Hi All,
May i know any settings for default the Costing Lot Size follow by material type?
Example:
Material A  - Type is ZFIN - So after i upload material into MM the Costing Lot Size will auto prompt 10,000
Material B -  Type is ZPAC - So after i upload material into MM the Costing Lot Size will auto prompt 1,000
Thank You.

Hi,
There is not setting or Config to set Material Type wise Costing Lot size.
System will read the data from MARC-MARC while running the standard cost estimate as per the standard process of SAP-Costing.
Regd.
Khan.

Similar Messages

  • Default costing lot size and price unit as 100 in material master

    Hello,
    The costing lot size and price unit is "1" by default in material master. Due to this in CK11N the costing lot size is coming as 1.
    Then we go to MM02 and change the master by making costing lot size as 100 and price unit as 100.
    Please advise how can we make this default as 100 instead of 1 in material master. So that everytime we don't need to change.
    Is it coming from BOM?
    Please suggest.
    Regards,
    Tapan

    Hi Tapan
    No doubts, it is ABAP's responsibility to develop it.. It requires ABAP code to be written
    The functional specifications need to be given by you.. This BADI is called during Mat Master Creation/Change.. Your Func Specs should cover
    1. Which Mat types it should be used for
    2. The costing lot size and price unit to be defaulted...
    I used it to check Plant = Profit Center and it worked... For whatever checks and validations required during Mat Master creation, this badi needs to be used
    Regards
    Ajay M

  • Costing Lot size in CK11N

    Hi,
    When we do Cost estimates using CK11N or CK40N the lot size arising is not the costing lot size (We gave 1000).
    For ex: We gave lot size as 1000, system give 987 or 990 etc.
    I have checked if scrap is playing any role in the calculation. But this is coming for materials even without scrap.
    Please let me know what might be causing the problem.
    Thanks
    Naveen

    HI,
    Is it for all the materials or for some of the materials.
    Check the material master, is it maintained wrongly with some value.
    Check in the BOM, is there any scrap % is maintained. Check in the material master also the scarp %.
    One more thing, Maintain material master with 1000 as lot size and run CK11n for the same material. Let us know the out come.
    Vijay

  • Is it possible to change the Costing Lot size for preference calculation?

    Hi Gurus,
    Is it possible to change the costing lot size for the preference calculation?
    Reason for my question is: We have all prices on price unit 100
    and we want to use also the price unit 100 for preference calcalation.
    But the preference calculation always take price unit 1.
    Is there any possibility to set somewhere the costing lot size for pref.calculation?
    Thanks
    Regards
    Dieter

    Does really nobody has a hint?

  • How to make lot size dependent in Material master?

    Hello Experts,
                   I created a Material master for a Finished product in Pharma industry and in work scheduling screen, under the section "In house production time in days", I see that "lot size independent". What change(s) in my settings in the Material Master can change it to "lot size dependent"?
    Does any changes in the  "Lot size data" section in the view "MRP1" have any effect on this field?
    Also one more question:
    Where is the Usage for BOM first specified? Is it in material Master or when creating a BOM?
    Thank you.
    Message was edited by: Visu Venkat

    Hi Visu
    No,Lot size data in MRP1 view will not have any effect in inhouse production time in work scheduling view.
    You need to maintain the base qty in work scheduling in order to get the scheduling time for lot size dependant.
    BOM useage is first specified only during BOM creation.
    Suppose if u maintain the BOM useage in material master before creation of BOM, then still u can create a BOM with different useage. During these case, there will be always inconsistencies.
    Hence Useage is always specified first during BOM creation.
    Hope u r clear now.
    Regards
    Vijay

  • Costing lot size error

    Hi Experts,
    We have repetitive manufacturing here. I just want to know for cost estimate (Product cose collector) which lot size system will take for costing so also if scrap is also there.
    Regards,
    Shivkumar Dachawar

    Hi Shivkumar
    Plz go through the below link hope that it will be useful to you.
    http://help.sap.com/SAPHELP_470/Helpdata/EN/90/ba64b7446711d189420000e829fbbd/content.htm

  • Pass on lot size" function not supported in costing runs

    hi when i am doing cost estimate through ck40n i am getting following error.
    Pass on lot size" function not supported in costing runs
    Message no. CK463
    Diagnosis
    You have selected costing variant PPC1 for the costing run. The Pass on lot size indicator is set in this costing variant. Costing variants in which this indicator is set cannot be used by the costing run.
    System Response
    The costing run is not created.
    Procedure
    You have the following options:
    Reset the Pass on lot size indicator in costing variant PPC1 so that the lot size is not passed on.
    Use a different costing variant in which the Pass on lot size indicator is not set.
    if any one had found any same king of error please help me in fix it.
    thanks
    kareem

    Probably this might be the cause
    Sales order by Costing
    Check out the below
    Pass On Lot Size
    Definition
    If this indicator is selected, the system determines the costing lot size using the lot size of the highest material in the BOM and the input quantities of the components.
    Use
    1) Do not pass on lot size
    If this indicator is not selected, the materials further down in the structure are costed in accordance with the lot size in the costing view of the material master record. When the materials in the next-highest costing level are costed, the costing results of the semifinished materials are converted to the lot size of the finished material to calculate the material costs for the finished product.
    2) Pass on lot size only with individual requirement
    In the MRP view of the material master record, you can specify that a material is planned as an individual requirement. If such a material is added to another material, costing uses the lot size of the highest material.
    3) Always pass on lot size
    Here, the costs for all the materials in a multi-level BOM are calculated using the costing lot size of the highest material. This function is used principally in sales order costing.
    If you are costing sales orders using product costing for a material with a multilevel BOM that is produced in-house, choose 2) or 3) . For those individual requirements materials, from a business management point of view it is recommended that the order lot size be used when costing the material components going into the finished product. On the other hand, materials subject to collective requirements are generally costed using the costing lot size in the material master record.
    Thanks

  • Material Cost Estimate with different lot size.

    What happens if the material cost estimate is run twice using different lot sizes each time  (all other parameters unchanged) for the same period?
    Will the cost estimate run later overwrites the results from cost estimate run earlier (though the lot size is different)? What is the role of lot size in a material cost estimate?

    The costing lot size impacts your cost estimate if you have lot size independent costs (i.e. setup cost).  Those fixed costs are spread over the costing lot sizee to give you a cost per unit..  Larger costing lot sizes can also help you minimize rounding issues.
    You can only have one marked cost estimate in a given period.  However, you can create and save a cost estimate as many times as you want as long as you have not marked it for release.  When you save the estimate it will overwrite an existing estimate.  You also have the option of creating multiple estimates under different versions or with different costing variants.

  • Costong Lot Size (Variant Costing/Configuration)

    We are trying to identify where to establisth multiple costing lot sizes "in general" --- and in relation to use of "Variant Configuration" in regards to Costing Variants for Varient Configurator.

    Material Master -Costing 1 screen is where the Costing lot size is defined.
    This can be segmented by plant.
    Generally (for your standard peice part materials) you want to keep it at "1". There are some documents where SAP uses "10" or "100" this is for some rounding  /calculation reasons. But this can cause other issues, and I just find it confusing to be anything other then "1" (although i have only dealt with standard, "tangible" mfg materials)
    The only Costing Variant reasons I can think of are for priority of what "cost" to use (i.e. look for last purchased price, then MM standard cost, then previous, etc) I assume you are talking about running a Sales Order Cost estimate on a Configurable Material ?
    Bill

  • CK727 -Lot size cannot be passed on in combination with mixed costing

    I get below error.
    We have KMAT materials and scenario  is Non Valuated Sales Order Stock.
    in our PPC4 - we have below settings. (Both are SAP recommended)
    Qty Structure tab we have Pass on Lot size "1" with individual requirements (must of Non Valuated Sales) and
    Transfer Control "PC03" has "Current Std Cost" with "Transfer only with Collective requirements"
    I just created a mixed cost qty structure. In it I even added Costing type "01". Sales order costing type is "18".
    Mixed costing works as expected. However we are unable to create any Sales Orders.
    Lot size cannot be passed on in combination with mixed costing
    Message no. CK727
    Diagnosis
    For costing variant PPC4 and costing version 01, it was defined in Customizing that a mixed cost estimate should be created for quantity structure category M0001. At the same time, it was defined in the costing variant that the Pass_on_lot_size function should be active.
    System Response
    Mixed costing cannot be carried out simultaneously with Pass on lot size . Costing cannot be proceeded with.
    Any help is appreciated.

    Hi Kala,
    system's response is correct
    In the standard program the combination of mixed costing and
    simultaneously pass on lot size is not possible.
    Please review SAP Notes 402440, 584420 and 749128 .
    In particular the SAP Note 402440 describes the determination of the
    costing lot size at a mixed costing in detail.
    br, Guido

  • Lot size not being generated

    The scenario is as follows:
    We have raw material for our internal consumption. for some reason, we have parted with some of the raw material one of the customer/competitor. since we have batch management in our company, we did maintain so. the objective of maintaining batch is to ease the tracing / tracking of the material.
    1.material(raw matl - matl type ROH) created. posted goods receipt with movement type 561. batch no. generated.
    2 subsequently, sales order created, delivered, billed. accounting doc generated.
    3 Further, returns sales doc generated, delivered and posted goods receipt and returned material directly taken into Quality Inspection.
    4 Inspection plan generated with inspection characteristics. control key used is "QM01"
    Now, system should generate the lot size for the material returned by the customer, which is not happened so far.
    Can someone guide as to how to generate the Inspection Lot?

    Hi
    Try with this but I am not sure.
    In Material Master, select "<b>Quality Management</b>" tab and include Inspection Type <b>05</b> and select "<b>Active</b>".
    By doing this, as and when <b>PGR</b> (Post Goods Receipt) is done, the respective stock will go to quality automatically.
    Thanks
    G. Lakshmipathi

  • Use of max stock level w/o lot size HB

    hello champs..
    need  a help on below functionality
    Can I have the functionlity of max stock level without using "lot size - HB" in material master.
    my requirement..tht system should not create any procurement proposal if stock reachs at max level..
    but with this i am using min lot size also..and this functionality got vanish if I use "lot size=HB" ..system dont see min or max lot size..it just create the proc proposal for the qty upto max stock level..
    my requirement
    for a material max stock level -100
    min lot size - 50  , max lot size 80
    and if my stock is 30 ,and my reuirement is for 80..system should not cross the max stock level and should create the prc proposal for 70 only..
    pl share your thoughts on this..I'll appriciate wih necessary reward points..
    Br
    Sumit

    Hi
    thanks for reply..but i am not sure whther w/o using HB max stock level will be considered or not..
    i yet have to test the same but as per SAP , if you want t maintain themax stock level in the plant , lot size should be EX
    is this undertsnding is okie..
    thx in advance
    BR
    Sumit

  • Lot Size "WB - Weekly Lot Size"

    Dear All,
    I have selected lot size "WB - Weekly Lot Size" for a material.
    The Planned week start day is Monday in planned calender.
    If i run MRP for the above maintained material it is not flowing the requirment and it is not combined on Monday, it is throing on Tuesday, Thursday and all the other day including MOnday also.
    Why is this system is not throwing correctky the requirment on every MOnday.
    Is there settings need be done to get this.
    Your valuable answer will be appreciated.
    Regards,
    Nagaraj S

    Please read SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d282c44af11d182b40000e829fbfe/frameset.htm
    Please check your settings in SPRO:
    SPRO > Production > MRP > Planning > Lot-Size Calculation > Check Lot-Sizing Procedure
    ...here you can check "Scheduling" field (V439A-TERBV) of lot size "WB". And you can check also field V439A-LGTER.
    F1 help for the field:
    Scheduling for period lot sizes in short-term area
    This indicator defines the time in the period the system is to create the availability date or the start date for the lot for period lot-sizing procedures.
    The availability date is the date on which the material, including the goods receipt processing time, is available again. In the MRP list, the availability date is equal to the MRP date.
    In in-house production, the start date is the order start date, in external procurement the start date is the release date.
    The following procedures exist:
    Availability date equal to requirement date
    Availability date at period start
    Availability date at period end
    Start date at period start
    Planned order start date at period start and availability date at period end
    With this setting, the in-house processing time in the material master record is ignored.
    Note
    The following is valid in all cases:
    If the start date lies in the past, the system switches to forward scheduling. The following example illustrates how the system procedes:
    The period start is Monday and the period end is Friday. The planned delivery time is 8 days. The indicator for determining the date is set to, "availability date at period end".
    Today is Monday, a requirement is planned on Wednesday. The system has to schedule forwards. As the system works using date determination, today's date is not selected as the start date. Instead, the system determines the next period end, and uses backward scheduling to calculate a start date that does not lie in the past. This means that the end date was planned for the Friday of next Week.
    Edited by: Csaba Szommer on Aug 5, 2010 9:32 AM
    Edited by: Csaba Szommer on Aug 5, 2010 9:35 AM

  • Issuance (pack size) Qty and Minimum Lot Size

    Hi Experts,
    I have a problem, I have to maintain Minimum Lot Size and issuance (pack size) in the material master. Suppose Minimum Lot size of one material is 2000 and Pack size vendor provides is 400.
    Means, when we place order, minimum order can be made for 2000 Nos and when we issue the material to WIP from Main Store the minimum issue quantity should be 400.
    How can we map in the system.
    Please help me.
    GR

    Dear,
    I would like to suggest as :
    Maintain the Base unit of measurement for material as PAK/CARTON/EA.
    In additional data, unit of measurement mention 400pc = 1 ea/carton.
    Whenever issue the material from stores, the quantity should be 1 ea (i.e 400 pcs) basing on base unit of measurement.
    Now comes to minimum order quantity should be 2000 pcs.
    Maintain ORDER UNIT in purchase tab of material master as PC.
    To restrict the order quantity must be 2000 pcs, In that vendor master
    Order optimisation restrictions u2013 quantity. This is useful while ordering the vendor.
    For example if the quantity to shipped from this vendor you enter as 2000 pcs. When creating purchase order, if quantity is less than 2000 the system will give message.
    Try this in quality with a full cycle of documents.
    Regards,
    Syed Hussain.

  • Minimum Pack Size for issuance material from main store to wip

    Hi Experts,
    I have a problem, I have to maintain Minimum Lot Size and issuance (pack size) in the material master. Suppose Minimum Lot size of one material is 2000 and Pack size vendor provides is 400.
    Means, when we place order, minimum order can be made for 2000 Nos and when we issue the material to WIP from Main Store the minimum issue quantity should be 400.
    How can we map in the system.
    Please help me.
    GR

    HI,
    Create one Alt Unit of measure like Box or Pkt and maintain Conversion factor  400 Nos = 1 Box or Pkt.
    Don't maintain no. of Decimal for this new Alt. Unit and use this as a issue unit in Plant Data 1.
    This is just an idea and not a perfect solution for this.But I think it will help to resolve your problem up to some extent not 100%.
    Regards,
    Dhaval