Production Order in REM

Experts,
I found that even if the material (Fert) is having REM scenario set up, it is possible to create production orders for the same material.
One of the material is having MTS REM scenario for which production is driven by planned Orders(run schd). Periodic settlement is done.
By mistake production Order was created for the same material.Goods receipt/issue is also done for this production Order.
How to restrict the system for not allowing to create the Production Order for REM scenario?
Thanks.
Suresh

Please note that Routing is required to create a Production order as the std setting in production ordere dependent parameter-OPL8.
Any way my sugestion is please delete the production order types if you are not using production order types.
In case if you are using production order for other materials then
goto OMS4
create  a status - XX , with production PO header message = E,
Assign this status in baisc data1 of the material - X material status (for which system should not create a Production order)
You will get following message
In-house production is not intended for material XXX status cannnot produce with descreet manufactreing                                                                               
Message no. CO 050                                                    
best of luck

Similar Messages

  • Varaince settlement and costing sheet in REM and Production order

    for REM, repetetive manufacturing, what's the difference between REM and production order in terms of variance settlement and settlement profile design? what's the difference between process order and production order in terms of variance settlement and settlement profile design?
    for actual overhead(fixed and variable), can it be calculated automatically by costing sheet? user is very angry to input actual overhead by jounal entry. also how about plan scrap, how to define it in configuration? besides order confirmation, where can I input actual scrap?

    For variances, there is no difference between the 3 diferrent orders. The settlement profile can also be the same.  The real difference from a CO perspective concerns the calculation of WIP and the settlement rule.  Process orders and production orders normally use a full settlement rule (though periodic settlement is also possible) and WIP is calculated based on actual cost.  Repetitive orders only use periodic settlement and WIP is valued at target cost.
    From an overhead perspective, there is no difference between the 3 types of orders.  Overhead sheets are assigned through the costing variant and costs are applied through period-end process. 
    Plan scrap is maintained in master data, either in material master, routing (receipe for process orders), or bill of material.  Acttual scrap usually happens based on the quantity of components issued to the order during confirmation or by the amount of scrap reported during confirmation.  If you are backflushing components, as you normally would do for repetitive, then you can adjusted the consumed quantities by doing an additional goods issue to the order (movement type 261).
    thanks,

  • Confirm Production on any open production order

    Hello Gurus.
    Our company receives material at the end of the production line and they need to report this production in the system. The problem is that at this point, they don't know what Production Order it relates to.
    Is there a transaction in SAP that allows you to report production and then apply this to any open production order that currently exists? For instance, apply it to the first open production order in the system.
    Somewhere where all the user would need to type is the material and quantity. The production order would be selected automatically.
    Thanks!

    Thanks for your replies.
    Regarding REM, I know how to set it up; however, we need to have Production Orders in place in order to drive the requirements of components.
    With REM, how would you know which components you need to purchase? Would you need to then use Re-order point planning or fixed forecasts in order to purchase them in time?
    It would be great if it was possible to use REM to receive the assemblies on stock, but instead of getting the results in a Product Cost collector, you would reduce open production orders. Though I understand this may not be standard functionality.

  • Manual creation of planned order in REM

    Hi, 
    Can we manually create a planned order in repetitive manufacturing? I know that in case we run MRP , then planned order for finished is created with order type 'PE' due to which it cannot be converted to production order.
    I dont want to run MRP , still can i create a planned order manually with the same order type 'PE' ? I tried in MD11, but not getting option to chose PE as it is not available  in F4 of planned order profile.
    Please help..
    Regards.

    Dear,
    You cannot create a planned order with PE order type manually, because a planned order of REM related material gets order type "PE" only when it is assigned with a Production Version.
    So achieve manual creation of REM Planned order with PE type with the following options,
    I - Using MD11 transaction create a planned order with LA type and assign a suitable REM related Production version to the planned order during creation itself, now this order would automatically become "PE" order type on saving the order.
    2. In the planning table using MF50, you can directly create a planned order for a production line using F7 key.
    Regards,
    Prasobh

  • Automatic Creation of Production order per month

    Hello Gurus,
    Good Day! Is it possible to schedule creation of production order in background for certain material per month basis?
    Thank you,
    raymond

    Hi Raymond,
    If the suggestion of REM does not work for your requirement, then take the help of your ABAPer use one of the below BAPI's & create a Z prog. for creation of order as required.
    1. Prdn order frm plnd order -> BAPI_PRODORD_CREATE_FROM_PLORD
    2. Prdn order -> BAPI_PRODORD_CREATE
    3. Prdn oder with ref -> BAPI_PRODORD_CREATE_FROM_REF
    Alternatively, create one order & keep it open for the entire year, just do monthly wip calc & at the end of financial year settle the order completely.
    If helpful award points
    Regards,
    Vivek

  • Creation of production order while mrp run

    hi
    ppgurus
    can any body explain how to create a production order by mrp run
    ie
    sysytem should create the production order directly while mrp run not PLANNED ORDERS
    what settings i need to do for  this plz explain
    urgent requirement
    regards
    sasikanth

    HI
    you gave a good way to solve the problem
    if it is a make to stock REM
    i  need not convert planned order to production oreder right
    plz suggest in  that scenario where i need to  do availability check
    in REM for which oder type (say PE IS STANDARD)
    to be assigned for availability  check
    plz suggest because in spro (t -code opjk) at order controll
    i dint see the order type PE
    the order controll (opjk) in discreet  :- avialability checking rule assigns
    in which setting this setting to be done in REM

  • Production Order in Repetitive Manufacturing

    Hi All,
    We are using REM scenarios. But we need to use the Production order for some material in the same plant where we are already using REM.
    Is it possible to use both Discrete and REM for the same material but at different periods? Using Discrete for some period and switching over to REM. Is there is anyway to use the above mentioned scenario.
    Kindly suggest.
    Regards,
    Sureshbabu G.

    Hi,
             As we know that In Repetitive Manufacturing, components are often staged at the production line without reference to a particular order.
    To create the demand program again for your production order, you must define the planning strategy for a product. Planning strategies represent the methods of production for planning and manufacturing or procuring a product. and run the scenario accordingly.
    Regards
    Chandra

  • Production order-rework

    Hi friends,
        My strategy is Make to stock production. I have created my production order of quantity 100. Then i have deliverd the same quantity of 100 to store in t.code MB31 (against my order). Then i closed my order
    My order status is:
    CLSD CNF DLV PRC MACM GMPS SETC.
    I have stocked my quantity in my store. Afrer 3 months, our people wants to sell the product through sale order. Now they find some damages in that final product. Now sales is returning the final product to production for rework.
    How to reprocess the closed order again? How to go about with this scenario?
    please guide me
    Thanks
    kumar

    Hi Senthil,
    Good afternoon and greetings,
    Made to stock in production term is called as Repetitive Manufacturing and the cost object for the same would be Product Cost Collector.  The Product Cost Collector doesnt have the concept of closing fully basically because the product cost collector would be a replica of the material itself.
    In your case, a rework for production order is applied through by adding an additional work centre in the routing called REWORK.  Re-opening a production in a different period may lead to confusion basically because the planned cost at the time of creating the order say before 3 months would have been £100 per PC.  Now the standard cost estimate is £125 per PC and reopening the order will redetermine the planned cost again and when it is settled it will hit your profitability very badly because the variance would be £25 + rework cost.  Thereby it is advisable to use the concept of standard REM.
    Alternatively, if you want to use the Production Order only, then follow the sequence as below
    1. Move the material from one code to another rework code
    2. Create a new routing with REWORK work centre for the rework material code.
    3. Create a production order for the rework material code
    4. Transfer the material from rework code to main material code.
    5. Settle the production order for the rework material code and thereby your P&L would be intact for the additional cost involved on the Rework.
    Please reward points if found useful.
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • In production order backflush  how components select valuation type

    Hi,
       i am using backflush in production order planning where components have valuation type. when i stage them i give the valuation type. but when i confirm a operation the backflush is giving problem.
      the problem is i have to enter the valuation type of componet which has to be backflushed. is there any provison to make it as default. which valaution type componenet is staged it has to be backflushed automatically.
    thanks in advance
    regards
    madan

    Madan,
    During MF60-pull list where exactly do you enter the valuation type?
    Try to understand the concept?
    Let us say i have storage loc A and production storage loc B.
    Now in production order/REM order you have entered the storge loc as B and you have stock in A.
    After running MRP and when you goto MF60, for that component, system will create storage loc order during staging.
    Once it come into storage loc B, how system will identify the stock that it is reserved for this order?
    If you have eneterd valuation type(I could not find), once it is in storage loc B, is there any identification for that order in storage loc B.
    Please come back so that I can help you?

  • Creating Production Order from Planned Order

    Hi,
    We are trying to use the BAPI 'BAPI_PRODORD_CREATE_FROM_PLORD' to create Prod. Orders. But it is failing with the message, 'Cannot be saved. Maintain serial no.' Now, the problem is there is no input parameter in this BAPI for providing the serial numbers. Our current Z program manually generates the Serial Numbers and uses BDC for 'CO48' to create the Prod. Order but has a horrible performance and for that reason we are trying to switch to BAPI instead).
    Now, the question is how best to achieve this objective: Use the BAPI to generate Prod. Orders from Planned orders with user-given serial numbers when there is no input option in the BAPI?
    I think of couple of options but not sure how good they are:
    1) Can we create/attach the serial numbers to the equipment/material first and then create production orders?
    2) Use implicit enhancement to add another parameter to BAPI and use it instead. This one seems little technically complicated because the BAPI itself calls tons of other programs (including CO48) to create Prod. Orders so the right place to insert the numbers might be difficult.
    Any clues how to solve this problem would be appreciated..
    Thank you

    Hi,
    REM manufacturing is simpler way to book the production.
    What is needed for REM is first question.
    1) REM profile
    2) Material on REM with this profile and REM tick
    3) Have normal BOM and routings/ rate routings and work center
    4) Define Production Version
    5) Define Product Cost Collector on which all costs are booked whenever you do your confirmation thro MFBF
    Having defined these master, once you run MRP you get planned order of PE type. It was earlier also callled as RS i.e Run Schedule.
    By using MFBF, backflushing transaction can book the production. REM is period based type of production booking unlike discrete where you make a production order of particular material for some dates, it is lot based production booking.
    Hope it is clear.
    Srini

  • CO-product configuration in REM scenario

    I am trying to configure co-product scenario with REM process. Is it possible?
    If any one worked on this scenario please let me know what are the special consideration we need to take or any SAP note available?
    Thanks in advaice.
    Rajesha Vittal

    in HELP.SAP.COM is the answer.
    Product Cost Collector
    Definition
    Cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. When you use a product cost collector, the product is the main cost object.
    Use
    Product cost collectors are independent of the production type. This means that you can collect actual costs on product cost collectors in the following production environments:
    In order-related production (that is, when you are using production orders) when you want to analyze the costs by period rather than by lot
    In process manufacturing (that is, when you are using process orders) when you want to analyze the costs by period rather than by lot
    Repetitive manufacturing
    In repetitive manufacturing you always use product cost collectors as cost objects.
    Product cost collectors are available from Release 4.5A onwards. In earlier releases, the costs of repetitive manufacturing materials were collected on production cost collectors. From Release 4.5A onwards, production cost collectors are converted into product cost collectors. For information on the conversion process, see Converting Production Cost Collectors into Product Cost Collectors.
    Order splits for production orders
    When you split production orders, the costs for the parent order and child order are allocated to the same product cost collector.
    See also: Order Splits in Cost Object Controlling
    Constraints
    Product cost collectors cannot be used for the following objects and production environments:
    Manufacturing orders that settle to a sales order item if you are using a nonvaluated sales order stock in sales-order-related production
    Sales-order-related production with a valuated sales order stock, except in repetitive manufacturing environments
    Engineer-to-order environments
    Manufacturing orders that are part of a collective order
    Joint production
    Joint production is a production process that yields two or more products in a single production run. In the Product Cost Controlling component (CO-PC), there are a number of special processing requirements in joint production environments regarding Product Cost Planning (CO-PC-PCP) and Cost Object Controlling (CO-PC-OBJ).
    In shop floor control, a manufacturing order (usually a process order) is created to manufacture co-products. In the manufacturing order, co-products are carried on the order items.
    In Cost Object Controlling, actual costs are collected on the header of the manufacturing order. At the end of the period, the actual costs on the order header are distributed to the individual order items. Work in process and variances are calculated at the order item level. The order items are then settled.
    Integration
    In joint production, the system normally accesses master data of Production Planning for the Process Industries (PP-PI) such as the master recipe and materials list, or master data of Production Planning (PP) . To distribute the planned and actual costs to the co-products, the system uses the apportionment structure that can be specified the material master record or in the manufacturing order itself.
    Terminology
    Co-product
    You specify that a material is a co-product by selecting the Co-product indicator in the MRP view or costing view of its master record.
    Fixed-price co-product
    A fixed-price co-product is a special type of co-product.
    Primary product
    You specify that a material is a primary product by selecting the Co-product indicator in the MRP view or costing view of its master record.
    Process material
    A process material is a nonstock material that is used in the R/3 System to represent the process by which co-products are produced. Instead of the primary products, you can enter a process material in the recipe header and in the order header.
    Process materials have material type PROC.
    By-product
    A by-product is a product that is produced incidental to the production process of other products. You enter by-products in the material list of a primary product or process material with a negative quantity.
    You do not set the Co-product indicator in the MRP view or costing view of the master records of by-products.
    Intra material
    Intra materials only exist temporarily between two processing steps. Intra materials appear in the material list as items of category M, but are not costed.
    If the process is interrupted because of a malfunction, however, intra materials may have to be transferred into inventory. In this case they are valuated with a price in the material master that is selected through the valuation variant for the valuation of goods received.
    Intra materials have material type INTR.
    Circulating material
    You can specify whether the cost of a circulating material should be included in the material list. The system selects a price for the circulating material from the costing view of the material master record.
    If the circulating material is flagged as relevant to costing, the material costs appear in the itemization twice: once with a plus sign and once with a minus sign. The balance is the material input costs.

  • Manual selection of production version in REM scenario.

    Hai gurus,
    I discrete manufacturing we  can several production versions and we can select the same manually
    when we convert planned order to production order. Like this whether it is possible in REM scenario
    to select the production version manually, if so what is the settings and procedure.
    waiting for the positive reply.
    regards,
    sekar chand.

    Dear Sekar Chand,
    Are you not able to select the production version in MFBF manually ,assuming if you have more than
    one production version for the same material?
    What Tejas has suggested you is to start the planning process itself based on Prod.versions ---> MRP
    run-> planned orders--> Production confirmation.
    In case if you do not take MRP run and go for a direct confirmation also you will be able to select the
    production version in MFBF.
    IF not means revert back.
    Regards
    Mangalraj.S

  • Error at time releasing production order

    Hi guru,
                         I am creating production order manually but at the time release i got error"No product cost collector could be deterimined for material " in material master i will check mRP -4 but there activation for REM. I am not get this exactly what happen, Pl do needful.
    With regards,
    Ravindra.

    Dear Ravindra,
    It seems for the production order type which you are using in CO01 has the order type dependent parameters where the check
    box  for product cost collector has been included (in the third tab - controlling).Check the setting in OPL8 for the production order
    type which you are using to create the production order and the plant combination.
    If it's included means you can remove this setting and try once again.
    Check and revert
    Regards
    Mangalraj.S

  • PCC vs Production Order Based Costing

    Hi,
    Please reply back difference between PCC and Production Order Based Costing.
    Thanks in advance.
    Regards,
    Sameer

    Hi,
    PCC is product cost collector which is  used in mostly REM process.
    1. Here you have to creat the product cost collector mean sthe cost is based on period, when u create PCC you are creating the priliminary cost means the quanity strucure costing considering BOM , activity prize and the cost from costing sheet i.e admin cost, etc .
    2. In product cost collector the the cost of document posted in backflush is posted periodiclly. For that u have to run standard cost run i. CK11N and CK24. monthly.
    3. but in Production oredr or Process order thre is no PCC instaed of PCC the cost is settle with the settlement profile defined in OPL8 i.e order type dependent parameter SPRO.
    4. Each prd ord is REL,CNF and TECO when the status is TECO means the logistic point of view the order is complet now ready to costing .
    5 Then FI consultant settle this order
    6. here order based costing no period based costing
    hope u r prob solve..
    Siddhesh

  • Want know the relation ship an production order

    Hi Friends,
    here at our client location the production order process has been changed to REM
    now the work center are not coming in the reports outputs because there is no
    production order for that pls give information how to get the work center with out
    having the production order.

    OPL8..
    Choose the relevant option for routing selection from below as appropriate.
    Rtg selec. Short Descript.
    0          No routings or reference operation sets to be used
    1          Always reference operation set (no routings selected)
    2          Routing/ref. op. set mandatory (automatic selection)
    3          Routing/ref. op. set optional (automatic selection)
    4          Routing/ref. op. set optional (manual selection)
    5          Routing/ref. op. set mandatory (manual selection)
    6          Routing mandatory (automatic selection)
    7          Routing mandatory (manual selection)
    8          Routing optional (manual selection)
    9          Routing optional (automatic selection)

Maybe you are looking for

  • Early 2008 Video Card Replacement Question

    BACKGROUND Hardware Overview: Model Name:                       Mac Pro Model Identifier:                  MacPro3,1 Processor Name:                  Quad-Core Intel Xeon Processor Speed:                  2.8 GHz Number of Processors:         2 Total

  • T61 with Advanced Dock and PCI-e graphics card?

    Purchased T61 laptop with NVidia Quadro NVS 140M graphics (Type: 7662-CTO). Purchased ThinkPad Advanced Dock for use with PCI-e graphics card for multi-monitors.  (Type: 2553) OS = Vista Ultimate Purchased PCI-e graphics card:   NVidia Quadro NVS 440

  • Silent Installation InDesign CS6 mit Retail Key

    Hallo Community, ich versuche schon seit etlichen Stunden, Adobe InDesign CS6 mit einem Retail Key im Hintergrund zu installieren. Der Adobe Application Manager Enterprise Edition ist für das Erstellen eines MSI Pakets leider nicht geeignet, da es si

  • Having problem with wifi on plane

    Can not keep pick up Internet on plane, it will find it but will not connect.

  • Connectivity to Bluetooth hifi

    Hi, I have used my Air to connect to my hifi now for months and never had a problem but just this morning it stopped, so I restarted but now I have no bluetooth logo at the top and when I try to start it, it just says "no bluetooth module found' and