Consider the following scenario
In Project A ,
Asset Cost Allocation Method = Spread Evenly
Group Method = Expenditure Type
An Asset A1 is created and assigned to the Task T1
Accumlate the CIP cost at Task 1
Then Run the Process "PRC: Generate Asset Lines for a Single Project"
When the process is finished the asset lines are generated and cost lines are assigned to asset A1.
Then Run the Process "PRC: Interface Assets to Oracle Assets" so the Asset A1 is interfaced to
Oracle FA
In Oracle FA RUn "Post Mass Addition
Next month a new Asset A2 is created and assigned to the Task T1
Accumlate the new CIP cost at Task 1
When the process is finished the asset lines are generated and cost lines are assigned to Asset A1
and Asset A2.
So why the new cost is assigned to both Assets A1 and A2. A1 is already assigned to the interfaced
to Oracle FA.
Can't we achieve that the new cost only to Asset A2 which is not interfaced to Oracle FA and not to
Asset A1.
Regards,

Hi
In case there are many projects , tasks and assets, consider using the client extensions available for capital projects.
You can develop the custom code for automatically generating assets in one client extension, and utilize the other extension to group costs into the relevant asset based on your own company logic.
Dina

Similar Messages

  • Common cost allocation to assets in service at different times

    Hi,
    My client constructs large assets that typically go into service over a period of several months. They track some asset costs on tasks assigned to a grouping level of specific assets, while other "general" costs are coded to a task assigned to a grouping level of "Common costs". The problem is that when one of the assets gets placed into service, all of the "common" costs get allocated to that assets. This is resulting in disproportionately larger asset costs for the first one placed in service and a smaller share of those costs allocated to the last asset placed into service.
    What is the best method to get these general-type costs to allocate proportionately across all the assets even though they are placed in service across several different months?
    Thanks!

    Hi
    The problem of equal prorating the common costs is that task may still incur costs after the first asset has been placed in service. The other assets will also incur additional costs.
    You may consider holding the common cost till the end of the entire project. That task should not be assigned to common cost, but instead assigned it to a separate asset, with quantity of 100 units. When project is completed and all other assets are placed in service go and interface the "common" asset lines to FA.
    In Mass Addition split that last asset into separate N assets, where N is the number of real assets generated from that project. Now add the cost of the last "common" assets to the other assets already in FA.
    Dina

  • Resource Breakdown structure role in Project Cost Allocation.

    Dear Experts,
    What is the role of resource breakdown structure while running project cost allocations? Is it possible that targets in the allocation process gets the cost allocated to the resources in RBS which is same for source as well as target projects?

    Hi
    The resource breakdown structure (RBS) is used in the system to summarize the amounts from the lowest level leaf to the grouping / parent levels.
    You can use a summarized amount of certain node on the RBS, per your source project, as the source amount that will be allocated.
    On the target projects the allocation transactions are created as expenditure items. Those expenditure items will be on target project and task, using the expenditure type and expenditure organization you have setup for the allocation rule.
    Dina

  • No accounting document created for distributed cost center and asset

    Hi experts,
    Why there is no accounting document created during GR for distibuted cost center and asset?
    Thanks

    Sorry guys, there's nothing to do with the config of the account assignment. The postings are ok for single cost center or single asset. SAP system message (info messsage) " Goods receipt for distributed cost center will be non valuated" are given when you are trying to unticked the GR non valuated.
    If someone could explain what is the logic behind that behavior.
    Thanks again.

  • F-47 Error "Purchase document is allocated to asset"

    Hi,
    I've created a PO for buy asset, Account assignment "A". Now I want to raised a 10% down payment request for this PO.
    I hit this error:
    Purchase document is allocated to asset
    Message no. F5378
    Diagnosis
    The asset number   assigned in the purchase document
    - is different from the asset number entered manually
    - cannot be transferred, because the 'Asset number' field was hidden for the account in question
    System Response
    In the first instance a warning appears, drawing your attention to the different account assignments. In the second instance an error message appears, because the asset number must be transferred from the purchase order but the necessary field is hidden.
    Procedure
    If you receive the warning, check which asset number is the correct number for this down payment.
    If you receive an error message, you must either choose another special G/L indicator for down payments so that it is possible to assign an asset number to the relevant general ledger account, or you must change or delete the the specified purchase document number. Only those purchase documents are allowed which are not assigned to assets.
    Please advice me, what should I do? Thanks

    Hi,
    on top of my setting, I also perform this changes:
    1. enter OBC4 and select field status variant
        -   Then double-click on Field Status Group
        -   Select field status group: Reconciliation Accounts
        -   Then, click on the magnifying glass " Edit field status"
        -   Double-click on Asset Accounting
        -   Change Asset number/subnumber to optional entry and save.
    Now it hit another error:-
    "You cannot use this transaction type to post to this asset"
    Message no. AA834
    Diagnosis
    The transaction type entered belongs to transaction type group 15. According to the specifications for this transaction type group, posting with transactions types belonging to this group are only allowed in specific asset classes (for example, asset classes for assets under construction).
    The asset to which you are posting belongs to class D01 (chart of depreciation L001). You cannot post to this class using the transaction type you have entered.
    Procedure
    Check the asset number entered. You may want to allow posting with this transaction type group for the asset class of the asset.
    Can I just change this error message to warning? Any impact if I do this? Thanks

  • Msg. error BK048 for manual cost allocation

    Hi,
    we got a warning message for manual cost allocation (KB15N), when posting this allocation just with a quantity and without an amount. We would like to post this allocation without amount and therefore need to change the message type from warning (W) to information (I), to do this posting.
    When using transaction OBA5, there is just a fixed and not adjustable value for Standard with "W". Do you know any workarounds or how we can change this message type to do this posting?
    Regards
    Florian

    Hi Florian,
    HAve you assigned users in OBA5?.
    Go to OBMSG, for this particular Message number in the allowed message types, specify IWE etc. In the standard column specify I. Also you could check on check box "Switch Off" if you want to have the option of not seeing the message at all.
    Now goto OBA5, against the message number, in the "Online" column , specify I or - (Switch Off) and do the same in the BAtchl column also.
    Now you need too specify a user only if you want this change for specific users , if you want all the users to be able to post manual cost allocation then do not specify any user name.
    Do tell me if it works.
    Regards
    Susan

  • Cost allocation flexfield

    hi
    after reading payroll UG, i am a bit confused about cost allocation flexfield for payroll, assignment, element link, org,element entry.
    can i consider this flexfield as a T ledger, the first popup field is for Debit, the second one is for Credit purposes, when they are used for those 5 sections?

    the payroll - org - element entry - assignment - element link are levels at which you can define to show a segment or not.
    In case a segment is specified at a higher level, it is inherited from the other levels, so an end user has not to enter all the data all over again. (like a waterfall)
    The most detailed level is the element entry level. Imagine if the end user must enter there for each segment and for each segment all values. Too much work and too error prone.
    So you can set values for a specific segment at a specific level (example company code at payroll level).
    Costing then rolls up all levels to fully qualify all the segments.

  • Multiple Cost Allocation Structures in Single Business Group

    We are curently looking at solution design of creating multiple Cost
    allocation flexfield in single business group environment.
    Purpose :
    Based on organization structure (18 companies) , the finance
    consultants proposed multiple COA structures with different
    valuesets , wherein values sets will be specific to the companies .
    This was suggested inorder to aviod tedious job of defining
    validations and post production support.
    This has impact on payroll solution design wrt to cost allocation FF ,
    where in we have to define multiple structures to map to Accounting
    FFs.
    Woudl like to check if oracle payroll supports this kind of setups.
    Note :The implementation is for UAE localization.
    Rgds/Lavanya

    If Finance System has multiple COA structures with different valuesets , wherein values sets will be specific to the companies then they will seperating cosing on Various OU Level.
    As my understanding, you have to create multiple Business Group as per multiple COA structures .
    Thanks

  • Cost allocation issue

    Hi,
    while doing Partial GR/IR i am getting below error message in Migo.
    " Cost allocation document was not posted due to enter an amount."
    Regards
    My

    Hi,
    Question is not clear.Can you clarify which message type and short error message.
    Regards,
    Sreekanth

  • Debt Extension Cost in Fixed Assets

    Hi,
    Could someone please explain Debt Extension Cost in Fixed Assets?
    thanks.
    S.Sriram

    Hi,
    You isolate assets where an amortized adjustment is made by checking fa_transactions_headers where (transaction_subtype = 'AMORTIZED' OR transaction_key = 'UA'). Any asset/book combination that meets that has an amortized adjustment. Since one can't make any expensed adjustments after an amortized adjustment, you don't have to check for a specific transaction. Just check where the condition exists.
    Regards.
    Ata ur Reman
    Thanks for Halim (My Oracle Support Community)

  • Reg. Document type for cost allocation

    Hi,
    Please let me know where can maintain document type for cost allocation so documents get post in GL.
    With best regards
    Praveen Atmakuri

    Hi Praveen
    Can't recollect fully, but please check the FI/CO real time recon variant   Or may be the controlling area in okkp
    Simply activate the real time reconciliation and carry out a cross profit center allocation. Either system will trigger the posting in FI or give you error for missing doc type
    Br. Ajay M

  • Landed Costs Alloc. Account

    Hi Dear;
    which account i have to choose for the Landed Costs Alloc. Account?
    is it the real account in the chart of account (expenses account) like insurance or shipping or its a stock expenses account?
    could you send me an example for the JE:
    1- that generates the Landed cost
    2- the Normal insurance or shipping accounts
    best regards;

    You may check this thread:
    Landed costs
    Thanks,
    Gordon

  • Tcode for mass upload of cost allocation?

    Hi all,
    I would like to get a transaction code that will allow me to run a mass upload of cost allocation?
    I tried  ZFR_COST_ALLOC but the system didnt accept it.
    Please help.
    Boubacar-Issa

    look https://forums.sdn.sap.com/click.jspa?searchID=641178&messageID=2895219
    A.

  • Change in Cost Allocation Flexfield

    Hello,
    Client is currently using HRMS for the past one year. Now we need to make a small change in the Cost Allocation Flexfield structure. How will this affect the past data. How can we address this scenario. I seek your expert advise to handle this effectively.
    Regards,
    Jeeves

    Hello Gaurav,
    We're trying to change the value of a segment from 4 digits to 5 digits. We want to update the existing values. Is this possible from the back end.
    Regards,
    Jeeva

  • Cost allocation without a fixed %

    Hi SAP Gurus,
    I have a peculiar query. My client would like to allocate costs (in Controlling) on varying percentages every period. For example on the basis of the % of COGS to Sales of the products. Though the method of calculating this % will stay the same, the percentage per se will change every period.
    Can this be done in SAP Controlling?
    Thanks & Regards,
    Sangeeta

    Hiya,
    Can you look at this thread please? It will save me some work typing the whole thing here again:
    Cost allocation - Urgent
    Cheers.