CM01 not updating upon partial confirmation of an activity in order

Hello PP Angels,
I am looking for an explanation for this.
When a production order is partially confirmed, (using CO11N),
for an activity -- say labor time.
(and do not confirm any quantity )
subsequently, on checking the CM01 Standard Overview,
I find the report unchanged, under the requirements column.
(for the week concerned)
But the same ( capacity requirements) gets reduced,
for the relevant week,
on doing a partial confirmation of production order,
for a value in the "Yield" field in C011N.
Is this the standard SAP behavior ?
I am in ECC6.
Thanks in advance !

Thanks for the reply !
I have tried it
It does work,
there is a change in the cap reqmnt column in CM01
But the value is not as expected, as explained below.
CM01 shows initial cap req as 33.5H
After confirming the production order
for 10 minutes (0.1667 H) of set up time
I would expect the Cap Req Column to have a value of 33.5 H - 0.1667 H  = 33.3 H
but CM01 displays only 0.17 H
( I have created this scenario such that CM01 reflects only one production order.
So there is no mix up of data. )
Can we see how the Cap Req column in CM01 is being calculated, (the details)
I did double click the cap Req  value in CM01
and it shows the relevant production order,
but no further details can be viewed pertaining to the calculations.
Thanks in advance !!!

Similar Messages

  • Transfer requirement status not updated after TO confirmation

    Hi Experts,
    I have an issue with transfer requirement which is not updated with completed status even after Transfer Order completed.
    Once TO is completed, relevant TR should be updated with completed status. We have many TR in open status even they are completed.
    Could you please help me out how to resolve the issue.
    Regards
    Gowri Sankar

    Hi
    You can use the Warehouse activity monitor (LL01) to select the completed TR's and select the d''delivery completed' button and this will get rid of them
    I hope that this helps
    Frenchy

  • AD Group membership not updating in Sharepoint Foundation when adding Active Directory group to Sharepoint group

    I have Sharepoint Foundation installed with the latest CU updates.  It is running on a VMware box (Windows Server 2008 R2 Standard) with its backend on a SQL Server 2008 R2 vmware box.  The farm account is a domain user and has been given all appropriate
    replication rights, etc to active directory.
    Everything seems to be working fine except for security integrated with AD groups.  When I go to edit permissions I can add individual AD users just fine and remove them just fine and their access is taken away right away or given to them right away.
     I can also find AD groups in the people picker and add them to the site. When I add new groups to AD, they are found immediately within Sharepoint, and when I delete groups from AD, they are taken out of the people picker right away.  Now comes
    the weird part.  When I add an AD group to the site, all users currently within that AD group are given access to the Sharepoint Site.  This works for the first time only.  Now when I add or remove users from the AD groups, it does not update
    in SharePoint.  For example, I have an AD testuser1 in the AD Group "All Users".  testuser1 does not have access to SharePoint.  So I add  the AD group to the Sharepoint group "Visitors".  testuser1 now has read access to the sharepoint
    site.  Now, I remove testuser1 from the AD group, but testuser 1 still has access to the site even though he is not part of the AD group, nor does he have any individual permissions to the site.  Now, I add testuser2 to the ad group.  testuser2
    does not have access to the site, even though he is part of the ad group.
    It seems that the only time AD group security is working for me is when I first initially add the AD group to the site.  From then on, it's like sharepoint is caching the members of the group and not updating any new adds or deletes from the groups.
     Any ideas?  I am lost on where to go from here as I have tried everything from clearing cache files, rebooting servers, iisresets....

    I think I have at least cornered the problem, but am not 100% sure yet that it is the correct answer.  I think it could be 1 of the following 2 scenarios.
    Scenario 1:  We have 3 web applications setup on our web server ports 80 - Our sharepoint Web app, 2020 - Our My Site Web App, 2040 - Our Search Web app.  We are using host headers (http://sharepoint.***.com) instead of a server name.  So
    we setup our access mappings (Central Admin -> Application Management -> Configure Alternate access mappings) to use the host header (http://sharepoint.***.com) as the default mapping and the server name as the intranet access mapping.  By
    setting the default access mapping to host headers, i noticed that Sharepoint automatically assumes that all web apps are on port 80.  You can see this by going to (Central Admin -> Manage Web Applications).  The port listed all 3 web apps on
    port 80.  So I think when I was doing a profile sync and using mysites, it was messing with my AD security because of this.  What I did was the following.  I went to Central Admin -> Manage Service Applications -> [Name of your user profile
    service] -> Setup my sites.  I made sure that my preferred search center had the correct port number on it (mine originally had no port number), that my my site host had a port (again no port number originally), as well as the personal site location.
     I then saved this.
    Scenario 2:  Our user profile sync had 2 BDC connections that were corrupt and throwing errors.  I rebuilt the connections, remapped them to the proper user profile property.
    I did both of these scenarios above around the same time.  I then restarted all my servers, and at last the AD Group security is now functioning appropriately.  I have done multiple IIS resets and server restarts.  The issue has only reappeared
    once.  After restarting the machine again, we were back to the AD groups functioning correctly.  Because we had the issue reappear once after doing the above, I still do not feel 100% sure that either one of the above corrected the issue completely.
    As long as we are up and running currently, I am moving on to other tasks with this project.  My only concern that it will break again and I will have to revisit it is when we restart the servers....which is never fun.  I will update as I find
    a "true" answer to this issue....  Let me know if any of the above helped you or if you find something I may not have thought of.

  • FPJ files not updating upon topic import

    Hi, Gang!
    We have a large project file that's been maintained seeming forever. It's probably nearly 8 years old and has been upgraded through four or five versions of RoboHelp. To take advantage of some downtime in between versions, we decided to create a fresh project and import all of the content from the age-old project file into a new, pristine project file. Very briefly, the process was:
    Create a new project and define a folder hierarchy in the Project Manager to match the original project. That is, create empty directories in the proper hierarchy for the project.
    Import one folder at a time, beginning with the lowest levels of each branch and working through the project.
    This worked really well except for about 30 broken links. Further investigation refvealed that the broken links were caused by files that imported but did not show up in the project manager because the fpj files didn't update.
    I can manually import the missing files and one-by-one, the broken links disappear. But, because the fpj files aren't updating (verified by watching the fpj file for a given directory as I reimport files), the problem topics and resultant broken links reappear when I reopen the project.
    By doing this repeatedly, I can occassionally get one or two fpj files to update, slightly changing the number of topics that are missing. But I can't get rid of them all.
    I've tried opening the project using the hhp file instead and letting the project rebuild, but that doesn't help.
    I've tried resetting the properties of the project directory to ensure that nothing is read-only, but that doesn't help.
    I've tried deleting just th fpj files in the problem directories and reimporting but that doesn't help. It creates a new fpj file but it has no topics listed, no matter how many times I try to import.
    So, here I sit with a project that's 90% there, were it not for the missing 10% of files that refuse to "stick" because when I import them the fpj files don't update.
    (I'm running version 10 and am wondering if version 11 would maybe solve my problem.)
    Any advice?
    Thanks!
    ------later that same day-------
    If I manually edit the fpj file for every offending directory and paste into it the content from the well behaved fpj files in the original project, the topics stay after project relaunch and the broken links stay resolved. The next step is to see if newly added topics are retained or if, once again, the fpj files are static and refuse to update.
    Message was edited by: Rocky_XYZZY to provide additional information

    If you want my opinion, forget about manual importing. I normally just
    place all topics I want in the directories of the target project and
    then fix the fpj files. Much faster than importing one by one. You just
    need to make sure to patch all the links to images, style sheets and the
    like in the target project. But that only applies if you change the
    structure of the project.
    You can also copy the information for context sensitivity this way.
    To update the fpj files, you can use the following script:
    http://www.wvanweelden.eu/product/missing-topics-fixer
    Kind regards,
    Willam

  • Profit Center not updated in J1IEX & New GL  is activated.

    Hi All,
    Good Morning to Every body
    We have activated  New GL concept making Profit Center mandatory. Thereafter, we have made a Import Purchase Order. The material for which import is being made is given the cost center in the master data. Then MIGO has been done. Accounting entry is picking up the Profit center filed automatically. Then MIRO is done and accounting entry is picking up the Profit Center filed automatically. When we do J1IEX " Post Excise Invoice" then system is not picking up the Profit Center Field automatically and is displaying an error while saving. System is saying" No profit center is updated for line item 001".
    That means, system is not picking up the profit center from the material after MIGO into J1IEX while posting excise invocie.
    Please some one help me as to how we should capture the Profit Center field automatcially or mannually so that Excise Invoice can be posted.
    Thanks in advance. Useful answers will be awarded with points.
    Thanks & Regards
    Rishikesh

    Hello Rishikesh,
    Please use the "Capture and post" option in migo for exicse invoice if you are using New G/L with profit centre.
    Regards

  • Route schedule not updated in some line item of a sales order

    Hi Gurus,
    All order are processed through the EDI interface automatically. Order
    XXXXXXXXX for USA customer 40000XXXX is maintained in route reschedule
    setup T-code VL52 on specific departure day thursday.
    above are line item of same sales order, with same shipping point and route .
    Why only some salesorder lines missing the route schedule ?? 
    Please Help
    Regards
    Abhilash

    When you post a query here, you need to have patience until some members go through your post.  Please dont expect somebody should respond to you immediately as everybody has their own priorities.
    Coming to your query, it could be due to many reasons as per the following note:-
    Note 1750978 - Route Schedule does not populate on sales order
    Go through the Resolutions given in the above note and check with your system
    G. Lakshmipathi

  • Can not update exchange due to error with Active directory

    Error:
    The following error was generated when "$error.Clear();
     Install-CannedRbacRoles -InvocationMode $RoleInstallationMode -DomainController $RoleDomainController
    " was run: "Active Directory operation failed . This error is not retriable. Additional information: Access is denied.
    Active directory response: 00000005: SecErr: DSID-031520B2, problem 4003 (INSUFF_ACCESS_RIGHTS), data 0
    I have tried everything I can find on the web. any assistance would be appreciated. Thank you.

    I see now that you have logged into domain
    Another thing, check if Allowed Inheritance is blocked on this account (bmoore)?
    Cheers,
    Gulab Prasad
    Technology Consultant
    Blog:
    http://www.exchangeranger.com    Twitter:
      LinkedIn:
       Check out CodeTwo’s tools for Exchange admins
    Note: Posts are provided “AS IS” without warranty of any kind, either expressed or implied, including but not limited to the implied warranties of merchantability and/or fitness for a particular purpose.

  • DLV status not updated in Process order

    Hi guys,
    I did GR and got goods receipt documents but system is not updating  DLV status  in process order.
    Actually i have by-product and co-products as components in order. I did posting of by-product from Confirmation screen COR6N and for co-products i did MB31 and goods movement doc. get generated. Qty. is also updated in order but NOT the dlv status.
    Pl.suggest

    Dear,
    This is System status and you cannnot maintain it manually once that Business Transaction(FULL Delivery) happens System will automatically sets that status.
    DLV status updated once Del completed tick is activated in order header, This tick will get uodated once you do GR for complete qty.
    You need to Final confirm (CNF) the Order to get the DLV Status.
    Or if the Delivery completed indicator is set in the Process Order, then also th System status will be DLV.
    If you want to make it manually then goto co02, enter the order, goto goods receipt tab page and activate delivery completed tick and save...DLV is activated in the head as status.
    Please check in BS22-I0012
    Regards,
    R.Brahmankar

  • PO not updated in SRM

    Hi SRM Experts,
    We are in SRM2.0 with classic scenario.
    The PO created in R/3( from Pur Req.) after Shopping Cart approval is updated back to SRM. This PO is then deleted and another PO is created from the same Pur.Req.
    Now the Deleted Status is updated back to the SRM but the newly created PO is not updated even after running BBP_GET_STATUS_2 job.
    As the new PO is not updated in SRM, Confirmation is not possible.
    Any clue on how to proceed for this issue ?
    Thanks & Regards,
    Ram

    Hi
    Please use report CLEAN_REQREQ_UP as well.
    See some other useful related links ->
    BBP_PDBEI missing item number
    Classic scenario: Update shopping cart with changes in backend PO?
    Update Document History in Shopping Cart
    Mismatch in EBP and backend SAP system
    Note 890319 ActualValues in SC from back-end documents are not deleted
    Note 631619 BBP_GET_STATUS_2: Number of data records updated
    Note 636527 BBP_GET_STATUS_2: Incorrect references
    Note 508819 Status, UI adjustment, BBP_GET_STATUS_2
    Note 494036 BBP_GET_STATUS, BBP_STATUS_READ: several problems in backend
    Hope this will help. Do let me know.
    Regards
    - Atul

  • Quantity not posted to object error in while activity confirmation

         Hello All,
    i am getting below error while activity confirmation , please help me on this below.
    Note : Activity and cost center and KP26 no changes are made compare to preview year and current year , for the fiscal year 2014 i didn't get any error , only for the fiscal year 2015 i getting  below error.

    Dear Hari,
    If the activity type of the confirmation has set the flags as
    mentioned (indicator MANIST in table COKL is set) the system will simply
    NOT post any quantity on the sender cost center/activity type during
    the confirmation.
    So all quantities which are currently missing (as these were not
    updated by the confirmation) must be posted with transaction KB51N.
    If you implement the coding corrections of #760437 you have the
    possibility to change the message BK263 from "I" to "A" in transaction -
    which is however not recommended.
    So the advised procedure is:
    -post all mising quantities with transaction KB51N first
    -then run the report ZRKMANIST_RESET to remove the flag MANIST (which is
    the reason why the confirmations did not post quantities on the
    sender cost centers)
    After this procedure, the quantities will again be updated when you
    post confirmations.
    Best regards,
    Jason

  • Sales order Partial confirmation

    Hi,
    I have an issue:
    1. When i create the order with KIT material it is confirming the Partial quantity as
    There is no sufficient quantity.
    2. When i create the order with Standard material it is NOT confirming the Partial
    Quantity even there is no sufficient quantity. Just it is showing confirm qty 0.
    My requirement is for KIT Material also it should not do the partial confirmation.
    This requirement was working fine before Upgrade the system.
    This is very urgent. Please suggest your ideas.
    Thanks,
    Naveen

    This is not an ABAP issue. I'd suggest to move your question to SD forum to get a better/faster response. Good luck!

  • Actual Cost not updating to Network Activity from CATS

    Dear All,
    Am back here for the expert suggestions / guidance.
    I am facing issue with respect to system not updating the actual cost in network activity / projects posted through time sheet i.e. CATS. I have planned my resource cost through work centre assigned with activity type, formula and cost centre. I have kept the employee master data in place with maintaining the 315 infotype. In CAT2 i am posting the respective time sheet on the particular network activity and am transferring the cost into projects by CAT5, the plan cost is getting updated but actuals are not hitting the projects.
    Kindly do the needful and suggest me if am missing something out of the track
    Thanks
    Praveen Mohanachary

    HI Gokul,
    There wasn't any error during confirmation and i have also checked in CN30 as well as COFC transaction. It is posting the time and the activity is getting the PCNF status set but there isn't any actuals posted. I used CATA for some activity and also used CAT5 for certain activity both are not posting actuals on projects.
    Thanks
    Praveen B M

  • Batch number(int/Ext) on partial confirmation

    Hi Gurus,
    I want to maintain separate batch no.(Int or Ext) for each partially confirmed quantity, for example, If order qty is 100 and if i confirm 50 qty system will promt for batch no. for that qty and same thing should happen for the remaining qty. Can you please tell me what are the cofiguration and master data settings i need to maintain.
    With Regards
    Rajib
    Edited by: Rajib Pathak on Sep 10, 2008 10:49 AM

    Hy Rajiv,
    For Multiple Batch No.During GR for Production Order you have to do below Settings.
    In Production Scheduling Profile T.code OPKP / CORY
    Select No Automatic Batch Creation in Production / Process Order.
    You can do this setting in T.code CORW - Define Batch Creation in Order.
    After This settings there is no Batch No will not generate automatically in Order.And Due to this system will generate Batch No, During Goods Receipt of Order  and this will happen for Partial and Final Goods receipt.
    But For this Most imp thing is Batch Creation for 101 Movement type is set active in SPRO (Batch Management)
    Regards,
    Dhaval

  • Want Automatic scheduling in case I partially confirm the activity

    Hi Experts,
    I have one network with two activities having FS relationship with duration for ex.10 & 20Days.
    Activity 1:  ES = 01-01-2009  & EF = 10-01-2009  (Date -Month - Year format)
    Activity 2:  ES = 11-01-2009  & EF = 30-01-2009
    I havedone the following settings:
    1) Adjust Basic Dates
    2) Automatic Scheduling
    3) In confirmation parameters - Propose dates
    Now I had done the partial confirmation of activity 1 with actual start 03-01-2009 & Actual Finish 11-01-2009  & forcast duration 2 days
    Now when i save the NW or Project but system dose not do the automatic scheduling Earliest dates remain same .For this I have to do manually
    Can some one help so that the system schedule automatically & the result would be as
    Activity 1:  ES = 03-01-2009  & EF = 13-01-2009
    Activity 2:  ES = 14-01-2009  & EF = 03-02-2009
    Regards,
    Deependra

    Hi
    The ES and EF dates are the dates for planning only. Scheduling is done for the planning purpose only.
    Once you do the actual / partial confirmation of the activity, the difference between your planned visa-vis your actual dates will help you to understand your planned credentials.
    Regards,
    Uddhab

  • Partial Confirmations in WIP

    Right now, when we confirm the full quantity of a production order, there will be no costs assigned to the G/L account for WIP.  However, when we confirm a partial quantity for the production order, then those costs will be assigned to the G/L account for WIP.
    How can we have partial quantities NOT show up in WIP?  How can this step be skipped?

    OPJ8 does not provide the solution I am looking for.  In OPJ8, I can alter the control keys for my operations, but it will not let me adjust how WIP is calculated.
    OPL8 also does not provide the solution I am looking for. In OPL8, I can change the RA key, but that only prevents WIP from being calculated.
    I am unsure what exactly I should be looking for in OKGC, this seems to just be the definitions of the RA keys that I can adjust in OPL8.
    I should clarify, I donu2019t necessarily want to u2018skipu2019 WIP calculation, I want all partial confirmations to post directly to the G/L. 
    So letu2019s say we partially confirm a quantity of 5 on an order of 10.  In this situation, we would typically see these associated costs in the G/L account for WIP.  We do not want to see any partial confirmations in WIP, we want these costs posted directly to the account after WIP.
    I want it so that if I were to run FBL3N u2013G/L Account Line Items (after the individual processing of a partially confirmed order), I would NOT see my partially confirmed order in this report.

Maybe you are looking for

  • Can't send or receive emails using Windows Live Mail. Webmail login says "account disabled."

    Since yesterday we have not been able to access our Verizon email through Windows Live Mail or loging on to the webmail service.  Nothing happens and we get a "accounts disabled" message.  I checked all of the POP settings and it won't connect.  When

  • Linux 3.9 VPN Client

    Anybody have any success connecting to a BM 3.8.5 VPN server (C2S) using this client? I've setup a SLED 10 box patched to the hilt and installed the latest Novell Client for Linux as well as the VPN client (installed and configured as per the documen

  • How to Restore iCal from Time Machine

    Dont now why all my events for next month and future are erase. I want to recover the last time machine back up but dont now how. Can some one bring me the step by step indications?

  • The ability to measure cash in and outflows based on the Profit Centers

    Hi, As you may be aware, we are currently undertaking a global project to split our Balance Sheet based on the divisional structure (Profit Centres in SAP).  The splitting of Receivables and Payables by Profit Centre. We have an additional requiremen

  • Data source creation for service contract configuration

    Hello all, I have to create a data source for extraction of service contract configuration. I think this could work like data source creation for sales order creation, but I don't know waht to enter in transaction CTBW. Anyone here has done this prev