Copy purchase requisition with me51n
Hi,
I have a problem when I want copy a purchase requisition in me51n.
I have two documents types in specific and I use a variant of transaction who fixed the document type.
I execute me51N
I search a purchase requisition with other types.
I do a drag & drop to copy the purchase requisition.
But in the first copy, there is a document type present on header level was copied and in the second copy it is a document type comes from reference that is copied.
I want for the first copy, the document type comes from reference in the copy.
What am I doing ?
Thanks.
in order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
are several steps necessary.
When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
the Purchase Requisition will be automatically inserted into the table EPRTRANS.
But not in case of if you create a Purchase Requisition without a Material-Numnber.
e.g. Purchase Requisition with free text and account assignment.
Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
into table EPRTRANS.
I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
It trnasfers all Purchase Requisition from EPRTTANS to the external system.
I hope it clarifys some of the confusion .
regds
ertas
Similar Messages
-
Creation of Purchase requisition with reference to Contract documents
Dear All
I am not able to create the Purchase requisition with reference to Contract documents, in outline agreement field if I enter the contract document number which is already existing it is not copying the details, again I have to enter all the details like Plant, Material, document type, Qty etc. Even after selecting the PR document type as RV for outline agreement also it is not coping. Kindly let me know that can we not able to give reference of Contract number in this outline agreement field to create Purchase requisition.
regards
Dhanu1.Logistics--Materials Management--Purchasing ---Purchase Requisition --Follow-on functions --- Assign and Process
2.ME57
3.Select the Assigned Purchase Requisitions checkbox if you also want to see requisitions already assigned, and choose Execute.
4.On the Assign and Process Purchase Requisitions screen, select the requisition lines for your material.
5.Choose Assign Manually if the info record already exists.
6.On the pop-up Assign Source of Supply Manually dialog box, make the following entries:
Agreement 46XXXXX Agmt item 10
7.Choose Assign Source of Supply.
For assign the source of supply, you can also choose Assign Automatically (only if not already assigned by MRP due to existing source list). If more than one source exists, select the contract in the Source Overview for Purchase Requisition 100XXXXX window and confirm with Enter.
When assigning a source, make sure to select the contract.
8.Choose Save.
9.Select the line item, and then choose Assignments Overview (SHIFT+F5).
10.On the Assign and Process Requisitions: Overview of Assignments screen, select the line below Vendor (you can only select one at a time), then choose Process Assignment.
11.On the Process Assignment: Create PO window, check and make sure the Order Type (NB), Purchasing Group and Purch. Organization fields then choose Continue (Enter) to confirm.
12.On the Create Purchase Order screen, select the requisition in the Document Overview section and choose Adopt in the left part of the Document Overview screen.
13.Choose Save. -
Material Purchase Requisition with WBS from Projects
Hi ;
As per our client requirement we need to create Material Purchase Requisition with WBS Element Material .Can Some one send me the procedure .
Thanks in Advance ;
Joydeep MukherjeeHI Joydeep,
This is not possible in PS via CJ20N transaction to create material PR without activities. This is standard SAP restriction, i guess this cannot be changed.
You can use ME51N by account assigning to Project / WBS element, then system will allow you to create.
This is kind of two different functionalities we have to create PR for WBS element / Project / Network.
Regards
Terence -
Rounding Values while creating purchase requisitions using ME51N
Hi MM Experts,
I have created some materials with a Rounding Value maintained in MRP1 View of the material master.
Whenever I raise a purchase order, the order quantity rounds off to the value maintained in the material master which is the correct functionality.
But when i try to create a purchase requisition using ME51N, the rounding functionality doesn't work.
Example: Rounding value (in MRP1 view) of a material is 25.
The order quantity entered is 4. But before saving the PURCHASE ORDER the order quantity will be changed to 25(which is the rounding value). This is the correct functionality but doesn't happen with the PURCHASE REQUISITION (ME51N)
Can someone guide me on how to make the rounding value work for purchase requisitions when using ME51N?
Thanks in advance.
cheers,
RandiHi!
i had the same problem with a company.
i did not find any customizing possibilities.
I solved it with BAdI ME_PROCESS_REQ_CUST
Method PROCESS_ITEM.
I hope this helps
Flo -
Hi Guru’s,
I have a scenario where purchase requisition with Item Category – L (subcontract External) for Repair items (Storeroom Process) need to get generated with Item category-L.This requirement is to MAP in my system.
I am aware that purchase requisition can be created with reference to maintenance orders.
Can anybody through some light on the integration between PM and MM.
If creation of purchase requisition is possible via maintenance orders then please explain me with detailed steps both configurations and master data so that I can able to replicate the same as per business requirement.
I look forward to the expert’s response.
Regards,
KumarHi Kumar.S
You have to installed DIMP 6.0, and activated the business function Refurbishment and Subcontracting (LOG_EAM_ROTSUB) and Serial Numbers in Purchasing (LOG_MM_SERNO) .
Please check the below link:
http://scn.sap.com/thread/1956895
Hope it will help you to resolve your issue.
Regards,
Ritesh -
How To Restrict Users To Only Create Purchase Requisitions with Item Catalog?
Hi, everyone
Please help me,
How To Restrict Users To Only Create Purchase Requisitions with Item Catalog? is it possible?
Regards, ManuelHi Steenie Norman
First click on the text item ---> Tools ---> Property Pallete ---->
and change the Keyboard State to Local Only also this Depend in your OS
hope this useful ....
Regards
Mohammed -
Delete purchase requisition with item category Subcontracting
Hi all,
I need to delete a purchase requisition with item category = L (subcontracting).
I am using already BAPI_REQUISITION_DELETE to delete other purchase requisitions but for the subcontracting it doest not work. In fact in the BAPI code you can see:
Requisitions with dependent reservations won't be processed
IF xeban-pstyp EQ 3 AND xeban-rsnum NE space.
So I am looking for other BAPI but I don't find any to delete this kind of requisitions. Do you know any way to do that or I have to do a batch input?
Thx,
ManelHi Manel,
I am using BAPI_PO_CHANGE to set EBAN_EBAKZ, however in most of the cases error thrown as "Instance PO Number of object type could not be changed".
Could you please help on this?
Thanks,
Murali -
Purchase Requisition with mat-nr and without mat-nr
Hi,
if I create a Purchase Requisition with a material number it will be transfered into the EPRTRANS,
but if I create a Purchase Requisition without a materialnumber (only with account assignment)
then it will be not transfered into EPRTRANS .
Do you have an idea why this strange behaivour happens.
Maybe there must be made some changes in Function Module BBP_EPRTRANS_MAINTAIN ?
Regards
ilhanin order to perform a Purchase Requisition-Upload from R/3 Backend system into another system there
are several steps necessary.
When I am creating a Purchase Requisition at the Backend regarding a valid material-number,
the Purchase Requisition will be automatically inserted into the table EPRTRANS.
But not in case of if you create a Purchase Requisition without a Material-Numnber.
e.g. Purchase Requisition with free text and account assignment.
Function Module BBP_EPRTRANS_MAINTAIN is reposible for transfering of Purchase Requisition
into table EPRTRANS.
I need these PR in the EPRTRANS in order to perform the report BBP_EXTREQ_TRANSFER finally.
It trnasfers all Purchase Requisition from EPRTTANS to the external system.
I hope it clarifys some of the confusion .
regds
ertas -
Purchase requisition with MRP controller
Hi everybody, I need support because I have to control during purchase requisition to block users with specific MRP controller.
I mean, user A only have permission to create purchase requisition with MRP controller Z and user B only have permission to create purchase requisition with MRP controller Y.
Thanks for all the ASAP cooperation.
Regards.Hi Mitra,
You will find your answer here.
MRP controller for PR document type
Do let me know if it helped, as I might have to explore this option for an upcoming requirement.
Thanks
Shailesh -
Purchase Requisition with wrong purchasing group - release strategy
Hello
There is a lot questions about release strategies but I cannot find answer.
I have release strategy based on:
- Plant
- Purchasing Group
If I create Purchase Requisition with right purchasing group release strategy is assigned to PR item.
When use wrong purchasing group - release strategy is not assigned.
How to easy set control if user use wrong purchasing group system automatically set one strategy which not allow to create purchase order.
There is too many plants (150) and purchasing groups (60) to create all combinations in strategy. So I cannot do that.
Maybe there is some useful user-exit?
I use SAP ECC 6.0
My problem occurred because SAP allow to create PO with reference to PR which have no assigned strategy.
Thanks in advance for help
ArekYes it is solution
But as I wrote before there is too many incorrect combination.
Example
PG A1, A2, A3, A4 . A50
Pl 2200, PG A1 OK
Pl 2200, PG A2 OK
Pl 2200, PG A3..50 NOK
For this example I have to set 48 combinations (strategy with S).
I noticed that I would have to set about 200 strategies. Client dont want accept it.
You wrote set up one unique strategy. How? As I know I need 200 strategies (or there is something I dont know
Kind regards
Arek -
Copying Purchase requisition header text to Purchase order.
Hi Experts,
Can you suggest me a way to copy purchase requisition header text to purchase order?
Best Regards,
ShailendraHi
PR header text cannot be copied to PO ....... its std SAP .... reason being many PR can be copied to same PO .... so how to decide which PR header text to be copied to the PO .... ??? -
Copy Purchase Requisition - Material Short Text
When creating a new purchase requisition by copying an existing purchase requisition using the document overview in ME51N, the material short text is always copied from material master (makt-MAKTX) instead of the line item (eban-TXZ01) from the source purchase requisition.
Is there a way to set up copy control for short texts as there is for long texts ?
using ECC 6.0
thanks in advanceHello Thomas,
Unfortunately no, when you copy the PR from another PR the System redetermined some fields from the material master,these fields are :
Planned Delivery Time,
Unit of Measure,
Material Short Text
Goods Receipt Processing Time,
Material Category,
MRP Controller...
This system behaviour is intended since many companies more often change the data in the material master rather than copying a purchase requisition that contains changed material data.
Regards,
Mauro -
Copy Purchase Requisition Header Text to Purchase Order
Hello!
I will like to copy the Header text of the Purchase Requisition to the Purchase Order.
I have read that SAP does not allow to copy it to the Header Text of the PO but it allow to copy it to the Item text of the PO.
Can you give some hint on how to do this.
Thanks.
Regards,Hi
You can't copy the header text of PR to PO header
because Sometimes you need to convert different PRs to one PO.So each PR will have different header text, how the system will identify in PO header text.
So whatever the item text you maintained for PR will be copied to item text of PO if you create the PO with respect to PR.
So for this reason SAP has not provided the option for link the PR header text to PO header text.
Hope you understand,
rgds
Chidanand -
Standard Smartform printing purchase requisition through - ME51N / ME52N
Hi Experts,
we are trying to build functionality to print Purchase requisition through transaction ME51N / ME52N / ME53N. we have created a print button on Customer data screen for that. Now we are looking for any standard smartform or script which can be used for printing Purchase requisition.
Please provide me some pointers for the same.
There is print button avalable at item level of purchase requisition. but it will not print header records. i am not able to find this form in system also. how can i find this form?
thanks>
rajpal sehrawat wrote:
> Hi,
>
>
> Header records means we might provide some header level information like PR number , short text and logo. Currently we are able to print only line items present in the ALV grid.
>
>
> we are looking for some similar form which can be enhanced.
>
>
> thanks
actually the PR number is a line item field - it comes out of table EBAN. You would have to store the logo someplace else, since it does not belong to the PR (EBAN) -> neither header nor item, but is 'simply' graphics stored elsewhere in the database.
I wouldn't know of any form in MM-PUR which you could easily adapt to printing PRs (and have never before heard of the need to print them) - so you will have to do a custom abap. Since there is no possibility to maintain NACE for PRs (it's simply not available) - I wouldn't know where you could use a smartform/sapscript ... that custom abap is all you can do ... -
Creation of Purchase Requisition with Sale order
Hi,
I have a scenario where I need to create a Purchase requisiton for the requirement from the sale order (like the Third party sale order).
I have done the required configurations to create the Purchase requisition.
My Sale order has three line items and each line item has different Item category and schedule line category.
I have configured different Purchase requisition document types for every schedule line.
When sales order is saved, I need seperate Purchase requisition since the PR document type are different for every schedule line.
But system creates only 1 PR with multiple lines. It picks the PR doucment type assigned to the schedule line category of 1st line item in the sale order.
How can I get different PR for different doucment type in a single Sale order?
RegardsThis can is happening b'coz at your sale order only one I cat is determining by default.
So, determine diff I cat with diff desired the sch lines cat in the doc.
Say,
maintain, I Cat determination(VOV4)
Sales Order(VOV8) - I Cat Group(material- MM02) - I Cat(VOV7)
ZTPS - ZTA1 - ZTA1
ZTPS - ZTA2 - ZTA2
ZTPS - ZTA3 - ZTA3
and also check.
I Cat (VOV7) - Sch Line Cat (VOV6)
ZTA1 - Z1
ZTA2 - Z2
ZTA3 - Z3
Hope this can assist you in understanding.
Thanks & Regards
JP
Maybe you are looking for
-
How to use console font in terminal
i love console font and color in the way it appears. there are some thread but it's not actually a solutions. https://bbs.archlinux.org/viewtopic.php?id=138811 https://bbs.archlinux.org/viewtopic.php?id=77522 is it possble to convert bitmap font to t
-
Ability to patch SAP by Module within Core R/3 ECC
A couple of years ago, SAP came out with a statement that in future releases we'd have the ability to 'patch' and / or 'upgrade' the core R/3 modules separately For example - You could patch the SD module only We're on NW2004 ECC 5.0 and I sure don't
-
Hi, I've a strange behaviour with a Solaris 10 box (x86). The box has an Adaptec 39160 with a NAS connected to each channel. On channel A, 3 LUNs, channel B, 3 LUNs -> No problem. If I create a 4th LUN on a NAS -> Solaris freezes @ boot time (after l
-
Keyword Search Functionality in CRM WEBUI
Hi Experts, I am working in CRM 7.0 WEBUI. I have a requirement where i need a Keyword search functionality.In the sense, for suppose i have all names starting with A , B and C as my values for field( can be drop down values). now when i type A on th
-
so today my ipod touch 4 gen ios 5.1.1 stopped responding to touch and then it got really hot and died so i try to charge it... nothing happens. what should i do?