Craeting data fiel for data from KNA1 and ADRC table...
Hi,
I want to create a data file (tab delimited) which will have data from two tables, KNA1 and ADRC. The customer number, Name1 and Name2 fields data will come from KNA1 but the Street field data will
come from ADRC table. The ADRNR number will be a linkage between two tables KNA1 and ADRC.
I don't want to write a reprot for this. Can someone tell me if I can use SQVI for this and then go to options download in excel sheet directly from the menu.
Is there any other smarter way to do it ?
Regards,
Tushar.
Use an inner join between KNA1 and ADRC...The use <b>GUI_DOWNLOAD</b> FM to download the file...
Greetings,
Blag.
Similar Messages
-
Problem in Selecting the data from EKPO and KONV tables
Hi Experts,
Presently I am working on Report with Comparision-Sheet Between the vendor's Quotations. I have to display the Discount, Freight, Packing and Forwarding, Vat in Item level data based on the conditions made in PO.
As per my Knowledge, Condition Types are stored in KONV Table. But there is no relation between KONV and EKPO tables. So, I am unable to print the data for Discount, Freight, Packing and Forwarding, Vat... How can I get the values from EKPO and KONV tables?
Thanks in Advance.
Thanks n Regards,
Muralikrishna.Don't recall if this is correct, but you may need the condition number from the header (EKKO) combined with EKPO-EBELP or other field as you key to access KONV (KNUMH and KPOSN). My site doesn't run PP, so can't verify if the data is actually stored that, so just a possibility.
-
BAPI to update data in KNA1 and ADR* tables
Hi,
I have to change customer data via BAPI.
I'm searching for a BAPI that updates KNA1 and ADR* tables.
(so that data will be coherent).
I found BAPI_CUSTOMER_CHANGEFROMDATA1 but it seems to only update KNA1
and BAPI_ADDRESSORG_CHANGE that only updates ADR* tables.
Can you help me ?
Thanks,
Sandrine.I came accross such a requirement but couldn't find a single function module.
I think try using both the FM's else BDC is the only option left.
you can use the FM "DEBITOR_BDCDATA" to get the BDC data for vendor and then edit it to add the address fields required. -
No control data maintained for checking group ZI and checking rule A
Dear all,
When i do the availability check in the sales order i got the message as No control data maintained for checking group ZI and checking rule A and finally availability check was not carried out, I check all the configuration under the sd-availabilitycheck and i maintained in material master also..........
Please give me the solution
Best Regards ,
KumarHi,
Did u maintain the scope of availability check like incluke reqts,planned reqts, purchase requisitions, production order, sales reqts,delivery reqts etc.
apart from that you have to put check(Tick) mark in Requirment class and scheduleline categorie
Then u have to maintain in material master individual requirmentss or daily requirments
checking rule like A,B or if its consignment AW if it is returnable packaging AV etc(ImgS&D-Basicfunctions-Availabiltycheck&Tor---availability check aginst ATP)
Then Total summarized daily reqts or summarized individual requts
Plz check above all setting then u will get clear idea.
Regards,
Murthy -
Hi,
I am getting below error in SharePoint PPS 2013 Dashboard Designer. While create the Analysis Service by using "PROVIDER="MSOLAP";DATA SOURCE="http://testpivot2013:9090/Source%20Documents/TestSSource.xlsx"
"An error occurred connecting to this data source. Please check the data source for any unsaved changes and click on Test Data Source button to confirm connection to the data source. "
I have checked all the Sites and done all the steps also. But still getting the error.Its frustrating like anything. Everything is configured correctly but still getting this error.
Thanks in advance.
Poomani SankaranHi Poomani,
Thanks for posting your issue,
you must have to Install SQL Server 2012 ADOMD.Net on your machine and find the browse the below mentioned URL to create SharePoint Dashboard with Analysis service step by step.
http://www.c-sharpcorner.com/UploadFile/a9d961/create-an-analysis-service-data-source-connection-using-shar/
I hope this is helpful to you, mark it as Helpful.
If this works, Please mark it as Answered.
Regards,
Dharmendra Singh (MCPD-EA | MCTS)
Blog : http://sharepoint-community.net/profile/DharmendraSingh -
Data Validation for SD Sales order and Deliveries
Hello All,
We activated the data flow for SD sales Order and Deliveries for Infocubes 0sd_co4 and 0sd_c05 and there correspoding datasources.
I have 2 queries
1. How to validate data for BI SD sales order with ECC.
2. How to validate data for BI SD Deliveries data with ECC.
Kindly help, <removed by moderator>.
Thanks,
Rakesh.
Edited by: Siegfried Szameitat on Jun 21, 2011 12:51 PMHi Rakesh,
You have to check the tables in R3 and then compare with the Datasources in BW.
For Examples
VBAK table in R3 for Sales Order on BW-2LIS_11_VAITM
VBRK table in R3 for Billing iin BW-2LS_13*
Check for that day how many sales order were there in VBAK table and there in BW.
Rgds
SVU123
Edited by: svu123 on Jun 21, 2011 8:19 PM -
How to set a date range for date field ?
Dear Experts,
Scenario:
I have a query in validating the date field in my BSP application. My application is for maintain infotype 0023 Other/Previous Employers online by employees in the company.
As per our design we are maintaining the all employment details of the employee both ( with in the current company / previous employment outside the company) in the same infotype.
Every employee will have a hiring date within the SAP HR system. We consider this date as the cutoff date between current and previous employment in our application. When the employee updating the details wia BSP page I need to check the following.
Record inside current company: Validation that, the user should only able to enter BEGIN DATE (BEGDA) greater than or equal HIRING DATE and END DATE(ENDDA) should be greater than FROM DATE (BEGDA).
Record outside current Company: Validation that, the user should only able to enter BEGIN DATE (BEGDA) less than or equal HIRING DATE and END DATE (ENDDA) should be greater than FROM DATE (BEGDA) and less than HIRING DATE.
Technical Requirement:
How to set a date range for date field, i.e. how we can limit the date range in a HTMLB date field? Can this it be achieved via standard functionality of HTMLB?
Following is the code to describe date field in my application.
<htmlb:inputField id= "ENDDA_NEW_IN"
type= "date"
doValidate= "TRUE"
showHelp= "TRUE"
disabled= "FALSE"
width= "183"
style= "cssTextAreadate"
value= "<%='99991231'%>"/>
Thanks a lot in advance for your assistance and help.
Cibinu2026
Edited by: cibin kuruvilla on Nov 12, 2008 11:13 AMHi,
This functionality is known to be very important and is a key part of the next major release of the JRC planned for the first half of 2008.
Regards,
<p>Blair Wheadon</p>
<p>Product Manager, Crystal Reports</p> -
Data validation for Date Field in Web Dynpro ABAP
Hi ,
In my WDA i want to perform data validation for date filed. (i.e. While creating a new record i have to check the Start Date should be always lesser than End Date.)
If u ll enter the wrong date it should validate the Date and throw an error message.
Please Reply soon its urgent.
Thanks,
DeepikaHi,
First read the two attributes start date and end date.
Then write the following condition.
IF item_start_date > item_end_date.
Error message.
Endif.
For pop up error message you need to use Create_window method of the Interface if_wd_window.
Thanks. -
How to display the same data simultaneously on both a graph and a table.
I am a beginner.
I would like to display a reference line(?) on dvt:graph
whenever a row is selected on the related af:table.
I would like to show the same data,
simultaneously on both a graph and a table.
Is it possible?
I hope for a good hint. ^-^...Hi,
yes. It depends on how the reference line is getting its data. If e.g you can use EL to bind it to ADF bindings then attribute bindings for attributes of the iterator that also renders the table are enough to get the current selection.
If this is not possible you can follow http://thepeninsulasedge.com/frank_nimphius/2007/07/02/adf-faces-rc-programmatically-executing-a-button-method-using-javascript/ and create a selection listener for the table to programmatically manipulate the graph
Frank -
i buy iphone 4sfrom some friend that's he got it from his friend in canada and me set up software for it from Itunes and it asking now for apple ID that's i don't used it for download apps and me can't open my Iphone right now !! what i should do ?
It's not stolen ,that iphone came from canada to Egypt and me activeted it last night i got the acc from the owner
Thanks for Replay Mr -
Add dynamic parameters for Year, From Week and To Week.
hi all,
my requirement is Add dynamic parameters for Year, From Week and To Week.
can any one help how to do this one plz....
in Answers..
advanced Thanks..hi kansal,
These requirement for the BI Publisher reports,
1)Add dynamic parameter for year, From week and To week.
2) Year to default to Current Year.
that's what i have dude..
may be we need to assign the dynamic variables for year ..
Edited by: 932326 on Sep 4, 2012 7:16 AM -
Which field we would put join in kna1 and likp table.
Hi,
which field we would put join in kna1 and likp table.
With thanks Regards.> which field we would put join in kna1 and likp table.
>
JoiN:
table KNA1-KUNNR WITH LIKP-KNKLI
Rwd points if reoslved
regards -
Open data slice for data entry and close afterwards
Dear all,
I have created one data slice for a characteristic combination country xy in order to prevent the data entry within the data entry query for the user. But for some reason I have to run a planning function in order to summarize some values and write a total value in the characteristic e.g. country xy.
The planning function brings out an error message because this can not be executed due to the fact that this combination is protected.
Is there a way to open the data slice before the planning function is writing the data in the cube? I have tried to to this in the Data slice exit, but I do not have an idea how to open the DS, save the data and close the DS again.
We are running NW BI 7.0. Any ideas would be great.
Best regards,
Stefan from Munich/GermanyI did something like this by creating an FM and calling that FM from a FOX function. I think you will have to use three commands to execute three functions one after the other (and not combine them in one planning sequence) - first one will switch off the data slice, next will be your planning function containing the logic, and the last will switch it back on.
The FM would be something like below:
FUNCTION Z_SWITCH_DSLICE.
*"*"Local Interface:
*" IMPORTING
*" REFERENCE(I_INFOPROV) TYPE RSINFOPROV
*" REFERENCE(I_DSNR) TYPE RSPLS_DSNR
*" REFERENCE(I_STATUS) TYPE I
*** This function imports the name of a real-time Infoprovider and a Data Slice number
*** and a parameter I_STATUS. If I_STATUS is 1, data slice is activated
*** If I_STATUS is -1, data slice is de-activated
data wa_ds type rspls_ds.
select single * from rspls_ds
into wa_ds
where infoprov = I_INFOPROV
AND objvers = 'A'
AND dsnr = I_DSNR.
if I_status = 1.
wa_ds-used = 'X'.
elseif I_status = -1.
wa_ds-used = ''.
endif.
update rspls_ds from wa_ds.
ENDFUNCTION.
The Fox code will be like below -
CALL FUNCTION Z_SWITCH_DSLICE
EXPORTING
I_INFOPROV = <infoprov name>
I_DSNR = <Data Slice Number>
I_STATUS = <0 or 1>. -
Hi,
As i am facing issue with Mismatching of dates in VA03 and VL03N.
Make to stock and Rote:0 days.
Can any body explain what might be reason of date changes.
Dates in VA03:-
Delivery date in schdule lines: 12/11/2009
Mat available date: 12/09/2009
Loading date: 12/11/2009
Dates in VL03N:-
Planned GI date 12/15/2009
Actual GI date 12/14/2009
Picking 12/11/2009
Trans planning: 12/15/2009
Loading: 12/15/2009
Delivery date: 12/15/2009
Regards,
Pavan.I see absolutely no issue with your dates, perhaps you should read below and search help.sap.com for transportation scheduling.
"During delivery and transportation scheduling, the point at which the goods arrive at the customer can be confirmed (confirmed delivery date) Different lead times are taken into consideration here: the pick/pack time, loading time, transportation lead time and the transit time
The following data plays a role in delivery scheduling:
u2022 Order date Date on which the order was issued
u2022 Material availability date: Date on which sufficient goods should be available for picking and packing
u2022 Loading date: Date on which picking and packing should be completed (and the the mode of transport should be there), in order that loading can begin on time
u2022 Goods issue date: the date on which the goods must leave the delivering plant, in order that they arrive at the customeru2019s at a specific time
u2022 Delivery date: Date at which the goods arrive at the customers. Here a difference is made between: Required delivery date: Date on which the customer wishes to receive his goods
confirmed delivery date: Date on which the arrival of the goods at the customers can be confirmed.
All activities that must be carried out before the goods can be delivered to the customer are taken into account during delivery scheduling. This includes loading, picking, and packing. Delivery scheduling determines the material availability deadline and the loading deadline.
All deadlines that are used for preparing and carrying out the transportation of goods are taken into account during transportation scheduling. This includes the transit time and the transportation lead time that you need for ordering a foreign forwarding agent or for arranging a truck from the your companyu2019s truck fleet. The goods issue deadline and the transportation scheduling deadline are determined by transportation scheduling." -
Data source for Deposit Advice (XML) and Live CheckWrite (XML) reports
Hello All,
We need to customize the Deposit Advice (XML) and Live Check Write(XML) reports to accomodate a few business requirements. We already have customizations for these reports in non-XML versions. For Ex: USPAYPST.rdf for Deposit Advice report. As these non-XML RDF reports are going to be unsupported by Oracle soon, we need to customize the XML versions of these report available in R12.1.3.
As these reports are kicked off by the PYUGEN spawned program, therefore I need information on the data source for these reports as soon as possible.
Looking forward to your prompt help.
Thanks,
RahulNow, I have anew problem here. I modified the USPAYPST.rdf report for Deposit Advice and then changed concurrent program output to XML from Text.
I attached a RTF template to the concurrent program to have the output in XML.
When I run Deposit Invoice Report from the SRS window, it finishes off normally and log file says the number of records processed but no output file is generated.
I also tried looking into the XML generated through View XMl and there too no output file is generated.
I am confused if the Deposit Advice program can only generate Text output. As PYUGEN is the executable for this report, I have no idea if XML file can even be generated.
All pointers to this issue are welcome.
Thanks,
Rahul
Maybe you are looking for
-
Re: Upgrading ebs 11i to r12 12.1.1 on Suse
We do not use OPM and gmfpostimportaad.sql is running for last 20 hrs. I tried to stop this process as per the note Long Running Cstpostimportaad.sql while upgrade to R12.1.1 (Doc ID 1453612.1)/ Even that was taking long to stop. I had cancell it and
-
I have several computers with Windows 7 Ultimate installed here at the Pioneer Library System. We have ~20 workstations running XP Pro on a Active Directory domain and are planning on rolling out Windows 7 this fall. I am running Windows 7 to test ou
-
I have CC for work and my PC to do work at home. At home I switched from PC to Mac this weekend. I want to redownload my apps for the iMac but it's telling my I'm using a 30 day free trial. I need to discontinue the PC apps and download to the new co
-
Basic javascript use in acrobat 9 pro
I admit to being very rusty and not familar with the new software. I am getting no results and no errors on the following on my acrobat form - I have an invoice form I'm using as a template. I have the following fields: to company address csz phone I
-
T400s max resolution for external monitor ?
Hello What is the max resolution for an external monitor connected to a thinkpad t400s ? The reason i am asking is that: a) Intel says: the max resolution of Graphics Media Accelerator 4500MHD is 2048x1536 b) Lenovo says: DisplayPort + D-sub dual-