COST ROLLUP SUGGESTION REQUIRED

Hi Gurus,
I got a requirement where i need to add three type of 'Planned Cost' to the material at the time of 'Cost rollup' by using Costing sheet.
These costs are - 'Discharge Cost' (Plant Specific), Freight (material specific) & local freight (material specific & it is also on need).
For meeting the requirement i created two type of 'Overhead Percentrage' i.e. D100(discharge cost)- this is having dependency D020 (Valuation type & Plant), & F100 (Freight Cost)- this is having dependency D010 (Valuation type & overheaad key).
But i am unable to plant for third cost i.e. local freight which may or may not be involve in 'Cost rollup'.
Please suggest in meeting this requirement & reply me any other information required.
Thanks
Sandeep

Hi,
Regaiding non working of origin group- example: i am having finished material 'A' which is made by material 'B', this material 'B' is there in both plant 1 & 2. if material 'B' moves from Plant 1 to Plant 2 then we need to capture 'Freight' (planned value), in this scenario if we use origin group is working fine as material is moving from plant 1 to plant 2 but when material 'A' is made by material 'B' from plant 1 itself, it will capture 'freight' which is wrong because there is no movement. And we cannot change every time material master data.
Red solution- value in material master: is it possible for you to give step by step solution along with tcode or path, as i don't know how to configure, it will be really gr8 help for me.
Thanks

Similar Messages

  • "Cost Rollup - No Report" not updating costs for some items.

    Hi ,
    We have an issue with "Cost Rollup - No Report" program. When it is run for all items in an Organization, some item costs were not getting updated.
    "Include in Cost Rollup" flag in Master Item form and in Item Costs form is enabled for these items. When we run the report for specific item , it is working fine, cost
    is getting updated. Only when we run the report for all items of an org, we are having this issue. Any suggestion or help in this regard is highly appreciated.
    Thanks in advance,
    Pavan.

    Hi,
    I mean B(Sub Assembly)
    Item Rollup Flag
    A No
    --B                       Yes
    ---B1 No
    ---B2 No
    ---B3 No
    --C                      Yes
    In this case when we run cost rollup by giving item A, Oracle will consider below structure.
    A
    --C
    Regards,
    Sarvottam.

  • Assembly cost rollup wrong for averag cost org

    HI,
    For two of the assembly items , when we complete wip jobs cost is coming as very less.
    When i see the item cost for these 2 assembly items , it seems cost rollup is not correct.
    Cost elements unit cost and material are showing up same value :X$
    Remaining fileds material overhead,Resource, Outside processing and resource overhead are blank with no cost.
    Include in rollup is already enabled and it is make item.
    So Cost rollup is not done properly for these 2 assembly items , but need a way how can we correct them.
    Please let me know the way to correct them.
    Thanks
    Vasudha.

    Hi,
    1. are all the 4 lines for same job? -- Yes
    please provide details of accounts on each of the 4 lines.
    For first 2 lines -- I00195-050002001-0-0-WB02-0-0-0 -- Inv valuation
    for 2nsd 2 lines -- I00195-052000000-0-0-WB02-0-0-0 -- WIP valuation
    2. have you setup any overheads?
    My guess is that the 4 lines corresponds to
    16625.29 WIP Assy Completion 30 => Inv Valuation Debit
    5689.43 WIP Assy Completion 30 => Inv Valuation Debit
    -16625.29 WIP Assy Completion -30 => WIP Material Account Credit
    -5689.43 WIP Assy Completion -30 => WIP Resource Account Credit
    Can you confirm? --Yes
    3. Go thru item cost history of finished good item and see if there is any change in cost on transaction date of WIP Completion Transaction.
    Check the details of cost elements.
    Distribution 4 lines are with date 02-FEB-2012 14:07:26
    If I look at record history of item costs form for this item last update date is -- 10-MAY-2012 15:19:03 and cost elements also of same date (costs button in item costs window)
    Here I can see costs as below
    Cost element basis rate or amount unit cost
    Material item 17.88 17.88
    Material item 0 0
    OSP item 0 0
    OSP item 0 0
    Please let me know if anything is required from my side to analyse the issue .
    Thanks for your response
    Vasudha.

  • Error in CO88 for SFG cost rollup to FG (MTO Sales Order is Cost Object)

    Experts,
    I am getting Error in CO08 as No price could be determined for material/batch 7000000001/ plant 1000Message no. CK465
    Lower level materials (Semi finished goods) not costing, when I am creating production order against Sales Order for Finished Goods.
    I have BOM & Routing for Both Materials as well as it is costing well at sales order level. When Material have Quantity Structure (PP Maters) why system searching for price in material master? Is it require do the any config for cost rollup. 
    Plz give me the your valuable solution for rectify the error.
    Please do the needful.
    Thanks & Regards
    Bhagirath

    Hi,
    When the MTO is created from sales end it will create the Planned order then it will convert to Production or Process order.
    Once the production do GR or confirm Produced QTY the stock will go to Sales stock not to inventory stock.From there the sales can do PGI to customer.once PGI has done the account entry for the customer account will take place automatically.
    Once the production completed the Production order need to calculate for the variance & the Settlement need to be done for the production order against the Material which you produced & sale to customer.The difference & variane amount will post to Price difference & moved to Product cost of the material automatically & COPA entry will be done automatically.
    The MTO Material need to run for the Cost estimate also.
    The WIP can be calculated & difference can be posted against the production order & the material which you produce.
    The Process is same as the Make TO Stock scenario.Only the difference is the Production will get generate automatically when the MTO order get created & the stock will post to sales stock automatically.Rest the CO part is same as MTS scenario.
    Regards,
    Raj

  • "Cost Rollup - No Report"  - allow updates getting flipped to No

    Hi ,
    We have an issue with "Cost Rollup - No Report" program.
    When running the 'Cost Rollup - No Report' job in Oracle for the any cost type, whether it is all items or range of items, the 'allow updates' flag for the that cost type keeps getting flipped in the 'Cost Types' form. The flipping of this flag is preventing us from updating any costs in ERP. Can you please advise why this flag keeps getting flipped so we can prevent in the future?
    Thanks in advance,
    Abhishek

    Hi,
    I mean B(Sub Assembly)
    Item Rollup Flag
    A No
    --B                       Yes
    ---B1 No
    ---B2 No
    ---B3 No
    --C                      Yes
    In this case when we run cost rollup by giving item A, Oracle will consider below structure.
    A
    --C
    Regards,
    Sarvottam.

  • Supply Chain Cost Rollup

    Does the Supply chain cost rollup only use sourcing rules and BODs in an assignment set? Would source org on mtl_system_items override source in a global sourcing rule?

    user5149250 wrote:
    No it works fine for the other Standard & Average costed orgs.
    Is there anything which could be cross checked or confirmed.Have you reviewed these docs?
    Account Analysis - (180 Char) Error: JVMCI161: FATAL ERROR in native method [ID 1300008.1]
    R12 Trial Balance Detail Report (GLRTBD) Errors With: 'JVMCI161: FATAL ERROR in native method' [ID 1085923.1]
    FAPROJ Depreciation Projection Terminated by Signal 6 [ID 1319134.1]
    Thanks,
    Hussein

  • Suggestions required on All-In-One System

    Dear Guru's,
    We're having 2 doubt's regarding All-in-One system,
    1. Shall we have 2 system landscape for All-in-One systems. System1(DEV Server)-having single instance with 2 clients 100 - DEV and 200 - QAS and System2(PRD server) having single instance with one client 100-PRD.
    2. In our Server, we deployed All-in-One component for country specific of Arabic, is it possible to have another country specific of India in the same server on different client. (100 - Arabic and 200 - India).
    Your valuable suggestions required for the above 2 queries.
    Thanks in advance.
    regards,
    Guna

    Hi,
    I guess the better approach is to raise a OSS message.
    Regards,
    Karthik D

  • How to set master cost center to required input in the maintaining position

    Dear experts,
             I have two questions in the HCM module,could you please tell me?
    Issue 1: How to set the column of master cost center to required input in the maintaining position screen?
    Issue 2: some of position has two cost center, i have maintained two cost center(cost center 1:90%,cost center 2:10%) percentage in the tab of cost distribution with trasaction code ppome.when i post to accounting,it only post to master cost center 100%,it can not distribute two cost center, Could you please tell me the reason?
    Looking forward to your reply.
    Best regards,
    Merry

    HI,
    Plz check with ur FICO Consultants as master Cost Center r desgined by them
    They will Loop group of Cost Centers to Master Cost Center.
    This concept has started in ECC 6.0 Version 
    Regards,
    Kiran

  • Costing Sheet in requirement class for Sales Order costing

    Hi Experts,
    Could you please explain me the necessity of costing sheet in requirement class configuration.
    There is a field for costing variant in requirement class. I hope costing sheet can be taken from that costing variant.
    So what is the purpose of costing sheet in requirement class and could someone explain me the use of that field in requirement class.
    What happens if the costing sheet in requirement class and costing sheet in costing variant mentioned in requirement class does not match.
    Thanks.
    Edited by: DSK on Dec 18, 2011 3:21 PM

    Costing Variant is assigned to Requirement class
    Requirement class is assigned to Requirement type
    Requirement type is assigned to Planning Strategy
    Planning strategy is assigned to strategy groups
    Strategy group is assigned to MRP3 tab in Material Master
    System picks the costing sheet in requirement class
    In this way product will be costed for Make to Order sale order costing.
    Srinivas

  • Supply Chain Cost Rollup error

    Hi All,
    need some help with this ...we have setup a new Standard Costed Inventory org and then we are trying to run the program : Supply Chain Cost Rollup - Print Report for this new org.
    This program has been ending in error mentioned below for this org while it is running fine for all the other inventory orgs.
    Could someone please advise what could be the issue here :
    stat_low = 86
    stat_high = 0
    emsg:was terminated by signal 6
    Enter Password:
    JVMCI161: FATAL ERROR in native method: Wrong method ID used to invoke a Java method
         at oracle.reports.engine.EngineImpl.CRunReport(Native Method)
         at oracle.reports.engine.EngineImpl.run(EngineImpl.java:441)
         at oracle.reports.server.JobManager.runJobInEngine(JobManager.java:975)
         at oracle.reports.server.ExecAsynchJobThread.run(ExecAsynchJobThread.java:54)
    Report Builder: Release 10.1.2.3.0 - Production on Mon Feb 27 11:10:39 2012
    JVMDG217: Dump Handler is Processing Signal 6 - Please Wait.
    JVMDG303: JVM Requesting Java core file
    JVMDG304: Java core file written to /applcommon01/EPRODR/log/EPRODR/javacore64618496.1330361288.txt
    JVMDG215: Dump Handler has Processed Error Signal 6.
    With due Regards..

    user5149250 wrote:
    No it works fine for the other Standard & Average costed orgs.
    Is there anything which could be cross checked or confirmed.Have you reviewed these docs?
    Account Analysis - (180 Char) Error: JVMCI161: FATAL ERROR in native method [ID 1300008.1]
    R12 Trial Balance Detail Report (GLRTBD) Errors With: 'JVMCI161: FATAL ERROR in native method' [ID 1085923.1]
    FAPROJ Depreciation Projection Terminated by Signal 6 [ID 1319134.1]
    Thanks,
    Hussein

  • Unassinged  resource is reflecting  cost rollup

    Hi ,
    We have defined 3 operations in Routing .
    Operation -10 has only one resource (example - Labor A )
    Operation -20& 30 has no resource .
    When we do cost roll up from Tools , Report is showing Labour A and Labor B .
    Labor B has been end dated through Engineering Change order , but why it is reflecting in Bills of Material Indented Cost Report .
    In Assembly cost also , system is showing two resources .
    Thanks in Advance
    Kiran

    Francesco,
    Under average costing the cost rollup is used to estimate costs into a non-average cost type, for comparison purposes only. It does not change or adjust the average cost itself. The average cost comes from your PO receipts (like for buy items), or from inter-org receipts (when transferring goods from one org to another) or from your WIP completion transactions from a work order (when you are building goods in WIP). Hope this helps,
    Doug Volz

  • What is the best way to make  certain cost centers as REQUIRING an internal

    Hello,
    What is the best way to make  certain cost centers as REQUIRING an internal order (when entering invoices in the accounts payable module u2013 transaction code FB60). At the present, if a cost center requires an internal order, and the employee who is  is entering the invoice in FB60 forgets to include the Internal Order, the invoice is incorrectly costed.
    Regards,
    Saeed

    Hai !!!
    The below method can solve your problem
    1.Create Internal order for each cost center from transaction code KO01 - Create and  enter the cost center under Requesting  CCtr
    2. Enter internal order or costcenter / while user post the transaction
        Example Fb60
    Regards
    shamul heq

  • Cost rollup to be released again

    HI,
    I am asked by my client to explore the possibility whether cost rollup can be released again in a month?
    The Client has already released the cost rollup as a whole for all the materials, however, they want to release it again.
    Whether it is possible?
    If so, what shall be procedure
    What are the possible effects if the cost rollup is released again?
    Thanking you,
    Santosh Kumar Agarwal
    Tata Technologies Ltd, India.

    Hi Santosh,
    Do you mean deleting costing run (CK40N, ck11n) by saying cost rollup.
    If yes, you can delete T-Code CK44.
    If you delete a current standard cost estimate, the fields for the current standard cost estimate in the material master record (Costing details) are reset to zero.
    If you use the Material Ledger, when you delete a standard cost estimate the standard prices are also deleted in the Material Ledger master data. The master record for the material then no longer contains a current standard price from a standard cost estimate.
    The above mean the all the stock value materials contained in the costing run would become zero and there would be a entry passed for Revaluation of Inventory. Again if you do the costing run again the value of inventory would increase with the new rates of materials with the quantity in stock for Revaluation of Inventory.
    Regards,
    Suraj

  • I want to purchase a new cinema display suggestion required

    Respected Readers
    i want to purchase a new cinema display suggestion required please guide me which on is good LCD , LED ,TFT, or any other i want to use it for color calibration help me i need it badly i have already 30 inch hd cinema display is it fine other or some other

    You only have two choices. The 24" Cinema Display and the 30" Cinema Display. Whichever one best fits your budget and needs, get that.

  • Cost rollup process

    Hi,
    I need detail cost rollup process and how it functions in SAP.

    Dear Sinha,
    1.At any point you can find out what is the standard cost of a product along with the split up of the component's cost,activity
    cost and the over head cost.
    2.This cost calculkation helps us to control or helps us to take some decision of modifying the BOM or routing for reducing the
    manufacturing cost or adjusting or to check the values.
    3.This cost becomes the base or the planned cost for checking the variance caluclation and settlement.
    Also before taking a cost rollup Check this,
    1.Check whether BOM exist for all the Inhouse manufactured products and the sub-contracted products.
    2.Check whether routing exists for all the inhouse manufactured products.
    3.Check whether a sub-contracting purchase info record exists for all the sub-contracted products(ME11 will be used for
    creating PIR - Purchase Info Record).
    4.Check whether the rates are properly assigned for activity type and cost center combination (KP27 can be used for checking
    this).
    5.Use CK40N for taking the cost rollup.
    6.Use CK11N only for the products for which you want to select a particular BOM or production version or routing for costing
    purpose and later on Mark and release the cost using CK24.
    7.Check what's the first priority given to the valuation variant for costing the raw materials say like planned price or else moving
    average price using the T Code OKKN and OKK4.
    8.After taking the cost rollup these costs gets stamped in the material master and henceforth all the stock will be valuated using
    this price.
    9.At any point you will be able to tell the product cost of a product which is only a planned and it can be more or less once after
    completing the production and then the variances can be calculated and settled.
    10.Ensure the user has got the full authorization for taking the costing run to save,mark,release.
    Check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Change layout of Adhoc query output list for Custom infotype

    Hi All, The fields in the Infoset query output on a custom infotype are aligned with the fields u2018payment typeu2019 and u2018amountu2019 appearing repeatedly(in columns) as declared in the Infotype and the output will be a long horizontal list. In

  • In Book mode, can I reverse pages in a photo spread (I'm designing via Blurb)?

    In Book mode, can I reverse pages in a photo spread (I'm designing via Blurb)?

  • N80 reception

    Hi got a N80 as upgrade to N70, love the phone but have poor reception in lower signal areas compared to other phones, N70 and 6680 can all be together, all on the same network, mine will not collect calls and drop outgoing calls when the others work

  • Skype Online numbers down? Major problems at Skype...

    It appears from viewing the message boards and our own experience, that Skype Online Numbers are down at the moment.  All calls to online numbers either don't ring or go through, OR the caller recieves the dreaded three tone "this number has been dis

  • Hero article not visible

    Okay, I have another issue. I'm using CC2014 and this Tutorial... How to make and style a web page in Dreamweaver | Adobe Dreamweaver CC tutorials ...is based on a previous version, so some things aren't where they're supposed to be.  I fixed my foot