CO-product configuration in REM scenario

I am trying to configure co-product scenario with REM process. Is it possible?
If any one worked on this scenario please let me know what are the special consideration we need to take or any SAP note available?
Thanks in advaice.
Rajesha Vittal

in HELP.SAP.COM is the answer.
Product Cost Collector
Definition
Cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. When you use a product cost collector, the product is the main cost object.
Use
Product cost collectors are independent of the production type. This means that you can collect actual costs on product cost collectors in the following production environments:
In order-related production (that is, when you are using production orders) when you want to analyze the costs by period rather than by lot
In process manufacturing (that is, when you are using process orders) when you want to analyze the costs by period rather than by lot
Repetitive manufacturing
In repetitive manufacturing you always use product cost collectors as cost objects.
Product cost collectors are available from Release 4.5A onwards. In earlier releases, the costs of repetitive manufacturing materials were collected on production cost collectors. From Release 4.5A onwards, production cost collectors are converted into product cost collectors. For information on the conversion process, see Converting Production Cost Collectors into Product Cost Collectors.
Order splits for production orders
When you split production orders, the costs for the parent order and child order are allocated to the same product cost collector.
See also: Order Splits in Cost Object Controlling
Constraints
Product cost collectors cannot be used for the following objects and production environments:
Manufacturing orders that settle to a sales order item if you are using a nonvaluated sales order stock in sales-order-related production
Sales-order-related production with a valuated sales order stock, except in repetitive manufacturing environments
Engineer-to-order environments
Manufacturing orders that are part of a collective order
Joint production
Joint production is a production process that yields two or more products in a single production run. In the Product Cost Controlling component (CO-PC), there are a number of special processing requirements in joint production environments regarding Product Cost Planning (CO-PC-PCP) and Cost Object Controlling (CO-PC-OBJ).
In shop floor control, a manufacturing order (usually a process order) is created to manufacture co-products. In the manufacturing order, co-products are carried on the order items.
In Cost Object Controlling, actual costs are collected on the header of the manufacturing order. At the end of the period, the actual costs on the order header are distributed to the individual order items. Work in process and variances are calculated at the order item level. The order items are then settled.
Integration
In joint production, the system normally accesses master data of Production Planning for the Process Industries (PP-PI) such as the master recipe and materials list, or master data of Production Planning (PP) . To distribute the planned and actual costs to the co-products, the system uses the apportionment structure that can be specified the material master record or in the manufacturing order itself.
Terminology
Co-product
You specify that a material is a co-product by selecting the Co-product indicator in the MRP view or costing view of its master record.
Fixed-price co-product
A fixed-price co-product is a special type of co-product.
Primary product
You specify that a material is a primary product by selecting the Co-product indicator in the MRP view or costing view of its master record.
Process material
A process material is a nonstock material that is used in the R/3 System to represent the process by which co-products are produced. Instead of the primary products, you can enter a process material in the recipe header and in the order header.
Process materials have material type PROC.
By-product
A by-product is a product that is produced incidental to the production process of other products. You enter by-products in the material list of a primary product or process material with a negative quantity.
You do not set the Co-product indicator in the MRP view or costing view of the master records of by-products.
Intra material
Intra materials only exist temporarily between two processing steps. Intra materials appear in the material list as items of category M, but are not costed.
If the process is interrupted because of a malfunction, however, intra materials may have to be transferred into inventory. In this case they are valuated with a price in the material master that is selected through the valuation variant for the valuation of goods received.
Intra materials have material type INTR.
Circulating material
You can specify whether the cost of a circulating material should be included in the material list. The system selects a price for the circulating material from the costing view of the material master record.
If the circulating material is flagged as relevant to costing, the material costs appear in the itemization twice: once with a plus sign and once with a minus sign. The balance is the material input costs.

Similar Messages

  • Manual selection of production version in REM scenario.

    Hai gurus,
    I discrete manufacturing we  can several production versions and we can select the same manually
    when we convert planned order to production order. Like this whether it is possible in REM scenario
    to select the production version manually, if so what is the settings and procedure.
    waiting for the positive reply.
    regards,
    sekar chand.

    Dear Sekar Chand,
    Are you not able to select the production version in MFBF manually ,assuming if you have more than
    one production version for the same material?
    What Tejas has suggested you is to start the planning process itself based on Prod.versions ---> MRP
    run-> planned orders--> Production confirmation.
    In case if you do not take MRP run and go for a direct confirmation also you will be able to select the
    production version in MFBF.
    IF not means revert back.
    Regards
    Mangalraj.S

  • Production Order in REM

    Experts,
    I found that even if the material (Fert) is having REM scenario set up, it is possible to create production orders for the same material.
    One of the material is having MTS REM scenario for which production is driven by planned Orders(run schd). Periodic settlement is done.
    By mistake production Order was created for the same material.Goods receipt/issue is also done for this production Order.
    How to restrict the system for not allowing to create the Production Order for REM scenario?
    Thanks.
    Suresh

    Please note that Routing is required to create a Production order as the std setting in production ordere dependent parameter-OPL8.
    Any way my sugestion is please delete the production order types if you are not using production order types.
    In case if you are using production order for other materials then
    goto OMS4
    create  a status - XX , with production PO header message = E,
    Assign this status in baisc data1 of the material - X material status (for which system should not create a Production order)
    You will get following message
    In-house production is not intended for material XXX status cannnot produce with descreet manufactreing                                                                               
    Message no. CO 050                                                    
    best of luck

  • External product configurator within a CRM-ERP LORD2 scenario?

    Is it possible to use an external product configurator within a CRM-ERP LORD2 scenario?
    My customer has a running webshop with an own configuration UI (java based) which is connected through badis with the ECC.
    And now we implemented in SAP CRM the ERP Quotation.
    Instead of rebuilding the varionatfunctions ord attributes seting the customer thinks about to intgrate the existing "konfigurator" of his web shop.
    Is there anyone who knows the interface
    Basic Functions -> Product Configuration -> Settings for External Configurators.
    more detailed.
    Where can I find an Interface declaration?
    Is the planned approached in general a valid way (from your point of view).
    thanks,
    Dirk

    Hi Stuart,
    You have to notice that in order to user R/3 BOM in CRM,
    you have to download object BOM (tcode R3AC1).
    But downloading object BOM into CRM only possible if
    your R/3 is Retail scenario (unfortunetly mine is not).
    Next thing I am going to test is, create Knowledge Base
    in R/3 (choosing the type = BOM). after that in CRM
    download using standard configurable object SCE.
    If this successfull, we can see the configurable in
    the Material Master CRM.
    I am going to try this in couple days, please try it
    first and let me know the result.
    Hope this give you some information.
    Cheers,
    Gun.

  • CRM 7.0: set up IPC product configuration

    Dear experts,
    we set up a CRM 7.0 with ERP 6.0 backend integration. In the ERP we apply ERP variant configuration (Materials). Quite simple: some configurable materials (material type KMAT) with a few characteristics and product variants of them (material type FERT) which are maintained in order processing. Variant conditions are maintained and automatically determined for product items. Now we need this in CRM for opportunity processing.
    Therefore we have created Knowledge Base and Runtime Version for the configurable products in ERP and downloaded test materials (one KMAT and one FERT (product variant) into CRM (download objects MATERIAL and SCE). In CRM product master data maintenance for the KMATconfigurable tab with the configuration profile is displayed. Afterwards we downloaded condition master data into CRM, among others variant condition VA00 with condition table A057. Everything looks fine.
    In CRM we want to set up opportunity management. In the opprotunity transaction processing pricing is working already besides the determination of variant pricing. As we intend to maintain only FERT materials (product variants)we do not need interactive product configuration in CRM sales order or product simulation in CRM product master data. We only want the variant prices to be determined automatically for the product variants (FERT) in opportunity processing. That is why we are not sure if it necessary to set IPC configuration settings (XCM etc.). This is my first question. Nevertheless we started to maintain settings for product configuration in order to find out if this is solves our problem:
    1.) XCM configuration (IPC): we set up a customer application for "crmproductsimulation" and defined customer components jco (RFC test worked) and productvariants and restarted J2EE Instance in TX: SMICM
    2.) We set up product configuration customizing:
    table: COMM_IPC_PROP:  caller; crmproductsimulation; scenario.xcm; ZCRMproductssimulation
    table: COMM_IPC_URL: UI_CFG; http://<host>:<port>100/ipc/ipc/command.do
    When starting simulation of product model for configurable product in TX: COMMPR01 I get following error message: "HTTP500: ISA Framework: The [XCM application configuration]='ZCRMproductssimulation' does not exist. Check XCM configuration.
    Details:   No details available". This application is maintained in XCM so I assume something else is missing.
    To sum up my questions:
    1.) Is it necessary to set up IPC product configuration as described above when we only want to maintain FERT products which are product variants and determine corresponding variant prices (VA00). No interactive product configuration is necessary.
    2.) If it is necessary to set up IPC product configuration to active product configuration (to see product variants in product master data maintenance and opportunity processing and corresponding variant condition data), what did I do wrong?
    Thank you very much for your help.
    KInd regards,
    Mark

    Hi Arup,
    thank you very much for your reply.
    Concerning XCM / CRM customizing I have done the steps you recommended:
    1. XCM:  I created customer applications for crmordermaintain and crmproductsimulation and maintained customer component JCO for both of them (Assigned JCO User has SAPALL / SAPNEW, test run was successful) Active and default are ticked. Are there any further steps missing.May be in General Application Settings > Customer > ipcwebappconfig - I changed nothing there (SSLenabled: true)
    2. In CRM customizing I maintained tables as follows:
    COMM_IPC_PROP:
    caller   crmordermaintain  scenario.xcm   Zcrmordermaintain  (name of customer xcm app -case sensitive)
    caller   crmproductsimulation  scenario.xcm  Zcrmproductsimulation (name of customer xcm app -case sensitive)
    COMM_IPC_URL:
    Destination: UI_CFG ;Appl.  <blank>; URL: http://<host>:<J2EEport/ipc/ipc/command.do
    Calling the IPC product configuration e.g. from the CRM product master (simulate model), I get the already mentioned HTTP error:"ISA Framework: The [XCM application configuration]='Zcrmproductsimulation' does not exist. Check XCM configuration.".
    That's why I am thinking that something is missing concerning the communication between CRM application and IPC,because XCM applications do definitely exist.
    Is the URL correct .../ipc/ipc/commando.do which I maintained in table COMM_IPC_URL?
    Is it possible to check if communication between CRM Online and Java does work respectively what  do you exactly mean by "IPC URL must be available for UI_CFG"? UI_CFG ist a RFC-connection which has to be maintained additionaly and if so what has to be maintained exactly?
    You mentioned a RFC_USER (This is the JCO-User I suppose?)and J2ee user. Is the J2ee user just the admin user of the J2EE engine or do you mean something different?
    Thanks in advance for your further help.
    Best regards,
    Mark
    Edited by: Mark Willhoeft on Jun 4, 2010 8:36 PM
    Just one further thing: After changing XCM config I restarted J2EE by TX SMICM (Administration - J2EE Instance local - Send soft shutdown - with restart). Is this enough to restart J2EE and activate changed XCM settings or has the restart to be handled different?

  • Standard report for Activity types in REM scenario.

    Hi PP Gurus,
    Is there any standard report like MCRP, MCP6, MF12 in REM scenario to capture time booked for Activity types? Please revert.
    Thanks & Regards,
    Abu Arbab

    Hi R. Brahmankar,
    Thanks for your prompt reply. We need to track Activity types booked in terms of quantity. We checked all the transaction code that you suggested.
    The track of Activity type is also possible in standard SAP system provided we do Separated Backflush only.
    T-code- MF12:
    Field Name- Production Activities:*
    Production activity posting in worklist
    If you select this indicator, the system only displays the document logs for which production activities still have to be posted.
    The selected documents provide you with a worklist which you process using the separate backflush transaction.
    Thanks & Regards,
    Abu Arbab
    Edited by: abu arbaba on Sep 24, 2008 11:07 AM
    Edited by: abu arbaba on Sep 24, 2008 11:12 AM
    Edited by: abu arbaba on Oct 16, 2008 8:16 AM

  • Reg REM scenario

    Dear all,
    Please clear my doubt what is the difference in REM profile when , we create REM profile we use in control data  back flush from standard cost estimate  for material instead of data from product cost collector
    Can we use normal routing in place of rate routing in REM scenario
    Regards
    venkat

    Dear Venkat,
    Yes we can use a normal routing instead of rate routing in REM scenario.
    When creating REM profile you have 2 option whether to post activities and whether to post as per the standard cost estimate
    details or based on the preliminary cost estimate of the product cost collector.
    If the option is elected for standard cost estimat is a mandatory before production booking that's backflush using MFBF.
    Check and revert back with your queries.
    Regards
    Mangalraj.S

  • Get Product Configuration

    Hello,
    Is there any BAPI or function that returns the Configuration Product data after i pass the PRODUCT_ID or the PRODUCT_GUID?
    In the scenario i have(CRM 3.1), the product configuration is made in R/3 and then the configuration data passes to IPC.
    What i see when i go to COMMPR01 in the tab Configuration and then click on Simulate Configuration button is a view from IPC with all the characteristics of the product.
    Best regards to all,
    Vasco Pires

    Hi Raj,
      I have a problem. When I create knowledge base and runtime version , the data is not getting downloaded to CRM.
    I am alwalys doing an Initial download to get the knowledge base.
    Any idea why delta download does not work. I assume when I generate the run time version, automatically the delta download should start. Am I right.
    We are having CRM 4.0 SP04.
    Do I need to export SCE Runtime version. I assume that this function export is used to export the sCE data to SCE database which resides in a PC and not to CRM middleware.
    Any ideas will be highly appreciated.
    Also do you have any idea of how to download configurable BOM's via knowledge base.
    Thanks in advance
    Jothi

  • New in CRM 5.0 Product Configuration

    Hi All,
    I am looking for information related changes in CRM 5.0 relavent to product configuration.I know SAP has delivered AP engine for product configuration,however need more detailed information in this regard.
    My main concern is: 1) How to create Charateristics, Classes etc in standard alone implementation.
    If we have R/3 as a backend,download the data from R/3...but if its standalone implementation..I am not sure about the steps involved.
    If anybody has documentation,please forward to [email protected]
    Thanks in advance

    Hi Ajay,
    We are using PME to configure the product attributes in one of our major implementation of CRM. It's very easy through PME.
    Have a look at the SAP Note 857969.
    <b>Reward points if it helps.</b>
    Regards,
    Amit Mishra

  • Issue in Product configurator component on Clicking DONE button - Session hung up

    Hi All,
    In our environment, eCommunications and eProdCFGObjMgr are separately configured in different servers..
    When we place order and take through product configurator to customize the product and click DONE button, the eCommunication session itself got hung.
    When i checked the eComm task, its just waiting for command and the eProdcfgObjMgr component shows the following error in their respective task
    bash-3.00$ more eProdCfgObjMgr_enu_0017_17825803.log
    2021 2013-08-22 20:11:25 0000-00-00 00:00:00 +0300 00000000 001 003f 0001 09 eProdCfgObjMgr_enu 17825803 8448 17 /u01/app/siebel/siebsrvr/enterprises/RIGSBLPR/SBLPR_CC4/log
    /eProdCfgObjMgr_enu_0017_17825803.log 8.0.0.5 [20420] ENU
    eProdCfgLog eProdCfgLog     0 0000000852162100:0      2013-08-22 20:11:25     VOD Broker File Cache Location for ISSCTXTOBJBR/ISS_SIGNAL: /u01/fs/prodfs/ISS_OBrkCach
    e/ISSCTXTOBJBR/ISS_SIGNAL/ENU
    eProdCfgLog eProdCfgLog     0 0000000852162100:0      2013-08-22 20:11:25     VOD Broker File Cache Location for ISSCTXTOBJBR/ISS_VAR_MAP: /u01/fs/prodfs/ISS_OBrkCac
    he/ISSCTXTOBJBR/ISS_VAR_MAP/ENU
    bash-3.00$
    We resolved the issue by restarting the component and clearing the mentioned cache directory. But i want to analyze deep as why it happened.
    Please reply me if you have come across such issue.
    Thanks,
    Madas              

    To achieve the above, try the below fix:
    var buttonBar:ButtonBar = new ButtonBar();
    buttonBar.requireSelection = true;
    Hopefully this works for you . Cheers!!

  • Service Pack 2 Update - Configuration Failed in Step 5:Products Configuration Wizard (Login Failed)

    THIS IS FOR THE TEST ENVIRONMENT, THERE IS ONLY ONE SP SERVER/ONE SQL SERVER
    The previous admin before me had already installed OWA Sp2/September 2014 CU on this box without Project Server Sp2 being installed along with it. I am now just updating Project Server to Service Pack 2. I downloaded the file from Microsoft, and installed
    the files on the box. I now am running the Products Configuration Wizard to complete the update. 
    note: the config database version is 14.0.7132.5000 (because of the OWA Sp2
    and September cumulative update installed, it does not say Service Pack 2 anywhere)
    Please see photos to see the error I am getting. I cannot access the central administration anymore, it is giving me a HTTP Error 503. I need to fix this ASAP! I have tried using another account that should have had permissions but still no dice.
    04/13/2015 11:23:43  13  ERR   Exception: System.Data.SqlClient.SqlException: Cannot open database "SharePoint_AdminContent_9ddeb31a-419b-4852-b9b5-da18ee2fb7ca" requested by the login.
    The login failed.
    Login failed for user 'domain\user'.
       at System.Data.ProviderBase.DbConnectionPool.GetConnection(DbConnection owningObject)
       at System.Data.ProviderBase.DbConnectionFactory.GetConnection(DbConnection owningConnection)
       at System.Data.ProviderBase.DbConnectionClosed.OpenConnection(DbConnection outerConnection, DbConnectionFactory
    connectionFactory)
       at System.Data.SqlClient.SqlConnection.Open()
       at Microsoft.SharePoint.Utilities.SqlSession.OpenConnection()
       at Microsoft.SharePoint.Utilities.SqlSession.ExecuteReader(SqlCommand command, CommandBehavior behavior, SqlQueryData
    monitoringData, Boolean retryForDeadLock)
       at Microsoft.SharePoint.Utilities.SqlSession.ExecuteReader(SqlCommand command, Boolean retryForDeadLock)
       at Microsoft.SharePoint.Utilities.SqlSession.ExecuteReader(SqlCommand command)
       at Microsoft.SharePoint.Upgrade.SPDatabaseSequence.GetVersion(SPDatabase database, Guid id, Version defaultVersion,
    SqlSession session, SPDatabaseSequence sequence)
       at Microsoft.SharePoint.Upgrade.SPDatabaseSequence.get_SchemaVersion()
       at Microsoft.SharePoint.Upgrade.SPSequence.get_IsBackwardsCompatible()
       at Microsoft.SharePoint.Upgrade.SPUpgradeSession.IsBackwardsCompatible(Object o, Boolean bRecurse)
       at Microsoft.SharePoint.Administration.SPPersistedUpgradableObject.get_IsBackwardsCompatible()
       at Microsoft.SharePoint.Administration.SPPersistedUpgradableObject.ValidateBackwardsCompatibility()
       at Microsoft.SharePoint.SPSite.PreinitializeServer(SPRequest request)
       at Microsoft.SharePoint.SPWeb.InitializeSPRequest()
       at Microsoft.SharePoint.SPListCollection.EnsureListsData(Guid webId, String strListName)
       at Microsoft.SharePoint.SPListCollection.get_Count()
       at Microsoft.SharePoint.Administration.SPAdministrationWebApplication.get_HealthRules()
       at Microsoft.SharePoint.Administration.Health.SPHealthAnalyzer.RegisterRules(Assembly assembly)
       at Microsoft.Office.InfoPath.Server.Util.HealthAnalyzerRegistration.RegisterHealthRules()
       at Microsoft.Office.InfoPath.Server.Administration.FormsService.Update()
       at Microsoft.SharePoint.PostSetupConfiguration.ServicesTask.InstallServiceInConfigDB(Boolean provisionTheServiceToo, String
    serviceRegistryKeyName)
       at Microsoft.SharePoint.PostSetupConfiguration.ServicesTask.InstallServices(Boolean provisionTheServicesToo)
       at Microsoft.SharePoint.PostSetupConfiguration.ServicesTask.Run()
       at Microsoft.SharePoint.PostSetupConfiguration.TaskThread.ExecuteTask()  

    Build number hasn't changed since I updated to Sp2. It still is 14.0.7132.5000. Is this supposed to be this way? 
    Previous admin before me had:
    Service Pack 2 for Microsoft Office Web Apps (KB2687470) 64-Bit Edition
    14.0.7015.1000
    Installed
     on all languages (arabic, english, french, german, russian, spanish) but we do not use any of them here. 
    Also, there are several hotfixes like this (not all show in photo, there are more)
    Hotfix for Microsoft Project Server 2010 (KB2883006) 64-Bit Edition
    14.0.7132.5000
    Installed
    Please see photos. 

  • Service product configuration

    Hi Experts,
    I have requirement to update characteristics of service product configuration in a service order, could you please let me know if you have any idea about any function modules and how to use them and what parameters need to pass to them.
    I am able to get the characteristics data through the function module VC_I_GET_CONFIGURATION, but I am unable to use FM
    CE_I_SET_CONFIGURATION to change or update the new characteristics data in the service product, as I am not clear what to pass on this.
    If this is not clear let me know.
    Thanks in advance..
    -Vinni

    Hi,
    It was a headache, but at last found a way to do that, but no error handling was possible in this case.
    You have to read the existing characteristics by using function module CUCB_GET_CONFIGURATION and then change/append the characteristics data as required, then use CUCB_SET_CONFIGURATION for updating the required data in service product, then use function modules CUCB_CONFIGURATION_TO_D and do the commit work subsequently.
    Thanks,
    Vinni

  • QM in REM Scenario

    Dear All,
    I am working on REM Scenario with QM integration,
    The requirement is there should be a inspection lot created which is stock relevant, similar to inspection type 04 in process industry and discrete industry where once GR is done against an order an inspection lot is created which is stock relevant.
    Similarily once back flush is done in MFBF no inspection lot is created and stock moves to unrestricted directly
    I know there is inspection type 13 which is used for in process inspection in REM but that is non stock relevant inspection.So my question is how can i map this type of scenario???
    Can we use inspection type 04 in REM???How can we bring the stock to inspection stock with a lot created after backflush is done in MFBF???
    Please provide your valuable inputs...

    Hi
    In REM 13 Is used for Inprocess whereas for Final Inspection 04 is used.
    In MFPR 13 inspection type lot is created.After MFBF ,backflush takes place & stock relevent 04 inspection type is created.
    Can we use inspection type 04 in REM???How can we bring the stock to inspection stock with a lot created after backflush is done in MFBF???
    04 will be automatically created after MFBF(QTY equal to backflush QTY) if it is active.This will solve your peprose
    I hope this will add some value
    Regards
    Sujit

  • T codes for production reports in REM

    Dear All,
    What are the std. t code for production reports in REM like daily production report,monthly production reports,shift wise production,bom reports etc.
    Thanx in advance
    rg
    Tushar

    Hi Tushar,
    Following are the standard reporting T-Codes REM
    MCP9 - SFIS: Select Run Schedule
    MCRM - Reporting Point Statistics: Selection
    MCRP - Material Consumption Analysis: Repetitive Manufacturing
    MCRK - Product Cost Analysis: Repetitive Manufacturing
    MCP6 - Goods Receipt Analysis: Repetitive Manufacturing
    MF26 - Display Reporting Point Quantity
    MF51 - Print Production Schedule
    MF52 - Display Master Production Schedule
    MF57 - Coll. Display of Planning Screens
    MF60 - Pull List 4.5
    LAS3 - Display Sequence Schedule
    If you won't find your requirement in these,you need to develop new one accordingly taking the technical consultants help.
    Regards.

  • Configured Individual PO scenario in SAP SD

    Hi Gurus,
    I was configured individual PO scenario and also tick mark in item category as create PO automatically.
    It is working fine and PO is also created successfully.
    Now as per client requirement in dellivery address they want ship to party address so for that i want to pass somewhere address number field into BAPI or ALE or something.
    Any one suggest how i will achieve the same through dome BAPI changes or enhancement.
    Regards,
    Chirag

    Hi,
    If a PO is created then in the PO you can view the Ship to Party to be delivered.
    or from the SOld to Party arrive the ship to party from KNVP and get the address from KNA1\
    Regards,
    Saju.S

Maybe you are looking for

  • I need the solution for a connection setup via a PPPoE connection. Manually the PPPoE works fine in NetworkCentre of laptop but isn't triggered by Thunderbird

    Does somebody have any experience in this? How to trigger the PPPoE port as this should open the satellite line on the satcom modem to the internet. The satcom line costs approx. $20,- per MB so can't stay open all the time. I am looking forward to t

  • Moving audio 1/2 frame

    Is it possible to move an audio track in the timeline one-half frame? It was recorded at 1080i 60i. I am using multicameras and wish to use one camera for the entire audio track. It was sent by the recording engineer to one camera but I guess there w

  • .Photos shows no photos after migration from iPhotos Library.

    I migrated an iPhotos Library to Photos Library.  Both files are around 409GB.  If I open the file packages I can see the photos.  However Photos opens an shows nothing.  And iPhotos is now useless so I can not get to pictures! And I have already tri

  • Heterogeneous System Copy.

    Hi, I need to do a het. sys. copy from DB2 AIX to DB2 Windows for ECC EhP4 System. I ran DB export using SAPinst in the source system, but could not find any data in the export directory. The SAPinst has only created some directories without data. To

  • Jb script error downloading software update