Can cash advance check against internal order budget?

I thought only cost elements can check against budget or statistical asset elements. But for AP balance sheet (cash advance via special GL), is that even possible?
Please advise.
Thanks in advance.

No Padmaja, Down payments made can be checked against budget using PS module
you specify a cost element in IMG to be used in the case of down payments and this is used to update PS module
Regards
Ajay M

Similar Messages

  • Internal Order Budget Check for PO with reference to PR / RFQ

    Hi All,
    I have a scenario where the budget availability control is not working for PO created with reference to PR or RFQ. While creating the PO if i modify the PO value more than RFQ or PR value then system is looking for budget control.
    If we create a direct PO system is checking for Budget control where the PO value is more than availability budget.
    We have the budget control check with internal order for services and non stock material based on substitution rule created for cost element group and cost center group.
    In tolerance limits budget availability control we have not activated for PR, itu2019s activated from PO.
    Kindly let me know what is the reason for budget availability control is not active where the PO is created with reference to PR or RFQ.
    Thanks & Regards,
    Rama Mohan

    493900 - FAQ: Release Strategy:
    It is not possible to create a purchase order if the referenced purchase requisition is not released. But the system allows you to put the purchase order on hold and then release the purchase requisition.
    On the other hand you can create a purchase order with reference to an unreleased request of quotation.

  • Can we do Internal order budget at period level

    Hi
    Can we do Internal Order Budget at Period level ?
    if yes, please let me know how can we do budget at period level.
    Appreciate your help.
    Regards,
    Kishore
    Moderator: Please, search SDN

    Dear,
    Re: Budget with availability check
    Regards,
    Chintan Joshi

  • Internal Order budgeting not checking at the time of FB60

    Dear All Experts,
    Very Good Morning !
    I have configured IO budgeting with Overall Planning ticked budget profile. I have assigned budger profile to Order type also.
    In KO23 I have given limit also of Rs.10,000 /- for overall and yearly 2011 Rs,5,000 /-. In define tolerance I have maintained two entries as below : 1 is with 01 Group wich will check PO's and 2nd one is 04 Group which will check Financial account document. ( I hope this correct, If not please rectify me ). In tolerance limit I have given 3 as a error should throw.
    I refer this thread [Internal Order Budget - Availability Control|Internal Order Budget - Availability Control; from our SDN forum. I activated budget control from KO23 and referring KO30 now system is showing GREEN Availability control is active.
    Now when I am running FB60 with assignment IO, system is not throwing any error, warning , it remains normal posting is happening.
    If anybody has gone through the same issue, experts inputs / guidance will be very helpfull.
    Regards,
    Revati Joshi.

    Your tolerance limits are fine
    Let me put you some points here.
    Creating IO
       1. Investment Profile is mandatory for Capital projects
       2. If you are using Investment management, then check IM32, & IM52
       3. KO02 - Check  - Investments tab - IM Program and Position ID assinged or not
       4. Need to assign the budget in both Controlling area currecny and object currency (KO12, & KO22)
       5. Availability control should be Active - KO30
       6. Planner plofile - KP04 - Just press F4 and check - if there are any created for your controlling area
       7. Check if you have any line itesm already posted to the IO - KOB1, KOB2, KOB3
    Now, the actual plan is - KPF6 and KDF6
    Here you need to input the below details
    Version                    0
    From Period               01
    To Period                      12
    Fiscal Year          2011
    Order                                           input the order
                      to
             or group
    Cost Element                              which Cost elemtn you are going to post in FB60
                      to
             or group
    Enter those details and in next screen - give the amount for that cost element.
    Now o and post in FB60
    Hope it helps
    Thanks

  • Downpayment against Internal Order

    I have created a statistical internal order for Asset Under Construction and assigne iin Asset Master Record. Budget is also allocated.
    At the time of migo system give POP UP if value exceeded from budget.
    Client requirement is :
    1. Downpayment against Internal Order
    2. Need POP UP if downpayment is morethan budget.
    Please help.
    regards
    imdad

    Hi,
    Maintain cost elements for the down payments (OKEP transaction) and the budget will be checked in regular procedure. You can read more here:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/2a/f9f71b493111d182b70000e829fbfe/frameset.htm
    Regards,
    Eli

  • Internal Order Budget - Availability Control

    I have done the budget profile, entered the budget figures, created internal order budget with the required profile.  However, when I entered the fi document with this statistical IO, system does not give any message as per the tolerance setting actions.  I tried to run the activate availability control again.  But the system gives a message that availability control is not activated.  Why this is happening ?  Where can I see the availability control is activated for this Internal order ?

    Hi
    1. Check if your order is released
    2. Check in budget profile (OKOB) if activation type is "1" and whether you have checked "overall" or not....
    3. Hope you have defined tolerance limits against the combination of contr area and budget profile
    Regards
    Ajay M

  • PLM table for Internal Order budget, Actual Cost and Actual Hrs

    Dear all
    In cProjects version 4.0, we have integration with existing ECC 6.0. We create Internal Order manually and assign it to cProjects.
    One cProject  having one Internal Order.
    Resource Planning part is managed in cProjects while Actual Time keeping(CATS with reference to Internal Order), budgeting of Internal Order, Material and Service Procurement which is done against Internal Order is managed in ECC. ECC and PLM are separate systems.
    We have RFCs established to transfer actual hrs, budget and actual cost data from ECC to PLM.
    Which is the ABAP table in PLM where we get linking of cProject with Internal Order and also actual hrs, budget and actual cost data in PLM system?
    Thanks & Regards
    Ashish

    actual hrs, budget and actual cost data in PLM system?
    Its not there, actual hours can be found in DPR_Task but it needs to be transferred by running a report.
    The planned cost etc is also calculated at runtime and passed on to Costing object in ECC (Int order/PS)
    Actual hours will be in CATSDB in ECC
    needless to say actual cost will also be there in ECC and not in PLM, PLM only displays at runtime based on RFC.
    If you want to try, Break the RFC and try to check the Evaluation..
    Niranjan

  • Project-Internal Order Budget Control

    Concerning on the Internal Order Budget in SAP, we have the following questions & need clarification :
    1) Since the promotion involving SD module, could we enhance the SD module with Internal Order functions & budget control as well? According to the SAP help desk documentation, its possible, pls provide guidelines.
    2) I've checked on SAP helpdesk that budget data (including sales & promotion) could capture in COPA via I/Order & pricing conditions. Could we use budget cost in COPA to control the sales & promotion posting in SD module ? pls provide guidelines. We had just implemented COPA with plan but not budget. Could we add this budget as new value field ?
    3) I/Order can be updated through different cost elements but would system allow us to control budget by each cost element but only using one for all the cost element ? According to the helpdesk, we could split the I/Order budget by cost centres, transaction group or budget object. Does this similar to our requirement ?
    4) I/Order Budget will control the spending by actual posting data or commitment ? Could we control both at once ? Example :
    Budget             500k
    Actual posting     300k
    Commitment     300k
    Budget              -ve 100k  not  +ve 200k
    5)  Concerning on the issuance of Credit note requisition (CRQ), if we using manual process as entry as Park document then post to FI (currently) and not using PR/PO process, then, how would we have commitment data ?
    6)  During year end, we may need to perform closing and carry forward the I/Order budget and commitment balance to next fiscal year. Does this mean that controlling need to perform period close also and order settlement even its statistical I/Orders ? we didn't practice this in controlling currently.
    7)  I/Order budget is control annually. Once the budget I/Order completed fully, it cannot be used again. Hence, does this mean that we need to have different set of I/Order for different year?
    Please feedback to us the above soonest possible.
    Thanks..............
    Elaine

    Lot's of questions;
    1) At the time of entering a sales order you can enter an Internal oder number as well. That then could be used as part of a tracking process.
    2) You control the budget by setting up availability control. Then at the time of entry it checks against the budget to see if you are within you tolerances. Youn can also have reporting in COPA to compare actual to plan and budgets. But there won't be the availablity control. It will be analytical reporting instead.
    3)The budget for internal orders is one total. You won't be able to set it up for different cost elements there.
    4)The availability control looks at all the components. Yes you can control both
    5)The credit will be picked up when posted as an actual posting
    6) You will need to do carryforward for all I/O.
    7) You can set up the budgets to be for a particular year not overall for I/O.
    try to limit the size of your questions in the future to make the response easier
    pls assign points if helpful as a way to say thanks.

  • How to block entry through internal order budget in F-02

    Hi,
    Kindly tell me during Purchase order creation through internal order (Order related PO) whreas budget is maintained against that internal order if the PO amount is exceede than budgeted amount it gives warning / error messge that budget is exceeded. Same internal order or any other internal order which has budget against that internal order if I go to  F-02 tcode and pass entry with cost center and internal order(budget is given) both it does not give any warning message if budget value exceeded i.e, F-02 posted amount is greater than budgetd amount. It goes to next screen which should not do. Kindly tell me the reason why it is not being blocked and goes to next screen or if there is any configuration  please guide me.
    Best Regards,
    Samrat
    Edited by: Samrat Roy on Nov 2, 2010 11:43 AM

    Hi Eli,
    Now I have observed during saving the record in F-02 it gives warning message as per tolerance limit set in config area. Actually I want in F-02 screen when you put Document date, posting date, type, period, company code, currency, posting key(debit), GL account, next 2nd screen you mention amount, cost center, internal order(budget is maintained), posting key(credit) and press enter for next 3rd screen to put credit amount. While you go from 2nd screen to 3rd screen then warning / error message should give if amount is exceeded than budgeted amount which I am getting during saving. Is it possible to make any check between two screens ????
    Beside I would ask you here tolerance limit is set as 95%, 100% and 102%. During PO creation through internal order it gives error message when amount is exceeded than 102% as budget is exceeded. If the amount is between 95% to 99% it does not give warning message which should do. But from posting in F-02 screen it gives proper messge in all levels since 95 % to 99% and 101% to 102%.
    Regards,
    Samrat

  • Internal Order budget - Monthwise

    Hi
    I have my internal order for telephone expense budget. I created one internal order (as statistical) and assigned yearly budget of Rs.240000 in KO22.
    My requirement is that the yearly budget of Rs.240000 should be splitted into 12 months. Is there any way where i can give monthly budget. How can i handle monthly budget process.

    Hi,
    Refer Note: 50191      Budgeting on a monthly basis
    Also check thread Internal Order Period-wise Budgeting
    regards
    Waman

  • Internal Order Budgeting

    Hi SAP Experts,
    Is it possible to set up the budget profile to enter budget on monthly basis. If so where do we specify that in configuration. When I created the budget profile, I gave the following values:
    Past 1
    Future 12
    Start
    Total Values <checked>
    Annual Values <checked>
    But when I try to enter the budget on the order the only fields I get is
    Overall
    2008
    2009
    2010
    2011
    2012
    ......2021
    Could someone please guide me with this one.
    Thanks in advance
    N.
    All answers will be duly rewarded....

    Hello,
    I am sorry (there is an amendement to my previous reply) there is no provision of distributing the budget values on internal order KO22 on a monthly basis. It is only annual values or overall values. Therefore no functionality to distribute the budgeted values by monthly basis.
    KP06 - Cost and Activity Inputs - Cost Center Planning - Monthly distribution is possible
    KP26 - Activity output / prices - Cost Center Planning - Monthly distribution is possible
    KP46 - Statistical Key Figures - Cost Center Planning - Monthly distribution is possible
    KPZ2 - Cost Center Budget - Only Annual Budget - NO monthly distribution is possible
    KO12 - Internal Order budgeting - Only monthwise distribution is possible if you maintain relevant element groups in detailed planning and unit costing area. - See OKOS
    KO22 - Only annual values budgeting is possible - NO monthly distribution is possible.
    Please let me know if you need further help.
    Regards,
    Ravi

  • Internal Order Budget exceeded error at the time of MIRO

    Internal Order 45000147 having total budget 1036144.57   and Payment done so far is 73640.00
    There are service purchase orders (66003816 & 17 only MIRO no MIGO)exists for same internal order of Rs 9, 25,000.
    We want to book  MIRO  against internal order of values approx 525000 but system is showing budget is exceeded as error message and we configured the tolerence as 100% if it cross 100 % then ti should give error message.

    Hi,
    is the amount 73640.00 shown as the assigned value in the active availability control? You could check this with the report BPFCTRA1 in SE38. If you enter '=SUM' in the OK-Code and press enter after execution of the report, a pop-up will appear if there are inconsisitent values. If no pop-up appears the assigned value displayed in BPFCTRA1 is correct.
    178837 explains how the assigned value for internal orders is calculated.
    Regards,
    Greta

  • KO22 internal order budget issue

    Hello All,
    while making changes for internal order budget with transaction code KO22 the system shows a error as u201CItem order xxxxxx budget exceededu201D & for some orders u2018Item order xxxxxx budget almost exhaustedu201D & also referring to a budget for year 2006,2007,2008 . & The system doesn't accept those changes .
    Another strange thing is that  the system allows the same changes for few items  (maybe 4, 5, or six that time it will get saved that time it will not give error) ,
    but trying to do  10-15 changes , the system shows the warning message as stated above
    If anyone has encountered this strange issue please share your inputs
    Thanks & regards,
    Prashant

    Dear,
    When making changes to budget then make sure you are increasing it not decreasing....
    When you decrease the budget then system will check tolerance defined............and display warning or error....
    For e.g in tolerance you have defined that system should display warning at 95% absorption of budget and Error at 100%.
    You have set budget 10000 INR for the Internal Order. So it means at 9500 INR system will issue warning and at 10000 INR or more system will give error.
    If posted amount to order is 9000 INR so you can noway reduce budget less than 9000 INR because it is 100% and system will give error.
    Regards,
    Chintan Joshi

  • How to create a service order and check the internal order in R/3

    Required Solution:
    1. How to copy existing service order and create new one and check the internal order in R/3, whether the certain service order is correctly created in r/3, can you polease explain the steps plz.
    2. If i am creating service order by service template finally the service order is getting created but it is not showing me in the table iaom_crm_aufk, how to check this.
    can any one help me in this issues as soon as possible.

    Hello Zita,
    Try to restart your portal after creating <b>ServiceUser</b> in both UME and KM.
    One more major difference between ServiceUser and normal portal user is that a ServiceUser does not have a UserAccount (IUserAccount)
    Object serviceContext = null;
            try {
                serviceContext = AccessController.doPrivileged(new PrivilegedExceptionAction() {
                    public Object run() throws WcmException {
                        return ResourceFactory.getInstance().getServiceContext(CONTRACT_SERVICE_USER);
            } catch (PrivilegedActionException e) {
                logger.severe(e, "ResourceContext for the technical " + serviceUser +
                     " user could not be retrieved.");
    IResourceContext resCtx = (IResourceContext) serviceContext;
    So I modify all KM resources with this resCtx.
    Hope this helps ...
    Greetings,
    Praveen Gudapati
    p.s. Points are always welcome for helpful answers

  • Internal order budget release

    hai,
    i have prepared internal order budget. how to release the budget?because system is saying that avilability control is not activated.
    govind.

    Hi,
    Use OKOB and check availability section for activation type.
    Regards,
    Murali

Maybe you are looking for

  • Installing Itunes on Windows XP x64

    I recently bought an i Pod and I'm trying to install i Tunes on my XP x64 bit computer and I keep getting told that I must have Windows Vista 64 bit. I had i Tunes 32 bit but I was not able to sync my i Pod or burn CD's. Is there anything I can do to

  • Long running threads in DB2 DBSM/ job triggered by DDIC

    Hi Basis Gurus, I have ECC 6.0 , DB2 8.1.5 and SM 4.0. Every day a job kicks up on the SM with user id DDIC and consumes a lot of CPU.This job fires up again at some irreular intervals 2-3 times in a day.And whenevrer it runs, takes a lot of CPU. In

  • Is it possible to use 32-bit firefox with 64-bit java plugin?

    Is it possible to use 32-bit firefox with 64-bit java plugin? I'd like to use 32-bit firefox and I already install 64-bit java plugin. Is that a right choice not to install 32-bit java plugin? Will these cause problem? Thanks in advance. Regards, Sea

  • My Powerbook is dead, now what?

    I bought my Powerbook in June 2002. I have used this computer for so long but it started acting up and so for Christmas, "Santa" gave me an external drive and I backed everything up. This week, my laptop died. In a really horrible, nasty way. I start

  • Attaching photos from iPhoto to Hotmail

    New to Mac, I'm trying to send a couple of photos as attachments using my Hotmail account. When I follow through the folders/directories, I seem to end up loading the entire photo library. I must be doing something wrong but can't see what. Can anyon