to set the AVAC status back through CjBN or any other direct methods.
    After investigation we could find that , since Availabilty control activation type is set as'1' which means the AVAC status should get set whenever a budget is assigned to the project. We could find that by just editing already existing budget in CJ30, automatically actiavted the AVAC status.
    Now the problem we are facing is that , this status is getting decativaed again. What could be the possible reasons ? anyone has faced such issue, please share your experinece/suggestions.
    Thanks in adavnce
    Sandeep

    Hi sudhir,
    Thanks for your reply.
    Is there anyway , we could check whether CJBW is run for that project or not ?
    I have checked for the project structure , but no chnages to the structure is made after the AVAC status is set for that project. so i assume this( problem)  is not due to any chnages to the project structure.
    Similarly can i see somewhere, if any transcation like CJBW or some postings have been done against the project, which could possibly deactivate the AVAC status ( just a guess).
    Is there any such reports ?
    Please let me know.
    thanks and regards
    Sandeep

  • Budgeting & Availability Control

    Hi Gurus
    We had activated Internal Order Budgeting & Availability Control check & had used it to procure Fixed Assets. The internal order is created (t-code KO01) & budget value is assigned (t-code KO22). The internal order is assigned to an asset (t-code AS01). This asset is used for procurement in MM module - purchase order (t-code ME21N), goods receipt (t-code MIGO) & subsequently invoice verification (t-code MIRO).
    We have a unique situation. Some of our colleagues have created the order, assigned the order to the asset & completed the procurement cycle without assigning the budget. Now we would like to assign the budget to the internal orders we had missed & would like to check the availabilty control for all the transactions we had carried out. Is there a way to meet our requirement. What are the alternatives available to us?
    Thanks,

    Hi,
    I suggest you collecting the data on these orders (KOB1/KOB2), sum up the amounts and check what budget these orders required. There is no retroactive availability check possible. You can switch it on, but it will be active only for future postings.
    Regards,
    Eli

  • Budgeting and control system

    friends,
    we implemented fi, co, mm, sd, pp and project systems. we want to implement budgeting and control system. what is the exact flow of BCS in between these modules,
    regards,

    Hi,
    Prepare Funds Management Installation
    When implementing the Funds Management Government component, you should take care to carry out the individual steps in a particular order. You enter the required preconfigurations and functions at different points in the SAP System.
    So when implementing Funds Management, you should observe the following sequence:
    1. You use the "Enterprise Structure" to create company codes, FM areas, and controlling areas. For more information, see the Enterprise structure IMG in sections:
    a) "Define, Copy, Delete, Check Company Code"
    b) "Maintain FM Area"
    c) "Define, Copy, Delete, Check Controlling Area"
    2. You then assign an FM area to each company code and controlling area relevant to Funds Management.
    For more information, see sections:
    a) Assign company code to FM area
    b) Assign controlling area to FM area
    3. You create your G/L accounts in the General Ledger Accounting menu. For more information, read the chapter: Create G/L accounts in the G/L accounting IMG (FI-GL) under G/L account master records.
    4. Use Financial Accounting customizing to maintain the field status definition groups. These determine which fields in the account can accept input, must be maintained, or are hidden, when you are entering business transactions. For more information, read: "Maintain field status variants" in the Financial Accounting Basic Settings.
    Note that the additional account assignments "Commitment item", "Funds center" and "Fund" will only accept input if you mark the relevant fields as required or optional entries. This applies, however, only to G/L accounts whose commitment items are assigned with the 30 such as a revenue account. G/L accounts whose commitment items are assigned with a transaction other than 30 should have the error hidden.
    If you want to reference earmarked funds when posting a payment, you must define the additional account assignment "Earmarked funds" as a required or optional entry.
    5. Likewise, for Materials Management purchase requisition and purchase order postings which do not go into stock, you must flag the "Commitment item", "Funds center" and "Fund" fields as required or optional entries in order to be able to make entries in them. You can find more information in the Purchasing IMG in section "Maintain account assignment types" .
    6. If you want to integrate inventory management with Funds Management, there are different ways of controlling this, depending on the warehouse concept you chose. For more information, go to the Funds Management IMG and read sections Make Other Settings and Integration with Inventory Management.
    7. If you want to integrate Assets Accounting, you must go to the Funds Management implementation guide and flag as budget relevant the transaction types for the individual transactions (acquisitions and retirements). You can find more information in the IMG Funds Management Government in the section Flag Transaction Types as Budget Relevant.
    8. If you want to integrate Payroll Accounting with Funds Management, you must define funds centers and funds for the individual Infotypes. For more information, see the Funds Management IMG Funds Management Government in the section "Define Start Date for HR Integration (Without HR Commitments Scenario 2)".
    9. If you want to integrate Travel Management with Funds Management, the "funds center", "commitment item" and "fund" fields must be ready to accept input when you post in Travel Expense Accounting. You enter these settings in the Travel Management IMG Dialogue and settlement control -> Screen layout for trip data input -> Set up variable construction for account assignment objects.
    10. You switch to the Funds Management application menu, create your master data (commitment items, funds centers and funds) and then define your account assignment derivation.
    For more information on account assignment derivation in Funds Management, see component Funds Management (PSM-FM) under Account Assignment Derivation as well as section Define Account Assignment Derivation.
    For more information on creating master data, see the component Master data in the componentFunds Management (PSM-FM).
    11. You can then subsequently make the remaining settings via the Funds Management implementation guide. For more information, read the following chapters.
    Further notes
    The Funds Management application component can not be used simultaneously with the components Cash Budget Management and/or Project Cash Management if you use year-dependent master data in Funds Management.
    If you want to use Funds Management with Cash Budget Management and/or Project Cash Management you must note that Cash Budget Management and Project Cash Management only process 10 character commitment items.
    Regards,
    Eli

  • Budget avilablity control

    Hi,
    I would like to have the avilablity control as below.
    I have created the budget and not released it and activated Budget avilablity control in CJBV.
    In this stage, i cannot cost plan deatil planning through actvities as system is throwing the error No budget is released. I can plan the cost on WBS Cost plan. It is accepting.
    When i release the project and confirimng the actvitiy, system is throuing the error as no budget. Its fine with me as long as i can plan the cost on WBS Level. Is any other way to plan the cost for network activity basis without getting the error.
    Even its throing the Error when i am trying create a reservation for any material. I want reservation to be created without any error and also system should thro the error when iam trying to do the Goods issue.
    And also i do not want system should thro the error when doing the Goods issue.
    I removed the actvity group for goods issue and tryed. Its not working out.
    Any other way to solve the problem.
    Regards
    N.Raju

    Hi, Thanks a lot.
    Iam creating a PR Thru PS Only. Its ok if iam getting the error as No budget.
    I want Reservation to be created if the material is in Stock and when i will try to do GI to the Project, system should thro the error as No budget and you should not take the material in to project for consumption.
    If i do exempt cost element group, it will even allow to to GI even though No budget. This should not happen.
    And also is there any way, i can plan the cost in network activities. Iam doing the Planning through Work centers. Without budget its not allowing to Plan the cost at Actvity level. It is allowing at WBS Element level.
    Regards
    N.Raju,

  • How to control errors in BPM

    HI all,
    We are developing a quite complicated BPM. We need to controle errors in File Adapter, just in case the comunication channel cannot write/read (for example with a wrong FTP account). In case of error we need to send an email. So we are trying to develop a module in the file adapter. We are not sure about behaviour of the BPM if one of the steps have an error. I mean the execution of the module will continue the BPM in case of error in the file adapter?
    Many thanks in advance
    Regards
    Noelia

    Hi Noelia,
    CCMS is SAP Computing Center Management System.  RWB is smoothly integrated with CCMS and CCMS alerts can be viewed thro' the Runtime WorkBench.
    First configure CCMS in XI System:-
    /people/sap.user72/blog/2005/11/24/xi-configuring-ccms-monitoring-for-xi-part-i
    For Monitoring in the CCMS:-
    http://help.sap.com/saphelp_nw04/helpdata/en/4d/6272376d3bfa2be10000009b38f8cf/frameset.htm
    Go thro' this link for configuration scenario:-
    /people/aravindh.prasanna/blog/2005/12/23/configuring-scenario-specific-e-mail-alerts-in-xi-ccms-part--1
    Hope this helps.
    Regards.
    Praveen

  • Integrated Budget in controlling

    Dear Guys,
                         My Client required integrated budget in Controlling. I will explain the scenario
    1. They are preparing Sales Plan by Marketing People.
    2. Based upon sales plan they verifying there capacity and requirement of material cost.
    3. Costing depot arriving material cost based upon the last purchase.
    4. finally costing depot adding O/H and arriving their operating profit.
    Right now they are following  in Excel Sheet now they are asking in SAP thru CO Module.
    Any one have idea about this , If you have any material regarding this pls forward to me.
    Thanks and regards
    avudaiappan

    COPA - Planning > Transfer of quantities from COPA to SOP-> Long term planning in PP> Transfer of activity hours to Cost center accounting-> COPA report on profitability

  • Elicense control error

    Hello all.  Everytime i try to start logic without my nexus license dongle i get the eLicense control error and logic refuses to start.  The problem is that I do a lot of work in logic on the plane and in hotel rooms and don't always have my license key handy.  I should still be able to work on that session and just not access those particular plug ins unless i have the key installed.  I don't see why i cannot even get the session to open.  Does anyone know a workaround for this.  I am buying the uad satellite bundle and im sure im going to have the same problem with this.  But my main goal is to be able to open any track and work on a particular part weather or not my license is plugged in.  This is how it is in ableton.  The session will open but i just cant access nexus or UAD.  PLEASE HELP

    Boyd Ostroff wrote:
    I wonder if you could setup two separate accounts on your laptop and only install nexus on one of them? Not sure if the nexus software is installed into the user library or a global location, but seems like it would be worth a try.
    Excellent suggestion....
    If that doesn't work the OP could just move the Nexus AU out of the Components folder before starting an "on the road" session.
    That would be in Root/Library/Audio/Plug-ins/Components
    Logic never did have graceful exit strategies... if it finds something amiss it often tends to freeze or crash.

  • Transaction Control Error

    Hi,
    i am getting "Transaction Control Error" in newly created Client while executing any tcode. can you please give the solution for this.
    venkat

    Hi,
    i copied from 000 client to new client. it was successfully completed. After that if execute mm01 or mm02 transactions this type error i am getting. Can you please give the solution..
    venkat

  • Error when re-starting an SQL Server Instance from VBA - [SQL-DMO]Service Control Error: Access is denied.

    Our Application needs to have the use of the [Named Pipes] and [TCP/IP] Protocols.  To save our Users the hassle of having to enable them manually our application has always done it for them and then stopped and restarted SQL Server.  However
    since the advent of Vista and Windows 7, the restart stopped working.  We solved the problem by detecting the failure to re-start and giving Users sufficient instructions for them to do it themselves.  Since this only occurs during installation on
    the Server, this approach has not been too much of a hassle.  However we would like to tidy this up if possible. This the VBA code that is causing the problem:
        obj_SQLServerInstance2.Start _
            g_SQL_UseWindowsAuthentication, _
            SQLServerInstance, _
            UserName, _
            Password
    This still works when run under XP, but fails under Windows 7 with the Error:
    [SQL-DMO]Service Control Error: Access is denied.
    Does anyone know how to resolve the problem?

    This still works when run under XP, but fails under Windows 7 with the Error:
    [SQL-DMO]Service Control Error: Access is denied.
    Hello Brian,
    Under Windows 7 you have to run the VBA script with admin permission, a normal user don't have permissions to start/stop services.
    Olaf Helper
    [ Blog] [ Xing] [ MVP]

  • Can Budget Availability Control be turned off at WBS elements Level?

    For Project and WBS elements, we activate the budget  availability control in the budget profile and assign the budget profile to the Project. So once we budget one WBS elements under that project and release the project, the availability control is active for all WBS elemens under this project.
    My question is whether we can turn off the availability control for one WBS element under that Project and let the availability control on for the other WBS elements under that project.
    thanks,
    Ting

    Hi,
    I doubt if this can happen. CJBW will deactivate avalability control for entire project. Try OPSX for that particular WBS, it will reset budgeted status. Not sure if this will help, try and confirm.
    One more way could be assigning userstatus to the WBS and restricting 'Availablity control' by that status. This option looks more practical.
    Regards
    Edited by: Shrikant Rakate on Sep 10, 2008 9:21 AM

  • How do I fix "could not be added to AVI control" error?

    How do I fix "could not be added to AVI control" error? I get this error when loading a file via the Clip/Insight Player.

    Hello acacord,
    are you working with an AVI using the Indeo codec? On Windows XP, after
    installing the service pack 2, files using this particular codec cannot
    be played if they are placed in the temporary Windows folder. This is
    due to Windows restrictions, not to CLIP.
    If you run a cip file in CLIP, it would unpack all its content
    (including the AVI) to that temp folder and play the video from there -
    which is not possible.
    With the current version, all CLIP examples are using the Radius codec
    instead ov the Indeo. As you can see ich you make a test with one of
    the example projects - it is working well.
    So in your case, just use a different codec than the Indeo.
    Ingo Schumacher
    Systems Engineer Sound&VibrationNational Instruments Germany

  • ChiliBean Control error '800a03e8'  java.lang.NoClassDefFoundError

    hi all,
    http://forum.java.sun.com/thread.jspa?forumID=759&threadID=5019680
    in reference to the post above, i have a Win2003 server running Sun ONE with Chilisoft ASP plug-in. i did the suggestions there but am still getting the same error, to be exact:
    ChiliBean Control error '800a03e8'
    java.lang.NoClassDefFoundError: MyHelloWorld
    /myhelloworld.asp, line 3
    <html>
        <% Dim mhw, mhwString, mwh1
    REM    Set mhw = NewJavaObject("MyHelloWorld")
           Set mhw = Server.CreateObject("Chili.Beans")
           Set mhw1 = mhw.Construct("MyHelloWorld")
           Set mhwString = mhw1.myString
           Response.Write(mhwString)
        %>
    </html>
    public class MyHelloWorld {
         public String myString = "Hello World!";
    }hope you could help me out.
    thanks in advance :D

    hi all,
    http://forum.java.sun.com/thread.jspa?forumID=759&threadID=5019680
    in reference to the post above, i have a Win2003 server running Sun ONE with Chilisoft ASP plug-in. i did the suggestions there but am still getting the same error, to be exact:
    ChiliBean Control error '800a03e8'
    java.lang.NoClassDefFoundError: MyHelloWorld
    /myhelloworld.asp, line 3
    <html>
        <% Dim mhw, mhwString, mwh1
    REM    Set mhw = NewJavaObject("MyHelloWorld")
           Set mhw = Server.CreateObject("Chili.Beans")
           Set mhw1 = mhw.Construct("MyHelloWorld")
           Set mhwString = mhw1.myString
           Response.Write(mhwString)
        %>
    </html>
    public class MyHelloWorld {
         public String myString = "Hello World!";
    }hope you could help me out.
    thanks in advance :D

  • Position Budgeting and Control

    Dear Friends,
                         Can antyone please tell me what is he function of and purpose of node "Position Budgeting and Control".
    i have searched alot about it and all I come to know about it is this that it is soe how realted with PCP and Payroll simulation but I am not getting any sense out of it .
    i mean why to use it. on using it what advantages could be attained in Personnel Cost Planning and Simulation and as well as for Enterprise Compensation Management.
    Currently we are implementing PCP and ECM so wanted to know if position budgeting and control woudl have any realtion with it. its importance while implementing PCP and ECM. and suppose f we dont implement this node that what we are loosing.
    your help and support would be highly appreciated.
    Regards

    Hi, I have lots of written information about Position Budgeting and Control, one of them a nice white paper mhich may give you an understanding of the principles. We evaluated it at a customer and decided "only" to implement PCP. As I understood PBC uses PCP as a motor for collecting plan data, but you will not be able to do detail planning f.ex, as in Personnel cost planning. So as I understood it is amongst others a way of collecting HR financial data from a data basis and integrate it with Financial, a bridge between HR and FI. The commitment processor is the engine for this integration, if I've understood it correct. I can't say that I fully understood the principles either, but if you like I may provide you with some documentation. Do not know how to reach you, though. I also have a comment from a PBC-expert, maybe this will enlighten you (FYI: this is taken out of a context):
    "...PBC is not intended to do detailed budgeting. PBC main feature is the possibility to create commitments / encumbrances and reserve this budget based on salary expenses.  Customers usually spend a big part of their budget in salaries, so this tool offers them the chance to monitor and control this effectively by reserving the budget they will need for a certain period of time (usually the fiscal year) and being able to monitor if there are budget deficiencies in case of salary adjustments or new hires.   PBC only uses the budget from FM to post agains it, but in no way pretends to offer a tool to manipulate this budget, plan or make decisions against the whole budget..."
    Regards

Maybe you are looking for

  • Error in Data selection in R/3 Generic Extraction Using function Modules

    Hi Friends, I have created a a generic data source using function module to load data from PA0000 and PA0001 Tables ,Function module is working fine when i execute it indipendently and  the data source is also working fine when i extract data using R

  • 21" iMac getting white screen and does not boot up

    Hi All! This is my first time to post here but have been using Mac OS since 2009. I am having issues with my  Mid 2011 iMac 21". I keep  getting a white screen and it does not boot up. I am a bit technical so I have done all the necessary steps as be

  • Not able to safely remove USB drive while Labview is open

    To all the Gurus, I am using LabView 8.5 and have made an Application which requires user to download data from USB drive/stick. So when VI runs user asked to select a .TXT file from USB to download. Here whole operation completes as desired. ONLY PR

  • Create report from 2 databases where one DB is a subset of the other

    I am pulling data from two databases (DB1 and DB2).  DB1 contains all records and DB2 contains only a subset.  The databases hold different information but each has a common primary key to link them. I want to create a report that shows all records. 

  • Column selector addition on drill down.

    Hi,, Problem: Can we dynamically add column selectors for those column which appear after drill down... Details: we have a report where we have 3 columns, A, B 1st & 2nd columns have selectors on them... 1st col -> Select A or B 2nd col -> Select B o