Co product indicator

Dear all,
I have a material xxxx as a co product... In CS03,THis material is having 3 comonents .THe line item numbers are 0010,0020,0030.
But when i create prod order for this material xxxx, in the production order BOM another line item 0000 is appearing automatically.
and that line item 0000 is the header material xxxx itself.PLease tell me how come this happen.
I want to disable the coproduct indicator for that material...in MRP2  i have disabled the indicator..But even after that,If i create rder in CO01,there is no change in the production order BOM
please help me out

HI
You left your previous thread unanswered.
For this you have to do Read PP master data after deleting the co product indicator in MM
Check and revert
Regards
Anupam Sharma

Similar Messages

  • Co-product indicator is not copied to BOM

    Hi Experts,
    I have created the materials with co-product indicator in MRP2view and using this material as component in BOM.  However the co-product indicator is not copied to the BOM in Item details basic data view.  When I crate a production order, components are not having co-product indicator in production order component view.
    When I create the BOM, system is accepting the quantity with negative value.
    What could be the reasons that system is not copied the co-product indicator in BOM.
    Pl provide your valuable suggestions.
    Best answer will be rewarded.
    Thanks & Regards,
    Surya
    +919000440032.

    Hi
    Steps for the coproduct feature in SAP are as follows :
    1. Create Material Masters for the main product and Coproduct. Select the Indicatore co-product for the co-product material. In MRP 2 View click the Joint Production Tab and maintain the Approtionment Structure i.e. One Main product is equal to X coproducts.
    2. Create the BOM for the Main product and maintain the Co-product as an Item with negative quantity and click the Coproduct check box in item detail manually. Then only this will be flowing to Production order .
    Note : System by default will not make it to flow to BOM from the MaterialMaster. You need to manually tick the check box in BOM either during BOM Creation or change.
    Hope this will help you.
    regards
    radhak mk

  • Material to be produce included in production order component review

    Hello gurus, i have a issue about production order.
    1. The BOM of XXXX material have the next components:
        A
        B
        C
    2. When i create a production order for 100 ST of  XXX material, the component review in production order includes the next:
      Position  Material  Quantity
      0000      XXXX        100 (row blocked)
      0010     A                  20 ST
      0020     B                   1.5 KG
       0030    C                    10 ST
    3. I don´t know why the component review in production order includes the position 0000 and blocked. It looks like the BOM of XXXX material have a recursive position, but isn´t real.
    Please, help me with this issue
    Regards,
    Johnny Leguia

    The issue was solved.
    The co-producto indicator in a BOM position makes that all co-product materials (that hace co-product indicator in mrp view) were listed in component overview. The material to be produced had this co-product indicator in mrp view.
    Thanks for help.
    Regards,
    Johnny Leguia

  • BY PRODUCT Costing

    Can anyone guide me through Config steps for By Product cost in detail ?
    Thanks & Regards
    Radha

    The manufacture of co-products can produce by-products in a production process automatically. The costs for these by-products are calculated with the net realizable-value method. This method determines the cost of goods manufactured for the primary product by deducting the costs of the by-products from the total cost of the production process. The costs of the by-products thus represent a reduction in the costs of the primary product or process.
    The Co-product indicator is not selected for the BOM item under which the by-product is entered. Instead, a negative quantity is entered.
    In the material list or BOM for the primary product or process, you enter the by-product with a negative quantity. If the by-product is indicated as being relevant to costing, the total cost of the process is reduced by the costs of the by-products.
    The cost of goods manufactured for a by-product can be calculated in two ways:
    •     A price from the material master is used. The costs of goods manufactured for the by-products are arrived at by multiplying the output quantity by the price, and appear in the itemization of the cost estimate as negative values.
         If you don’t want to include the costs of the by-products, deselect the relevant to costing indicator in the material list item.
    •     The by-product can be manufactured using an alternative production structure, and a cost estimate for the by-product already exists. In this case, this cost components of the cost component split for the by-product are subtracted. The cost of goods manufactured for the by-products is arrived at by multiplying the output quantity by the costing results of the by-product from the alternative cost estimate.
    Regards,
    LakshmiPrasanna

  • By product in CK11n

    Hello guys,
    I have a problem with by product, when I run CK11n. So, in the left screen, it appear me zero value for byproduct with "minus quantity". Why CK11n doesn`t multiply q-ty of byproduct with price defined in material master and valuation variant. Also, I increase costing lot size, but it doesn`t help.
    So, is the anyone has some idea to solve it. And to give negative value for my byproduct?

    Hi!
    In the BOM of the material of CO Product tick on CO-Product indicator. While entering quantity in BOM for this CO - Product enter it as negative quantity.
                       Also tick on CO-Product indicator in Material Master in MRP-2 View. Also You should enter the item as a stock item.
    Hope it will help. Pls get back for further query.
    Thanks & Regards,
    Taral Patel

  • Co-Product

    Hi  friends
    My main product is say X. From this co-product is generating say Y. As per your experience for which material we have to set co-product indicator .
    and wat about costs. for which matieral we have to set approtionement structure. Pl explain indetail including costing related settings also ie., appronement structure settings.
    regardss
    ssp

    Hi,
    1. For Coproduct & also in main material make tick mark in MRP2 view as a coproduct.
    2. Assign the coproduct as a line item in the BOM with negative sign.
    3. In BOM, indicate coproduct indicator in item detail screen.
    4. In main material of MRP2 view or in costing view assign Joint production. In this give Equalance no. for costing purpose.
    5. Costing setting will be done by CO person. You have to assign that in the material master of main material.
    Regards,
    Dharma

  • LLC generation with a "recursiveness allowed" indicator in BOM

    Dear planning friends,
    I have the following problem with the low-level code generation in SNP.
    We have few products, that have indicator "recursiveness allowed" in the material BOM.
    How in the APO side the PPM reflects that (the circular reference - the product is produced from itself and another component). Has something to do with the "Primary product" indicator in the PPM? If yes, is it checked automatically (in the PP/DS PPM and in SNP PPM)? Should it be checked for the input or for the output product.
    Anyway now the LLC generation fails. I'd like to include these materials in planning, but how to set up the master data?
    Thank you for your help.
    Message was edited by:
            Mikhail Kenanoff

    Hi Mikhail,
    Please note recursiveness in BOM components is not standard in APO PPMs. <a href="http://service.sap.com/notes">SMP Notes</a> 611063 gives the restrictions where recursiveness is allowed. You may also like to look at Note 648093.
    Thanks,
    Somnath

  • CO-product configuration in REM scenario

    I am trying to configure co-product scenario with REM process. Is it possible?
    If any one worked on this scenario please let me know what are the special consideration we need to take or any SAP note available?
    Thanks in advaice.
    Rajesha Vittal

    in HELP.SAP.COM is the answer.
    Product Cost Collector
    Definition
    Cost object in Product Cost by Period that collects the periodic actual costs incurred in the production of a material. When you use a product cost collector, the product is the main cost object.
    Use
    Product cost collectors are independent of the production type. This means that you can collect actual costs on product cost collectors in the following production environments:
    In order-related production (that is, when you are using production orders) when you want to analyze the costs by period rather than by lot
    In process manufacturing (that is, when you are using process orders) when you want to analyze the costs by period rather than by lot
    Repetitive manufacturing
    In repetitive manufacturing you always use product cost collectors as cost objects.
    Product cost collectors are available from Release 4.5A onwards. In earlier releases, the costs of repetitive manufacturing materials were collected on production cost collectors. From Release 4.5A onwards, production cost collectors are converted into product cost collectors. For information on the conversion process, see Converting Production Cost Collectors into Product Cost Collectors.
    Order splits for production orders
    When you split production orders, the costs for the parent order and child order are allocated to the same product cost collector.
    See also: Order Splits in Cost Object Controlling
    Constraints
    Product cost collectors cannot be used for the following objects and production environments:
    Manufacturing orders that settle to a sales order item if you are using a nonvaluated sales order stock in sales-order-related production
    Sales-order-related production with a valuated sales order stock, except in repetitive manufacturing environments
    Engineer-to-order environments
    Manufacturing orders that are part of a collective order
    Joint production
    Joint production is a production process that yields two or more products in a single production run. In the Product Cost Controlling component (CO-PC), there are a number of special processing requirements in joint production environments regarding Product Cost Planning (CO-PC-PCP) and Cost Object Controlling (CO-PC-OBJ).
    In shop floor control, a manufacturing order (usually a process order) is created to manufacture co-products. In the manufacturing order, co-products are carried on the order items.
    In Cost Object Controlling, actual costs are collected on the header of the manufacturing order. At the end of the period, the actual costs on the order header are distributed to the individual order items. Work in process and variances are calculated at the order item level. The order items are then settled.
    Integration
    In joint production, the system normally accesses master data of Production Planning for the Process Industries (PP-PI) such as the master recipe and materials list, or master data of Production Planning (PP) . To distribute the planned and actual costs to the co-products, the system uses the apportionment structure that can be specified the material master record or in the manufacturing order itself.
    Terminology
    Co-product
    You specify that a material is a co-product by selecting the Co-product indicator in the MRP view or costing view of its master record.
    Fixed-price co-product
    A fixed-price co-product is a special type of co-product.
    Primary product
    You specify that a material is a primary product by selecting the Co-product indicator in the MRP view or costing view of its master record.
    Process material
    A process material is a nonstock material that is used in the R/3 System to represent the process by which co-products are produced. Instead of the primary products, you can enter a process material in the recipe header and in the order header.
    Process materials have material type PROC.
    By-product
    A by-product is a product that is produced incidental to the production process of other products. You enter by-products in the material list of a primary product or process material with a negative quantity.
    You do not set the Co-product indicator in the MRP view or costing view of the master records of by-products.
    Intra material
    Intra materials only exist temporarily between two processing steps. Intra materials appear in the material list as items of category M, but are not costed.
    If the process is interrupted because of a malfunction, however, intra materials may have to be transferred into inventory. In this case they are valuated with a price in the material master that is selected through the valuation variant for the valuation of goods received.
    Intra materials have material type INTR.
    Circulating material
    You can specify whether the cost of a circulating material should be included in the material list. The system selects a price for the circulating material from the costing view of the material master record.
    If the circulating material is flagged as relevant to costing, the material costs appear in the itemization twice: once with a plus sign and once with a minus sign. The balance is the material input costs.

  • Co-product PDS generation

    Dear PP/DS Experts,
    When transferring PDS form ERP to APO, co-product PDSs are generated automatically in APO even though the production versions of co-product do not exist.
    Is this normal case ? How can I control this, I mean I want to exclude the generation of co-product PDS.
    Please enlighten me for this question.
    Regards,
    Lee, Seung Won

    Hi Lee,
    PDS gets generated from Bom data.  If there is co-product
    indicator maintained in the BOM.(Select the material in the
    bom and press F7 to get the coproduct indicator).  The
    same will also be defined in Material master of R/3 under
    MRP2 view.   From this, the coproduct values are
    populated to APO into PDS data
    Regards
    R. Senthil Mareeswaran.

  • Co product Clarification

    Dear all,
    I have a material xxxx as a co product... In CS03,THis material is having 3 comonents .THe line item numbers are 0010,0020,0030.
    But when i create prod order for this material xxxx, in the production order BOM another line item 0000 is appearing automatically.
    and that line item 0000 is the header material xxxx itself.PLease tell me how come this happen.
    Please reply..
    points for sure

    HI
    When you create this material XXXX as Co product then you cant make production order for it you have to make it with the header material during the production of which this material XXXX is produced.for this you have to maintain this material XXXX in the BOM of header material with co product indicator on and also in MM of this material XXXX.
    while confirmation of header material when you confirm the operation to which this XXXX is assigned GR will be done
    correct me if i am wrong
    Regards
    Anupam Sharma

  • Company Code - Productive

    Hi Friends,
    We have many company codes for which in FA Global Settings, Company Code is productive indicator is not selected.
    Now we want to activate this indicator. Is there any implication if we activitate it now considering that there are transactions which are already done.
    Is there any negative effect by activating this?
    Regards
    Hari

    As such there is no retrospective impact of setting company code to productive. It will imply that data can't be deleted from that point onwards.
    Hence, you can do the same safely without any impact on old data in ur system.
    If the answer satisfy ur query, please assign award points.
    Regards,
    Nitin.

  • Required Overlapping VS Continuos Flow Production

    Hi SAP Experts,
    I have a few questions regarding the overlapping indicator in routing as below:
    1. What is the difference between "Required Overlapping" & "Continous Flow Production" indicator in routing? I have tested with both indicator but still cannot see the logic behind on how APO scheduled the orders based on these indicators.
    2. Is it a must to maintain both "overlap time" & "Send ahead quantity" in the routing if I select either "Required Overlapping" or "Continous Flow Production"? Or, I can just maintain either of them?
    3. If my planned order's quantity is less than the send ahead quantity set in the routing, there will be a gap between 0010 Produce End Time with 0020 Setup Start Time. Is this a APO standard behavior?
    4. Refer to question (2), if the answer is yes, is there any way so that the APO will schedule the operation back to back if the planned order quantity is less than the send ahead quantity without any gap in between?
    Thanks.
    Regards,
    Hooi Chia

    Hi Santosh.A,
    Yes, overlaps in routing is integrated with APO. The changes on overlap indicator in ECC routing is reflecting in APO PDS. I have tested the overlap scenarios for both "Required Overlapping" & "Continous Production Flow" and both are working in APO. But, I do not understand the difference of these 2 indicator. Moreover, there is a gap between my 1st operation Produce End Time & 2nd operation setup start time if my order quantity is less than the send ahead quantity set in the routing.
    Please help to clear my doubts.
    Below are the examples of scheduling result for overlapping, overlapping set at operation 0010:
    1.
    Overlapping: Required Overlapping
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 500m
    Result:
    0010S: 03/01/2011 10:28:54 to 03/01/2011 15:06:59
    0010P: 03/01/2011 15:06:59 to 03/01/2011 16:51:28
    0020S: 04/01/2011 11:36:52 to 04/01/2011 15:06:52
    0020P: 04/01/2011 15:06:52 to 04/01/2011 15:48:47
    2.
    Overlapping: Required Overlapping
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 10,000m
    Result:
    0010S: 03/01/2011 10:45:19 to 03/01/2011 15:23:24
    0010P: 03/01/2011 15:23:24 to 05/01/2011 02:03:26
    0020S: 04/01/2011 19:16:20 to 04/01/2011 22:46:20
    0020P: 04/01/2011 22:46:20 to 05/01/2011 12:40:59
    3.
    Overlapping: Continous Flow Production
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 500m
    Result:
    0010S: 03/01/2011 14:25:55 to 03/01/2011 19:04:00
    0010P: 03/01/2011 19:04:00 to 03/01/2011 20:48:29
    0020S: 04/01/2011 15:33:53 to 04/01/2011 19:03:53
    0020P: 04/01/2011 19:03:53 to 04/01/2011 20:38:34
    4.
    Overlapping: Continous Flow Production
    Min Send Ahead Qty: 7650m
    Min Overlap Time: -
    Order Qty: 10,000m
    Result:
    0010S: 03/01/2011 14:25:55 to 03/01/2011 19:04:00
    0010P: 03/01/2011 19:04:00 to 05/01/2011 05:44:02
    0020S: 04/01/2011 15:33:53 to 04/01/2011 19:03:53
    0020P: 04/01/2011 19:03:53 to 06/01/2011 02:28:54
    Thanks.
    Regards,
    Hooi Chia

  • Byproducts from Production process

    Hi all,
    Any suggestions how I can handle by-products being produced in the Production process?
    The scenario is...
    BOM
    Produced Item: 1(unit) X P1 - 1000lt Drum of Liquid Syrup
    By-product Item: 2.5(kg) X B1 - Waste Metal
    Comp1: C1 = 5 Unit (a 200lt Drum Liquid Ingredient)
    Comp2: C2 = 1 Unit (a 1000lt Drum Packaging Material)
    So as the above goes, To Produce 1 X P1, I need 5 x Drum of 200lt Ingredient and 1 X Packaging Drum.  In the production process, we get waste material B1 which is the packaging material of our C1 component and this B1 waste material is stocked and is sold to recycle companies.
    How do we incorporate this in our BOM?  Can SBO handle By-products?
    Thanks

    Hi Noor
    Your explanation for my questions were  sufficient.
    SBO addressing the co-products concept.
    Try out following steps and let me know results.
    <u>Material Masters Required</u>.
    1. Main Product - 1000lt Pkd. Syrup
       While creating above material master "tick" the
       co- product indicator in MRP-2 Procurement Tab.
    2. 200lt Pkd. Ingradient. Maintain all views as required.
    3. Drum Empty 200lt - "tick" the co-product indicator in
       MRP-2 view.
    4. Empty drum 1000lt maintain all views as required.
    <u>BOM Design</u>
    1. Header - 1000lt. Pkd Syrub
    2. Bom Items. Other than Header materials.
        *Important Note: For Item Drum Empty - Qty should
         be -ve. ie. as per your input give 5-.
        select this item and click "detail" icon which will
        take you details of above item. There in Basic tab,
        General Data "tick" co-product indicator. SAVE BOM.
    Now Run MRP after maintaining all master data.
    hope above steps will help you to start.
    Rest in next.
    Best Regds
    Poongunran

  • Co product process related queries..

    Dear Experts,
    Request you to guide me on the below process.
    Co product process and costing
    Material (A) is consumed under production process and SFG1 (60%)and SFG 2 (40%) are produced. Need to set co product for the same.
    1) Where i will set co product indicator in SFG1 or SFG2.
    2) If both are co product then where is my main material.nee to define one main product along with two co products or i can produce two co product without main products.
    3) Where i will set portionment structure or source structure.
    4) How to define equivalence no.
    5) What tcode or process need to be done in order to distribute cost in 60 and 40 %.
    Request you to guide me the complete process flow along with costing process.
    your help will be highly appreciated.
    regards
    RR

    Dear Ajay,
    Thanks for your advice
    I have ticked co product indicator in SFG1(Main Product) and SFG2 (CO product).
    I have bom of SFG1 inside that SFG2 is a component as Co product with - ve QTY
    I have ticked co product and assigned source structure in SFG1.
    Inside source structure There are 3 assignement seperatly for SG1 and SFG2 based on material cost ,production cost and others ratio is 60 for main and 40 for co product for all assignments.
    While Running cost estimate system of SFG1. System is showing Sfg2 as co product and value based on ratio.If i will execute cost estimate of SFG2 then system is showing SFG1 as co product  vice versa.
    Is it correct approach.If no then where i m lacking.
    regards
    Raman Rana

  • Confirming an order for a by product

    Am having a problem, If l confirm an order without a by-product an inspection lot is generated automatically and its post to inspection stock for Quality inspection, but the moment l try to confirm an order of the same product with a by-product it is posted to unrestricted-use stock but the material have 04 as its inspection lot origins in the material master. What can l do to post to inspection stock for this material with and without by-product.

    In SAP standard there is no problem when an order is confirmed with or without co-product.
    If co-product should be post to inspection stock and be inspected, the inspection type '04' should be activated and selected 'post to insp. stock' indicator in material master of co-product.
    I would suggest you check the material master and production order.
    The co-product indicator is checked in MRP2 view of material master.
    The quantity of product and co-product are negative(-) and the product is checked at co-product column in component overview of production order.
    Regards
    Luke

Maybe you are looking for

  • How do I drag a file out of Swing to Windows

    I have an application which has BLOBs stored in a DB. From either Windows or Linux I can drag a file and drop it into my application and store it in the DB. I have also enabled a JTable to act as a Drag source, and I by encoding the result as a uri-l

  • Nokia E6 live streaming not working

    its only one month i've updated my mobibe due to hanging problem and now it s giving me another pain for not playing any live streaming video like online tv or you tube streaming... Also still have the hanging problem. Help me out if anybody has a so

  • Intercompany billing price discount

    Dear Experts : I do following steps. 1. created a sales order and input a condition type ZDIS for discount in head condition by manual 2. created DN 3. created IV billing for intercompany ,transfer ZDIS from sales order to IV billling I would like to

  • Facebook games will not show fully in Firefox Browser

    All the games in Facebook will not load fully in FireFox.

  • [Boot Camp] Trying to partition for Windows and progress bar remains with "Status : Idle"

    I'm trying to setup WIndows using Boot camp on my iMac OS X10.7.4. It worked perfectly fine until yesterday. I don't have a OS X installation disc or something to re-install or something. But wanted to know meanwhile, if there is someone who can prov