Cost center into automatic Purchasing Requisitons

Hi:
For MM Release strategies reasons, I need Cost Center field complete into PM purchasing requsitions .
Usually, PM Purch Req have Account assigment category F, but in this case, I also need to complete Cost Center field, with settlement rule Cost Center info.
I can I do that ?

Heberto:
I understand that you are triyng to avoid the settlement process, puting the cost directly into the Center Cost, instead of passing him trough ther order, right?. I'm afraid that's not possible becouse a limitation in the process. I mind, PM Orders are design to receive CO cost and then, trought the settlement process, distribute him to the center cost. If you want to put the cost directly in the center cost, and not pass it trough the PM order, why are you using an PM order?. Are you trying to use the PM order as an PR generator? Maybe you can test with PS module, generating the PR trough a Network (they are quite similar to the orders)
Another option is create an PR, and pointing his imputation to an preavious created PM Order, but i'm quite sure that this is not what you have in mind.
Hope this help
Saludos!

Similar Messages

  • Cost Center in automatically created line items in MIRO

    Hello SAP Gurus,
    While doing MIRO cost center is getting picked automatically in Tax line item even though there is no automatica account assignment in OKB9.
    Is it coming from validation or substitution? Please advise h

    Hi Ravi,
    Thanks! Yes it was assigned in Cost Element Master data.
    Now I have removed it. But now how can I assign internal order while posting to that GL in MIRO. I know we can assign default internal order in cost element but I don't want default account assignment.
    The GR/IR line item is picking internal order no from PO but the tax line item is not picking internal order. Is there any way we can change the line item of MIRO while simulation.
    Regards,
    Tapan

  • Shipment cost documents in automatic purchase order

    Does somebody can help me about a shipping problem ?
    While transferring shipment cost documents to FI-co with automatic generation of purchase order, SAP create one purchase item order for all my shipment cost documents. Is it possible to customize the purchase order to get 1 item  purchase order by shipment cost documents ?
    In my case, i have 1 purchase order with only one item that contains several entry sheet..
    CMA

    Hi AP,
    Thanks for your reply. When you said "it will be possible to create multiple service entry with reference to the same purchase order."
    I'm agree with you but all the services entry with reference to the same purchase order are grouped on the same item post.
    In my purchase order I would like to have one item by services entry.
    I expect to to have 1 purchase order with several item ( one for each shipping)
    1 services entry = shipment cost document =  1 Shipping.
    Is it possible to do that with SAP in standard ?
    It exists a lot of oss notes on this topic but they don't solved my problem, and sap documentation is not clear on this topic.
    CMA

  • Asset cost center assignment missing in purchase req or purchase order

    Has anyone else ever encountered this? 
    When we create a purchase requsition for assets, the cost assignment is determined from the existing asset. Most assets bring over the cost center into the account assignment. A few do not.  FMDERIVE shows the cost center populated when tracing. When you exit the derivation trace, the cost center is missing from the purchase requeistion or purchase order line item.  Any ideas? 
    PS: THis happens whether or not the asset has an entered serial number.
    Any thoughts of what to check are appreciated.
    Bob

    No, our FMDERIVE defaults Funds Center from Cost Center, which IS occurring, and, as stated above, the cost center appears correctly as expected on the FMDERIVE trace screen.. 
    Added info: In our test system we have reconfigured the ME51N entry screen to allow manual input of the cost center.  It is STILL automagically cleared during the save/validation process.
    Thanks for your question!
    Bob

  • Cost center Number to be be Populated in Purchase Requisition

    Hi All,
    How can we Populate Cost center Number in Purchase Requisition as default.
    Best Regards,
    RAju

    Hi Raju,
       Can you be more specific about the question? Whether you want to procure stock materials or consumables?
       For the consumables, you will need to assign the account category K and enter the G/L Number for assigning the cost to the Cost Center. This again depends on material type if a material master record exists.
    With Best Regards
       Srinivas

  • URGENT ( To put a validation in Purchase requistion based on Cost center)

    Dear All,
    I require to put a validation in purchase requistion, based on user and cost center.
    Each user is assigned to one cost center, and that particular user must be allowed to input or change only that cost center in the purchase requistion.That is by default based on the user the cost center field must be filled in purchase requistion.
    thanks.....
    Deepak

    Dear Deepak,
    <b>That is by default based on the user the cost center field must be filled in purchase requistion.</b>
    You can maintain this by maintaining proper value for parameter ID of cost center in the user record.
    <b>Each user is assigned to one cost center, and that particular user must be allowed to input or change only that cost center in the purchase requistion.</b>
    You can achieve this by maintain proper authorization for the user.
    Hope this will help.
    Regards,
    Naveen.

  • How can we change Cost Center in Material document(MIGO).

    Dear Experts,
    Wrong cost center selected in Purchase order, the same copied into" MIGO" document,
    now i need to maintain right cost center .
    please guide me, to change cost center.

    Hi
    If the PO is completely delivered, simply go to KB11N and transfer the value from old cost center to new cost center
    If you are yet to receive the goods, reverse the MIGO, change the PO and do MIGO again
    Regards
    Ajay M

  • Free of goods cost center...

    Hi Experts-
    When client is issuing the free goods, at the time of PGI, the entry will be
    DR xxxxx (This is cost element cat 1)
    CR FG.
    At the time of PGI the gl account amount is posting to one Cost center, when i saw in materuial document in that account assignment the Cost center is coming automatically, How that cost center coming automatically ....where we need to do hanges for that....pls advise...
    Thanks
    Chandu

    Thanks for your repaly..
    But there is no assignment in the sales order account asssignment.....
    Pls tell  any alternatives.......
    Edited by: G.C.S.Reddy on Aug 26, 2011 8:38 AM

  • Defaulting a Cost Center during PR/PO creation for Indirect Materials

    Dear Gurus,
    When creating a PR or PO for indirect materials (No Material Master/Numer), is there a way to default a Cost Center (maybe based on the Material Group) in the PR/PO during creation ?
    I know that there is a way to default the GL Account Code via Entry Aids. Is there something similiar for Cost Center ?
    Thanks

    I don;t think it is possible via config but you can do it with User exit where you can insert the logic for account assignment category and Material group combination and material number is blank than insert the particular cost center into the cost center field.
    use PR item level user exit for PR and same way for PO.

  • Cost Center and GL account in Sales Order / Delivery

    I have a requirement where we want user to specify what cost center and GL account should be used while posting goods issue.
    Currently GL account and Cost Center is automatically determined based on OBYC configuration.
    Is there a way  user can populate Cost center and GL account at Sales order or Delivery document level and what ever they have specified will be used for Posting Goods Issue.
    If user doesnt specify anything then standard OBYC determination should take place.
    I looked at OVF3 transaction which can default cost center (though no GL account) but its not useful in our requirement.
    I also looked at OKB9 transaction but not sure if we can use it either.
    Again we want user to enter Cost center and GL account at either SO or Delivery document level and then that should be used for Post goods issue.
    Thanks in advance.

    Hi,
    In delivery under tab GOODS MOVEMENT DATA
    After valuation type column COST CENTER & G/L Account column available
    Now with the help of FI consultant make it change mode so user can maintain  also I observe that if delivery created without reference to order then that fields are in change mode means user cn maintain data for this but if with reference to order it is disable mode
    Check in t-code OMJJ FIELD SELECTION FOR MOVEMENT TYPE
    Put movement 601
    Then select movement type and double click on filed selection (from 201)
    Then go to additional account assignment and for cost centre make it optional or requirement
    or Else under field selection enjoy for movement type 602 indsert field KONT0 and KOSTL and check
    If this can not work there is option field selection for G/L account check that with FI
    Kapil

  • Unplanned Delivery Cost through INVOIC IDOC - Failing due to Cost Center

    Hello all,
    We are using INVOIC idoc for incoming invoice from the vendors, and are using E1EDK05-BETRG for getting the unplanned delivery costs.  However, we don't want to use a default cost center (OKB9) for the "Unplanned Delivery GL Account", instead we want to use the cost center from the Purchase Order.
    Is there any way we can get the cost center from the Purchase order while processing the invoice through IDOC?
    Thank you,
    Krishna

    Hello Krishna,
    As per my knowledge unplanned delivery cost is liability account not expenses ! Beyond delivery expenses you planned in PO ,you would enter in LIV. That time mentioned entry will be post
    Material account........Dr ( If materials available)
      To Vendor account,,,,,,,,Cr
    Price difference account.......Dr ( If material not avialble)
      To Vendor account..........Cr
    Frieght alwasy materialized while doing the GRN.
    Regards
    Mani Kumar

  • Additional Cost Center Default value

    Hello Experts,
    I have one problem..when I want to book incoming invoice using FB01,
    The system pics up the cost center XXXX automatically. And that is the mystery at the moment.
    Why it is Default cost center XXXX ? There are some other cost centers which are linked to business area YYYY.
    I have already checked tcodes : OKB9, KA03, KA02, GGB1, GGB4.
    in above tcodes cost center is not defined.
    Please guide me How to solve this problem.
    Thanks in advance.
    Regards,
    Sujeet

    Please check also CO substitution (OKC9).

  • Unabsorbed cost on cost center

    Dear All,
    Our company product valuation is being done on standard price. Now the management wants a report where it can see the actual cost of the product from sfg level to FG, line item wise.
    Now there are some cost remaining on the cost center unabsorbed and we want the same to be allocated to the product manufactured during the period as sustaining cost in the Z report.
    Is it possible to do it. Please suggest any other workaround available. We are not using COPA.
    Regards,
    Divraj

    Hi
    How can you allocate the costs to products when you are not having COPA??
    I guess what you are asking for is to absorb all the costs incurred on the cost center into Production orders... Is that right?
    thats very much possible... What you need to do and ensure is
    a. Assessment cycle - Allocate costs from Service cost centers of manufacturing plant to manufacturing cost centers...
    The balance of service cost centers should be zero after that... I am not including marketing and other ex-factory costs here
    b. Calculate actual activity price on prod cost centers
    c. revaluate prod orders with actual act price (CON2).... Allow revaluation in Plan Version 0 in OKEQ
    d. Your Activity Master KL02 should have Actual Price Based on Activity indicator
    With all these settings, there wil be no under/over absorbed cost in Manufacturing plant
    Any marketing and other ex-factory costs can be allocated if you have COPA....Since you dont have COPA, you can subtract the costs incurred on them at a Higher level in your reports
    br, Ajay M

  • Cost Center not appearing in Hierarchy

    Hello,
    I am sending an IDoc from an external system into ERP to create new cost centers.  The IDoc comes in successfully and creates the cost center and I can see that it was correctly assigned to the cost center area if I look at the record in KS03.  However, when I look at the cost center hierarchy it does not show that the cost center has been assigned to the correct node. 
    Any clue why this may be happening?

    Hi,
    When sending cost center data with COSMAS01 this will include the hierarchy node in the cost center master data (separate field in cost center table CSKS). So only the information of the cost center node is transported. However, COSMAS does not include the hierarchy itself.
    This is a separate IDoc type, namely COGRP1 which is not transported with IDoc type COSMAS01.
    Nevertheless, the hierarchy can then be rebuilt in the target system by running RKCORRH1. This report will read the cost center´s master data and insert this cost center into the specified node of the standard hierarchy.
    This is actually a regular procedure - if you do not want to run the report you may also need to send the hierarchy with IDoc type COGRP1 separately.
    regards
    Waman

  • Blocked cost center in PO

    Hello , a PO has been created. It is impossible to do goods receipt on the PO since the cost center is blocked(and should be deleted). We are unable to modify the PO since the cost center in also present in the SC. how should we tackle this?

    check with business team the possibilities of unlock cost center and do good receipt.
    or
    change the cost center  in the Purchase order and do good receipt.
    if you were already Invoice done for this PO, you must cancell the invoice to change the cost center in the PO.
    Muthu

Maybe you are looking for

  • Inconsistent placement of anchored text frame in data merge document

    Just writing up this bug so that anyone else who encounters it can find out what's going on with less head-scratching. It seems that InDesign's data merge feature gets confused when there are anchored objects in a text frame that's anchored inside an

  • Locked in text field

    I'm setting up a daily calendar using text fields for a person to enter their name in a certain time spot. Is there a way that once their name is in that spot on the calendar it is locked in so that no one else can delete or change it? Thanks for the

  • How to AP recon. account  balance transfer to new recon. account

    Hi gurus, I have to transfer old recon. balance to new created recon. account. how can i do this? can anybody help me to work out this issue? Than'x Dhananjay R.

  • SSRS report in Internet Explorer 11

    Hi All, We are using project server 2013. We have developed some reports and deployed in Project Server BI site using performance dashboard designer. When we open with IE 8 or 10 it is working fine, but when we try with IE 11 only half of the report

  • MATRIX LIMITATION IN ORACLE

    Hi, I encountered this problem in my matrix report implementation: I have a matrix which has a column with fixed width. The row height was initially fixed but I had to change it so that the height is now variable. Problem is, I can't seem to make the