CM25 : adjust setup time automatically when i dispatch production orders

Dear guru ,
I dispatch the production orders according to a specific sequence.
After the dispatching I can adjust setup time automatically using setup matrix.
Does exist a chance to adjust setup time automatically when i dispatch production orders ?
Thanks.

no replies

Similar Messages

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Capacitity leveling - Dispatching production order considering PM block

    Dear friends,
    I am trying to dispatch a production order of large Qty by using transaction CM21.
    The order will take 15 days to complete.
    Two days are blocked by plant maintenance order on that work center in future. They are shown as black in CM21.
    When I try to dispatch, system is automatically dispatching the order in such a way that its end date is before PM block date or start date is after PM block date.
    e.g. Order will run from 10th August to 25th august.
    PM has blocked dates 20 & 21st August.
    Hence the expected result is start the order on 10th and will end on 27th.
    But when I dispatch the order on 10th, system automatically takes it to 22nd (First day after PM block).
    Can we not plan orders with PM block period in between?
    Best Regards,
    Avinash

    You need to enable splits in the operation (routing definition).

  • Automatic batch management for Production order receipt

    Hello ,
    I have a requirement to setup & activate Batch Management only for Production order Good Receipt . I am looking out for what all configuration / data setup will be required to complete this .
    To start with I have following questions .
    1. Whether such activation is possible only for Production order Good receipt - 101 mov.type
    2. IF yes , is Batch management activation status be at material or plant level .
    3. As I need automatic assignment , should I be selecting Internal batch management .
    4. What should be selected for valuation for Goods movement in Inventory management.
    5. Is it necessary to have batch determination by maintaining Condition tables / Access sequence
    6. What would be standard Class / characteristics to be maintained for automatic determination.
    Also I will have to work with the running system where Material are already active and have stock in system . What precautions will I have take if I have to activate the Batch Management in a running system.
    Appreciate all your expert advise.
    Regards,
    Lawrei

    Thanks Adler for your comments .
    With reference to your point , need further clarifications
    1. If batch management is selected to material , this means that it will be active for all movement types for Inventory and cannot be restricted to 101 mov.type .
    I see that in config node
    +Define Batch Creation for Goods Movements+
        +Using this function, you can define for each movement type whether a new+
        +batch is created for a goods receipt and how it is created.+
    Can I not restrict batch creation only for 101 movement , but again here I don't have options to select only for Good receipt for order - Tran/Ev type - WF .
    & what about below config node
    +Define Batch Creation for Production Order / Process Order+
        +In this step you can make the following settings in batch management for+
        +the existing production control profiles:+
    Is it possible in this node .
    Please advise.
    Regards.
    Lawrei

  • Automatic Batch Determination   in Production order

    Dear All,
    We are using automatic batch determination is based on FIFO (first Mfg first out) for components..After releasing the order.
    I have maintained Batch Class in all the materials which are used as a all material special Characteristic LOBM_HSDAT as a one of the class characteristic. as we want batch determination  on GR date for few material and for few material LOBM_VFDAT for self life material and its class.
    Then create Sort Rule CU70 mainatained the same LOBM_HSDAT in it. and one with LOBM_VFDAT.
    Then create Batch serch Strategy (USE T.Code COB1- search strategy CO01the respective sort rule and selection critoria.for All ROH HALB and Finish material.
    In Material Master of all component in MRP 2 view select value 3 (Automatic Batch Determination) for BATCH ENTRY. All ROH HALB and Finish material
    After mainting above all prerequisite I should able to do the Automatic Batch Determination as per my selection Rule.
    But Automatic Batch Determination  in Production order after release is not working.
    Please need your help.
    Regards,
    Manish
    Edited by: manish gurnule on Dec 30, 2008 5:26 AM

    Dear,
    Define the batch determination search strategy for process order in COB1 with sort rule in CU70.
    On the initial screen of your application choose Logistics>centrel function>batch management>Batch determination>For process order -->Batch search strategy --> Create.
    On the initial screen of your application choose Batch search strategy -->Create.
    Choose the strategy type, say choose co02
    Choose the key combination-
    Enter the required dat-->say plant ,production order type, product,valid from and component for which you want to have this
    Choose Selection criteria push button. Choose a sort sequence.
    If no values have been entered, enter the selection class and the characteristic values.
    Go back to the screen on which you create a batch search strategy.
    Choose Sort if required(it should be defined earlier(in CU70- here you are giving the charateristic name on which you want to sort)
    For component you need to use MBC1 with search stratgey as ME01 for your plant movement type and material and assign the sort rule and search procedure here.
    Check also in COR4, for the combination of plant and order type...you have selected search procedure-CO0001
    Batch management> Batch serach procedure allocation and check activation
    T.Code to be looked specifically OMCG , CORC
    Hope it will help you.
    Regards,
    Madhu

  • Allocation error when I create production order

    Hi guys:
       I met allocation error when I created production order with CO01.could you help me out?urgent!

    hi
    What is the excatly the error so that we can tell u the reason
    regards
    ramakant

  • Dispatch production orders/planned orders

    Hello:
    Is there a standatard function module available to dispatch production orders/planned orers? Equivalent to MF50, where an order is dispatched.
    Sarita.

    HI Saritha,
    I have teh same requirement , can you please share how did u met the requirement.
    Thanks & regards,
    Adr

  • Can't dispatch planned order (LA), but can dispatch production order

    Hello,
       I'm new to capacity planning and all of the related configuration screens.  I'm probably missing something simple.  We've configured our work centers and routings.  We've configured our production order types (tcode OPU3, type US01) and planned order types (tcode OPU5, type LA) so that all create capacity requirements and are relevant to 'detailed scheduling'.  Requirements are being generated for production orders and planned orders.  We can see correct setup and production times in the graphical planning table CM21.
       Here's the problem: When we try to dispatch a planned order, nothing happens.  There is no error, but the order is not dispatched.  If we convert the planned order into a production order, accepting all SAP proposed defaults, and then try to dispatch the production order, it works fine.
       What configuration are we missing?  My first thought was to look in OPU5 for order type LA.  In the detailed scheduling section, scheduling horizon is zero (is this Ok?), SelID: Detailed is 01, 'scheduled' and 'generate capacity reqs' are checked.
    Thanks,
    Randy

    Randy ,
    Please analyse the below note related to your issue.Hope this will help you to sort out the problem.I have cheked the configuration area.I hope u are correct .In fact , it may related to your production version if you do automatic dipatch.Please reade the note and come back.
    If an error arises when automatically dispatching planned orders (for example, a capacity overload at a work center) then the system schedules the affected planned orders to another production line.This function is available in both types of planning table. It is of interest for all areas that use planned orders, for example in repetitive manufacturing or in MRP/MPS. It can also be used in production control when later converting planned orders to production orders.
    this function the following conditions must be met:
    The dispatching function Change production version on error must be set in the strategy profile.
    The original work center
    must be entered in the production version of the material as the production line (not necessarily in the current production version).
    can only be assigned to one operation in the routing for this production version
    The alternative work center can only be assigned to one operation in the routing for the alternative production version
    If an error arises the system copies the production version with the version key that is next alphanumerically into the planned order. The planned order is rescheduled with this production version. However, it is not dispatched to the new production line but remains in the pool. In this way you can dispatch the rescheduled planned orders together with other planned orders in the pool to the new production line.
    To give you a better overview and to improve handling you should choose a sort key with which the planned orders in the pool are sorted according to work center and, for example, latest start date. All orders that are to be dispatched to a production line are then placed next to one another in the pool. If an error arises during automatic dispatching to the new line every planned order affected is rescheduled with the next production version
    . If the conditions are not met then the following occurs depending on your settings in the strategy profile:
    Dispatching is terminated
    Dispatching to the same work center is continued and error messages are written to the planning log
    You can only dispatch main operations with this function, but not sub-operations. Operations are always dispatched with the full quantity to the new work center
    Reward point if useful
    Regards
    Jia

  • How to get Operation wise Time for a list of Production Orders

    Dear Sir,
    We have a list of Production Orders numbers and need to know the operation wise time duration for these production orers (off course the desired time is same as mentioned in the routing for the relevant component)
    Kindly guide us as how can we get these timing details .
    Rgds
    Sonia agarwal

    Sonia,
    I hope your are refering to setup time, process time, teardown time in the production order.
    use report COOIS for it.
    In the 'List choose operation.
    Give input for the production orders in the slection scren. Execute.
    In the report select the columns as per your requirement.
    Hope this helps you.
    SmanS

  • How to create the Batch Automatically during creation of Production order

    Hi All,
    I wanted to create the Batch Automatically for the Specific order type during creation.
    Not for all order type so OPKP transction will not work for me.
    Please suggest any way or user exit any production order.
    Thanks,
    Amit Shah

    Hi All,
    Thanks for your inputs.  
      1. Why we want create the Batch Auto -
          For Std Production Order type we want to generate Batch Automatically.
          For Re-work Production Order type we don't want Batch Created Auto.
          If you have better solution please let me know.
    2.  Scheduling profile.
          I think I misunderstood your solution.
          You want to say that mainatin the Schd profile in the SPRO with repect to Sub Schdler.
          Already client is maintaining the Schd Profile in the Material Master.
           please correct me if i am wrong.
    Thanks,
    Amit Shah

  • Automatic GR Problem for Production Order - Missing PARTS

    Hello
    Stocks are available in the QA stock, The Availability check is considering this stock also, but during Production order confirmation,( CO11N)  we are getting error  message missing parts , we have two problem
    1) we don't want to consider the different storage location / QA stock for availability check
    2) Once we transfered the stock to Unrest stock , we can't do CO11N , we have to do manual GR / GI , how to overcome this.
    Thanks
    Ni

    Hy Nick,
    For your First Qustion,
    For this go to OPJJ - Avaibility Check Control
    Select Chcking Group which you have assign to your Order type
    (OPJK) and remove tick from Incl. QI stock.And for Storage location don't tick No Storage Location after doing system will check Material availability in only production storage location (Which you have maintain in MRP - 2 view of Material Master) .
    For pop up option, go to T.Code OPJK Slect your Plant , Order type and option 1 or 2 (At the time order Creation or Release).
    Material Availability checks,
    Don't tick No check option,
    This setting will give the option of Pop up screen with Massage of Missing Parts.
    For your Second Question
    Sorry still I still don't under stand your Problm.
    But I guess you want to restrict the GR until GI is not done due to Missing parts.Correct or not?
    If yes then do the below settings,
    go  to t.code OPK4 (Parameters for Order Confirmation):-
    Go to second tab General Individual Entry,
    Tick Goods Movement selecttion and then also tick Terminate for Incorrect Goods movement.
    This setting will help to terminate any confirmation for which goods movement containes any error.
    Hope it will help to solve your problem.
    Regards,
    Dhaval

  • Change output printer when printing a production order

    I can see that there is a specific printer associated with the output of a production order.  Is there a way to change the destination (a different printer) when printing a single production order?
    Right now I can see where the printer destination is shown in CO02, but I do not know how to change it. The screen is display only. The menu path is Order->Settings->Print info.
    Any help would be appreciated.

    Hi Janet,
    Try this.
    Path: CO02 -> Enter PO-> Settings -> List Control -> Here you can change the printer -> Click on continue button.
    Regards,
    Ferry Lianto

  • Error when release the production order

    Hi all,
    while release the production order i am getting the error :-   Plant 1000 is not the only plant assigned to valuation area 1000 , how to resolve this error .
    & can we release the prod order without calculating the cost ?
    Thanks & regards
    satish

    Hello,
    I'm facing the same issue when trying to create a production order using tran. CO01 with inputs (Material:  P-100, Production plant: 1000, Order type: PP01. Next the total quatity of material is chosen freely, Dates/start is set to todays date, Scheduling is set to Forwards scheduling).
    Error message :
    "Plant 1000 is not the only plant assigned to valuation area 1000"
    Message no. CK238
    As explanation SAP says:
    "Diagnosis
    You are attempting to use material costing or order costing. However, the system has determined that plant 1000 is not the only plant assigned to valuation area 1000.
    Costing is only possible when each plant has its own valuation area to which no other plants are assigned.
    System Response
    It is not possible to cost in your system.
    Procedure for System Administration
    Go into Customizing for the Corporate Structure and check the valuation level. The valuation level must be the plant level"
    The error message implies that the user is not given the opportunity to create and save a production order.
    I have secured the followings:
    1. Valuation level is set to Plant level so that the valuation is now done at plant level. (The other option was at Company code level, which is not checked.)
    Question:
    Is there a solution to this problem?
    Thanks and Regards!
    Edited by: WilliamG on Feb 16, 2010 4:04 PM

  • Automatic TECO of a Production order

    Dear All,
    Once i do confirmation of last operation ie Goods movement as Final confirmation then
    Production order status should change from REL to TECO automatically.
    Pls guide me how to achieve this?
    Thanks

    Dear Mangalraj & Sabrine,
    Tried with BADI Workorder_cofirm order workorder_save.
    After final conf while clicking SAVE system is not returning
    DLV before saving. DLV comes after saving.
    ABAPer says no return code of DLV.
    Pls suggest some other USEREXIT or BADI
    It's urgent req of my Client
    Thanks

  • Number range error for some materials when converting into Production order

    Hi,
    Please I need some help with my error.
    When trying to convert planned orders into production orders, I receive an error message saying Internal assignment not defined for number range XX.
    The strange part is that is only happening for two materials! Material type is the same one we always use.
    The planned orders have also the same type.
    Any idea?
    Thanks,

    Hi,
    I think for these 2 materials system is selecting the order type for which external number range is marked and ingternal number range is switched off.
    Can you go to CO01 and create a production order for these materials directly w/o assigning order type on intial screen. check which order type is detrmined by system and check its number range in co86.
    please check.

Maybe you are looking for