Changes in Purchase Requistion post its Release

Hi,
I have created a PR in SAP ECC-5.0
And the same is released. But after its released still system allows to change the Article no & Site. Only the qty get freezes once the PR is released.
Is this the standard SAP functionality behavior.
You can simulate the same PR in our QA3 client.Access details are available in the main access database.
Regards,
SD

Hi,
To ensure that a release strategy cannot be changed once it has been
released, please set the changeability indicator to 1 "Cannot be
changed" for the release indicator in the customising settings.
This is standard behaviour of the system. If you set the final release
indicator with a changeability of 1 ('Cannot be changed') the
purchase requisition will not be modifiable via ME52 or ME52N
Otherwise  for each Release indicator you can assign a Field Selection Key (trx OLME > PR >release startegy > Set Up Procedure with Classification > release indicator )
BR
Nadia Orlandi

Similar Messages

  • Material number changed after purchase order released

    Hi Experts
    Please we are experiencing this behavior in our system.
    A purchase order for a specific material number is created and released, after this we can change the material number and its plant ¿is this a standard and right be way of SAP?
    Thank for your help
    JM

    Hi,
    You can design your process as the business demand.You can set Release Indicator 1 in designing Release procedure for  PO , where release Indicator 1 is used for purchasing document cannot be changed/Change not allowed after release.
    Regards,
    Biju K

  • Release of purchase requistion

    Hi friends,
    We have made our purchase requistion can't be released without Fixed vendor. We have made this for ME54N(Individual release of PR).
    Users are smart enough to release them by using ME55(collective release of PR) without any fixed vendor assign to PR. How can we control this. PR can be released without fixed vendor.
    We controlled it in MM54N.
    How to control this in ME55.
    Please any help ??
    Thanks,
    Bhairav

    hi,
    just check by making the screen selection for PR Fixed vendor field mandatory.
    I have checked without release strategy and in MRP system is not suggesting for Fixed vendor,(but with some other problem i am not able to activate the release strategy in my system) while ur going to change the PR then system is asking for the Fixed vendor and iam assuming that after the release strategy activating for PR that generated through MRP and while releasing in ME54 or ME 55 system will ask for the fixed vendor, then he can save that PR.
    please check from ur end and please let me know.
    Regards,
    batchu

  • Purchase Requistion release procedure

    Hi,
    Purchase requistion header level approval procedure activated. We required two level of approvals procedure based on total PR value range. Eventhrough i have maintained relase strategy its pulls always single stragey.
    Do the needful.
    Regards
    Mohan

    Dear,
    Have a look at:
    http://www.scribd.com/doc/548510/SAP-Release-Strategy
    Regards,
    Syed Hussain.

  • Purchase Requistion Release Stratergy

    Hi,
    I have a situation where I need to get the details of the classification Net total in purchase Requistion for the particluar Release Stratergy and Release Group from the relevant table for raising an event manually in work flow, which I am uable to trace out.Please help in this regard for identifying the tables which holds the data of the Net value for the same.
    Thanks in Advance for your Help
    Regards,
    Krishna Mukthineni

    Hi Krishna,
    the classifications of the release strategy is best read via the API (interfaces) for the class system. To get quick results and to check, if your designed process could be working at all, you could hard-code the class' name and it's characteristics. Later on -- to be more precisely -- you should read the class name from the customizing and the characteristic definition from the class system.
    To get an example of how SAP determines the release strategy from the classification (which is kinda the other way round), you may consult the following function modules/coding sections:
    Function module ME_REL_COM_STRATEGY_EBAN
    --> Form strategie_neu
    ->-> Function module CLSC_SELECT_OBJECTS
    To see the usage of this function module within your system, you could set a break-point there and create/change a requisition in your system.
    The internal table iausp holds the values of the characteristics.
    The referenced characteristic you'll be possibly looking for is based on CEKKO-GNETW
    Best regards,
    Florin

  • Change in Purchase Order Release Strategy Values

    Dear All,
    I am in process of changing Purchase Order release strategy values.
    I have following release strategy -
                           Current Value                  (Proposed Value)
    Level 1 -         Upto INR 0.1 Mn               (Proposed value - Upto 1.0 Mn)
    Level 2 -         From 0.11 Mn to 0.5 Mn   (Proposed Value - From 1.01 Mn to 5.00 Mn)
    Level 3 -         From 0.51 Mn to 1.0 Mn   (Proposed Value - From 5.01 Mn to 10.0 Mn)
    Level 4 -         Above 1.0 Mn                  (Proposed Value - Above 10.0 Mn)
    My questions are -
    1) Will this change affect the existing Purchase Orders (already created) which are not yet released?
    2) Will this change affect the existing Purchase Orders (already created) which are released?
    3) Are there any risk factors?
    Can you pl. put light on above questions?
    Regards,
    Prashant Kolhatkar

    Hi,
    Actually, what you had given is not enough to determine if the existing PO will be impacted or not
    If you are just changing the classification but not changing the number of release level of the release code in the release strategy, the partial released PO will not be impacted unless there's PO changes. PO that are released will definitely not be impacted unless there are changed.
    In general, after a release strategy is determined for PO, SAP will retrieve the latest list of release code of that release strategy for display for that PO. If this list never change (mean you only change classification of the release strategy), then they will not be apparent to the user. But if this list change (you add new release code, replace existing release code or remove release code), then you will see some discrepency on screen as you will only see the modified list of release code and not the old list of release code
    Hope this help

  • Price changes in Purchase order Line Items its displaying as"WF-BATCH"

    Hi Experts,
    I need some Information about Price changes in Purchase order Line Items,In PO Documents Price changes through this wf-batch has  changed the value of this row to xxx.xx USD, which does not correspond the invoice.
    If  i selected the Item changes in the Purchase Order its displaying as"WF-BATCH".
    So please try to clarify where this batch originates from.
    Brgds,
    RK

    Hi Jurgen,
    Thanks for your reply.
    But how i can check this in Purchase orders,on what basis this price changes information is recorded in PO Line Item level.
    can you pls guide me some steps to check the price changes through WF-BATCH.
    Brgds,
    RK

  • How to change the Purchase Organization filed in the Purchase requistion..

    Hello All,
    I am creating the requirement of material through MD62. Later I am runiing MRP through MDO3 to create the purchase requistion against that. Now my requirement is that if the source list is not maintainted ( ME01) for that material, I want to change the purchase organization field for the puchasre requistion created through MD03.
    Can any one help me how can  I changed that though programming. Any user exit or badi for that .
    Note* : I am working in SAP 4.6 system.
    Thanks and Regards,

    Hi, Umesh:
         Picture1 is  my OPJP initial screen ,I want to change to be Picture B . but I got an error .
         In fact , I  don't have project stock . but I have sales order stock.
         I try to change 'Q' to other option . but I got the same error.
    picture 1
    picture 2

  • Release have to be retrigger if any body changes the purchase order

    Hi all,
    Actually my requirement is.....once a PO is released by a purchasing group.....and later any body  have changed the  purchasing group in  the same PO release should be retrigger how to configure this.
    Regards,
    Bhargav...

    Go to SPRO > Materials Management > Purchasing > Purchase Order > Release Procedure for Purchase Orders > Define Release Procedure for Purchase Orders > Release indicator
    Select the release indicator for the final release.
    Once you are there, make "Chgable" = 6 and "% Value change" needs to be "blank".
    Hope this helps.

  • How to block changes in purchase order after purchase release

    Dear all
    Can u please tell us how to block any changes in purchase order after purchase order is released...
    (We don't want any line items addition or quantity addition or any changes once purchase order is released..)We wanted this for a particular purchase order type only
    Regards
    Sudha

    Dear Sudha
    Yes it is possible to confiquire your system insuch a way where once if the PO  gets final relase then it cannot be changed.Only possiblity that will be available for the user to make chanegs in PO is possible when the final release is to be reset and then make the changes.
    Release Indicator: specicfies whether the PO documents is blocked or can be processed for the follow functions.
    You can define the release indicators you need for your release procedure:
    •The Released indicator is used to specify whether messages (PO documents in output format) may be transmitted for a purchase order with this indicator.
    •The Changeability indicator shows the effect of changes to the PO (a change to a PO may require a new release strategy to be determined, for instance).
    •By means of the Value change indicator, you can specify that the release strategy is to be re-started if a PO is changed and the value of a PO item thereby increases by a certain percentage (e.g. 10%). Set the Changeability indicator to "4 - Changeable, new release in case of new strategy or value change" or "6 - Changeable, new release in case of new strategy or value change/outputted" and enter a percentage in the Value change field.
    And after that you can specify release statuese where you can specify which release indicator/status a PO is to have after having been released via a certain release code.
    and after release simulation .
    Test for the PO change after final release System will not allow you tomake changes by giving the message that the release  indicator doesnot allow you make the changes in PO.
    Regards
    Sunny

  • Release Strategy - Purchase requistion go back to unreleased

    Hi Friends,
    I am facing  two  problem in release strategy in our client system.
    Problem. 1:- Purchase Requisition changes( Other then the characteristics maintained) causing PReq go back to Unreleased.
    Current System Settings;-
    Release Procedure:- Procedure with classification ( Also setting available for  setup procedure without classification maintained )
    Characteristic maintained in class :- ( Plant, Value , Creation Indicator)
    Value maintained in CL24N for plant , Creation indicator.
    Release Indicator:- 1 Stage:- X. Blocked
                                    2 Nd Stage:- 4.RFQ/PO no changes
    Scenario :- When  PR is created and released , If any one changes the Purchase Group in any line item  which is not part of the release Strategy. Release strategy gets retriggered and the relase staus goes Blank for some case and for some case release strategy retrigger. My Question is if Purchase Group is not part of my release Characteristic then why release strategy gets retriggerd.( I used only purchase group here for Example, Any other changes also effect the release strategy to retrigger)
    I checked all the system setting and it seems to be correct except when i  use transaction OMGQCK to check PR release strategies, the log shows 3 errors of type:
    Checks re requisns. with item-wise release 3
    -> Checks re release group and release class 2
    -> No release group exists 1
    Problem. 2:- Purchase Requisition not triggering when  PR is created from other source linked to SAP.
    Please suggest the solution for the above problem.

    Hello Kunal,
    A few thoughts and questions on your problem:
    You generally can't have both release procedure without classification and release procedure with classification working at the same time.
    To get the system with classification working, you have to have several things in place and consistent: You need a release group.  It should have a class.  That class should have all the characteristics you need to assign a strategy to every requisition (or item, if you're doing item-based release).  You should use CL20N (or CL24N) assign values to strategies so that you have no possible cases where a requisition (or item) doesn't get assigned to a strategy.
    You have to choose item-based or overall release for each requisition document type.  You mark this on the document type.  You must also choose the same option for the release groups that the document type will be assigned to.  Example: document type NB is item-based.  Document type ZB is overall.  Document type will be a characteristic.  CL20N will assign requisitions with document type NB to strategies in release group NN and requisitions with document type ZB to strategies in release group ZZ.  Release group NN will be marked as item-based.  Release group ZB will be marked as overall-based.  Usually, I think, you will  just use one or the other, and it will be less complicated, but the release group must match the document type.
    The indicators themselves have some configuration, including a field for changeability.  Your configuration defines the indicator assigned after a release, and that changeability field will determine whether the requisition can be changed and whether that determines a new release.
    As Prasoon mentioned, if there's an enhancement active, that could affect things beyond configuration.
    If you are using workflow, there might be custom events related to the business objects involved that  can change things, as well.
    Are you using workflow?
    Are you using overall or item-based release?
    Good luck,
    - Jeff

  • User Exit for Purchase Requistion / Purchase Order Release Strategy

    Hi
    Can any one please tell me the List of User Exit / Enchancement Package for Purchase Requisition / Purchase Order Release Strategy .
    Thanks

    M06B0001                                                               
    Role determination for release of requisitions                         
    M06B0001                                                               
    Changes to communication structure for release of requisitions         
    M06B0005                                                               
    Changes to communication structure for overall release of purchase     
    requisitions                                                           
    M06E0004                                                               
    Changes to communication structure for release of purchasing document  
    M06E0005                                                               
    Role determination for release of purchasing documents

  • Sales order released from Credit block, but Purchase Requistion not created

    Hi,
    In third party sales scenario based on Scheduline Line category configuration purchase requistion creates when the order is created. If order is blocked for credit check then purchase requistion will not be created until order released from credit.
    Here my scenario is
    I have two users like A and B. When A releases the order from credit block by using transaction VKM1, Sales order releasing from credit and creating Purchase requistion. But, if the order is released by B, Sales order is getting released from credit but purchase requstion is not getting created.
    There is no issue from security side, we activated trace and analysed everything it is not security issue.
    Thanks and Regards
    Alokam Chandra Sekhar

    Hi Lakshmi,
    Thanks for reply. I followed your instructions, pls find my observations below.
    1. Can you check the below settings:
    What is the Credit status in the header status tab page of the sales order for the B's sales order?
    Is it "Not approved or releasedu201D If it is not approved, you might have released the sales order in VKM3, but you might not have saved it.
    Reply: We are releasing order through VKM1 and after releasing the order the status is showing as "Released".
    2. Did you use the same material for B's Sales order? If it a different material check the Item category and Schedule line category whether these are same with A's sales order.
    Reply: Both the orders has same information, like material Item category and scheduline category
    3. Check in the Schedule line tab page --> Procurement button whether you have maintain vendor, Source determination and Info record.
    Source list has been verified through ME03 transaction and vendor data maintained correctly.
    I really appreciate your time and efforts on this.. looking forward some more suggestions...
    Thanks and Regards
    Alokam Chandra Sekhar

  • I recently destroyed my macbook pro and lost all my info.  I need to redownload my programs.  I bought CS5.5, but was upgraded to CS6 because it was purchased just a few weeks before its release.  How do I do this?  Thanks!

    Hi!
    I recently destroyed my macbook pro and lost all my info.  I need to redownload my programs.  I bought CS5.5, but was upgraded to CS6 because it was purchased just a few weeks before its release.  How do I do this?  Thanks!

    Downloadable installation files available:
    Suites and Programs:  CC 2014 | CC | CS6 | CS5.5 | CS5 | CS4, CS4 Web Standard | CS3
    Acrobat:  XI, X | 9,8 | 9 standard
    Premiere Elements:  13 | 12 | 11, 10 | 9, 8, 7 win | 8 mac | 7 mac
    Photoshop Elements:  13 |12 | 11, 10 | 9,8,7 win | 8 mac | 7 mac
    Lightroom:  5.7.1| 5 | 4 | 3
    Captivate:  8 | 7 | 6 | 5.5, 5 | 1
    Contribute:  CS5 | CS4, CS3 | 3,2
    FrameMaker:  12, 11, 10, 9, 8, 7.2
    Download and installation help for Adobe links
    Download and installation help for Prodesigntools links are listed on most linked pages.  They are critical; especially steps 1, 2 and 3.  If you click a link that does not have those steps listed, open a second window using the Lightroom 3 link to see those 'Important Instructions'.

  • Restrict changes in purchase requisition if it is released.

    hi experts.
    I tried to restrict changes in released purchase requisitions using exit - cozf0001( for externally processed operation) and cozf0002(for externally procured component). I am displaying an error message if somebody tries to change a Pur. Req. and save it.
    It is working fine in case of cozf0001.
    But in case of cozf0002 after my message statement execution is going to a subroutine - 'SAVE_NEW_OBJECT' called by main program SAPLCOMD. In that subroutine
    code is like-
      message id sy-msgid type 'I'      number sy-msgno
       with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    as a result my message eis coming as a warning even if I have my message type is 'E'. Please give me some solution so that my message can be error but not a warning or information.
    Thanx in advance.
    Partha

    Hi,
    In release procedure for PR under rellease indicators the changebility indicator might have set as 2 or 3 or 4. Hence the system is allowing to change the PR after release. The changeability indicator function to allow changes of PR after completion of release PR. There are 4 indicators pertaining to PR. According to the requirement can set. If you set 1 indicator system won't allow to change the PR. I hope this will resolve your issue. Thanking you.

Maybe you are looking for

  • How to Add record to the ExcelUploadforVoucher.xls

    Hi, I got a work regarding "Voucher upload for Recorded Payments" Requirment: To allow the voucher upload process to pass the recorded payment information into PeopleSoft and create pre-approved, manual recorded vouchers. How:Utilize the existing PYM

  • OSB 10.3.1, WebLogic 10.3.0

    I downloaded and installed Oracle Service Bus 10.3.1, which comes with WebLogic Server 10.3.0. Is there a supported, simple way of keeping the OSB while upgrading WebLogic to 11g (10.3.1)? Cheers, Morten T

  • Shared MobileMe calendars - gone forever?

    My team shares a couple of calendars in MobileMe.  They're pretty key to doing our jobs effectively.  I've migrated to iCloud, and lost those calendars.  And my team is unable to invite me back, because my iCloud ID is the same as my MobileMe ID, and

  • Error in FP50 - Manual Outgoing Checks Lot

    Hi Experts, I am getting error while I am creating outgoing check using FP50 - Account determination not possible for key 7777  /      /CS    /0600 /0020. I have maintained the main sub 0600 0020 in SPRO at below path - Financial Accounting (New) -->

  • How to setup and position resizable Scroll Bars in Java ?

    I seem to be asking a trivial question - I having MFC code below, how to convert it to Java ? For a given bigger image_dims and smaller view_dims - MFC code below sets-up and positions the ScrollBars. What is the corresponding class and member functi