Internal Order Budget Check for PO with reference to PR / RFQ

Hi All,
I have a scenario where the budget availability control is not working for PO created with reference to PR or RFQ. While creating the PO if i modify the PO value more than RFQ or PR value then system is looking for budget control.
If we create a direct PO system is checking for Budget control where the PO value is more than availability budget.
We have the budget control check with internal order for services and non stock material based on substitution rule created for cost element group and cost center group.
In tolerance limits budget availability control we have not activated for PR, itu2019s activated from PO.
Kindly let me know what is the reason for budget availability control is not active where the PO is created with reference to PR or RFQ.
Thanks & Regards,
Rama Mohan

493900 - FAQ: Release Strategy:
It is not possible to create a purchase order if the referenced purchase requisition is not released. But the system allows you to put the purchase order on hold and then release the purchase requisition.
On the other hand you can create a purchase order with reference to an unreleased request of quotation.

Similar Messages

  • Internal Order Budget check while asset procurement through PR or PO

    Hello Experts ,
                            Hope this is the correct place to post my issue!!
    I have created the IO- KO01
    Assign Budget         - KO22
    Activated tolerance limit and availability control and released the IO
    status of IO is- REL AUC AVAC BUDG
    Now, i want to create the PR/PO for this IO. Please tell me the process ahead ie. which a/c assign category is to be used,what document type is needed etc.
    Please Also , suggest what are the other things/configuration needed for the same i,e. G/L assignment or Cost Element creation.
    Please help experts.
    Regards,
    Ankur
    Moderator: Please, search before posting

    HI,
    .1. Create Investment program  (IM01 u2013 Create)
    2. Create top node (IM11 u2013 Create Top Position)
    3. create position id (IM22 u2013 Change)
    4. Put appropriate budget on position id (IM32 u2013 Edit Original)
    5. Create an internal order with internal order type CAPX- Capital Investment Orders (KO01 u2013 Create)
    6. System will ask to create AuC assets at this time. We need to create AuC Assets here. It will be used to post the value from CWIP account at the month end.
    7. Assign this order to appropriate investment program node. (IM32 u2013 Edit Original)
    8. Change the status of I/O from u201CINPL- Initial Planning by Locationsu201D to u201CINPR- In-Principle Sanctionu201D (KO02-Change)
    9. Allocate the appropriate budget to this I/O (T-Code IM52)
    10. Change the status of I/O from u201CINPR- In-Principle Sanctionu201D to u201C30 APPR Board Note Approu201D and from u201C30 APPR Board Note Approu201D to u201C40 EXEC Execution Phaseu201D. (KO02: Change)
    11. Create PO with reference of this I/O and give the expense GL account (ME21)
    12. Goods receipt (MIGO) with reference to PO and refer the vendor excise invoice created in above step.
    13. At this time cost element u201CCWIP accountu201D will be posted with reference of I/O. (KOB1 Line Item display for Order)
    14. At the month end we need to run the settlement for the I/O through KO88. It will post the value to AuC and credit the u201CCWIP accountu201D. It makes the CWIP account zero at the month end.
    15. Create an assets master for final settlement. (AS01)
    16. To settle the value from the AuC to Final asset we need to run the order settlement once again and at this time we need to give the final assets in the settlement rule for I/O. It will post the final assets and credit the AuC. (KO88 u2013 Line Item settlement)
    17. At the month end depreciation need to be run (AFAB u2013 Execute)
    18. Do retirement for transferee asset.
    See the bellow Link also
    http://help.sap.com/saphelp_470/helpdata/en/4f/71e6f0448011d189f00000e81ddfac/content.htm
    Thanks,
    Raviteja

  • Budget checking for services with "Unlilmited" indicator set

    hi friends,
    Under normal cases, the budget checking is happening properly for the services in a project.
    But I have certain service activities where I require to set the "Unlimited" indicator set (in the service specification screen)and some other services where I set a value limit to the unplanned services (in the Limit section of the service specification screen).
    In these cases, the budget checking is not happening as expected by the standard methods. Please note that the availability control is active.
    Please help me out.
    regards
    Pratap.V

    Hi Nitni,
    Thanks for the prompt replies.
    Now you have struck the point. Assume I have a budget of rs.50000. The planned services in PR is of Rs.20000 and I have set a limit of rs.50000 for the unplanned services in the same PR. Now my commitment is Rs.20000 only which is right.
    In our specific case, the budget check will not happen at PR.
    Now I am creating a PO of the above PR. So PO commt is rs.20000.
    After this, when I go to the service entry sheet and enter a planned services of rs.20000 and unplanned services of rs.40000 (remember i set a 50000 limit for unplanned services in the PR). Hence my total actual cost is rs.60000. Obviously I want the system to do a budget check here and stop the user at the time of service entry sheet. But this is not happening. The budget check is not happening at service entry sheet if I am having any unplanned services in the PR or if I tick the "unlimited" indicator against a particular service.
    Hope I have put my point clearly.
    regards
    Pratap

  • PLM table for Internal Order budget, Actual Cost and Actual Hrs

    Dear all
    In cProjects version 4.0, we have integration with existing ECC 6.0. We create Internal Order manually and assign it to cProjects.
    One cProject  having one Internal Order.
    Resource Planning part is managed in cProjects while Actual Time keeping(CATS with reference to Internal Order), budgeting of Internal Order, Material and Service Procurement which is done against Internal Order is managed in ECC. ECC and PLM are separate systems.
    We have RFCs established to transfer actual hrs, budget and actual cost data from ECC to PLM.
    Which is the ABAP table in PLM where we get linking of cProject with Internal Order and also actual hrs, budget and actual cost data in PLM system?
    Thanks & Regards
    Ashish

    actual hrs, budget and actual cost data in PLM system?
    Its not there, actual hours can be found in DPR_Task but it needs to be transferred by running a report.
    The planned cost etc is also calculated at runtime and passed on to Costing object in ECC (Int order/PS)
    Actual hours will be in CATSDB in ECC
    needless to say actual cost will also be there in ECC and not in PLM, PLM only displays at runtime based on RFC.
    If you want to try, Break the RFC and try to check the Evaluation..
    Niranjan

  • Internal Order budgeting not checking at the time of FB60

    Dear All Experts,
    Very Good Morning !
    I have configured IO budgeting with Overall Planning ticked budget profile. I have assigned budger profile to Order type also.
    In KO23 I have given limit also of Rs.10,000 /- for overall and yearly 2011 Rs,5,000 /-. In define tolerance I have maintained two entries as below : 1 is with 01 Group wich will check PO's and 2nd one is 04 Group which will check Financial account document. ( I hope this correct, If not please rectify me ). In tolerance limit I have given 3 as a error should throw.
    I refer this thread [Internal Order Budget - Availability Control|Internal Order Budget - Availability Control; from our SDN forum. I activated budget control from KO23 and referring KO30 now system is showing GREEN Availability control is active.
    Now when I am running FB60 with assignment IO, system is not throwing any error, warning , it remains normal posting is happening.
    If anybody has gone through the same issue, experts inputs / guidance will be very helpfull.
    Regards,
    Revati Joshi.

    Your tolerance limits are fine
    Let me put you some points here.
    Creating IO
       1. Investment Profile is mandatory for Capital projects
       2. If you are using Investment management, then check IM32, & IM52
       3. KO02 - Check  - Investments tab - IM Program and Position ID assinged or not
       4. Need to assign the budget in both Controlling area currecny and object currency (KO12, & KO22)
       5. Availability control should be Active - KO30
       6. Planner plofile - KP04 - Just press F4 and check - if there are any created for your controlling area
       7. Check if you have any line itesm already posted to the IO - KOB1, KOB2, KOB3
    Now, the actual plan is - KPF6 and KDF6
    Here you need to input the below details
    Version                    0
    From Period               01
    To Period                      12
    Fiscal Year          2011
    Order                                           input the order
                      to
             or group
    Cost Element                              which Cost elemtn you are going to post in FB60
                      to
             or group
    Enter those details and in next screen - give the amount for that cost element.
    Now o and post in FB60
    Hope it helps
    Thanks

  • Internal Order Budgeting for HR and Plant maintenance

    Dear All,
    I am using internal order for budgeting control. I want to use internal order budgeting for Payroll also. How do i assign internal order for the same.
    I want to check budget through internal order for plant maintenance order also. At the time of issue of material to PM order or at the time of settlement.
    regards
    ranga

    Budget Profile:
    IMG => Internal Orders => Budgeting and Availability Control => Maintain Budget Profile
    Make sure activation type made to 1.
    Availability control settings:
    IMG => Internal Orders => Budgeting and Availability Control => Define Tolerance Limits for Availability Control
    Regards,
    Ravi

  • Budget check for purchase order

    Hi everyone!
    We have NO problems with budget check for the SC. But when we create a PO and exceeds the budget no message are displayed. The only thing that happens is that the PO gets status "error in process". But if we change the PO (still exceeding budget) we receive a correct message. Is this a program error?
    Sincerely
    Anders

    Hi
    Temporarily deactivate budget check: SRM: using Badi
    BBP_BUDGET_CHECK, AVC Backend customizing.
    Did you do budget check while creating sc? what did it says?
    Refere this old notes.
    Note 740933 - Incorrct purchasing budget for currencies w/o decimal
    places
    Note 747143 - User purchasing budget in pop-up incorrectly formatted
    regards
    Muthu
    Edited by: Muthuraman Govindasamy on Nov 5, 2008 3:08 PM

  • How to block entry through internal order budget in F-02

    Hi,
    Kindly tell me during Purchase order creation through internal order (Order related PO) whreas budget is maintained against that internal order if the PO amount is exceede than budgeted amount it gives warning / error messge that budget is exceeded. Same internal order or any other internal order which has budget against that internal order if I go to  F-02 tcode and pass entry with cost center and internal order(budget is given) both it does not give any warning message if budget value exceeded i.e, F-02 posted amount is greater than budgetd amount. It goes to next screen which should not do. Kindly tell me the reason why it is not being blocked and goes to next screen or if there is any configuration  please guide me.
    Best Regards,
    Samrat
    Edited by: Samrat Roy on Nov 2, 2010 11:43 AM

    Hi Eli,
    Now I have observed during saving the record in F-02 it gives warning message as per tolerance limit set in config area. Actually I want in F-02 screen when you put Document date, posting date, type, period, company code, currency, posting key(debit), GL account, next 2nd screen you mention amount, cost center, internal order(budget is maintained), posting key(credit) and press enter for next 3rd screen to put credit amount. While you go from 2nd screen to 3rd screen then warning / error message should give if amount is exceeded than budgeted amount which I am getting during saving. Is it possible to make any check between two screens ????
    Beside I would ask you here tolerance limit is set as 95%, 100% and 102%. During PO creation through internal order it gives error message when amount is exceeded than 102% as budget is exceeded. If the amount is between 95% to 99% it does not give warning message which should do. But from posting in F-02 screen it gives proper messge in all levels since 95 % to 99% and 101% to 102%.
    Regards,
    Samrat

  • Internal Order not allowed for revenue posting

    Hello all,
    I have a problem, while doing migo for subcontracting materials(movement type 105) following error has occurred:
    Message no. KO014:Order 5000012 cannot carry revenues
    Steps i have followed:
    Step-1: In transaction MB1B materials are transferred to stock with subcontractor with movement type -541(Transfer posting to stock with subcontractor from unrestricted.-use stock) and with reference to scheduling agreement number. (A material document is generated).
    Step-2: Creation of Subcontracting Challan through T-code-J1IF01 with reference to material document generated in step-1 above.
    Step-3:  Goods receipt through T-Code-MIGO with movement type 103(Goods receipt for purchase order into GR blocked stock) with reference to scheduling agreement number mentioned above. (A material document number is generated)
    Step-4: Release of GR blocked through T-Code-MIGO with movement type 105(GR from blocked stock) and with reference to material document generated in step-3 above.
    When the material document is checked, system does not give any error but at the time of posting the same system displays the following message:
    Order 5000012 cannot carry revenues
    The above order is an internal order and is assigned to Stock Change Account (a primary cost element) in OKB9 (Default account assignment).

    Hi
    Go to T.code KO02 and check in the Control data tab if your Internal Order is blocked for Revenue Posting or not.
    Regards
    Hari

  • PO should not exceed Internal Order Value ( Check Required )

    Hi experts,
    Ideally PO should not be made for more value than the sanctioned amount raised through  Internal Order no ( KO01).
    But we find that users are creating PO for more value than the sannctioned value in internal order no.
    Check is required .  Pl. suggest how it can achieved.
    Regards,
    ( Rajneesh Gulati )

    Hi,
    In SPRO
    Controlling>Internal Orders>Budgeting and Availability Control-->Maintain Budget Profile
    Maintain Budget profile and assign  to the order type.(Controlling>Internal Orders>Order Master Data-->Define Order Types)
    Maintain Tolerances in below path.
    Controlling>Internal Orders>Budgeting and Availability Control-->Define Tolerance Limits for Availability Control
    You can maintain the tolerance limits with which in PO, you can give error or warning message when the value exceeds.
    Regards
    Edited by: Varaghamurthy  Chakravarthy Kannan on Sep 2, 2009 11:14 AM
    Edited by: Varaghamurthy  Chakravarthy Kannan on Sep 2, 2009 11:16 AM

  • Internal Order Budget - Availability Control

    I have done the budget profile, entered the budget figures, created internal order budget with the required profile.  However, when I entered the fi document with this statistical IO, system does not give any message as per the tolerance setting actions.  I tried to run the activate availability control again.  But the system gives a message that availability control is not activated.  Why this is happening ?  Where can I see the availability control is activated for this Internal order ?

    Hi
    1. Check if your order is released
    2. Check in budget profile (OKOB) if activation type is "1" and whether you have checked "overall" or not....
    3. Hope you have defined tolerance limits against the combination of contr area and budget profile
    Regards
    Ajay M

  • Order budget checking in creation PA30

    Hi everyone,
    My requirement is to have order budget checking in HR modul.
    Currently if user create claim transaction with internal order number, there is no checking for the order budget.
    I noticed that the HR module and FI module is not related in this phase (creation phase)
    During end month, user will run PC00_M99_CIPE to create a document to be posted to FI.
    In this phase, SAP will do the checking if got error due to order budget exceeded.
    My requirement is to have the checking in creation phase.
    What I have done :
    1. use exit EXIT_SAPFP50M_002
    2. currently on button save clicked, I will have checking on amount filled by user and current availability of budget in table BPGE
    Problem :
    1. Creation phase not yet updating the balance of budget availibility, so the comparison I make above, is not accurate.
    2. If I want to create a temporary table for every transaction saved -> update budget availibility
    another problem I'm facing, I cannot diferentiate which data is posted to FI and which one not yet.
    Please any solution / suggestion ?
    Thanks,
    Melissa

    Thnx alex
    i already maintained in derivation rule but it is working for PM only maintaince order creation.But for production order and process order it is not working means while i am doing migo against a process order or porduction order same error is coming no fund center derived. Please suggest me if i did any thing wrong
    i applied this  function moudle
    FMDT_READ_ORDER_PM_FROM_FMZUOB
    enhancement
    SAPLFMDT - EXIT_SAPLFMDT_001
    Regards

  • Order budget checking from PA30

    Hi everyone,
    My requirement is to have order budget checking in HR modul.
    Currently if user create claim transaction with internal order number, there is no checking for the order budget.
    I noticed that the HR module and FI module is not related in this phase (creation phase)
    During end month, user will run PC00_M99_CIPE to create a document to be posted to FI.
    In this phase, SAP will do the checking if got error due to order budget exceeded.
    My requirement is to have the checking in creation phase.
    What I have done :
    1. use exit EXIT_SAPFP50M_002
    2. currently on button save clicked, I will have checking on amount filled by user and current availability of budget in table BPGE
    Problem :
    1. Creation phase not yet updating the balance of budget availibility, so the comparison I make above, is not accurate.
    2. If I want to create a temporary table for every transaction saved -> update budget availibility
        another problem I'm facing, I cannot diferentiate which data is posted to FI and which one not yet.
    Please any solution / suggestion ?
    Thanks,
    Melissa

    Great question! Unfortunately, the functionality of order - WBS budget availability checking does not allow you to allocate the order to multiple WBS elements nor to distribute the (planned) costs across multiple WBS elements. Neither does the PM - IM (Investment Management) budget checking functionality. And by definition, direct budget setting at order level, where the order itself is the budget object - doesn't allow it either.
    If you turn on operation account assignment, available with EHP5 Business Function LOG_EAM_OLC - operations become cost collectors - and you can settle operations to different receivers. You can also assign WBS elements to the operations, so I would suspect that WBS budget availability checking is also supported.Can anyone confirm that WBS budget availability checking is functional for operations when operation level costing is turned on?
    Andrew

  • KO22 internal order budget issue

    Hello All,
    while making changes for internal order budget with transaction code KO22 the system shows a error as u201CItem order xxxxxx budget exceededu201D & for some orders u2018Item order xxxxxx budget almost exhaustedu201D & also referring to a budget for year 2006,2007,2008 . & The system doesn't accept those changes .
    Another strange thing is that  the system allows the same changes for few items  (maybe 4, 5, or six that time it will get saved that time it will not give error) ,
    but trying to do  10-15 changes , the system shows the warning message as stated above
    If anyone has encountered this strange issue please share your inputs
    Thanks & regards,
    Prashant

    Dear,
    When making changes to budget then make sure you are increasing it not decreasing....
    When you decrease the budget then system will check tolerance defined............and display warning or error....
    For e.g in tolerance you have defined that system should display warning at 95% absorption of budget and Error at 100%.
    You have set budget 10000 INR for the Internal Order. So it means at 9500 INR system will issue warning and at 10000 INR or more system will give error.
    If posted amount to order is 9000 INR so you can noway reduce budget less than 9000 INR because it is 100% and system will give error.
    Regards,
    Chintan Joshi

  • Project-Internal Order Budget Control

    Concerning on the Internal Order Budget in SAP, we have the following questions & need clarification :
    1) Since the promotion involving SD module, could we enhance the SD module with Internal Order functions & budget control as well? According to the SAP help desk documentation, its possible, pls provide guidelines.
    2) I've checked on SAP helpdesk that budget data (including sales & promotion) could capture in COPA via I/Order & pricing conditions. Could we use budget cost in COPA to control the sales & promotion posting in SD module ? pls provide guidelines. We had just implemented COPA with plan but not budget. Could we add this budget as new value field ?
    3) I/Order can be updated through different cost elements but would system allow us to control budget by each cost element but only using one for all the cost element ? According to the helpdesk, we could split the I/Order budget by cost centres, transaction group or budget object. Does this similar to our requirement ?
    4) I/Order Budget will control the spending by actual posting data or commitment ? Could we control both at once ? Example :
    Budget             500k
    Actual posting     300k
    Commitment     300k
    Budget              -ve 100k  not  +ve 200k
    5)  Concerning on the issuance of Credit note requisition (CRQ), if we using manual process as entry as Park document then post to FI (currently) and not using PR/PO process, then, how would we have commitment data ?
    6)  During year end, we may need to perform closing and carry forward the I/Order budget and commitment balance to next fiscal year. Does this mean that controlling need to perform period close also and order settlement even its statistical I/Orders ? we didn't practice this in controlling currently.
    7)  I/Order budget is control annually. Once the budget I/Order completed fully, it cannot be used again. Hence, does this mean that we need to have different set of I/Order for different year?
    Please feedback to us the above soonest possible.
    Thanks..............
    Elaine

    Lot's of questions;
    1) At the time of entering a sales order you can enter an Internal oder number as well. That then could be used as part of a tracking process.
    2) You control the budget by setting up availability control. Then at the time of entry it checks against the budget to see if you are within you tolerances. Youn can also have reporting in COPA to compare actual to plan and budgets. But there won't be the availablity control. It will be analytical reporting instead.
    3)The budget for internal orders is one total. You won't be able to set it up for different cost elements there.
    4)The availability control looks at all the components. Yes you can control both
    5)The credit will be picked up when posted as an actual posting
    6) You will need to do carryforward for all I/O.
    7) You can set up the budgets to be for a particular year not overall for I/O.
    try to limit the size of your questions in the future to make the response easier
    pls assign points if helpful as a way to say thanks.

Maybe you are looking for

  • User cannot see the "-" signs on amounts in ALV report

    Hi all, We have a problem with a user, who cannot see the signs on the amounts in an ALV report: <a href="http://img66.imageshack.us/img66/1424/nataliabr9.jpg">Report without signs</a> The user has tested this report with his user, and another test u

  • Load data only for current month using ABAP Routine

    Hi Everyone, I am loading data from R/3 using the 0HR_PA_OS_1 extractor. This requirement is to load the position numbers from R/3. Using the extractor for a given position 28 I get the following dataset results. CALMONTH  POSITION 11-2004          

  • How can I convert a PDF/A file into a PDF file with Acrobat Pro X?

    How can I convert a PDF/A file into a PDF file with Acrobat Pro X? I'd like to modifiy the file which I have only as a PDF/A.

  • Export as non-Flash file?

    Hello, I've inherited some tutorial files that were developed in Captivate, but I'm now working in an environment where Flash is not deployed as standard. Are there any alternate Save or Export options available in the current version that do not rep

  • Play Count/Ratings won't update.

    For some reason neither the play counts nor the ratings will update if I do them on my Nano. If I play and/or rate a song on iTunes, the information will usually be saved. This actually happened before early in the month, but the problem (temporarily