Cost of order and total standard activity times

Hi,
please let me know from which table i can get the following
1.Planned total cost of a production order  &
2.Total standard activity times of production order.
Regards
Ramesh

for order cost use function module /CWM/CKCOPROD_ORD_TARGET_COST
test the function module with your abaper if it returns the vadesired values, through table it will be vary complecated.
for order related activity times please check AFVV, AFVC and AFRU tables .
hope this will help
reward if useful
Thank you
Anand

Similar Messages

  • Cant change COST CENTER GROUPS and/or Standard Hierarchy

    Hello all,
    im facing some problems during change of COST CENTER GROUPS and/or Standard hierarchy.
    When im trying to select im getting following error Value maintenance not allowed ->Standard Hierarchy
    When i do get the selection of the cost center that i want to remove from the hierarchy im getting this error Function is not supported in the standard hierarchy.
    I dont know anymore what to do.
    ive searched in forum and google but still didnt find enything usefull.
    Regards
    Laurynas Prikockis

    Hello,
    There is no word called removal in SAP. It would have been properly pronounced if say "Delete".
    In case of delete, I do accept, there should not be any planned or actual line items during the fiscal year. If there are any actual or planned lines items you cannot delete the cost center during that period.
    However, you can still delete the cost center in the next fiscal year if there are no actual or planned line items.
    Hope this makes clear.
    Regards,
    Ravi

  • Availablity Check in Sales Order with Total Replenishment Lead Time

    Dear PP Consultants,
    This is regarding the TRLT field functionality during availablity check of Sales Order.
    I understand the TRLT field is defined manually in Material Master MRP-3 view as the sum of the longest lead time of raw material, in-house-production time and floats.
    If during the availablity check of Sales Order, the raw material which is having the longest lead time is already available in stock, can the system calculate the TRLT dynamically and propose the delivery date in sales order only based on in-house production time??
    Is there any setting that can be made so that during availability check of Sales Order, the system considers the stock of raw materials and then propose the confirmed dates?
    Your early respose is much appreciated. Thanks a lot in advance for your valauble suggestions.
    Thanks,
    Kishore

    Hi,
    The RLT is not dynamic, and is not related to the stock situation of the components.
    It's only purpose is to give an estimated availability date for the finished material (sold) when no better information is present (like a procurement element).
    The only way I know to get an availability date taking into account the availability of components, is the assemble-to-order scenario. In this scenario (MTO!), a production order is created automatically during the creation of the sales order. The system can then use the production order features like scheduling and availability check of components to propose the availability date for the finished product.
    Besides that, you can get much more complex solutions for ATP using APO's ATP engine.
    Regards,
    Mario

  • PO report with cost center, order and delivery date

    Hi,
    pls. I just need a report to display the next fields Account Assigment and Delivery Date.
    I attempted with standard reports like ME2N, ME2K but it is impossible to display all the information in the same screen.
    Thanks a lot for cooperation.
    Regards.

    HI,
    Create a Infoset query or ask ababper
    Tables EKKN, EKPO, EKKO
    Regards,
    Pardeep Mlaik

  • Adding fixed cost in production order and creating liability

    Dear All,
    We are manufacturing one of our grade of material in a plant which we do not own.We pay some fixed charges to the owner of that plant @ Rs150 PMT produced in that plant.This  fixed charges is to be included in the production order and at the same time liability for that  fixed charges is also to be created so that payment can be made to that vendor.
    For charging this expenses to the production order we have created one activity type and one secondary cost element.But with this the liability can not be created.
    Please advice how to proceed in this circumstances.
    Regards,
    Shivaji

    hi
    I am following this thread...but want to add some views on this..
    As I understood from your requirement that you are sending this material to a third party for some conversion with a fixed charge...so you must have a conversion contract with that party. In my views the process should be...
    1. Conversion contract with the party (MM)
    2. Material will be received from third party with conversion cost at the time of GR (MM)
         Example... Original cost + fixed conv cost = GR value
    3. Invoicing ... MIRO ..Party will be credited at fixed conversion cost
    4, When the same material is issued to another prod order the GI will be at cost as per sl.2
       Please revert back if you have any question
       Kamal 

  • Description on product cost by order.

    Can anyone give me a example of differenct product cost ?
    1) product cost by order and product cost by sales order ?
    Also what is the difference between those two production order.

    Hi,
    In the SAP standard (as per the transaction codes indicated by you) it is not possible to include multiple plants. Either you have to execute for one Plant or for all plants. Probably, in Test run you can execute for all Plants and check the results, and then decide.
    Thanks
    Murali.

  • Difference between partner order and partner oject?

    hi all,
    Can any one please explain the difference between partner order and partner object?
    What is the purpose of partner object from controlling perspective?
    Thanks in advance,
    Regards,
    S.Sumana.

    Hi Kumar,
    coming to customization in between SO(Rush order) and OR(Standard order).
    Go to VOV8 T.Code.
    The Rush order has the details as "Under Shipping tab",
    There will be "X" mark in the immediate delivery .
    the Rush order will be having the order related billing.
    But the Standard order can be either Order related or Delivery related.
    In Standard order after creating the order we are going to create the order we are going to create the delivery by using "VL01n" T.Code.After that we are going to create the billing by using "VF01" T.Code.
    Regards,
    Mohan.
    I think you understood if you need any other info. pls ask.

  • Difference between Sales Order and Rush order

    Hi
    Whatu2019s the Difference between Sales Order and Rush order
    What are the customizations for Sales Order and Rush Order?
    Thanks
    Mahesh

    Hi Kumar,
    coming to customization in between SO(Rush order) and OR(Standard order).
    Go to VOV8 T.Code.
    The Rush order has the details as "Under Shipping tab",
    There will be "X" mark in the immediate delivery .
    the Rush order will be having the order related billing.
    But the Standard order can be either Order related or Delivery related.
    In Standard order after creating the order we are going to create the order we are going to create the delivery by using "VL01n" T.Code.After that we are going to create the billing by using "VF01" T.Code.
    Regards,
    Mohan.
    I think you understood if you need any other info. pls ask.

  • Difference beteween Order and Delivery order

    what is the difference between delivery order  and regular standard sales order??
    S Krishnan

    Sales Order & Delivery Order are 2 separate Documents. In normal sales order cycle, the process flow is: Sales Order --> Delivery (Create Delivery , Picking , Packing & PGI ) --> Billing.
    The configuration is as under:
    Normal Sales Order Cycle:-
    Step 1: Sales Document Type
    IMG > Sales and Distribution > Sales > Sales Documents >
    Sales Document Header:
    1. Sales Document Type:The sales document types represent the different business transactions, such as Inquiry, Quotation, Sales Order, etc. To create new sales order type, always copy as with reference to similar sales order. If possible use standard sales order.
    2. Define Number Ranges For Sales Documents: Maintain number range with discussion with core team.
    3. Assign Sales Area To Sales Document Types:
    A. Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.
    B. Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Sales Document Item:
    1. Define Item Categories: If possible use Standard Item Category. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Item Categories: If possible, use standard. Formula for deriving item category: Sales Document Type + Item Category Group + Usage + Higher Level Item Category = Item Category
    Schedule Line:
    1. Define Schedule Line Categories: If possible use Standard Schedule Lines. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Schedule Line Categories: If possible, use standard. Formula for deriving Schedule Line: Item Category + MRP Type / No MRP Type.
    Step 2:
    IMG > Logistic Execution > Shipping > Deliveries >
    1. Define Delivery Types: If possible use Standard Delivery Type. Incase if required to create new, copy as from standard & maintain New.
    2. Define Item Categories for Deliveries: If possible use Standard Item Categories for Delivery Type. Incase if required to create new, copy as from standard & maintain New.
    3. Define Number Ranges for Deliveries: Ensure to maintain number range.
    Step 3:
    IMG > Sales and Distribution > Billing >
    1. Define Billing Types: If possible use Standard Billing Type. Incase if required to create new, copy as from standard & maintain New.
    2. Define Number Range For Billing Documents: Ensure to maintain number range.
    3. Maintain Copying Control For Billing Documents: Maintain relevant copy controls such as Sales Order to Billing, Deliver to Billing, etc.
    Note: Ensure that Copy Control settings are done
    Sales Order to Sales Order (QT --> OR): VTAA
    Sales Order to Delivery (OR --> LF): VTLA
    Sales Order to Billing (OR --> F1): VTFA
    Delivery to Billing(LF --> F2): VTFL
    Billing to Sales Order (F2 --> RE): VTAF
    The configuration differs from scenario to scenario & requirement of the client.
    Regards,
    Rajesh Banka
    Reward point if useful.

  • OPM Process Execution and OPM Standard Costing for Poultry Business

    I have a business requirement from the client at their Poultry Processing plant where the client feels that the OPM Execution steps are too cumbersome until closing the batches. The client wants to maintain minimum number of batches in Production: one for Primary, one for Secondary and one for Further Processing, rather than having multiple batches based on different formulas. There are 3 main types of processing which can be briefly described as follows:
    A.) Primary Processing:
    Live Birds (Ingredient) become Whole Dressed Chicken with Neck, without Neck, Liver, Heart, etc... (40 Finished Products)
    e.g. Live Birds (Broiler) -> Whole Dressed Chicken with/without neck, Whole Dressed Chicken with/without neck, etc.
    B.) Secondary Processing:
    Only one type of Whole Dressed Chicken (from Primary Processing) become Chicken Cuts (80 Finished Products).
    e.g.[Scenario B1] Whole Dressed Chicken (Broiler) -> Drumsticks, Thighs, Wings, Breasts, Backbone, etc.
    [Scenario B2] Breasts -> Filets and Deboned Breasts (2 FGs)
    [Scenario B3] Thighs -> Thighs in Plain Bag
    Please note that the Whole Dressed Chicken is also sold as a Finished Good as well as an Ingredient for the Secondary Processing.
    C.) Further Processing:
    Chicken Cuts become 40 Finished Products
    e.g Filets -> Chicken Nuggets, Chicken Fries, etc...
    The client is using Standard Costing method for its OPM Financials and all the finished products (160 Products in all) are having different production cost. Please note that 1 kg of Chicken Wings is not equal to 1 Kg of Chicken Thighs. Different body parts have different costs. In order to alleviate the maintenance of multiple batches per day on the production floor, the client wishes to have minimum batches. We therefore would wish if you can confirm the below approach to be correct?
    a.) OPM Process Execution:
    ==========================
    EITHER should I (Option 1):
    a.) Create ONLY 3 Formulas for Primary, Secondary and Further Processing . The 3 Formulas will have all the processing line Finished Products grouped together (as per the scenarios explained above). Formula for Primary and Secondary Processing can also combined together, reducing it to only 2 batches to maintain per day.
    b.) Can set any Quantity Values for the Ingredient, Product and By-Product in the Formula details with ANY Cost Allocation (amounting to a total of '1') in the Products section
    c.) Set the Validity Rules as 'PRODUCTION' for the 3 Recipes
    d.) Complete the steps defined in the 'OPM Cost Management' (as described below)
    e.) Create the 2 or 3 batches and record the appropriate quantities at the end of the day before closing the batches
    OR should I (Option 2):
    a.) Create MULTIPLE Formulas (above 100 formulas) for Primary, Secondary and Further Processing based on the different products processed.
    b.) Can set any Quantity Values for the Ingredient, Product and By-Product in the Formula details with ANY Cost Allocation (amounting to a total of '1') in the Products section
    c.) Set the Validity Rules as 'PRODUCTION' for the 3 Recipes
    d.) Complete the steps defined in the 'OPM Cost Management' (as described below)
    e.) Create the MULTIPLE batches and record the appropriate quantities at the end of the day before closing the batches.
    b.) OPM Cost Management:
    ========================
    Whether (Option 1 or Option 2) selected, the below needs to be set for OPM Costing:
    a.) Define multiple formulas (above 100), as in Option 2.
    b.) Set the Quantity value to be '1' for the Ingredient, Product and By-Product in the Formula details with the appropriate Cost Allocation in the Products section
    c.) Set the Validity Rules as 'COSTING' and 'PRODUCTION' for each Recipe
    d.) Run Cost Rollup at least once so that the products can have an item cost per unit
    As per me, for the purpose of Costing, it would be imperative to have multiple batches (created one time only) with appropriate Cost Allocation in the Formulas and the ‘Recipe Use’ in the Validity Rules should be set as ‘COSTING’. Then, setting Profile Option 'GMF: Use Only Costing Validity Rules for Cost Rollup' to 'Yes'. In this way, we are sure that the different products in the formula with correct Cost Allocation will have their Item Cost calculated after performing the Cost Rollup. AND, for the purpose of operations, we can only one combined formula of Live Birds (as Ingredients) to yield -> All FGs for Primary and Secondary Processing with Cuts. But, this time, the ‘Recipe Use’ in the Validity Rules of the Recipe should be set as ‘PRODUCTION’.
    I want to confirm which approach (Option 1 or Option 2) is more appropriate in terms of Operations and confirm that the above proposed steps are correct with no circular reference (as certain finished products are also used as ingredients for another product in the Secondary Processing)?
    Thanks and regards
    Raveesh Nobeen
    [email protected]
    Edited by: user12189219 on Jan 20, 2010 3:48 PM

    Hi Raveesh
    I am implementing OPM R12 in Poultry Processing business, I think option 1 (Create 3 formulas/recipes/batches) is more appropriate. In my case we are using actual costing (Moving Average) as a costing method.
    I have set the profile option GMF: Cost Allocation Factor Calculation to be "Dynamic" to calculate the batch cost allocations as a ratio of actual quantity of each product produced to the total production batch output quantity and I have used OPM Financial Cost Allocation process to allocate GL expenses on different products based on Fixed percentage % according to product "value" where Filets has a return more than wings.
    Can you please share your knowledge in this business area and confirm to what extend my approach is correct ??
    Thank you and best regards
    Mamdouh Ragab

  • Additive cost not seen in production order and while settling hits PRD

    I am using additive costs for my product costing via CK74n.
    Cost estimate looks good since I have the valuation variants setup to include additive costs.
    But when I see the production order that is being created, all others costs are being considered except additive costs. They are recognized but not as a line item instead as a variance. When I settle the order the costs actually hit price difference account and not even the GL account that I had assigned for the additive cost. SAP did not consider the cost as variance even if it was showing up as variance initially. This as I understood is partly because of the settlement rule that I have in place which tells SAP to go and settle on the material (which is standard SAP to do since I want all the costs from the production order to settle on the eventual material going into stock) so SAP went on to settling on the material. Since the material is set as standard price the variance is being booked as a price difference entry.
    Ideally I would have expected the additive cost getting debited to the order and credited to the gl account that I assigned for the additive cost. The eventual cost (incl. additive cost) should hit the inventory.
    Am I missing a step?

    Hi Sapluver,
    Appreciate your prompt response..Please see my response in italics
    Few queries related to your post.
    1. So your standard cost got two part, one with quantity structure ( materials, labor, OSC etc) which the system cost automatically and one manual part, which is your additive cost. While costing system picks up this manual part from CK74N.
    I hope this part you got correct. Yes, the cost estimate is reading from both the qty structure and the additive costs and the cost roll-up is coming up correctly
    2. Now in actual cost controlling, i think System is not sure how to valuate your additive cost actual part.I agree, the additive cost does appear in the cost analysis section of the production order but does not show up as a line item initially. Instead it comes up as a difference item right in the bottom of the screen after totals have been displayed without any line item reference. As if the system is not sure how to display the line item. Once I have done the material issuance confirmation to the order, the additive cost got picked up correctly as I have set it up in the cost component structure as material overhead but again shows up only as variance
    Which method you used to debit your production order with additive cost, is it a normal journal entry or through some automatic posting through routing ( example OSC through Purchase order/Good Receipt).I probably need to understand your point more clearly? I am not manually debiting the production order at all for the additive cost. I was expecting SAP to debit the order the same way it does for overheads. Overheads too initially show up as variance but then when we run the overhead calculation KGI2 the overheads costs get debited to the production order. Was expecting similar behavior for additive costs. I am receiving the finished product from the production order into stock via MIGO goods receipt movement type 101. I was expecting the debit to happen perhaps at the time of settlement via CO88 but here the system posted it to the price difference account via account key PRD. This I understand the system did because the settlement rule is set to post all the costs on the material and the material has the valuation control as standard price; so the system is seeing the additive cost as a price difference hence posting it to the price difference account.
    System is unaware of the additive cost from actual cost point of view, there is no specification to additive cost from costing variant for actual cost. So you have to debit the order with the additive cost part.So do I manually debit the order with the additive cost? What about the price difference additive cost sitting on the order? Would appreciate if you can tell me the process steps for posting this correctly
    regards
    Sapluver

  • Issue in service order billing- total cost is positive but negative cost exists in different periods

    Hello Experts,
    Need you advice/solutuin on the below scenario:
    In a service order the total accumulated cost is positive, (some material positings has been reversed in some other periods, so that is displayed as negative cost in the cost overveiw): but when we try to the billing in DP90. it is asking for credit memo request also. 
    In the DIP profile configuration following characteristics are maintained for generation of dynamic items:
    Activity type, Cost element, Material, Object number, Period, Posting row, Transaction Currency, Unit of Measure,
    As per my understanding negative cost is taken into consideration because of the "Period" characteristics maintained in the ODP1 tcode. And this is causing the creation of credit memo request due to cancelled postings in different period, as a result for that period total accumulated cost is not positive.
    My analysis may not be correct, Please let me know your understanding on this and how we can handle this situation if not want to create the credit memo request (because it will require extra configuration i.e. sales area mapping etc and may lead to change in interfaces etc..)
    Regards
    Pankaj verma

    Hello Experts,
    Please give your inputs.

  • Sales order - show total plan costs (from production order) on sales order

    Hi all,
    I have the following question/scenario:
    We create prodction order to collect cost (hours) for a service. There exists also a material master for this service.
    The confirmed hours are posted on the production order and then setteld to the respective sales order (settlement rule SDI).
    What to I have to maintain/customize to show the total plan cost (for the service) on gthe sales order?
    If I check the sales order via VA03 --> environment --> cost report , I can see the planned sales revenue but no planned costs?
    (the actual value flows work so far, postings via settlement or billing document).
    I hope the topic is understandable. Any ideas?
    Thanks in advance.
    Edited by: Butch66 on Sep 27, 2010 7:07 PM
    Edited by: Butch66 on Sep 27, 2010 7:08 PM

    Hi
    Planned costs from prod order can not show on sale order.. Both are 2 separate entities in their own respects
    Unless you calculate sales order cost estimate on your sales order, you cant see planned costs on sale order...
    To calculate sale order cost estimate, make settings in your requirement class...
    1. Go to procurement tab of sale order
    2. See whats the requirement type
    3. Go to IMG > Controlling > Prod cost Contr > Cost Obj Contr > Prod Cost by Sales Order > Control of Requirements
    4. Here you can see mapping of req type to req class....
    5. If you want to have sales order costing and have sales order as CO object inorder to have sales order wise profitability, you should have following settings in Req class...
    >Acct Assignment Category should be E
    >Costing: Either Blank or X
    >Costing Id and Costing Method: As per your requirement
    Regards
    Ajay M

  • Open production orders and its costs migration

    Hi All,
    We are migrating open production orders from legacy to SAP.
    We have some standard cost production orders are open in legacy and like to migrate a open production orders to SAP?
    May I know how can I do from controlling point of view?
    I have one typical scenario.
    I have one production order in legacy with 10 standard cost materials produce and out of 10, 5 materials are completed in legacy and we wants to migrate remaining 5 materials to SAP.
    What are the steps I needs to follow to migrate open production orders.
    Any help is appreciated.
    Thanks,
    Anusha

    Hi Anusha,
    Below is the process: (presuming that you're uploading balances as of 01.04.2009)
    Upload all material masters,
    Upload material initial balances,
    Create new Production Orders as of cut off date, say 01.04.2009
    Issues goods to Production Orders created above.
    All the goods/material issued to Production are debited to raw material consumption account.
    The value of WIP can only be ascertained during month-end closing process.
    If it is pressing requirement then upload the balances as of 31.03.2009 and then do a month-end/year-end closing.
    Thanks,
    Srikanth

  • Process Order Cost Analysis Target and Actual Quantity Missing

    This is related to Process order costing .
    Issue : Before activating  Material Update field in Costing view 1 of Material master , we have created few process orders and Delivered .
    Hence cost analysis shows Actual and target cost fields  Empty in COST ANALYSIS  report of  order  . After Updating field in Material master , New Process orders are calculated with Actual and Target cost .
    Solution needed : How to do Actual and Target cost estimation back in cost analysis report  for old process orders which are created before Material Update field ?

    You have deleted the Component in the BoM.
    Then you have created a production order, check if the start date of this order is after the date change in the BoM..... Can be that the component stills exists in the order ? Have you tried deleting the compoent in the order BoM ?

Maybe you are looking for

  • How can i create forward and back buttons for a dreamweaver slideshow?

    Hi I am an illustrator attempting to create a website in dreamweaver (basically it will be an online portfolio). I would like to have a box/slideshow with images of my work that someone can browse through by clicking 'next' and 'back' buttons. Does a

  • Can't find Dowloads foler in iTunes Music Folder

    Hi, I can't find the iTunes Downloads Folder in iTunes Music Folder. I've tried searching for it using Find and Spotlight, but couldn't locate it. Can anyone tell me how to find it? Caoim

  • Display all levels in Cash Flow Report (FF7A)

    Hi all, I am new to FF7A and I would like to get all levels of my different grouping levels to appear on one screen. I can't figure how to do it. So far I can see BANKEN and PERSONEN and drilldown in each of them but can't get to see the details of b

  • Calling RFC placed in PI from Portal

    Dear All, We have a scenario where we have RFCs in ECC and it has to be called from Portal through PI. Please suggest the possible and easiest ways. Please note these RFC are already being called from Portal to ECC directly. So we need to change it b

  • User name changing!

    hi there, i got my username wrong how to change it...