Cancel Inbound delivery

Hi,
We've posted a GR for Inbound Delivery for the false scheduling agreement.
Now we want to cancel this GR for Inbound Delivery and delete the old scheduling agreement.
Problem: Material was with HU. We couldn't cancel the GR because of HU
We've delete the HU. Now We get the Error "HU could no be found"
How can we resolve the case (cancel the GR and delete the scheduling agreement).
Thanks

Hi,
I did it but I get the Error "No HU could be found"

Similar Messages

  • PGR of inbound delivery

    Hi
    Experts
    In matrial master  1 BI = 0.4 kg
    We have Stock transfer order for 1 BI (BI is a unit of measure) which  0.4 kg.
    but goods issue is done with 1 BI but qty 0.2 kg with movement 641.
    User has  created inbound delivery with 1 BI  but for 0.4 kg.
    He also confirmed the TO & created the handling unit.
    But when he go for doing PGR it is giving error that PL stock in transit exceeded by 0.2 kg
    I want to do PGR with qty 0.2 kg only. Please let me know how I can do this.
    As TO is confirmed & handling unit is created it is not possible to cancel  the inbound delivery.
    Thanks,
    Kiran

    conversion rate is not changed in between GI and Goods issue.
    Goods issue is done with only 0.20 kg that what I can see in GI document.
    Unit of entry is Kg in goods issue document , in the qty tab >>> qty unit of entry & qty in sku is 0.2 kg.
    If I do change handling unit qty to 0.20 kg , inbound delivery to 0.20 kg & TO qty in 0.20 kg at table level then will my issue get resolved.
    I think as per TO it is considering batch xxxxx  of 0.40 kg qty but as stock in transit stock is only 0.20 kg for that batch it is throughing error of  PL Stock in transit excedded by 0.200 kg
    Am I correct if I do table level entry.
    As I am stuck I am not able to do PGR or not able to cancel inbound delivery & not able to cancel inbound delivery as TO is already confirmed.
    Please helpppp

  • Inbound delivery - reg.,

    Hi guru's
    can anybody explain how can we stop an item which is in transit / not reached to the required point. in an inbound delivery.
    Thanks in advance
    tulja singh.

    U have the option of cancelling inbound delivery if created..

  • Cancellation of Invoice, Material doc, Inbound delivery and TO

    Hi
    I have run the following business ME21N->VL31N->LT03(TO)->LT12(TO confirmation)->Material doc is created->MIRO.
    Now i want to reverse the whole process. I have cancelled the Invoice then cancelled the Material document (MIGO), after the material document is cancelled a TR(LB11) is created, then i have created a TO from the TR created(LT04) ->TO confirmation. After this the quants are reversed from the bin to the GR area external reciepts.(nullifying with the first TO)
    My question here is how to post the stock again i.e. from where should i start ? When i am trying to create TO wrt VL32n its not happening because the status showing as completed and is it possible to cancel the inbound delivery created, If yes how to do that.
    The reason for this scenario is that the customer for some reason entered incorrect values and want to cancel the documents created.Everything should be cancelled except PO

    Scenario 1
    While creating the customer master my client forget to give the account assignment group in the billing tab of the sales area data. Because of this it did not hit the proper G/L Account. Automatically it went to some other accounts.
    My question is weather we want to cancel only the invoice or we want to reverse the delivery
    If your GL accounts will be determined based on the customer account assignment group and material account assginment group combination then you can enter manually in Billing document (if accounting document is not created), No need to reverse the invoice and delivery.
    Second Scenario 2
    My client taken the invoice without calculating the TAX and the same also released to accounts.
    Now he wants to Add the TAX
    You can cancel the previous invoice and create new invoice with taxes.

  • Inspection lot not getting cancelled after the inbound delivery is created

    Hello,
    The scenraio is like this.
    1. Material was procured in plant A.
    2. Using the stock transfer purchase order, transferred the material from Plant A to Plant B.
    3. Outbound delivery was created, Handling units were assigned and Post Goods issue was done.
    4. As soon as this was done, inbound delivery got created automatically in plant B and Handling units were assigned.
    5. Inspection lot was created with origin "08".
    6. Now I want to reverse all the transactions, so I did as mentioned below.
    7. Handling units were deassigned from the inbound delivery and inbound delivery was successfully deleted.
    8. Now tried to do the reverse post goods issue and got the error "Handling unit XXXXXX cannot be reversed"..Goods movement cannot be reversed for handling unit XXXXX because it has been changed or assigned to object since the last goods movement posting".
    The issue is that as soon as the inbound delivery is deleted, the inspection lot status should change, which has not changed. So kindly let me know how to make the system cancel the inspection lot as soon as the deassignment of handling units is done in inbound delivery or the inbound delievry is deleted.
    Regards,
    Narendra Bora

    Hello,
    Can anyone please reply.
    Regards,
    Narendra Bora

  • How to create one inbound delivery for multiple purchase order?

    Hi Experts,
    Please let me know how can I create one inbound delivery for multiple purchasing documents(PO or SA)? 
    Is there a configuration needed for this?  If yes, please let me know the configuration to make this happen.
    Appreciate your help on this.  Right answers will be rewarded.
    Thank you.
    with regards,
    Muthu Ganapathy.

    Hi,
    my situation is:
    - a WM managed warehouse, society A;
    - a HU managed warehouse (without WM), society B;
    - a purchasing process of HU from society A towards society B.
    Society B have a scheduling agreement; when a delivery schedule appears, in society A born a sales order and a delivery. After the registration of the delivery good issue, an idoc transfer information for inbound delivery creation.
    This process is ok without WM, but with a WM managed warehouse the idoc has the following problem:
    "V51VP - item was not found - process cancelled".
    Can you help me to transfer these HU?

  • Stock Transfer Inbound Delivery with HU Stuck - Unable to PGR

    Hi Gurus,
    Please help me with the situation.
    For 7 HUs there was a Two-Step Sloc to Sloc to transfer that was attempted to be performed.
    1. An Outbound Delivery is created from Plant 1000/0061 (313-)
    2. Picked and PGI-ed
    3. Inbound Delivery is created in the Receiving Plant 1000/0028
    5. This was done through a two step Sloc to Sloc Transfer (313 and 315)
    6. Since the receiving Sloc is WM Managed, a TOs were created and confirmed
    7. This happened sometime in April 2008
    8. THE PROBLEM NOW IS WE ARE UNABLE TO PGR THE INBOUND DELIVERY BECAUSE THE STOCK IN TRANSIT IS UNAVAILABLE
    9. Checked for SIT Stock; Unavailable
    10. Checked for any 315 movements after the TO Confirmation Date, but could not find any, until today's date
    11. LT0G is not working citing the reasons that LT0G will not work for TOs with HUs
    12. Cancellation of TO is not working under any Transaction
    13. The Stock of the material is 0 in Plant 1000/All SLocs
    THE HUs ARE SHOWING IN HUMO IN 1000/0028.
    How can I PGR the stock, or even cancel the whole transaction and scrap the stock.
    KINDLY HELP.
    Thanks.
    Ananth.
    Edited by: Ananthram Sundarababu on Jul 2, 2010 5:31 PM

    Hi,
    my situation is:
    - a WM managed warehouse, society A;
    - a HU managed warehouse (without WM), society B;
    - a purchasing process of HU from society A towards society B.
    Society B have a scheduling agreement; when a delivery schedule appears, in society A born a sales order and a delivery. After the registration of the delivery good issue, an idoc transfer information for inbound delivery creation.
    This process is ok without WM, but with a WM managed warehouse the idoc has the following problem:
    "V51VP - item was not found - process cancelled".
    Can you help me to transfer these HU?

  • Inbound delivery split

    hi,
    We are crateing PO and sending it to third party.
    We get ASN Idoc from third party to create the inbound delivery.
    In the ASN the delivery itme is split, because all the item quantity cannnot come from one plant.
    ex: delivery item has 40 quantity, split 20 from plant A, 20 from Plant B.
    While loading the idoc we get the following error message:
    'Error while generating packaging data' and 'V51VP - item was not found - process cancelled'.
    Can you please let me know what do i need to do for delivery split scenario to create two inbound deliveries ?
    Regards,
    Chandan

    ok

  • Goods Receipt reversal posing for Inbound delivery

    Hi Gurus,
    There is an interface running which create, IDOC, Inbound delivery, HU and material received (material document created - 521mvt type) to stock.
    Now there is some problem in the HU weight and I need to reverse the Material docuement with 522 mvt type.
    As the GR is created through VL32n, I can not reverse the GR using MBST or MIGO cancellation. I am also not allowed to reverse through VL09. I am getting error This is not possible with movement type 522.
    Kindly inform me if you have any suggestion to reverse this material document.
    Best Regards,
    Mohan

    Hi,
    VL09 is the correct transaction.
    I doubt if this will work but try looking at theconfig of the 521 and 522 movement types and check the "allowed transactions" see if VL09 is linked to it, if not then link it and try VL09 again.
    It is a longshot but VL09 shouldwork (although my HU knowledge is not good).
    Steve B

  • Goods Receipt w/ref. to inbound delivery can not be reversed....

    Hello Gurus,
    My clients wants to reverse Goods Receipt document which it was created with reference to an inbound delivery. Previously the inbound delivery was created with reference to a PO, the ID generated several HU and TOs that were confirmed.
    Now he wants to cancel the Goods Receipt posting but the problem is that the quants created in the TOs have changed the storage bin destination, so I really dont know how coudl he handle this process.....indeed he also wants to cancel de ID.....
    What do you think that could be the correct procedure???
    Thanks!!!

    Hi Pablo,
    Yes you are right you can use MIGO to cancel the individual line item however you can do the same in VL09 also by selecting the individual material document
    Please have a look on the below post which was provided by me in one of the earlier thread
    Delivery with multiple line item, reversal required for one line item
    Now you can have a scenario where you are having 4 line item in the delivery and you want to reverse only one, in this scenario you can use the VL09 with material document option, system will display all the possible material document for the IBD reverse the respective Material document as per your requirement and then use the TO view of LT0G to reverse the particular line item

  • Inbound delivery item deleted is not deleted from BI DSO?

    Hi All
      An Inbound deliver created and pushed to BI..
    Source PSA is FULL UPDATE and DTP is DELTA UPDATE
    Ex: 800000 10   10000
                        20  10000
    This is what pushed to ODS..Later next day,
    they deleted the to 800000 10 10000
    So PSA is refreshed with one item .
    800000 10 10000
    whereas DSO still shows as follows:
    800000 10 10000
                  20 10000
    I have following options:
      1. convert DTP to FULL update, so the data gets refreshed..
    2. ELse delete the only one record..
    But user sometimes need to delete the inbound delivery....based on item required..
    we cannot go and delete everytime for this issue..
    What are the best solutions that you experts can suggest.??

    HI...
    This is a known problem in ECC-BI.   Deliveries can only be deleted from ECC system but can not be cancelled. So the extractor is not able to provide a deleted image for the record. 
    Two solution can be there,
    1. Full Load of all BI target every day ---this solution is practical only when your data volume is less and full load does not take much time. But if your data volume is huge and flow is complex one then this is not the solution.
    2. Second solution is to identify which Delivery Doc - Item combination got deleted from ECC system and then you can just put a flag against those documents. 
    You can easily find which doc- item got deleted from CDPOS and CDHDR entry. In our project we created one DataSource based on InfoSet Query ( SQ02) on CDPOS ( item level) and CDHDR ( header level) and pulling all the documents which got deleted in ECC system. For all those Delivery-Item we put a deletion flag and restrict the query accordingly.
    in CDPOS following fields are important.
    a) CHNGIND: Change Type (U, I, S, D) u2013 This field shows whether the entry is deleted, updated or inserted. We are here interested in the value: D (Deleted).
    b) OBJECTCLAS: Object class u2013 This field is used to get the data related to Deliveries, Sales etc. For deliveries, value is LIEFERUNG; For Sales, value is VERKBELEG
    c)TABNAME: Table Name u2013 This field contains the table name from which the value is deleted. The tables for Deliveries are LIKP and LIPS. To get the item level data, keep the value as LIPS.
    d) TABKEY is 18 characters long field, in which first 3 numbers is the client number, next 10 shows the document number and next 5 shows the item number. E.g.: 750001099999900010, where 750 is client, 0010999999 is document number and 00010 is item number
    Also have a look at How to Guide below
    Link [CDPOS-CDHDR|http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/50dd3fb9-0dad-2d10-0ea7-cbb0bb8b391b?QuickLink=index&overridelayout=true]
    how to view deleted delivery
    Regards
    Anindya

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Inbound delivery goods receipt

    G'day All,
    We have just implemented WMS and use both EDI and manual ASN's for Purchase Orders.
    Pre WMS we would receipt the Inbound Delivery via MIGO and if the receipt amount is outside the Confirmation Control Key tolerance for KG's we would receive a message. ie "PU Ordered quantity exceeded by xxx KG".
    Now we are using WMS and before we Goods Receipt, for each Inbound Delivery we also create an Inbound Transfer Order using VL06I “For Putaway”.
    BUT now when we use VL06I (instead of MIGO) to confirm and Goods Receipt in ONE step by using “For confirmatn”.
    For each inbound delivery we choose confirm in background and use option 2 in Adopt Putaway qty (Copy stock plcmt qty as deliv.qty into delivery and post GI).
    The problem is we do NOT receive the error message we did in MIGO. The Inbound TO is confirmed but the GR fails but we don’t know anything about it until we discover a negative amount in our interim GR Storage Type.
    If we do it in two steps and use option 1 (Stock placement qty adopted into delivery as delivery qty) which confirms the TO first, then use “For gds receipt” we get the error message.
    Can anyone help me with ideas on getting the message to display in VL06IC “For confirmatn” When we confirm the TO and GR in one step? We do not want to use the 2 step method as our Despatch department is already overworked and they will rebel and take the easy way out, leaving our inventory controllers with large headaches!
    Thankyou
    Luke
    null

    Hi
    If you are carrying out a Put away against the inbound delivery first and confirming the TO the negative balance is normal as IM Does not know it has arrived yet.
    Once the Put away is completed you need to go back to the inbound delivery and Post Goods receipt. This will show the stock in IM and remove the negative.
    Reason
    Because you are putting the stock away before you inform IM then the stock has to come from somewhere and as the movement type is 101 it creates a negative qty in 902. The post goods issue will post corresponding qty in 902 and cancel out the negative.
    I hope that this helps

  • Error during Inbound Delivery creation by Idoc DELVRY05

    Hi,
    We are trying to consolidate ASNs and creating an inbound delivery for the same. Thus we have more than one PO information in the idoc.
    It processes fine and creates an inbound delivery if all the line item nos are different.
    But the issue is, when there are articles which have the same line item no. even if the articles are different and they are on different POs. It gives the following errors.
    1) "Delivery item cannot be exactly determined
    Message no. HUFUNCTIONS313"
    I tried to debug the above error and found that while packing it looks to the lips-vbeln/posnr & not the PO nr./PO item.
    I am not sure if this could be handled by some config. Please advice.
    2) "V51VP - item was not found - process cancelled
    Message no. HUGENERAL056"
    Any hints or comments on the above would be appreciated.
    Thanks & Regards,
    Akshay

    Hi Raghavendra,
    It has been a long time. But, as far as I can remember we had made coding adjustments in the customer-exit EXIT_SAPLV55K_004, include ZXTRKU12 to fetch the correct item and fill the idoc segment fields.
    This resolved the issue.
    Best Regards,
    Akshay

  • Not able to post GR for an Inbound delivery

    Hello Experts,
    We are into support project. We have an issue with GR for inbound delivery. The issue detail is below.
    1. Purchase Order created for a material for 100 qty
    2. Inbound delivery created for the same
    3. GR done for the same quantity
    4. GR document got updated in the inbound delivery as well as PO history
    5. Reversed 50 qty using MB01 with movement type 102.
    6. Reversal qty and document got updated in the PO history where it is not updated in the inbound document flow.
    Now when we do the GR for balance qty 50 which we have reversed, we are not able to do the GR.
    The error message is "Qty to be posted is greater than maximum postable quantity" and message number is VLA 308.
    We are not able to cancel the material document which we have reversed nor able to post goods receipt.
    Could anybody tell me how to resolve this issue?
    Thanks
    Bala

    Hi,
    Please check SAP note 1050944
    Regarding this issue

Maybe you are looking for