Cost alocation and or distribution

Hello Gurus,
ive got a requirement to settle the spcific % of costs from one cost center and cost element into another cost element.
These steps are done to calculate the primal cost of the workers months load. i.e. if we planned 1000 working hours, but the fact was 500 working hours then we should take 50 % from the posted amount and send it to a specific cost element and cost center.
What is the best way to do that?
Today ive created distribution cycle which collects the specific % of amount and sends it from Cost center and Cost element into Internal order (using TC: KSV5) then i close the IO with KO8G which puts the collected amount into a General ledger account (WITHOUT cost element) then those amounts must be manualy removed from the GL and sent to cost element with cost center.
best regards
Laurynas Prikockis

Hi..
  You should allocate through assessment cycle to be created KSU7(for Plan) KSU1(for Act) and to be executed through KSUB (For Plan KSU5 (for Act).
You also creat one secodary cost element in KA06 with Cat 42.
Proceed. if any further help required pl revart back.
kkumar

Similar Messages

  • Difference between Costing Sheet and Assessment & Distribution Cycle.

    Hello Co Experts
    I need to understand the exact difference bewteen Costing sheet and Assessment dictribution cycles and their use for applying overhead cost to cost object especially Project WBS. Kind request to illustrate the preference of these two functionalityover each other with respect to business scenarios.
    Best Regards
    Adwait A Deshpande
    help.sap.com

    Hi Deshpande,
    The purpose of both are completely different.
    Assessment or Distribution cycles are used to transfer cost from the service/utility cost centers to the Production cost centers.
    Where as Costing sheet is a tool where you configure how system should calculate Production, Material ,Administration & Selling&Distribution in Product costing.
    Hope this helps.
    Thanks & Regards,
    Ravi Kumar

  • What is the difference between define Assessment and define distribution

    What is the difference between define Assessment(S_ALR_87005742)  and define distribution(S_ALR_87005757)

    Hi,
    Assessment and distribution of relevant overhead costs is performed at period closing (actual data) or plan closing (plan data). This is usually done directly in CO. It is then reflected in the data in Profit Center Accounting.If you have a service profit center or allocation profit center in your profit center hierarchy, you may need to assess or Distribute costs again in Profit center Accounting.
    In Profit Center Accounting, the allocation function allows you to allocate the following plan and actual data.
    -- Costs (assessment and/or distribution)
    -- Revenues and sales deductions (assessment and/or distribution)
    -- Balance sheet items (distribution)
    Assessment is made using a special cost/revenue element. In distribution, the original cost/revenue element/account number is retained.
    Assesment,you set rules in the form of cycles for allocating primary and secondary costs in plan.
    Activities in assesment are
    Create an plan assessment cycle by proceeding as follows:
    1. Enter a name for the cycle
    2. Enter a validity timeframe for the cycle
    3. Maintain the header data for the cycle by entering the following:
    a) In which currencies the costs should be charged
    b) Whether consumption quantities should be charged
    c) Whether negative tracing factors should be scaled
    d) Whether the cycle should be processed iteratively
    e) In which version the cycle is valid
    4. Create segments for the cycle that contain the following information:
    a) The sender cost element to be distributed
    b) Criteria to distribute the costs among the receivers
    c) Sender objects
    d) Receiver objects
    Distribution ,you create rules in the form of cycle for the settlement of primary costs on a cost center.
    Activities in distribution are
    Create a plan distribution cycle by proceeding as follows:
    1. Determine a name for the cycle.
    2. Determine a validity period for the cycle.
    3. Maintain the header data for the cycle by entering the following.
    a) Which currencies are to be used in the allocations
    b) Whether consumption is to be allocated or not
    c) Whether negative tracing factors are scaled or not
    d) Whether cycle processing is to be iterative
    e) In which version the allocation is to take place
    4. Define cycle segments in which you store the following information.
    a) Sender cost element to be distributed
    b) Criteria for cost distribution to the receiver
    c) Sender objects
    d) Receiver objects
    regards,
    Santosh kumar

  • Cost Centers and distribution rules

    I need to allocate costs to profit centers and would like to have the costs be allocated first to the department cost center then distributed to product profit center by %.
    Example:  An invoice is first allocated to the sales department, then the distribution rule will allocate the cost between 4 product lines (33 % chemical A, 33 % chemical b, 17 % chemical c and 17 % chemical d).
    How would I setup the profit centers, cost centers and distribution rule to accomplish the above task.
    Thank you,
    Wayne

    Hi Fred,
    I assume you using 8.81?
    1. Administration - General Settings - Cost Accounting : Tick "Use Multidimensions" option
    2. Financial - Cost Accounting - Dimensions : Tick "Dimension 1" and "Dimension 2".
    Give proper description to each dimension, in your case maybe "Department" to Dimension 1 and "Product" to Dimension 2
    3. Financial - Cost Accounting - Cost Centers : Create your intended cost centre, "Sales" cost centre with dimension "Department", "Chemical A" to "Chemical D" with dimension "Product"
    4. Financial - Cost Accounting - Distribution Rules :
    As for your intention to allocate the invoice to Sales Department, since you want to allocate it 100% to Sales Department, you don't need to create a distribution rules, since B1 will automatically create a distribution rule with 100% allocation for each cost centre you created.
    As for your production cost allocation, create a distribution rule with your code "DR-P01" as an example, choose dimension "Product", set the Total with "100". In the detail section, choose each cost centre (Chemical A to D), enter respective value and click "Add" button.

  • COPA derivation for thecombination of Cost center and Cost element/GL accou

    Hi Gurus,
    In COPA derivation using KEDR i am trying to make a derivation for the
    combination of Cost center and Cost element. Here i got following problems
    • While posting FI document using t.code FB50 system not automatically
    updating the fields Cost center and cost element in Profitability
    segment. Hence system not posting COPA document. How can i make this
    derivation? Is there any note should i apply regarding these.
    • How can i create cost element as characteristic.
    • If i configure derivation for the combination of Cost center and cost
    element will it be posted with copa document for postings or automatic
    postings from MM,HR and FI
    Pls provide me solution at the earliest.
    Thanks and Best regards,
    Dhanumjaya.Ranga
    Mobile: - 919940093579
    Mail : [email protected]

    Hi Murali
    Thanks for update
    I explain my req clearly
    For me segment is Distribution channel field (EXPORT and DOMESTIC)
    If GL account is 1000-2000     always                      Export
    If GL account is 2001-3000    and Cost center is     X then Export.
    If GL account is 2001-3000    and Cost center is     Y then Domestic.
    Based on above REQ i am making derivation using KEDR T.code.
    These postings should work for all modules postings such as MM, HR also.
    Actually this should work automatically and after saving the transaction we should have copa document also.
    But problem is in source fields of derivation we have GL account (HKONT) and Cost element (KSTAR). I am making derivation using either of these.
    But after posting document system not giving COPA document.
    I found the reason is  at GL postings we are giving input to GL account (HKONT) but we took in KEDR source field as GL account (SAKNR). GL account (HKONT) is not updating GL account (SAKNR) field in PSEG screen in Fb50. Even i try with cost element (KSTAR), GL account (HKONT) is not updating this in PSEG screen in fb50.
    If GL account (HKONT) updates either GL account (SAKNR) or cost element (KSTAR) at the time of posting FB50
    Or
    If we have the field GL account (HKONT) as source field in KEDR i hope my problem
    Get solved.
    If you want further info pls give me your mobile number then i ll call you

  • Is it possible multiple line items debit & single line item credit and different cost centers and different profit centers in fbcj

    Hi all ,
    I have a requirement to Post Cash Journal Document using FBCJ tcode.
    Is it possible multiple line items debit & single line item credit and different cost centers and different profit centers
    for exp:
    pk   GL a/c   description       amount   cost center  profit center
    40  400101  telephone exp   500        1403            P 1000
    40  400101  telephone exp    100       1404            P 2000
    50  200100  cash in hand      600-                             
       This is My requirement  is it possible in fbcj
        Please suggest me.ASAP.
    Regards
       Naresh.

    Hi,
      This you can do it in two ways:
    1. Make three header under top level....one Product A, 2nd Product B ( as Billing element) and third as Common expense ( only cost). Now 1st & 2 nd WBS, you have to have sales order linking with individual lint item, for third you will accumulate all the common expense till the period end then make a reposting of the same in desired proportion to both products WBS hierarchy
    (This is if you want to have a track on the common expense as well.......like planning, budgeting & control)
    After this reposting, run RA for individual billing element and hence you will all the complement detailing and control over Revenue and expense with respect to Product A and Product B individually.
    2. If you don't want to maintain that kind of detailing the common expense and keep track of it through project, then have cost centers accordingly and make an assesment/ distribution with respect to expenses accumulated at those cost centers for the period to the respective WBS under each product. Then execute the period end processes for the project.
    Or
    You can try with have two more line items in the costing sheet as an overhead against common expenses with respect each product.
    I hope this should help you.
    Regards
    Avisek Bhardwaj

  • Cost center and proit center bi reports

    hi all ;
       we want to prepare bi reports for cost center and profit centers same as r/3 report standard and r/3 features in bi so help me out in this how to follow iam new to bi l
    regards
    ram

    Hi Raman..
    Cost Center : It provides information on the costs incurred by your business. Within SAP, you have the ability to assign Cost Centers to departments and /or Managers responsible for certain areas of the business as well as functional areas within your organization. Cost Centers can be created for such functional areas as Marketing, Purchasing, Human Resources, Finance, Facilities, Information Systems, Administrative Support,  Legal, Shipping/Receiving, or even  Quality.
    Some of the benefits of Cost Center  : (1) Managers can set Budget /Cost Center targets; (2) Cost Center visibility of functional departments/areas of your business; (3)  Planning ; (4) Availability of Cost allocation methods; and (5) Assessments/Distribution of costs to other cost objects.
    Profit Center : provides visibility of an organizationu2019s profit and losses by profit center. The methods which can be utilized for EC-PCA (Profit Center Accounting) are period accounting or by  the cost-of-sales approach. Profit Centers can be set-up to identify product lines, divisions, geographical regions, offices, production sites or by functions. Profit Centers are used for Internal Control purposes enabling management  the ability to review areas of responsibility within their organization. The difference between a Cost Center and a Profit Center is that the Cost Center represents individual costs incurred during a given period and Profit Centers contain the balances of costs and revenues.
    Regards
    Sudheer

  • Cost / work project revenue distribution

    Hi
    I am looking at cost / work project revenue distribution results and I see that GDR created 2 lines in the revenue: one for expenditure and one for the event. I know that event was created from billing extension. The expenditure line has 0 distribution. The accrued_revenue and accrual_rate columns are set to 0. I cannot find where and how this 0 lines gets created. Is this seeded logic for cost / work type projects? Your help on this greatly appreciated.
    thank you in advance
    Ed
    Edited by: user_Ed_123 on Mar 11, 2012 2:48 PM

    Hi
    any help is appreciated.
    thanks!

  • Costing run and activity allocation

    hi,
    as there is a costing run (routing) to get the cost, may i know why still need to do direct or indirect activity allocation ; actual assessment ; actual distribution?
    thanks
    rgds

    hi,
    Costing run and activity allocation are two different processes..... 
    the former calculates the cost of a product
    whereas the later distirbutes the cost among various heads as you want to

  • Installer build wants Sound and Vibration Distribution but my vi dont need any

    My vi contains some ordinary serial inputs, and an ordinary DAQ to read some 4-20mA, refer attached.
    So I save a new project and build a exe with the vi, no problem, refer project files attached.
    Then I start to build the installer by clicking on the below libraries to install. I think I click the right library right?
    But lo! NI say i need Sound and Vibration Distribution, now where did that come from? My vi doesn't have sound and vibrations functions...
    I click no, Labview don't build the installer.
    I click yes, Labview kept on asking me where is the Sound and vibration library. 
    I bought a NI Developer suite, that expensive stuff costing around US$4000+. My software vendor told me I dont have the license for Sound and Vibration Distribution.
    So what should I do? Did I click some wrong settings during installer build? Is there someway to bypass this problem? Advance thanks!
    Solved!
    Go to Solution.
    Attachments:
    all-instrumentasst 4aug.vi ‏177 KB
    gmail.vi ‏16 KB
    project config.zip ‏5 KB

    pallen a écrit:
    So if I understand the KB correctly; What may have happened with the OP is that a newer version of Max (or another dependency of DAQmx) was installed along with the Sound and Vibration Suite.   So that now the "source" of those dependencies is indicated as residing within that Suite even though the software itself was not licensed/activated on that machine. 
    Something like that?  
    Hi,
    Yes, but as the note said,you can solve this problem depending on the LV version you use. In LabVIEW versions 8.6 and later, the Installer Source Location field is not editable.
    In order to update this property, you must uninstall the associated
    software and reinstall with the installers in the desired location as Christan said.
    For previous version, you have to copy the
    entire contents of the Device Driver
    CDs to your hard drive. Then next time you build your installer, change
    the Installer Source Location in the Advanced Installers dialog box to the location where you copied the contents of the Device Driver CD.
    Regards, 
    Steve M.
    National Instruments France
    #adMrkt{text-align: center;font-size:11px; font-weight: bold;} #adMrkt a {text-decoration: none;} #adMrkt a:hover{font-size: 9px;} #adMrkt a span{display: none;} #adMrkt a:hover span{display: block;}
    >> Vidéo-t'chats de l'été : présentations techniques et ingénieurs pour répondre à vos questions

  • Costing Based And Account based COPA - Need Assistance

    Hello All,
    In our project, with no other option we are planning to implement both costing based and account based COPA. I have been told that it is not recommended by SAP because for every entry there will two line items, one in cost based and another in account based (Correct me if I am wrong). But I could not understand why it is creating 2 line items in COPA. - Please help to understand this concept with an Example.
    Thanks
    PM

    Hi
    Costing based and account based COPA serve the same purpose...   analyze profitability of the product ....
    Costing based COPA should always be preferred over account based COPA, as it provides greater flexibility, some extra features, some extra planning mechanism and faster reports
    Following  are the point of differences between Costing based vs. Account based copa (ABC)
    1. Account based copa uses transaction tables (COEP, BSEG) and hence affects performance of CO transactions.CBC takes values from CE1XXXX to CE4XXXX tables. XXXX means Operating Concern name.
    2. Estimated / Statistical values not possible in ABC, say, calculating frieght upon invoice on a thumb rule basis to have better view of profitability per customer.. no valuation strategy in Accounts based COPA..
    3. Reports based on line items not possible in ABC.. possible in CBC.
    4 Actual Top Down distribution only available in CBC not in ABC .
    5. Revaluation of actual data to plan data is not available in ABC
    6. No key figure schemes are available in ABC
    7. In ABC, settlement cost elements are used to settle values to prof segments unlike value fields in CBC
    8. Production variance / COGS accounts shud be defined as cost element in ABC.
    System creates a document for each type of COPA as it stores values in different tables and what you can do with this data also differs like you can do TOP down in Costing Based Copa..
    Hence, you will have two COPA documents always......................
    Fot further clarifications .. please revert back..
    Regards
    Sarada

  • Display descriptions of cost center and G/L account in ME51N/ME52N/ME53N

    Hi Experts,
    Can any one suggest that how to display descriptions of cost center and G/L account in account assignment subscreen- ME51N / ME52N / ME53N.
    Thanks in Advance...
    Siva

    hi
    if the field is required then u have to enter them manually
    so if this are not required then goto OKB9 here give the default cost center for the Gl acct

  • Report Painter Request - Cost Center and WBS Element

    Hi Everyone,
    Currently, my company settles all project related expenses through to a cost center by way of an internal settlement cost element (category 21).  The issue with this is that when the expense gets to the cost center, they lose all visability as to where the expense originated, such as salaries or travel expense (category 1 cost elements).  We can't switch the settlements to the originating cost element from wbs to cost center just because of the additional data/volume that will cause.  My thought was to create a report painter that can run by cost center but also show the wbs's that settle to that cost center and group the expenses by primary cost element (cat 1).  I'm assuming that there is a way to marry a cost center and wbs element by way of the wbs settlement rule but how would that be done for reporting purposes?  I've seen it done before by way of a nightly job that created sets based on the combination of cost center and wbs but I'm not sure how that was done.  Any advise and examples?
    Example:
    Cost Center:  IT
    WBS: A.0017.01.01 (settles to cost center IT)
    Postings made:
    1.  CC IT and CE 552000 "salaries"..............................$20,000
    2.  WBS A.0017.01.01 and CE 552000 "salaries"........... $5,000
    3.  Settlement of WBS to CC (expenses flow through to CC IT by way of CE 985000)
    I want to run CC IT and see that the account 552000 really shows $25,000 and can be broken down by cost object (CC and WBS by the amounts above)
    Thanks,
    Pete

    Hi Peter,
    I had a similar requirement and used report painter report group 1SHK-002 (in library 1VK).
    I took a copy of the standard and ameneded it slightly, I switched the explode so it occured on the cost center not cost element.
    The report runs so that direct costs on the cost center are shown at primary cost level. And values settled to the cost center are shown on the partner object. In your case i guess WBS Elements (Partner ObjType WBS).
    Now in my case I didnt need cost element breakdown on partner level, just on cost center so effectively I have(sorry for text alignment but I hope you get the idea):
    GL1   .............  100
    GL2   .............  250
    + Cost center1 total ....350
    GL3 .............   50
    GL4 ............. 100
    + Cost center2 total.... 150
    Primary Cost Total ..... 500
    X-YZ-1.200 .............   50
    X-YZ-1.400 ............. 100
    + WBS total ............. 150
    IO 1............. 100
    IO 2  ............. 100
    +IO total  ............. 200
    Partner Total............. 350
    Overall total .............  850.
    Its not exactly like your requirement but it might be a good report for you to work with to get what you need.
    Elaine

  • How to get the cost center and division for a given FI vendor document...

    Hello Experts,
    I am currently developing a report wherein I have to show the cost center and division used in the given FI document.
    These documents are vendor related transactions.
    In the file that was given to me by the user, she indicated the cost centers used by the FI documents
    but when I view it via VA03 I cannot theere are no cost centers used in all the line items.So are there
    any FM, BAPIs and/or tables that I can use for my requirement?
    Hope you can help me guys. Thank you and take care!

    Hi
    I am not sure on the requirement. You are developing a FI report and accessing VA03 which is sales transaction. Anyway for getting cost center you can go to table VBAK,VBAP for line items.
    Hope solves ur problem
    Thiru

  • KO88 - Error when settling for Cost Center AND Auc for the same Internal Or

    Hi Experts,
    We need to configure Investment Internal Orders that could settle to both Cost Center and Auc, but each assignments with different Source Cost Elements
    We did the following:
    1. Created Auc Class
    2. Created Investment Profile "IMOBIL" and assigned to Auc Class, flagging Auc
    3. Created Allocation Structure "CV" with two assignments:
    01, Source = Cost elements 7000000000 to 7999999999, receiver AUC "by cost element"
    02 Source = Cost elements 4000000000 to 4999999999, receiver CTR "by cost element"
    4. Created Model Order, filling the Investment Profile IMOBIL created in step 2.
    5 Created Settlement Profile ZCV0001, assigning Allocation Strucutre CV, allowing CTR and AUC for receivers, default receiver is "FXA", doc type "AA".
    6 Created ORder Type CV01, assigning Settlement Profile ZCV0001.
    When I post only for Asset Expenses (Source Cost element 7, Assigment 01), the settlement through KO88 correctly settles to AUC, and also creates the settlement rule for cost center (i'm using the strategy to create from Responsible Cost Center).
    But when I post for Asset Expenses (cost elements 7, receiver AUC) AND General Expenses (Source Cost element 4, receiver CTR), KO88 generates an error KD506, saying that for Assigment 02 - AUC I didnt define a settlement cost element.
    1. Assignment 02 is not AUC, is CTR;
    2. I flagged "by cost element", so I don't need a settlement cost element. And also, I was able to post to AUC when the source posting was only for cost element 7.
    Did you face any problem like this?
    I cannot find out what is the missing configuration, or if it is a program error...
    Kind Regards
    Mayumi Blak

    Hi Ajay
    I already created Source Structure and assigned to my Setllement profile (so I assigned Allocation Structure AND Source Structure).
    I don't understand when you say that I need to assign the Source Sutrcture in each rule....because the Source structure is in the Settlement Parameters valid for both rules...
    When I post to Asset Expenses only for the internal Order, the 2 rules (CTR and AUC) are created when I run KO88 (but only AUC rule is settled). This is OK.
    The problem is when I post for both General Expenses AND Asset Expenses, the system is not recognizing that I have 2 source structures, neither is findind that for CTR AND AUC the Settlement cost elements are the original cost elements.
    I'm thinking about changing message KD506 to warning, do you know if this can help?