Confirmation of external processing operation

Dear All,
I would like to know is it possible to prevent the confirmation of an external processing operation (pp02 control key) until the Purchase Order associated with that operation is received (GR) ?
I checked the forum for this, but was unable to find any inputs & also in customizing where i find only settings for confirmation of orders & not at operation level.
Hope my problem is clear, await inputs.
Regards,
Vivek

Yes,
it can be done but no through std SAP setting...but with user exit.
Check this exit
CONFPP03  PP order conf.: Cust. specific check after op. selection
CONFPP04  PP order conf.: Customer specific input checks       
CONFPP05  PP order conf.: Customer specific enhancements.

Similar Messages

  • Auto Confirmation of Externally Processed Operation

    Dear Experts,
    I am uing externally procesed operation.  The process is working well.
    But when I do the GR of the externalluy processed oepration, I want the operation to be confirmed automatically.  Is this possible?
    Please advice.
    Regards
    Tom

    Hi,
    I can think of 1 option.
    Create a Z program using BAPI - BAPI_PRODORDCONF_CREATE_ACT & in this program check if control key is PP02 & the operation has received the status EODL. If it has the status then trigger the BAPI to post activity confirmation. 
    You can schedule the Z program to run periodically in background say every night or every hour or as per your business need.
    Regards,
    Vivek

  • Tracking of wip material in externally processed operation

    Hi All,
    As part of production process, most of the operations would be processed internally in the manufacturing plant and some of the operations would be
    performed by vendor at his own premises (outside the manufacturing plant). Material will be called as WIP (work in process) material if it completes some of the operations (two operations completed out of four operations) in production process without forming its final product shape
    WIP (work in process) material will be sent out to vendor against externally processed operation in production order. We’ve a business requirement to track the WIP (Work in Process, No inventory yet in system) material status details such as when was the WIP material shipped out to service provider by purchasing department or returned back to production floor from stores after receiving from vendor for externally processed operation in production
    order
    The scenario is explained below and the process in SAP would be as follows.
    1. Production order would be created for
    respective header material (semi-finished/finished) with required quantity with five operations to be processed, for example: OP10 (turning), OP20 (drilling), OP30 (milling), OP40 (shaping), OP50 (powder coating). OP10, OP20, OP40, OP50. would be processed internally in the shop floor of the manufacturing plant
    2.After finishing the internal processing at OP10 and OP20,  Operation no 30 (OP30-milling) for the respective header
    material would be processed externally by sending the partially processed part(WIP) to vendor outside the manufacturing plant. In SAP, the partially processed part doesn't have any material code and will not be updated in the inventory and will be treated as WIP (work in process) and automatic purchase requisition for external processing through production order is generated as follows
    For OP30 Milling (Externally processed operation), from PP module perspective, we would be maintaining a control key which supports external
    processing in the Operation 30 (OP30, external processed operation - An externally processed operation is not carried out within own organization, but is assigned to a vendor, who then does the work) with relevant information such as material group, purchase group, description of operation, cost element to track costs in the production order.
    When the respective production order is saved, system creates a purchase requisition for external processed operation 30. We can see
    the number of the purchase requisition on the external processing tab of operation details screen of OP30 in SAP Production order.
    Purchasing department generates a purchase order against the automatic purchase requisition generated in production order, which informs the
    vendor which service is required.
    With reference to the purchase order – service oriented, the WIP material (no material code exists in SAP) is sent out to vendor. After the material has been processed, the vendor delivers the material back to manufacturing plant. When a goods receipt against purchase order is posted at manufacturing plant, the system displays the received quantity on the external processing tab of operation details screen of the operation - OP30 in production order and also displays in order information system reports. It also possible to track the cost incurred for external operation. However, Goods receipt against production order does not cause an increase in the quantity and value of the warehouse stock of header material of production order.
    The above mentioned process is not a subcontracting process - where in we send raw materials and receive semi-finished/finished materials from vendor
    3. The respective partially processed part (WIP) received from vendor is sent to shop floor to complete the rest of the process
    in OP40 (shaping) and OP50 (powder coating).
    4. After OP50, the respective header material (semi-finished/finished) of the production order will be received (goods
    receipt against production order) as inventory in respective storage location.
    With reference to the above process, we can track the status of receipt of WIP material from vendor after processing at his premises;
    however, we can’t track when WIP material ( after completing processing at OP20) was sent out to vendor for external processing by purchasing department and when WIP material was returned back to production shop floor for further processing at OP40 after receiving from vendor by stores.
       Please provide your feedback for the possibility to track the details of WIP material (no material code exists in SAP system) sent out to
    vendor and received back at shop floor from stores for external processed operation of production order
    Thanks for help in advance.
    Regards,
    Rajesh

    Hi Rajesh,
    Process what ever you have explained is the right process with respective to operation wise subcontracting as per SAP Best practice. As you rihtly said in operation wise subcontracting PR is created with any material code. Once PR is created after PO and GR actual cost of that particular operation will be seen on the order. I believe sub contact operation after GR can be confirmed through confirmation transactions. Since it is subcontract operation specfic to peration seperate inventory is not tracked instead cost is reflecting directly on order
    If you to want to track the inventory of the intermdiate product then you need to have a seperate material code for intermediate product (Eg A) received after second operation and do seperate subcontacting PR for seperate new material (Eg B) by issuing the intermediate material (Eg. A). Upon receivng GR for PO inventory will be updated for the new material (Eg B).This new material can be issued to your final product which has operation 0040 and 0050. Here two different material codes will be required.
    Else follow the suggestion given by expert Caetano.
    Thanks & Regards,
    Ramagiri

  • Regarding Costing in External processing operation in production Order

    Hi Everybody,
    We are trying to do sub contracting through external processing operation in production order. In brief, we are creating a production order which contains just one operation and when the prod.order gets released, it creates a purchase req through external processing operation. Pur.Req is being converted to Pur.Order with all the Raw's which we are going to send to Sub Contractor..
    The costing issues we are facing are
    1. First we receive GR against Pur.Order, once its done, the Raw's which we sent to Sub.Contractor will be backflushed.. but we dont receive the Finihsed part until we confirm the production order.... there is a Gap between this two processes.. so how can we make sure that there wont be any differences in terms of FI..
    2. Second issue is, some times even if we ordered 10 pcs, subcontractor can only send 5pcs and 5 pcs afterwards.. but every month end FI dept tries to close the books, so how can we deal with this issue if i receive 5 pcs in this month and remaining 5 in the next month...
    If any body dealth with this kind of situation.. your hints will be really valuable,
    Adavnce thanks
    srikanth

    Dear Srikanth,
    Please note the following:
    1. First we receive GR against Pur.Order, once its done, the Raw's which we sent to Sub.Contractor will be backflushed.. but we dont receive the Finihsed part until we confirm the production order.... there is a Gap between this two processes.. so how can we make sure that there wont be any differences in terms of FI..
      - a) Issue your raw materials through T.Code. - MB1B, Mvt. Type - 541. This will transfer materials from your stock to vendor stock (provided you have initiated vendor material provision and activated 541 mvt. type for PP)
        b) After you receive the material back from vendor, run the T.Code MB01, which will cause Mvt. Types 543 and 101. Now the material has come back to your Production order, but not in Storage location stock.
       c) Then carry on normal CO11N and MB31 for your production order.
    Hope this will solve your problem.
    Revert back if you still have any question.
    Regards,
    Angshuman Kar

  • Need Schedule Lines for the External Processed Operation

    Dear All,
    In My routing, I have totally 10 operations. 2 of which are externally processed Operations.
    When i create Production Order, the system creates Purchase Requisitions for both the Operations.
    My client wants, Schedule lines to be created in the Production Order Operations.
    Please guide me where will be the settings to get this.
    Thanks & Regards
    Bala

    Hi,
    For schedule lines cofigration kindly check the following Path:
    Material management--  Purchasing--
    Schdulling agreement
    Here you need to do the cofigration of the following as per your requirements:
    Number ranges
    Docuemnt types
    Release procedure
    Screen layout ( if required)
    Authorization check for GL Account
    Regards,
    Syed

  • Externally processed operation and planned order

    Hello experts,
    When an operation is defined as externally processed, once the production order (from a planned order generated via MRP) is created, the purchase requisition for that operation is automatically generated. My question is if it is possible to generate the purchase requisition before generating the production order, I mean, with the planned order.
    Although this external operation is defined in the routing, the planned order does not show it and it means that the purchase requisition is not generated.
    In our scenario we want to convert the production orders as late as possible to have automatic changes in BOM, but if we do not convert the planned orders to production orders, we won’t have this purchase requisitions.
    Is there any way to solve this?
    Regards

    Hi Laura
    No, it's not possible to generate the purchase requisition for an externally processed operation before the creation of the production order. The planned order routing is only exploded for scheduling and capacity requirements calculation and an operation is not actually created.
    As an alternative, you can create a separated material number and assign the special procurement 30 for subcontracting to this material. If you add this component to the BOM of the parent material, MRP will directly generate a purchase requisition for subcontracting.
    BR
    Caetano

  • Error in Externally Processed Operation

    Dear Experts,
    I am setting up "externally processed operation".  I have created the purchase info record & the control key is PP02.  When I release the production order, I get the following error.
    Material class differs from material class  from info record
    Message no. 06354
    Diagnosis
    The material class or material group of the info record differs from that of the item.
    Procedure
    Check the material class or material group entered, or the info record number.
    The material group is same in the material & purchase info record.  I have also maintained the same class in the material (Class type 001) & purchase info record (Claas Type: 057).
    Do I need to make any other settings?  Kindly advice.
    Regards
    Tom

    why don't you use PM02 key?
    an operation can only be processed externally if its control key allows or prescribes external processing
    just in case: since an external operation has to be sent to a different company, additional data needs to be maintained on the 'External processing' tab page. You can maintain the data in the routing or in the production order
    you said that "I have also maintained the same class in the material (Class type 001) & purchase info record (Claas Type: 057)" - what is the 057??

  • External process operation

    hi
    how to inspect external process operation which are given for  subcontracting, how to reject the operation which was done by subcontractiong
    regards
    Baswa

    Dear Raj,
    Inspection of external process is done in the same way as of internal one.
    Please check the following:
    1. You must make sure that the operation control key in the production order specifies external processing.
    2. You must activate a goods receipt inspection for the operations to be processed externally by:
          a. Specifying an inspection type (inspection lot origin 01) in the routing (external processing data for the operation)
          b. Activating this inspection type in the material master of the final product
    Regards,
    Alok Tiwari

  • Externally Processed Operation

    Hi All,
    I want to perform end-to-end cycle for externally processed material. Please provide link or document having step-by-step guideline.
    I got following error:
    I have performed following steps:
    1) In the routing control key maintained which is externally processed (PP02)
    2) Purchase Info record (ME11) maintained with 'Subcontracting' item category
    3) While creating production order if I select that purchase info record then it prompts me an error "Material class differs from material class  from info record"
    Purchase Info record is created with 057 class default. The same class is not available under material classification.

    Raja Sekhar.S wrote:
    Hi,
    >
    > In external Processing
    >
    > you will not create Production order you have to Create purchase order for the material
    >
    > In this case you will create Purchase order on the material which you would receive but you will be sending different semi finished material. (because you will be sending one material and after the operation it will convert to other form)
    > you should create separate BOM for the material which you will be receiving after external operation
    > You have to  create work center with Control key=PP02
    > with 521 movement type you can send the material to vendor
    >
    >
    > Regards,
    > Raj
    Hi  typing error
    Actually  movement should me 541 instead of 521
    regards,
    Raj

  • Control key for external process operation & internal.

    Hello,
    We have created one control key (ZP01) T code OP67.
    In the customisation (OP67) for "External processing" selection field we select "X" i.e. "Internal processed operation / Extarnal processing possible.
    If this field is blank then it is a "Internal operation"
    If this field is "+" Then it is external operation, in this case system creates the purchase requisition after release the production order.
    We want to know,
    If this field is with "X", then what is the proceedure to create the purchase requisition for external operation.
    Thanks in advance.
    Best regards
    Nilesh

    Hello Brahmankar,
    Thanks for your prompt detail reply.
    As per your suggestion already we have that setting for another controll key (PP02)
    It is std for SAP it is working fine, in this control key the setting is "+" for external proceesing in OP67.
    Now my requirement is instead of "+" I made it "X" i.e. Internal processed operation / External processing possible. In this case system is not generating purchase requisition after production order release.
    I want to know for external processing whether I have to create purchase requisition manualy?
    or any other process we have to follow?
    Thanks & Regards,
    Nilesh..

  • Control Key for External processing

    Hi
    I have a work center for external process and a control key created for external as well. In setting up the control key I choose "automatic goods receipt" and "confirmation required".
    Then I have 2 semi parts A and B. Same routings are created for them with the work center and control key mentioned above.
    When I create production orders for A and B, I can get a purchase requisition for external process and convert it to a PO. Further when I make a goods receipt to the PO, the production orders are marked with status "CNF". What's surprising me is only for part A the goods receipt of production order is done automatically when the PO is done with goods receipt. No "DLV" for the B production order.
    I compare the material master of A and B - can't see any difference...
    Please give me some suggestion on where I should look into. Thanks a lot in advance.
    yu

    At least I can see the difference now.
    The scenario is still a production order with an external processing operation (PO to supplier).
    When I use movement type 101 to GR the PO, the production order gets CNF and DLV
    When I use movement type 103+105 to GR the PO, the production order gets nothing and the external processing operation just gets EODL.
    For QC process, we choose to use 103 to GR the PO first and 105 is made when quality check is finished. Is there any solution for this issue?
    Yu

  • External Processing with material Provided to Vendor

    Dear All,
    I have a problem in external processing of Maintenance Order.
    When i have created external processing operation.
    I have assigned one component for that external operation which i have to send to vendor.
    After saving the Maintenance order, system is generating Purchase Requisition for that operation.
    That purchase requisition is having account assignment category F. But it is not picking the item category L and the component assigned for this external operation is not flowing to the purchase requisition.
    Please guide me to solve this issue.
    Thanks & Regards
    Bala

    Hi
    For external service we can use PM03, for that we have to create service sheet and proceed further.
    But here my requirement is, just like PP external processing they are doing one operation outside.
    If you look at PP routing, Operation overview there is given external processing data and there will be subcontracting tick.
    If we tick the sub-contracting button, then system will pick the component assigned to that operation to the Purchase requisition.
    If we don't tick that button, system will not copy the component to PReq. .
    Is there any option available here in PM?
    Please guide me.
    Thanks & Regards
    Bala

  • External processing badi BAdI PP_OM_BD_BANF_HEADER_MATERIAL

    Hi,
      Please any one can help me regarding this badi implementation and explain the process flow of the scenario.
    I have 5 operations and operation 3 is external processing
    1.   once purchase order is created which material is supplied to vendor.
    2.   once external processing operation is done for which material the GR is done to recieve  from vendor.
    Thanks
    Krishna

    Hi Ritesh,
                  Thank you for the reply, But My question is if the header material is done GR wat about the inventory levels the same material shows work in  progress and again it is showed in inventory. correct me if i am wrong.
    Another question: my bom is like this A header
                                                               B Raw material1 assigned to operation 1
                                                               C Raw material2 assigned to operation 2
                                                               D Raw material3 assigned to operation 3
    Now to make the operation 3(external) we have to issue the assembly of B,C along with D, if  i am correct the purchase order will show the component D only to issue. How to issue the header and its tracking if possible.?

  • Can SAP get material number in Purchase order in external processing?

    I have a question that:
    As I know, Exeternal processing is a service, so that Material number can not be shown in purchase order converted from PR for external processing. Here, PR can be automately generated from transaction CO01 to create an external processing production order. Meanwhile, for external processing, purchase info record is created without material number only with material group.
    So, I want to know that if there any solutions to show material number in purchase order generated for external processing?
    thanks,
    best regards,

    If therer are no production order, How can I get finished products from internal activity and external processing?
    Now, external processing in our company like this:
    1.create an purchase info record. (type:subcontracting, with material group, but not material ID)
    2.Maintan external processing data in external operation where external processing happens.(control key: pp02, external processing data: info record, purchase org. net price, cost element etc.)
    3.create a production order for the material.(one of the operations is an external processing operation described like step 2)
    4.Purchase requstion is changed into Purchase order. (Purchase requestion is automately created with the production order)
    5.MIGO to receive goods from the purchase order.
    6.finished the production order and delivery goods.then the production order is DLV.
    In step 4, purchase order can only get the production order ID, but there are no material ID shown in it. Only method to show material is that maintaining a description text in the external operation, then, purchase order item could show material in material text(but, here, there is no material ID derectly from info record or production order).
    this is the big problem now for our company. No material ID can be automately carried into the purchase order.
    Hope you help..
    thanks...

  • Routing and Externally Process and Purchase requisition

    Dear Experts
    I try to set routing with External processing.
    I have 2 questions.
    I would really appreciate you, if you could answer my questions.
    I still have not understood the relationship between "Control key" and "Purchase Order"
    The routing is like below
    10 self manufacturing
    20 External Processing with the control key is pp02
    30 self manufacturing
    In case I set "+"  (Externally processed operation)   for "External Processing" in "pp02", the Purchase Requisition will be created.
    However in case I set "X"  (Internally processed operation / Externally processed operation)  for "External Processing" in "pp02", the Purchase Requisition will not be created.
    My question is in case I set "X" for "External Processing" for Control key, how can I create Purchase Requisition?
    Should I create Purchase Requisition manually?
    In case I set task 20 as External Processing.
    What kind of Work center should I regist for task20?
    Is it dummy work center or is empty OK?
    Best Regards

    Dear,
    When you maintain external processing in your control key PP02 and the system will create a purchase requisition when you release the production order. For that particular external processing operation you need to maintain the purchasing group and info record details in the external processing tab in routing.
    Please refer my reply from this link,
    Re: Control key for external process operation & internal.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • New Airport extreme station and Powerbooks. No go

    Got a new AE (802.11n) FW 7.1 and got 4 Macintel computers on it, that works. But then I got 2 Powerbooks that sometimes sees the network but when connected only stay connected for maximum 30 min. And then you cant connect for about one hour. Powerbo

  • How to export data from a string to a CSV file

    Hello, i do have a string in a Livecycle Designer script object with a couple of rows with different entries divided by a semicolon: COLUMN1;COLUMN2;COLUMN3 Entry1;Entry2;Entry3 Entry4;Entry5;Entry6 The goal is now to export this string from Livecycl

  • "ExpressInvoiceAgent no longer supported"????

    Hi, Ive bought a new iMac today & it looks like i've transferred over all of my dats inc itunes, photos etc correctly from my old mac..all apart from one annoying problem that is driving me mad!..i'm now getting constant warnings that are filling the

  • IBook G4 and External Widescreen LCD?

    Hi All, I've been using the Screen Spanning Doctor successfully for a couple months, but am looking into getting a 19" widescreen LCD display (the Acer AL1916W to be exact). Does anyone have any experience with hooking an iBook G4 up to an external w

  • Retrieve int using sql statements

    Hi there, Does anyone have any ideas as to how i can update a database table with an integer, returned from a second table as part of an sql statement. Here is part of the method to get the value i want out of the database: public int retrieveId() th