Hi Experts,
We have repetitive manufacturing here. I just want to know for cost estimate (Product cose collector) which lot size system will take for costing so also if scrap is also there.
Regards,
Shivkumar Dachawar

Hi Shivkumar
Plz go through the below link hope that it will be useful to you.
http://help.sap.com/SAPHELP_470/Helpdata/EN/90/ba64b7446711d189420000e829fbbd/content.htm

Similar Messages

  • Is it possible to change the Costing Lot size for preference calculation?

    Hi Gurus,
    Is it possible to change the costing lot size for the preference calculation?
    Reason for my question is: We have all prices on price unit 100
    and we want to use also the price unit 100 for preference calcalation.
    But the preference calculation always take price unit 1.
    Is there any possibility to set somewhere the costing lot size for pref.calculation?
    Thanks
    Regards
    Dieter

    Does really nobody has a hint?

  • Default costing lot size and price unit as 100 in material master

    Hello,
    The costing lot size and price unit is "1" by default in material master. Due to this in CK11N the costing lot size is coming as 1.
    Then we go to MM02 and change the master by making costing lot size as 100 and price unit as 100.
    Please advise how can we make this default as 100 instead of 1 in material master. So that everytime we don't need to change.
    Is it coming from BOM?
    Please suggest.
    Regards,
    Tapan

    Hi Tapan
    No doubts, it is ABAP's responsibility to develop it.. It requires ABAP code to be written
    The functional specifications need to be given by you.. This BADI is called during Mat Master Creation/Change.. Your Func Specs should cover
    1. Which Mat types it should be used for
    2. The costing lot size and price unit to be defaulted...
    I used it to check Plant = Profit Center and it worked... For whatever checks and validations required during Mat Master creation, this badi needs to be used
    Regards
    Ajay M

  • Costing Lot size in Master Material

    Hi All,
    May i know any settings for default the Costing Lot Size follow by material type?
    Example:
    Material A  - Type is ZFIN - So after i upload material into MM the Costing Lot Size will auto prompt 10,000
    Material B -  Type is ZPAC - So after i upload material into MM the Costing Lot Size will auto prompt 1,000
    Thank You.

    Hi,
    There is not setting or Config to set Material Type wise Costing Lot size.
    System will read the data from MARC-MARC while running the standard cost estimate as per the standard process of SAP-Costing.
    Regd.
    Khan.

  • Costing Lot size in CK11N

    Hi,
    When we do Cost estimates using CK11N or CK40N the lot size arising is not the costing lot size (We gave 1000).
    For ex: We gave lot size as 1000, system give 987 or 990 etc.
    I have checked if scrap is playing any role in the calculation. But this is coming for materials even without scrap.
    Please let me know what might be causing the problem.
    Thanks
    Naveen

    HI,
    Is it for all the materials or for some of the materials.
    Check the material master, is it maintained wrongly with some value.
    Check in the BOM, is there any scrap % is maintained. Check in the material master also the scarp %.
    One more thing, Maintain material master with 1000 as lot size and run CK11n for the same material. Let us know the out come.
    Vijay

  • CK727 -Lot size cannot be passed on in combination with mixed costing

    I get below error.
    We have KMAT materials and scenario  is Non Valuated Sales Order Stock.
    in our PPC4 - we have below settings. (Both are SAP recommended)
    Qty Structure tab we have Pass on Lot size "1" with individual requirements (must of Non Valuated Sales) and
    Transfer Control "PC03" has "Current Std Cost" with "Transfer only with Collective requirements"
    I just created a mixed cost qty structure. In it I even added Costing type "01". Sales order costing type is "18".
    Mixed costing works as expected. However we are unable to create any Sales Orders.
    Lot size cannot be passed on in combination with mixed costing
    Message no. CK727
    Diagnosis
    For costing variant PPC4 and costing version 01, it was defined in Customizing that a mixed cost estimate should be created for quantity structure category M0001. At the same time, it was defined in the costing variant that the Pass_on_lot_size function should be active.
    System Response
    Mixed costing cannot be carried out simultaneously with Pass on lot size . Costing cannot be proceeded with.
    Any help is appreciated.

    Hi Kala,
    system's response is correct
    In the standard program the combination of mixed costing and
    simultaneously pass on lot size is not possible.
    Please review SAP Notes 402440, 584420 and 749128 .
    In particular the SAP Note 402440 describes the determination of the
    costing lot size at a mixed costing in detail.
    br, Guido

  • Pass on lot size" function not supported in costing runs

    hi when i am doing cost estimate through ck40n i am getting following error.
    Pass on lot size" function not supported in costing runs
    Message no. CK463
    Diagnosis
    You have selected costing variant PPC1 for the costing run. The Pass on lot size indicator is set in this costing variant. Costing variants in which this indicator is set cannot be used by the costing run.
    System Response
    The costing run is not created.
    Procedure
    You have the following options:
    Reset the Pass on lot size indicator in costing variant PPC1 so that the lot size is not passed on.
    Use a different costing variant in which the Pass on lot size indicator is not set.
    if any one had found any same king of error please help me in fix it.
    thanks
    kareem

    Probably this might be the cause
    Sales order by Costing
    Check out the below
    Pass On Lot Size
    Definition
    If this indicator is selected, the system determines the costing lot size using the lot size of the highest material in the BOM and the input quantities of the components.
    Use
    1) Do not pass on lot size
    If this indicator is not selected, the materials further down in the structure are costed in accordance with the lot size in the costing view of the material master record. When the materials in the next-highest costing level are costed, the costing results of the semifinished materials are converted to the lot size of the finished material to calculate the material costs for the finished product.
    2) Pass on lot size only with individual requirement
    In the MRP view of the material master record, you can specify that a material is planned as an individual requirement. If such a material is added to another material, costing uses the lot size of the highest material.
    3) Always pass on lot size
    Here, the costs for all the materials in a multi-level BOM are calculated using the costing lot size of the highest material. This function is used principally in sales order costing.
    If you are costing sales orders using product costing for a material with a multilevel BOM that is produced in-house, choose 2) or 3) . For those individual requirements materials, from a business management point of view it is recommended that the order lot size be used when costing the material components going into the finished product. On the other hand, materials subject to collective requirements are generally costed using the costing lot size in the material master record.
    Thanks

  • Material Cost Estimate with different lot size.

    What happens if the material cost estimate is run twice using different lot sizes each time  (all other parameters unchanged) for the same period?
    Will the cost estimate run later overwrites the results from cost estimate run earlier (though the lot size is different)? What is the role of lot size in a material cost estimate?

    The costing lot size impacts your cost estimate if you have lot size independent costs (i.e. setup cost).  Those fixed costs are spread over the costing lot sizee to give you a cost per unit..  Larger costing lot sizes can also help you minimize rounding issues.
    You can only have one marked cost estimate in a given period.  However, you can create and save a cost estimate as many times as you want as long as you have not marked it for release.  When you save the estimate it will overwrite an existing estimate.  You also have the option of creating multiple estimates under different versions or with different costing variants.

  • Costong Lot Size (Variant Costing/Configuration)

    We are trying to identify where to establisth multiple costing lot sizes "in general" --- and in relation to use of "Variant Configuration" in regards to Costing Variants for Varient Configurator.

    Material Master -Costing 1 screen is where the Costing lot size is defined.
    This can be segmented by plant.
    Generally (for your standard peice part materials) you want to keep it at "1". There are some documents where SAP uses "10" or "100" this is for some rounding  /calculation reasons. But this can cause other issues, and I just find it confusing to be anything other then "1" (although i have only dealt with standard, "tangible" mfg materials)
    The only Costing Variant reasons I can think of are for priority of what "cost" to use (i.e. look for last purchased price, then MM standard cost, then previous, etc) I assume you are talking about running a Sales Order Cost estimate on a Configurable Material ?
    Bill

  • Lot Size for Split Cost

    Hello,
    My company has just had SAP installed and I am trying to confirm whether there is a  general calculation in SAP or whether it is due to the configuration that has been choosen from our implementor.
    I have costed some materials we have setup as a split cost (choice of either purchased or manufactured) and setup the mixing ratio. I then cost it but SAP generates the Lot size automatically and this can not be changed.
    i.e. 90%:10% split gives a lot size of 280 (252 and 28) and 50%:50% split gives a lot size of 200 (100 and 100).
    Please can you confirm that this is normal and also if it can be overriden?
    Thank you for your assistance

    Hi,
    This is a normal behaviour of the system.
    regards,
    Sayujya

  • Item Cost update Coneversion Error

    Hi All,
    I am doing item Cost Update conversion, while doing this i am getting the Following only one error for all the items.
    Error Explanation - 'The default cost type for the cost type is not valid.'
    Error Code - CST_INVALID_DEFCSTTYPE
    i am inserting the data in the interface table 'CST_ITEM_CST_DTLS_INTERFACE'
    in this table i am taking only the below columns
    INVENTORY_ITEM_ID,
    ORGANIZATION_ID,
    COST_TYPE,
    RESOURCE_CODE,
    USAGE_RATE_OR_AMOUNT,
    COST_ELEMENT_ID,
    PROCESS_FLAG
    and i am doing this only for materail cost, is there any extra columns i have to take in the interface table for doing with out getting the above error.
    please provide me the data also for the extra columns.
    Any help would be appreciated.
    thanks
    Anushka

    the above error can come only when the row being imported is missing any of "lot size" or "based on rollup flag" or
    "shrinkage rate" or "inventory asset flag" values. Most probably it could be a setup issue.
    when any of these values are missing, the values are defaulted from the default cost type
    of the current cost type into which item costs are being imported into. If the
    default cost type too does not have the values set for the above mentioned
    columns which are having Null values, this message is displayed.

  • Mirrored RAID:  MediaKit reports block size error

    I am trying to create a 2nd set up backup drives for my photos.  I have two new iomega 2TB drives, which look essentially identical to drives I'm currently using as my primary backups as a mirrored RAID set.
    I can start the process with freshly erased and reformatted drives (with the default mac format, extended, journaled, unencrypted, not case-sensitive).  And after a minute or three, I see
    "MediaKit reports block size error, usually caused by not being a multiple of 512."
    The RAID options are Mirrored RAID, Mac extended journaled, and options settings are default.
    I see several series of posts with complaints about encrypting RAIDs and disk block sizes, but not unencrypted errors.   I actually started out trying to do this with the 2006 MBP running 10.6.8 and got a different error:  "POSIX reports:  the operation couldn't be completed. Operation not permitted."  I wasn't sure whether the 2TB RAID I already have was set up iwth the older or newer computer--it was definitely before I put Lion on this one--so I tried this one and now have a different error.
    Any idea what the problem might be? 

    Update:  I spent some time on the phone with an Apple support RAID expert, and couldn't figure out what the error was; we couldn't bypass it by playing with partitions on the drives, or any of another couple of manuevers that I've already forgotten.  He noted that his own searches were showing a lot of mentions of similar problems but only with Iomega drives, and he was finding the same links I found earlier about problems creating encrypted drives.  Now trying to decide if it's worth throwing more good money after bad for a call with Iomega support, and waiting to see if the iomega forum is at all helpful.

  • Lot Size Check at Good Receipt in MIGO

    How can I check lot sizes at the point of GR within MIGO? (as oppose to qty tolerances).
    Example, if my lot size is 100 and I raise a PO for 100 at the GR is for qty 80 (i.e not a complete lot size, which could mean a split pack) how can I get the system to produce an error message?
    Thanks in advance.

    Hi,
    U can use Shipping Instruction which is there in Purchasing Value Key(Purchasig View). Using this while GR u can give some points for Complete supply or Partial Supply.
    This is for tracking of partial supply and u can aslo this info. for vendor evaluation..
    Regards,
    Rajeev

  • Lot size (materials planning)

    Dear All
    Pl explain me in details Concept of Lot size and its relavance in Planing of material
    Regards
    Manoj

    Hi,
    MRP will firstly determine the EXACT qty required.
    It then looks at the Lot size indicator on the material to see what should actually be ordered / produced.
    You might indicate an "exact" lot size, in which case it does just that, it tries to procure the exact amount it has determined.
    You might want the system to replenish up to maximum stock and so the lot size would cause the exact requirement to be change to the qty to bring the stock up to the maximum qty.
    You might want the system to bundle together the requirements over X days, weeks or months etc. and so produce one large requirement instead of one for each.
    You can even get the system to determine if it is cheaper to have large stocks and few PO charges or more frequent POs and so cheaper storage costs.
    there are lost of lots sizes and they all try to bring in sensible quantities, instead of just what is immediately required.
    Steve B

  • Lot Size different to master data

    Dear Gurus,
    In master recipe, when I am trying to save the following error message is appearing.
    Lot size different to master data
    Can anyone help me on this issue.
    Thanks in advance,
    Arul.

    Dear,
    Please check,
    When a master recipe is scheduled, the lot size can be proposed in two different units of measure
    If a base quantity is maintained in the material master (view Work scheduling), the lot size is entered in the base quantity of the material master. If no base quantity is maintained, it is entered in the unit of measure of the recipe header (header unit).
    That is, the unit of measure of the lot size is predefined by the system and you cannot choose it.
    If the lot size is entered in base unit of measure for scheduling, up to now, no conversion between base unit of measure and header unit occurs. The lot size (in base unit of measure) is converted into the operation quantity directly via the conversion factors of the operation. The scheduling result is incorrect. and system display the message   Lot Size different to master data.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Problems with iTunes 10.6.1 and Apple TV 3.0.2

    Hi I'm having problems with syncing my Apple TV (ATV) 3.0.2 to iTunes 10.6.1: Only a random sub-set of my music and videos appears against the ATV in iTunes and a different sub-set is actually showing on the ATV itself.  There are no error messages r

  • 6/10/14 - Release - AIR 14 Runtime and SDK

    Today we're pleased to announce that the next version of AIR is available for immediate download. This update includes the following fixes and security updates: Security update details can be found here: Security Bulletin (APSB14-14) New Features: An

  • How to upload database tab(ztable) before executing of report

    hi all,         I have developed a report , in which i have a check box in selection screen, when ever i check this and give inputs to report(year, period), upto that year and period , the database table(ztable), have to be updated (the data is intur

  • Application Object to capture system information

    I need to capture some information on a system such as machine name, IP address, and MAC address. I built an application object based on Coolsolutions article http://www.novell.com/coolsolutions/...dress2_zw.html My question is, how do I capture the

  • Not all photos in photostream

    Hi, for some reason one or two photos every so often do not appear in my iphoto photo stream folder on my mac book pro and ipad from my iphone 5 Usually all is well but I just wondered if there is something I may have set up wrong and is there a way