Calculation of start date with backward scheduling

Dear all,
I am facing an issue related to backward scheduling. I have requirement in which whenever backward scheduling is used, system should calculate from last activity to first for calculation of schedules which is fine. But when running scheduling i am giving finish date as input and system is always using start date as current date and not calculation last date from last. For example if i input finish date as 15 feb 2015, and there is only one activity of 15 days, system should count start date from 1 feb 2015. Please help me how i can achieve this, currently its always putting start date as current date.
My current settings are--
Project definition-  WBS Scheduling profile-  Backward scheduling
                              scheduling scenario-  Free scheduling
Network-      Planning type- basic dates
                    Scheduling type- Backward
Please help.
Thanks

Dear all, this issue is resloved. Reason was that by default i am using forward scheduling for all project but in case of backward scheduling, user change schedule type at project definition and network. I was removing start date and putting finish date and running scheduling. Missing step from my side was i need to first copy date from top to down than run scheduling again.
Thanks.

Similar Messages

  • Basic finish date earlier than basic start date while backward scheduling

    I am encountering an issue where in when I am selecting backward scheduling for a process order and I am entering the Basic finish date, afte which system is giving me a Basic startdate which is after the basic finish date.
    For eg:- When i give the basic finish date as 08.12.2011, system is giving me basic start date as 09.12.2011
    I have checked the recipe of the material. In the recipe one major flaw that i found out was that all the activity timings were maintained as 0. But when i created a similar scenario in the testing client, i am not getting the issue.
    Please help.

    Hi,
    Check what is maintawined in number of days the start day is allowed to be in the past in scheduling parameters of the order type, in OPU3. If there is an opening float defined in schedule margin key of the order, and concerning this float backward scheduling finds a start date which falls into past, lead time scheduling will automatically switch to forward scheduling starting from today. 9.12.2011 could have been deducted this way. Also check the factory calendar if days upto 9.12.2011 are defined as working days.
    Regards.

  • Task Scheduled Start Date with RAPI

    Task Scheduled Start Date with RAPI
    Is it possible to have a scheduled start date for a task in a service that is generated by RAPI, and, which does not have any authorizations/reviews? RAPI seems to throw the request into the service delivery moment without calculating the tasks even if I supply a date onload (in a field for the task start date to use). It works fine if there are authorizations or reviews, which is expected, but I can't get it to work without them. Thanks!

    Fascinating. As a workaround could you try throwing in a dummy authorization? For example, externalize it with ServiceLink dummy and autocomplete adapters, or keep it internal, but conditional with a condition that would always be false.

  • How can I  get System dates  with time scheduler using threads

    how can I get System dates with time scheduler using threads.is there any idea to update Date in my application along with system Date automatic updation...

    What the heck are you talking about and whatr has it to do with threads?
    Current time: System.currentTimeMillis. Date instances are not supposed to be updated.

  • Process/Production Order WIP Reverse on Month starting date with postiing d

    Hi Experts,
    Is it possible to reverse the WIP of Production/Process Order at month starting date eg. 01/07/09. Posting date & Document date should be: 01/070/09.
    In my current project production is batch management system. Some of the batches start at month ending days (Eg. 29/06/09) for we calculated WIP at dated: 30/06/09.
    My Client wants to reverse that WIP next day, month starting hours Eg. 01/07/09 but while reversing the WIP system is posting the WIP reversing doc. posting date is 31/07/09.
    Same batch which started production on 29/06/06 is closed at 03/07/09 as well as goods received same date. FG Stock A/c updated in accounting books.
    At the same day If I print my trail balance system showing the Stock value double (WIP stock as well as FG stock)
    First Month
    Eg. Process Order WIP at 30/06/09                              : 50000/-INR
    Second Month
          WIP Reversal Posting date:31/07/09 by system     : 50000/-INR
          FG Stock received at 03/07/09                               : 50000/-INR
    If I Print Trail Balance on 03/07/09 system shows        : 1, 00, 000/-INR (based on Posting date)
    Which is wrong..
    Please tell me the way for Change the Posting date of WIP reverse document. OSS guys are replying as consulting issue. 
    I am waiting for your valuable reply.
    Thanks & regards
    Bhagiradha

    In KO88, CO88 Select Menu bar Extras-> Posting date
    Enter Posting and execute
    Thanks for Rajesh (SAP Labs)
    Thnaks & Regards
    Bhagiradh

  • Dates for Backwards scheduling when MRP Run

    Hello experts,
    When MRP run, which calendar does SAP take to schedule planned orders? where could I indicate it?
    Thanks in advance.
    Laura

    Thank you all,
    I have checked the calendar that is assigned to my plant, and, as you have said, is the one that is taking into consideration to determine the dates.
    In my case, Saturdays and Sundays are not workdays. As a result, every purchase requisition has its release date assigned to a workday.  What I have noticed is that although Saturdays and Sundays are not work days, planned delivery time and In-house production time is taking them into consideration to calculate the release date. What I mean is that those two fields are defined as calendar days. Is that correct??
    Thanks again.

  • Calculation logic for date with respect to time.

    Dear all,
    In BI, i want to get the time for two different dates - how to caculate this
    For example
    Initial date :- 01.08.2007
    Final date :- 24.08.2007  - I want system to calculate the total hours between these dates - the logic should also be applicable if years,months and days are different.
    Regards,
    M.M

    Dear ....
    By subtracting final from the initial we will be able to get if the difference is only in days but if the month or year is differing will the same logic hold good - kindly explain?
    Regards,
    M.M

  • Start date is in the past: today scheduling

    Dear all,
    How can I fix that error:
    *Start date is in the past: today scheduling*
    *Message no. C7030*
    Diagnosis
    The start date determined in scheduling is in the past.
    In customizing, you have defined the number of days that the start date is allowed to be in the past.  This number is exceeded.
    System Response
    "Today" scheduling is carried out.
    how can i definea new number of days ???????????

    Open ur project in Planning board then go to "Settings->options"
    and enter number of days in the "Start in past" filed more than difference between todays date and Project Start date. Then Scheduling will consider the Project start date as Scheduling start date. Otherwise system will do "Todays scheduling" and it will reset the Project start date to todays date.
    Venkat

  • How to include print date with time on SkillBuilders Schedule Plug In?

    Hi,
    Do you have an idea how to include and get the print date with time on the SkillBuilders Plug In? It shows me the date only, time not included. Have tried to put "HH24:MI", "HH24MI" or Tochar(HH24:MI)? No result??
    select p.fullname, sbip_schedule.start_date(e.event_schedule) start_date
    , sbip_schedule.end_date(e.event_schedule) end_date
    , sbip_schedule.duration_seconds(e.event_schedule) duration_seconds
    , sbip_schedule.calendar_summary(e.event_schedule) calendar_summary
    from app_events e
    Thanks!

    I forget to clarify I am looking for the answer is how to get the print of date with time, Start date with time and End Date with time.

  • Early schedule start date, early schedule finish date

    I want early schedule start date, early schedule finish date and project cost plan in my report. This is a PS requirement. In the standard cube (0PS_C02) I can find actual start date and actual finish date. Has anybody used early schedule start date and early schedule finish date in the reports? If yes then did you get it using standard cube/ODS or you went for enhancement?

    HI,
    He have to go for few tables in which u can find all the data.
    Firstly u have to enhance the datasource .
    First go to table AFKO here you insert  AFUNR (Order Number) this table you will get AUFPL .
    Then take AUFLP and go to AFVV table and insert AFUPL . you will get all the activites and all dates of each activity  for example early start date ,early finish date, foirecost date etc.
    Thanks and Regards
    Dinesh

  • OIM 11g - User Not enabled After the job "enable user after start date"

    Hi,
    I have a future hired user in OIM whose start date is set in OIM. The status of the user in OIM is 'Disabled Until Start Date'.
    After the start date has passed and the scheduled job 'enable user after start date' is run, I see that the user is still in the status 'Disabled Until Start Date'. I re-run the scheduled job 'enable user after start date', this time manually, still the state of the user remains unchanged.
    Please help in troubleshooting as to find out the root cause of the issue and a workaround/solution, if possible.
    This issue is intermittent and has happened with quite a number of user. Any pointer would be helpful.
    Regards,
    Sudipto S.

    I agree with Nayan.
    One alternative approach can be to write your own custom scheduler which can overcome the limitation of OOTB scheduled job 'enable user after start date'. Let the OOTB job get executed first. After it, your custom scheduler should fire a simple SQL Query:
    SELECT USR_KEY, USR_STATUS FROM USR WHERE (USR_START_DATE > SYSDATE -1) AND USR_STATUS='Disabled Until Start Date';
    //Means those users who are supposed to get enabled today and are still not yet enabled and are in 'Disabled Until Start Date'. May be 2-3 user keys at max will come...
    As you said it happens only intermittently and not for all users... So, let the OOTB scheduled job take care of most of such users... And after it has finished, if any user still remains in 'Disabled Until Start Date', your custom scheduler should enable it via using tcUserOperationsIntf.enableUser(userKey);
    Using API is always better than database update... Because APIs trigger downstream provisioning workflows as well and not just updates OIM Database...
    Keeping your constraints in mind, I think it is the correct answer.

  • Production finish date differs from basic finish date in backward schedulin

    Hi, experts.
    When i do scheduling the planned order,
    production finish date differs from basic finish date in backward scheduling as below.
    Scheduling: Backward
    Basic finish date : 2010.01.22
    Basic start date : 2010.01.21
    Production finish date : 2010.01.23  09:00:00
    Production start date ; 2010.01.22 03:57:09
    *GR time : 0.
    *Scheduling Margin key : 0.
    I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
    Please reply me.
    Thanks.

    Dear Jong,
    1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
    2) you must find a exception Mssg for that plan order in MD04
    3) basic scheduling take the time from material master & lead time scheduling will take time
    from Routing
    Regards
    Madhu

  • Re : Backward Scheduling

    Hi
          How to set transit time, Picking time, Packing time for the required delivery date in Backward Scheduling Process.
    Thanks
    Mani

    Dear Mani,
    Example of Backward Scheduling for In-House Production
    Example Data
    Requirements date
    25.6. (Friday)
    Goods receipt processing time
    2 days (workdays)
    In-house production time for the material:
    6 days (workdays)
    Opening period
    6 days (workdays)
    Workdays = Monday to Friday, no bank holiday
    Scheduling
    Requirements data minus goods receipt processing time = order finish date
    25.6. (Friday) minus 2 workdays = 23.6. (Wednesday)
    Order finish date minus in-house production time = order start date
    23.6. (Wednesday) minus 6 workdays = 15.6. (Tuesday)
    Order start date minus opening period = order opening date
    15.6. (Tuesday) minus 6 workdays = 7.6. (Monday)
    Example of Backward Scheduling for External Procurement
    Example Data
    Requirements date
    31.10. (Monday)
    Planned delivery time of the material
    10 days (calendar days)
    Processing time for purchasing
    1 day (workdays)
    Goods receipt processing time
    2 days (workdays)
    Opening period
    10 days (workdays)
    Workdays = Monday to Friday
    Scheduling
    Requirements data minus goods receipt processing time = order finish date (provision date for vendor)
    31.10. (Tuesday) minus 2 workdays = 27.10. (Friday)
    Order finish date minus planned delivery time minus processing time for purchasing = release date for purchase requisition or order start date of planned order for external procurement.
    27.10. (Friday) minus 10 calendar days minus 1 workday = 16.10. (Monday)
    Release date minus opening period for planned order = opening date of planned order
    16.10. (Monday) minus 10 workdays = 2.10. (Monday)
    I hope it will help you,
    Regards,
    Murali.

  • Define start date in SNP interactive table of planned order

    hi,
    does anyone know how to control the start date and the scheduling of planned order created in the SNP interactive table?

    Hi Arieh,
    For SNP Pl.Order the standard SAP APO behavior is to control the availability date (End date).
    To control Start date you have to convert SNP Pl.Order in PP/DS Pl.Order. Then in the PPT1, production periodic view you can change by start date if you change the strategy to Forwards.
    Regards, Marius

  • Appointment - End Date/Time to be default sames as Start Date/Time

    When a sales rep chooses a “start date/time” to schedule an appointment in CRM, can the “end date/time” be updated as same as “start date/time”?
    E.g. Select Start Time: 4/5/2010 10:00AM, then the End Time: 4/5/2010 11:00AM should default to the selected Start Time.
    Thanks for your help.
    Edited by: MaheshCRM on Mar 23, 2010 4:06 PM

    Hi Narendra
    Function mdoule STU3_ALERTS_CONV_UTC_2_LOCAL may help you in order to solve your issue. you may use it in user-exit.
    regards
    M.

Maybe you are looking for

  • How to change the fontsize of LinkToAction's Text....

    Hi All, I am using LinkToAction UI Element. In the text property of this UI Element, I had given as "_signin_". But now I want to change the font size of that and I want to remove to underline of that. Is there any code to do this.because there is no

  • POSTING_INTERFACE_CLEARING - deselecting lines

    We are using POSTING_INTERFACE_CLEARING to perform clearing. We need a way to restrict (deselect) certain line items (as you would do in FB05 manually by double-clicking). Is there a user exit / BADI that performs this functionality? Any other sugges

  • What are the Manual check Deposit Tables and  Fields(FF68)

    Hi Gurus, I have reqirement to get get Details about  SlipNO,Cheque NO,Cheque Date,Posting Date, Party code,Bank key,Currency ,Amount,Bank Account,Value Date,Entry Date,Banker's name. could u help me Thanks in Advance Sivakumar.

  • InDesign CS3 VB Set Ink Alias

    How would I set the ink alias (Output panel of the Print dialog box) for all non-process colors to Process Black using VB Script? Thanks, Archie

  • Leopard on new mac mini

    Can I install leopard on the new mac mini A1347 ?