Cost / work project revenue distribution

Hi
I am looking at cost / work project revenue distribution results and I see that GDR created 2 lines in the revenue: one for expenditure and one for the event. I know that event was created from billing extension. The expenditure line has 0 distribution. The accrued_revenue and accrual_rate columns are set to 0. I cannot find where and how this 0 lines gets created. Is this seeded logic for cost / work type projects? Your help on this greatly appreciated.
thank you in advance
Ed
Edited by: user_Ed_123 on Mar 11, 2012 2:48 PM

Hi
any help is appreciated.
thanks!

Similar Messages

  • Project POC to determine actual cost and actual revenue

    Dear all experts,
    please help me on the following issue.
    i am working on a project for sales.
    the project actual cost and actual revenue will be determined by the project POC.
    i have read the SAP help about project progress.
    but it confused me.
    my first question is how can i caculated the actual POC?
    is there a standard predefined way to solve it?
    please give me some hints or suggestions.
    thanks a lot.
    Judy

    Hi,
    Can anyone detail the steps involved in carrying out RA with Valuation Method 7 with progressive value analysis. Here, we can give a percentage of POC into the system as certified by the Engineers unlike Valuation method 3 where the POC is calculated on the basis of actual costs incurred.
    In the case of valuation method 3, only revenue is analysed by the system with reference to the POC and necessary entries are posted as Revenue surplus or Revenue in excess of billings. Whereas in the case of valuation method 7, both the revenue and costs are analysed and necessary provisions are made both for revenue and costs.
    Regards,
    Judy

  • Evaluation - Cost/Revenue Costing for Project

    Hello,
    executing the evaluation "Cost/Revenue Costing for Project" I get no results. Could someone tell me where the values for this report come from? Can I find somewhere a list with all the evaluations (except the one like completed checkpoint items, ... which are really self explaining) and the source of the shown values?
    Thx, Max

    Hi,
    I hope that you have assigned Cost revenue rate to Roles.
    Check in spro> cProjects> Evaluation--> Define extract layout, Iterator for the specific layout RES_PART, Object and attributes.
    Also check in Define evaluation assigned extract layout to Evaluation is correct which is defined in earlier step.
    Regards,
    Karan Hon
    Award if useful..

  • LOADING ADDITIONAL COSTS (change matches revenue cost of goods in warehouse

    Subject: LOADING ADDITIONAL COSTS (change matches revenue cost of goods in warehouse and not accounting for the year 2008)
    Problem:
    we must add the cost of goods of the raw material (for which was made a check invoice) of the costs, which are arising and charged by different suppliers (transport, freight, insurance, etc. ..). These are already included in FI with fb60.
    The result should be:
    - From the consignment of goods entering, add (only in Warehouse (STOCK), NOT IN ACCOUNTING ') cost accessory
    - Do not change the quantity
    - Having the total cost of stock
    - Exploiting the average cost to FIFO must consider the total cost after additional adjustment
    Example:                                                                                data
    ME21N: purchaise order No. 321 = article 1000kg a price of u20AC / kg 2.30               01/07/2008
    MIGO: goods receipt PO confirms price quantity x (u20AC 23,000) batch 298                      07/07/2008
    MIRO(enter incoming invoice): Check invoice OK per (u20AC 23,000) batch 298           07/08/2008
    Invoices received for costs Accessories:                                                                08/08/2008
    FB60: transportation bill on all'purchaise order above cost u20AC / 0.11 kg
    0.11 * 1000kg = 110 recorded in cost and accounting of stock.
    In accounting, the cost has been reported, in warehouse I need to reverse (add) u20AC / kg to 0.11 initial cost of u20AC / 2.30 kg without adjustments in general accounting, but only in warehouse value and not in the quantity.
    So in the end I should have:
    batch n° 298 -  kg  1000 at a cost of u20AC 2.41 (2.30 +0.11) for the year 2008. How should I do?
    thanks

    Thomas,
    I presume that your client has activated 'Revenue Recognition' component in SAP.
    If your client has already activated the RR component, they may be aware that the activation is unreversible.
    Recognition of costs in a deferred revenue scenario requires some customization effort but definitely do-able. It is not falling within standard SAP.
    I worked on scope of one such project but it did not happen unfortunately.
    Can you please post your regular updates in this forum?
    All the best.
    Thanks
    PS: I am not an employee of SAP AG and by answering questions, I am not getting any monetary benefits anywhere. I am answering questions here in my spare time for recognition and the points awarded, which gives me a sense of self-satisfaction. Awarding points is also a way of saying thanks and it will encourage me to answer more questions and share my knowledge and experience

  • I want to create a document/spreadsheet (whichever) that I can send to agencies to type in information for work projects. Any ideas? I have an Excel file but it does not convert over very well and I am having trouble making changes to it.

    Need to create a new spreadsheet or be able to edit the one I have.
    I use this spreadsheet as a work order form for social service agencies. They enter name address etc., and then there are various work projects that they can select as well.
    The one I have from the organization I work with is an excel file but it does not convert over very well. Instead of being 7 pages it is more like 11 or so because things run off the page.  I am trying to delete certain things and move them over but not working out very well so thought it might be easier to start over fresh.
    Is numbers the program to use? If so, any useful tips?

    If the form is going to be used on an iPad, Numbers is the only game in town.
    Numbers is available for Macs only (and iOS devices). Excel is available for PCs and Macs. If you are in a mixed environment of Windows PCs and Macs and you are using this document as an electronic form, Excel is probably the better choice. Otherwise you will need to export to Excel for the PC users then import from Excel to retrieve their data. The import/export process is not perfect. A file that has been exported then reimported will not be the same as the original file. I would assume social services agencies are almost entirely PC-based. 
    If the form is to be printed or turned into a PDF for distribution and use by the social services agencies, either Excel or Numbers would do the job but right now Excel might be the better choice. I would have recommended Numbers '09 but I cannot recommend Numbers 3 for anything thsat requires printing until they give us the layout and printing functionality we used to have (editing in Print View, ability to set margins, etc).
    If everything else in your department/operation/agency is Windows PC and Microsoft Office based, you would be better off sticking with the standard.
    I hope that helps.

  • Settlement of project revenue

    Dear PS Experts,
    If the user choose to settle the project revenue to a GL account, the GL should be a balance sheet acount and not a primary gl account or cost element (since the cost elem. will require a cost object during posting and this will cause an error when execute CJ88).
    The questions is whether settlement of revenue to a B/S account is recommended in SAP best practise?
    Please help and thanks for the advise
    Yuzeila

    Hi,
        If it is posting to the first line means....
    Follow the steps below:
    First try to create a project and post the actuals and revenues.
    Go to cost element report pick up those cost elements both for costs and revenues.
    Go to Soruce Structure in the config, define the structure with name for Ex: 'Z1' and define two assignments, one is Costs and other Revenue, by selecting the costs go to Source mention the cost element where the actual costs are posted on (Mention only that cost element no other cost elements), next select the Revenue assignment and click on Source and mention the only cost element where the revenue wsa posted (Mention only that revenue cost element no other cost elements) and save the transaction.
    Come back to project builder, select the wbs and click on settlement rule, in the menu goto-->settlement parameters and check whether the source and settlement profiles are correct or not, incase source structure is not available mention the same.
    come back to settlement Rule overview and fill the fields as mentioned below:
    1st line:   Category: GL
                  GL Account: GL Account Number
                  Source Structure: COSTS
    2nd Line: Category: GL
                  GL Account: GL Account Number (Revenue Account)
                  Source Structure: REVENUE.
    Now Run the Settlement for the specific period costs posted, the costs will be posted seperately to the two different GL Accounts.
    I think this will resolve your problem.
    Rgds
    Sudhir Reddy

  • Capture equipment cost in project

    Dear All,
    need to capture the cost of equipment which uses for project,but problem is that they take equipment from stock & uses for project work & keep it back in stock after use,
    How we can capture this cost in project?
    please help me out.
    Regards
    Gajjen

    Hi,
    If you are only using some tools for which requires simple functionalities, they can be defined as PRT's. In case they need to be treated as Assets with depreciation functionality, maintenance functionality as equipments ans so on, then treating them as equipments would me more appropriate. There is one more module in SAP called ETM which has enhanced functionality over PM in handling of equipments.
    Usage depends on your requirement. Consult other modules too before deciding.
    Regards,
    Arul.

  • Retirement Cost in Project Costing

    Hi,
    Can anyone help me out the steps to capture the retirement costs in Project costing for Capital Projects.
    Regards,
    Murthy

    Well, in a capital project, you collect the CIP and expense costs for each asset you are building. The same applies to retirement costs. You use a capital project to accumulate/capture costs associated with the retirement of a group asset. Oracle manuals do specifcally use the term "retirement of group assets" when capturing retirement work in process (RWIP). You would then interface the RWIP costs to Oracle Assets (the same Mass Additions process as setting up a new asset). Why they say group asset, that I do not understand? Why should it matter if it is a group asset or not, when it comes to retirement? I personally have never done this though. If we have any retirement costs, we just record directly to the general ledger - don't record any Oracle project cost. But then we don't have a lot of assets and don't retire many assets as a result. Will be interesting to see if any Oracle customer out there is actually doing this. You may have to end up going to Oracle Support to get this information. The user guide is not very information about exactly how this RWIP thing works. Make any sense?
    John Dickey

  • Uploading the past cost on project

    Hi,
    We have implemented PS module in our company recently. We have many ongoing projects, whose past cost and revenue need to be uploaded on a WBS so that actual cost and actual revenue for that project comes true in all PS reports. How can i do this without affecting any GLs ad i dont want to disturb GL balance.
    Regards
    Kalpesh

    Hi Kalpesh,
    You can upload Planned Cost and Revenues using BDC or BAPI Function Module. Show the way how you are going to do cost planning to your ABAPer and He will guide you the suitable method to be choosen for uploading the Data at WBSE Level and can generate a program for uploading data from external flat file in to SAP.
    Br
    Hari

  • How to reconstruct the statistical cost of project stock?

    Hi, Experts,
    We added the statistical cost element of 90 category for project stock BS account.
    Now we find that some of the project stock don't have statistical cost,
    some of the project stock have statistical cost(Value type: WRTTP=11).
    How can we reconstruct the statistical cost of project stock to make it right?
    Thanks a lot in advance.
    Best Regards,
    Nansen

    Try running CJEN for your project. Make sure you remove the test run tick.
    Regards

  • SCHEDULES: NON PROJECT REVENUE REPORT

    HI GURUS,
    can you please tell me where to find out the standard reports and Datasources used and Tables related to  <b>NON PROJECT REVENUE</b>.
    points will be given.
    Thanks
    regards

    Hello
    what is the source of non revenue. Is it booked to a GL account ?
    Non billable recievables is a special GL account.
    Check OUVR for setting.
    Even deferred revenue is a special GL account.
    Once you know where the amounts are booked. Execute a normal standard report from GL info systems.
    Reg

  • Capital Planning Report - Insert Actual cost of project  for Investment

    HI All,
    We developed Z report for capital planning report. We inserted Over all plan Investment cost and Total value of assets planned. Now client requires to add <b><b>Actual cost of Project. Could you please give me Table name/ Function modules or any other logic .
    Regards
    Shirisha

    Hi,
    Thanks for your solutions.
    But I m looking for the Profit center in the report (display screen), not in selection screen.
    My scenario is like, the cost was posted to WBSE with X profit center/cost center in January, now I changed the profit center to Y for the same WBSE and posted.
    Want to see thru which PC I have posted to WBSE and how much. So that I can reversal.
    Thanks again.
    Krishna.
    Edited by: krishna.gujju on Jul 8, 2011 6:56 PM

  • How to extract Plan cost from project #

    Hi,
    I am new to PS.I have a requirement for extracting plan cost from Project #
    Is there any FM? or table for this?
    Plan cost should be equal to S_ALR_87013532 report Plan column.
    FYI..I am writing an ABAP report.
    rgds
    vara
    Edited by: Vara K on Jan 13, 2009 11:48 PM

    First Get Struture name for Transaction CJ40
    Goto SE11, and enter your structure name.eg. RKPLN
    Goto the field that holds your data (e.g.WKGXXX), and double-click on the element name. Once inside the element, do a where-used list for that element, searching tables only.
    Then go into each table, and see if you can find the one holding your data.
    E.g COEJ,COEP,COSS
    Regards,
    Nitin

  • Project Revenue Plan Not Update from Sales Order Item

    I am generating a network and project from the sales order item using Assembly processing. I am using milestone billing on the sales order item and the milestones attached to the project network activities are appearing as billing blocks on the sales order item billing plan. However, the project revenue is not getting updated from the sales order billing plan. Can someone please help?
    I have deleted the billing plan on the billing WBS element and activated revenue planning update from sales order in cusomization for PS. I am looking at CNS41 under the project revenue sched in version 0. Is there a different report I should be looking at?
    Regards,
    Venkat.

    HI Venkat,
    You are looking at the correct report & I believe you have also done the necessary customization. If you create a sales order and reference it to a quotation, the related plan values in the WBS element are refreshed automatically.
    When the payment data is recorded, the terms of payment and the customer payment history are taken into consideration. One of the probable causes could be the credit limit of the customer might have been exceeded. Take help of your SD consultant & increase the credit limit for that customer (from the sales document), t-code FD32 if it is permitted in the business.
    After the new credit limit is set execute the following steps:
    u2022     Go to the t-code Change billing request (VA02)
    u2022     Open the required billing request
    u2022     Remove the account assignment of WBS element from each line item
    u2022     Save the billing request
    u2022     Reopen the billing request in change mode
    u2022     Reassign the WBS elements to all line items
    u2022     Now the changed credit limit will take affect
    u2022     Check the Planned Revenue for the said project in CNS41, it should get updated.
    Rgds
    Deepak

  • UNIT OR ASYNCHRONOUS COSTING IN PROJECTS

    HI ALL,
    I HAVE ATTACHED SOME FINISHED PRODUCTS IN PROJECTS- WBS ,FOR WWHICH I HAVE WBS-WISE SPECIFIC BOMS AND ROUTINGS,AND WHEN I RUN MRP PLANNED ORDERS ARE CREATED FROM WHICH SIMULTANEOUSLY PRODUCTION ORDERS ARE CREATED.
    NOW WHEN I AM TRYING TO RUN THE  ASYNCHRONOUS COSTING THROUGH CJ9K,UNLESS OTHERWISE PRODUCTION ORDERS ARE CREATED ,MY PLANNED COST FROM THE PRODUCTION ORDERS DONT FLOW TO MY PROJECTS,AND THE SYSTEM GIVES ME AN ERROR SAYING THAT MY FOR MY FINISHED MATERIAL COST COULD NOT BE DEERMINED.
    HOW CAN  I INSTEAD RETRIEVE THE PLANNED ESTIMATE COST IN PROJECTS FROM THE BOMS AND ROUTINGS,RATHER THAN FROM THE PRODUCTION ORDERS.
    IF ANY ONE CAN HELP .
    THANK YOU.
    MERCY

    Hi,
    I know that accessing the VA01 / VA02 t.codes will kill the performance.   Is there any other t.code available in CO to update the unit cost estimate for sales order.  Or if any function modules?
    Rgds,
    Mallik
    Edited by: mallik on Mar 8, 2010 3:19 PM
    Edited by: mallik on Mar 8, 2010 3:19 PM 1213131

Maybe you are looking for